Shift A HSE Observations DATE: 9/3/2015
LOCATIONPHOTOISSUEACTION REQUIREDACT BYDATE CLOSED
Air Compressor House entireStair case Failure to provide handrails for entire stair-case
Air Compressor House8mFailure to provide edge protection
Air Compressor House8m1. Failure to provide permanent handrails.2. Failure to prevent falling of objects that may cause harm.3. Failure to provide proper walk-way.
Air Compressor House8mFailure to provide proper edge protection
DG HOUSE 0 TO 8 M
01. Failure to provide fall protection.(Handrail not provided)
DG HOUSE 8 M01. Failure to provide fall protection (Failure to provide edge protection)
DG HOUSE 0 M01. Unprotected floor openings.
DG House0-16 m01. Failure to provide proper access / working platform for working at height. 02. Failure to construct in compliance with national standards