Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23
Transcript
Page 1: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Shipbreaking

Module 4: Heavy Equipment & Material Movement

4.2 Winch rig, Cables, Hooks, & ClampsSusan Harwood Grant Number SH-17820-08-60-F-23

Page 2: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Disclaimer

2

This material was produced under grant number SH-17820-08-60-F-23 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily reflect the views or polices of the U.S. Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government.

Page 3: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Objectives

3

Recognize the difference between slings, gear, and rigging

Describe inspection and documentation of gear

Describe winch operations and safety concerns

Page 4: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

4

Page 5: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

5

Page 6: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Rigging and gear is just as important as the equipment itself.

6Figure 1 Crane moving section around the yard

Page 7: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Gear is the working part of the operations that constantly comes in contact with the material and hoist.

7Figure 2 Cargo boom and rigging on vessel

Page 8: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

There should be a regular visual and documented inspection on all working gear and rigging.

8Figure 3 Block and with suspended load

Page 9: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Inspect synthetic and natural rope and slings for abrasions, wear, and cuts.

9Figure 4 Natural and synthetic rope

Page 10: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Knots can not replace splices and clamps must be designed for the application.

10Figure 5 Knots in the mooring line

Page 11: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Wire rope and slings become damaged by kinks, crushing, and overloading.

11Figure 6 Close up view of wire rope and corrosion

Page 12: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

When putting eyes in wire rope check the chart to ensure that a sufficient number of clamps are used and facing properly.

12Figure 7 Crane moving rigging and slings into position

Page 13: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Common phase: “Never saddle a dead horse”

13Figure 8 Bridle properly made up during hoist

Page 14: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Remove wire rope from service if damage is observed from heat, deformity, or corrosion.

14Figure 9 Wire rope close up view of damage and corrosion

Page 15: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Hooks have to be replaced if the opening is more than 15 percent of the original diameter.

15Figure 10 Hook with proper mousing

Page 16: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Chains must be visually inspected prior to being used.

16Figure 11 Chain and shackles on pallets in the yard

Page 17: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Chains and slings must be thoroughly inspected every three months and tagged. Written documentation must be kept.

17Figure 12 Used wire rope being surveyed

Page 18: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Remove chains and slings if there is evidence of being stretched, kinked, bent or twisted in any fashion.

18Figure 13 Chains and rigging removed from the vessel

Page 19: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Do not shorten chain by means of bolting, wiring, or knotting.

19Figure 14 Chain shorted by use of screw pin shackles

Page 20: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Do not use any gear or rigging that is questionable. Report immediately to the supervisor.

20Figure 15 Three cranes and rigging suspended

Page 21: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

21

Page 22: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

The winch is the work horse of the operation.

22Figure 16 Slip area near the winch

Page 23: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

As the vessel is being lightened the winch continues pulling the vessel to the bank.

23Figure 17 Winch secured to the hull

Page 24: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Potential problems are centered around personnel getting crushed in the moving parts of the rigging.

24Figure 18 Workers performing hot work on the bow area

Page 25: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Failure of the rigging can severely injure or cause death by gear snapping back after failure.

25Figure 19 Head block aligned

Page 26: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

When making the connection to the vessel ensure that workers have been briefed and minimize workers in the area.

26Figure 20 Close up view of attachment point

Page 27: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Watch overhead as the crane moves the rigging in place and that personnel have the appropriate PPE.

27Figure 21 View from the cargo hold to the winch area

Page 28: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

The supervisor must carefully watch the operation and look for safety violations or problems with the rigging.

28Figure 22 Winch at the head of the slip

Page 29: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

Prior to operating the winch check the rigging for alignment, proper connections, and personnel are clear of the area.

29Figure 23 Cables are aligned with the winch and block

Page 30: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

During hauling in watch the rigging from a safe distance, for overloading or problems.

30Figure 24 Rigging in alignment and under static load

Page 31: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

After the operation is completed block the rigging in place and secure the winch.

31Figure 25 Winch secured with brake applied

Page 32: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

32

Page 33: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

33

Page 34: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

References

34

Page 35: Shipbreaking Module 4: Heavy Equipment & Material Movement 4.2 Winch rig, Cables, Hooks, & Clamps Susan Harwood Grant Number SH-17820-08-60-F-23.

35

Worker safety is a priority