+ All Categories
Home > Documents > Shree -13-06-2014

Shree -13-06-2014

Date post: 21-Jul-2016
Category:
Upload: chauhan878
View: 224 times
Download: 4 times
Share this document with a friend
Description:
hello
5
BUREAU VERITAS Surveyor's Attendance Sheet/ Time Sheet BV File No .: 1ND.P.4.14.0055-R2 BVZIGNO:6031682 BV Client: Thermax Limited,Pune Vendor : M/s SHREE ALLOYS INDUSTRIES PVT LTD, Bhilwara, Rajasthan. Contracting Centre: BV-Pune Performing Centre: BV-DELHI PROJECT/ P.O. on BV: Reliance INDUSTRIES LIMITED. JAMNAGAR Client'P.O.onVendoiv 176008677 Dt:10/01/14 Surveyor's name DEVESH CHAUHAN Date of visit 13-06-14 Inspection Place M/s Shree Alloys Industries Pvt. Ltd, Bhilwara, Rajasthan Man day/ Hours (Insp.+ Travel) 0.5 Manday Actual KMs Travelled If Insp. Place > 50KM. ^ Reference: DEVESH CHAUHAN Surveyor Name & Signature "tew Mr. ANKITMU, Client's / Vendor Representative (Signature/ Name/ Stamp) (If Any)
Transcript
Page 1: Shree -13-06-2014

BUREAU

VERITAS Surveyor's Attendance Sheet/Time Sheet

BV File No .: 1ND.P.4.14.0055-R2 BVZIGNO:6031682

BV Client: Thermax Limited,Pune

Vendor : M/s SHREE ALLOYS INDUSTRIES PVT LTD, Bhilwara, Rajasthan.

Contracting Centre: BV-Pune Performing Centre: BV-DELHI

PROJECT/ P.O. on BV: Reliance INDUSTRIES LIMITED. JAMNAGAR

Client'P.O.onVendoiv 176008677 Dt:10/01/14

Surveyor's name

DEVESHCHAUHAN

Date of visit

13-06-14

Inspection Place

M/s Shree Alloys IndustriesPvt. Ltd, Bhilwara, Rajasthan

Man day/Hours(Insp.+Travel)

0.5Manday

Actual KMsTravelled IfInsp. Place

> 50KM.

— ̂

Reference: —

DEVESH CHAUHAN

Surveyor Name & Signature

"tewMr. ANKITMU,

Client's / Vendor Representative(Signature/ Name/ Stamp)

(If Any)

Page 2: Shree -13-06-2014

Bureau VeritasIndia) Private Limited

FIELD INSPECTION REPORT

BV Ref: IND.P.4.14.0055-R2Zig No.:6031682

No of Page.: 1/3

Date: 13-06-14

'reject: M/s Reliance Industries ltd,Jamnagar Manufacturer: M/s Shree Alloys Industries Pvt Ltd,

Bhilwara, Rajasthan.

Supply intended for: M/s Thermax Ltd,pune P.O. No: 176008677 Dated : 10/01/14(Client to Manufacturer)

Supplier: M/s Shree alloys Industries PvtJd, Bhilwara, Rajasthan.

Supply: COAL SILO

[ssuer RC: BV-pune Executive RC: BV Delhi

Drawing No: ~ Rev. -- QAP No.: ITP/PC0481/N11 Rev. 01; Dated 02-09-2013

Documents for reference:

Title Reference n° Rev. Approved by Date

PO 176008677 Thermax Limited,pune 10/01/14QAP ITP/PC0481/N11 Thermax Limited,pune 02/09/13

Drawing No. F11-OCF-016322 Thermax Limited,pune 13/12/13

Painting specification N11-CF-CS-59211 Reliance Industries Ltd.

Description of inspection:

Following inspection activities was carried out at M/s Shree alloys Industries, Bhilwara; Dated 13-06-

14 with respect to QA Plan ( ITP/PC0481/N11 Rev. 01; Dated 02-09-2013)

Attendees - 1 .Mr. Devesh Chauhan - BV Delhi

2. Mr. Ankit Mundaniya - M/s Shree Alloys Industries Pvt. Ltd.

ITEMS INSPECTED: Coal Silo

1) HOU.NO.-A0016321004/05(PC0471) Hopper No. 04 & 05 (Match marking 13&15)Qty-01

each.

Page 3: Shree -13-06-2014

Page 2/3

Details of inspection activities carried out with respect to scope of work

Activities Performed:

As per QAP Clause no. 10 & 11 for ( Surface preparation & painting inspection)

> Prior to start of blasting witness, atmospheric condition checked (frequency 3 times/day) like Dry bulb

temperature, Wet bulb temperature, Relative humidity, Dew point temperature and observed values in

acceptable parameter and hence ok to work.

> DFT measurement carried out using coating thickness gauge, after 2nd layer of MIO coat and found in the

range of 160 urn to 183 urn and free from paint film defects at time of inspection hence acceptable and

allowed for final layer of PU on external side. For detail refer surface preparation & painting report no

63.

> Identification marking & match marking verified and found as per specification.

Result of inspection:

Final Polyurethane coat(Exterior) is pending while blasting, primer and intermediate coating activities are beingperformed on daily basis.(for details of parts being blasted and painted refer daily blasting and painting report).

Category: 1. Accepted. 2. Conditionally Accepted S.Reinspection Required. 4 Rejected S.Advice/I

Travel Time :Inspection Time :Over Time :Holiday :

NCR

ORDERSTATUS

Y

N

C

B

Mr. Ankit MundanfrSupplier's Signature & Date Surveyor's/

SignatureSign & Date

Page 4: Shree -13-06-2014

'hotographs Page 3/3

Photograph 03

Photograph 05

END OF REPORT

Photograph 02

Photograph 04

Photograph 06'1

Page 5: Shree -13-06-2014

Shree alloys Industries Private Limited

Painting Report 64

CLIENT :- M/S THERMAX LTD. DATE : 13.04.2014

PROJECT NAME :-M/S RELIANCE INDUSTRIES LTD., JAMNAGAR j

PURCHASE ORDER NO. :- 174O08&77 DATED: 10.01.2014 ( COAL SILO SET NO. 03) \T NAME :- ARRANGEMENT I DETAIL OF COAL SILO

SL

1

' DRAWING NO.

Fll-OCF-01 6322, REV. 1

PROJECT CODE HOU. NO.

PC0471 HOUNO.:A00163210048,05

ITEM NO.

HOPPER NO. 04 8,05

MATCH MARKING -13 &15

QUANTITY

1 each

INTERMEDIATE COAT OFNEROPOXY SUPER HIGH BUILD MIO

( INTERNAL SURFACE 1 EXTERNAL SURFACE )

REQUIRED(MICRONS)

150-175

OBSERVED (MICRONS) ON EXTERNAL SURFACE REMARKS

SPOT 1(M) SPOT 2 ( (I)

160 161

AMBIENT CONDITIONS

S.NO.

1

2

3

4

5

DESCRIPTION

DRY BULB TEMP. | ° C )

WET BULB TEMP. ( ° C )

RH%

DEW POINT TEMP. ( ° C )

SURFACE TEMP. ( « C )

11:00 AM

36 'c

32 'c

75%

32' c

39 'c

2:00 PM

40' C

37 'c

82%

41'c

46 'c

5:00 PM

34 'c

30'c

74%

22' c

30' c

\T MATERIAL DETAILS

SR.

#

DESCRIPTION MFG NAME DESCRIPTION

'•TNlEftytEplATBXpXf̂ ftlEROPOXY SUPER HIGH BUILD MIO KANSAI NEROLAC PAINT LIMITED

--,'V'i- '_r~- .._' '•''•' \\

SLJt̂LOG^NC, / •' > jj

BATCH NO.

COMPONENT- A -2108461 &

COMPONENT - B - 2 1 07787

MFG DATE MIXING RATIO SHADE APPLICATION METHOD

01/01/2014 80:20 BROWNISH RED SELF STD. SPRAY

>| fl I1"") Or For M/s Thermpx

\y\\ ^J J\JSA\\. Sr̂ /\


Recommended