Date post: | 21-Jul-2016 |
Category: |
Documents |
Upload: | chauhan878 |
View: | 224 times |
Download: | 4 times |
BUREAU
VERITAS Surveyor's Attendance Sheet/Time Sheet
BV File No .: 1ND.P.4.14.0055-R2 BVZIGNO:6031682
BV Client: Thermax Limited,Pune
Vendor : M/s SHREE ALLOYS INDUSTRIES PVT LTD, Bhilwara, Rajasthan.
Contracting Centre: BV-Pune Performing Centre: BV-DELHI
PROJECT/ P.O. on BV: Reliance INDUSTRIES LIMITED. JAMNAGAR
Client'P.O.onVendoiv 176008677 Dt:10/01/14
Surveyor's name
DEVESHCHAUHAN
Date of visit
13-06-14
Inspection Place
M/s Shree Alloys IndustriesPvt. Ltd, Bhilwara, Rajasthan
Man day/Hours(Insp.+Travel)
0.5Manday
Actual KMsTravelled IfInsp. Place
> 50KM.
— ̂
Reference: —
DEVESH CHAUHAN
Surveyor Name & Signature
"tewMr. ANKITMU,
Client's / Vendor Representative(Signature/ Name/ Stamp)
(If Any)
Bureau VeritasIndia) Private Limited
FIELD INSPECTION REPORT
BV Ref: IND.P.4.14.0055-R2Zig No.:6031682
No of Page.: 1/3
Date: 13-06-14
'reject: M/s Reliance Industries ltd,Jamnagar Manufacturer: M/s Shree Alloys Industries Pvt Ltd,
Bhilwara, Rajasthan.
Supply intended for: M/s Thermax Ltd,pune P.O. No: 176008677 Dated : 10/01/14(Client to Manufacturer)
Supplier: M/s Shree alloys Industries PvtJd, Bhilwara, Rajasthan.
Supply: COAL SILO
[ssuer RC: BV-pune Executive RC: BV Delhi
Drawing No: ~ Rev. -- QAP No.: ITP/PC0481/N11 Rev. 01; Dated 02-09-2013
Documents for reference:
Title Reference n° Rev. Approved by Date
PO 176008677 Thermax Limited,pune 10/01/14QAP ITP/PC0481/N11 Thermax Limited,pune 02/09/13
Drawing No. F11-OCF-016322 Thermax Limited,pune 13/12/13
Painting specification N11-CF-CS-59211 Reliance Industries Ltd.
Description of inspection:
Following inspection activities was carried out at M/s Shree alloys Industries, Bhilwara; Dated 13-06-
14 with respect to QA Plan ( ITP/PC0481/N11 Rev. 01; Dated 02-09-2013)
Attendees - 1 .Mr. Devesh Chauhan - BV Delhi
2. Mr. Ankit Mundaniya - M/s Shree Alloys Industries Pvt. Ltd.
ITEMS INSPECTED: Coal Silo
1) HOU.NO.-A0016321004/05(PC0471) Hopper No. 04 & 05 (Match marking 13&15)Qty-01
each.
Page 2/3
Details of inspection activities carried out with respect to scope of work
Activities Performed:
As per QAP Clause no. 10 & 11 for ( Surface preparation & painting inspection)
> Prior to start of blasting witness, atmospheric condition checked (frequency 3 times/day) like Dry bulb
temperature, Wet bulb temperature, Relative humidity, Dew point temperature and observed values in
acceptable parameter and hence ok to work.
> DFT measurement carried out using coating thickness gauge, after 2nd layer of MIO coat and found in the
range of 160 urn to 183 urn and free from paint film defects at time of inspection hence acceptable and
allowed for final layer of PU on external side. For detail refer surface preparation & painting report no
63.
> Identification marking & match marking verified and found as per specification.
Result of inspection:
Final Polyurethane coat(Exterior) is pending while blasting, primer and intermediate coating activities are beingperformed on daily basis.(for details of parts being blasted and painted refer daily blasting and painting report).
Category: 1. Accepted. 2. Conditionally Accepted S.Reinspection Required. 4 Rejected S.Advice/I
Travel Time :Inspection Time :Over Time :Holiday :
NCR
ORDERSTATUS
Y
N
C
B
Mr. Ankit MundanfrSupplier's Signature & Date Surveyor's/
SignatureSign & Date
'hotographs Page 3/3
Photograph 03
Photograph 05
END OF REPORT
Photograph 02
Photograph 04
Photograph 06'1
Shree alloys Industries Private Limited
Painting Report 64
CLIENT :- M/S THERMAX LTD. DATE : 13.04.2014
PROJECT NAME :-M/S RELIANCE INDUSTRIES LTD., JAMNAGAR j
PURCHASE ORDER NO. :- 174O08&77 DATED: 10.01.2014 ( COAL SILO SET NO. 03) \T NAME :- ARRANGEMENT I DETAIL OF COAL SILO
SL
1
' DRAWING NO.
Fll-OCF-01 6322, REV. 1
PROJECT CODE HOU. NO.
PC0471 HOUNO.:A00163210048,05
ITEM NO.
HOPPER NO. 04 8,05
MATCH MARKING -13 &15
QUANTITY
1 each
INTERMEDIATE COAT OFNEROPOXY SUPER HIGH BUILD MIO
( INTERNAL SURFACE 1 EXTERNAL SURFACE )
REQUIRED(MICRONS)
150-175
OBSERVED (MICRONS) ON EXTERNAL SURFACE REMARKS
SPOT 1(M) SPOT 2 ( (I)
160 161
AMBIENT CONDITIONS
S.NO.
1
2
3
4
5
DESCRIPTION
DRY BULB TEMP. | ° C )
WET BULB TEMP. ( ° C )
RH%
DEW POINT TEMP. ( ° C )
SURFACE TEMP. ( « C )
11:00 AM
36 'c
32 'c
75%
32' c
39 'c
2:00 PM
40' C
37 'c
82%
41'c
46 'c
5:00 PM
34 'c
30'c
74%
22' c
30' c
\T MATERIAL DETAILS
SR.
#
DESCRIPTION MFG NAME DESCRIPTION
'•TNlEftytEplATBXpXf̂ ftlEROPOXY SUPER HIGH BUILD MIO KANSAI NEROLAC PAINT LIMITED
--,'V'i- '_r~- .._' '•''•' \\
SLJt̂LOG^NC, / •' > jj
BATCH NO.
COMPONENT- A -2108461 &
COMPONENT - B - 2 1 07787
MFG DATE MIXING RATIO SHADE APPLICATION METHOD
01/01/2014 80:20 BROWNISH RED SELF STD. SPRAY
>| fl I1"") Or For M/s Thermpx
\y\\ ^J J\JSA\\. Sr̂ /\