+ All Categories
Home > Documents > SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as...

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as...

Date post: 13-Jul-2020
Category:
Upload: others
View: 19 times
Download: 0 times
Share this document with a friend
42
Transcript
Page 1: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on
Page 2: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHANCOMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.:

J-11011/343/2012-IA-II (I) dated: September 10, 2015April-2016 to September-2016

Sr. No.

Environment Clearance conditions Compliance

i The project proponent should install 24x7 air devices to monitor air emission, as provided by CPCB and submit report to Ministry and its Regional Office

∑ Opacity meters have been installed for continuous monitoring of PM at the stack of Kiln, Clinker cooler, cement mill, coal mill and Boiler.

∑ CEMS have been installed for continuous monitoring of SO2 and NOx at the stack of Kiln and Boiler

∑ Emission level for the period of April-2016 to September-2016 isenclosed as annexure 1.

ii The standards prescribed for cement plants vide the recent MOEF&CC notification GSR612 (E) dated 25.08.2014 shall be implemented.

∑ Presently the stack of Kiln, Clinker cooler, Coal mill, Cement mill are complying with PM<50 mg/Nm3

iii Project shall not start without EC for expansion of captive limestone mines. ∑ EC has been granted by MoEF&CC vide letter no. J-

11015/327/2012-IA.II(M) dated 21st July 2015 & amended dated 11th February 2016 for increase of limestone production from 17.2 to 19.6 MTPA

∑ Copy of EC has been submitted on 18/09/2015.iv Continuous stack monitoring facilities to

monitor gaseous emissions from the process stacks shall be provided. After expansion, limit of PM shall be controlled within 50 mg/Nm3 by installing adequate air pollution control system. Electrostatic precipitators to clinker cooler, bag house to raw mill kiln and bag filters to coal mill and cement mill. Low NOx burners shall be provided to control NOx emissions. Regular Calibration of the instruments must be ensured.

∑ Opacity meters have been installed for continuous monitoring of PM at the stack of Kiln, Clinker cooler, cement mill, coal mill and Boiler.

∑ CEMS have been installed for continuous monitoring of SO2 and NOx at the stack of Kiln and Boiler

∑ PM Emission levels are < 50 mg/Nm3.∑ Adequate air pollution control device have been installed. ∑ Low NOx burners have been installed with all kilns. ∑ Calibration of all instruments is being done on regular basis.

v Secondary fugitive emissions shall be controlled and shall be within the prescribed limits and regularly monitored. Guidelines/ Code of Practice issued by the CPCB in this regard shall be followed.

∑ CPCB guidelines for control of fugitive emission have been implemented.

∑ Following measures have been taken for the control of fugitive emission:¸ Use of covered vehicle for cement and clinker

transported ¸ Use of closed containers and bulkers for fly ash

transportation¸ Use of Rail along with road transportation.¸ All movement area is cemented.¸ Silos for the storage of Clinker and fly ash¸ Covered storage for gypsum¸ Proposed covered storage for coal¸ All unlading hoppers are covered and bag dust

collectors have provided.¸ All conveyor belts are covered¸ Bag dust collectors have been provided at all material

transfer points.¸ Water spray system has been provided with reclaimed

and limestone unloading points.¸ Vacuum sweeping m/c are being used for better

Page 3: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

housekeeping.¸ Planation all around the plant premises.

∑ Fugitive emission is well and within limit. Emission level are enclosed as annexure 2.

vi Arsenic and Mercury shall be monitored in emissions, ambient air and water.

∑ Arsenic and Mercury in Stack emissions, ambient air and ground water carried out by approved lab and analysis report is enclosing as annexure-3.

vii Efforts shall be made to reduce impact of the transport of the raw materials and end products on the surrounding environment including agricultural land. All the raw materials including fly ash shall be transported in the closed containers only and shall not be overloaded. The company shall have separate truck parking area. Vehicular emissions shall be regularly monitored.

Following measures have been taken for the control of transportation emission:

∑ Cement and clinker are being transported in covered vehicles. ∑ Fly ash is being transported in the closed containers and

bulkers. ∑ All vehicles used in transportation are loaded as per the

capacity.∑ Vehicles with PUC are allowed.∑ Rail transportation has been adopted along with road to

reduce impact.viii Effort shall be made to further reduce water

consumption by using air cooled condensers. All the treated waste water shall be recycled and reused in the process and / or for dust suppression and green belt development and other plant related activities etc. No process wastewater shall be discharged outside the factory premises and ‘zero’ discharge shall be adopted.

∑ All boilers of power plant & WHRS have been attached with air cooled condensers.

∑ Cement manufacturing process is based dry processtechnology.

∑ RO reject from CPP & WHRS is being used for synthetic gypsum manufacturing & ash quenching.

∑ Domestic waste water generated from office toilets, mess guest house is being treated in STP and treated water is used for greenbelt development.

∑ ‘Zero’ discharge has been achieved. ix Effort shall be made to make use of rain

water harvested. If needed, capacity of the reservoir shall be enhanced to meet the maximum water requirement. Only balance water requirement shall be met from other sources.

∑ Rain water collection pits have been developed at the following locations to use for plant & mining activities and to recharge the ground water.

S.No. Structure Water storage Capacity in KL

1. Harvesting Pit-1 at Mines 9000002. Harvesting Pit-2 at Mines 40000

3.Harvesting Pit-3 near plant gate

147000

4.Harvesting Pit-4 in Colony near Vill. Bhagatpura

40000

∑ Total water requirement entire Ras project (Cement, Power, Mine and Residential colony) is 4380 KLD.

∑ CGWA have been granted permission to withdraw 4000 KLD ground water.

∑ The balance 380 KLD water will be used from the rain water collected in above pits.

x Regular monitoring of influent and effluent surface, sub-surface and ground water shall be ensured and treated wastewater shall meet the norms prescribed by the State Pollution Control Board or described under the Environment (Protection) Act, 1986 whichever are more stringent. Leachate study for the effluent generated and analysis shall also be regularly carried out and report submitted to the Ministry's Regional of MoEF,

∑ There is Rain water & ground water used for project.∑ There is no effluent discharge on land or outside of plant

premises.∑ Domestic waste water generated from office toilets, mess and

guest house is being treated in to STP, and treated water used for greenbelt development. Analysis report of STP treated wateris enclosing as annexure 4.

∑ Ground water level and quality monitoring are been carried out on regular basis and results are enclosed as annexure 5.

Page 4: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

SPCB and CPCB.xi All the bag filter dust, raw mill dust, coal dust,

clinker dust and cement dust from pollution control devices shall be recycled and reused in the process and used for cement manufacturing. Spent oil and batteries shall be sold to authorized recycler / preprocessors only.

∑ Dust collected in air pollution control equipment is reused in process.

∑ Used oil and batteries are sold to authorized recycler / preprocessors only.

xii All the fly ash shall be utilized as per Fly ash Notification 1999 subsequently amended in 2003 and 2008. Efforts shall be made to use fly ash maximum in making Pozzolona Cement (PPC)

∑ Fly ash is used for making the PPC.∑ Fly ash generated in captive power plant is being utilized for

cement manufacturing.

xiii A detailed study on chemical composition of coal used particularly heavy metal and radio activity contents shall be carried out through a reputed institute and report shall be submitted to Regional Office of the Ministry. Only after ascertaining its radioactive level shall fly ash be supplied for utilization in cement manufacturing.

Heavy metal analysis in coal has been carried out by approved lab and analysis report is enclosing as annexure-3

xiv Effort shall be made to use low-grade lime, more fly ash and solid waste in the cement manufacturing.

∑ We have in-house R&D facility for use of fly ash and low grade lime stone.

∑ Lead Zinc slag of Hindustan Zinc Limited is being used as alternative raw material in place of iron ore.

∑ CPCB & RSPCB permissions have been obtained for the following waste and started to use:¸ Paint sludge. ¸ ETP sludge and Phosphate sludge of automobile

industries. ¸CETP sludge of Pali.

CPCB & RSPCB permissions have been obtained for the following waste to start shortly:

¸Chemical Gypsum¸ Tyre chips,¸ Solid mix waste and liquid mix waste,¸Oil soaked cotton and grinding waste,¸Oily rags and incineration ash

xv Greenbelt of about 15-20 meter width shall be developed all along the periphery of the plant. Apart from that an area of 33% of total plant area shall be provided for development the green belt 3 layers of plantation shall be provided. Tree plantation shall more on the prevalent wind direction based upon the outcome of windrose at the site. Selection of plant species shall be as per the CPCB guidelines in consultation with the DFO.

∑ 3 layers plantation has been provide along with boundary wall.∑ Out of total plant area of 187.56 hectares, green belt has been

developed in 63.8 hectares (34%) area with 165311numbers of saplings.

∑ Local native species of plants have been planted for increase survival rate.

∑ CPCB guidelines for plantation have been followed.

xvi All the recommendation made in the Charter on Corporate Responsibility for Environment Protection (CREP) shall be implemented.

∑ All CREP recommendations have been implemented.

Page 5: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

S. No.

CREP Condition Action Plan

1. The new cement kiln to be accorded NOC/ Environmental Clearance w.e.f 1/4/03 will meet the limit of 50 mg/Nm3 for particulate matter emission.

All Pollution Control equipment are meeting the particulate matter emission level < 50 mg/Nm3.

2. The cement industries will control fugitive emission from all raw material and product storage and transfer points by December 2003. However, the National Task Force will decide the feasibility for the control of fugitive emission from limestone and coal storage areas. The NTF shall submit its recommendations within months.

Closed storages / silos have been provided for Clinker, Fly Ash, Gypsum and Cement storage.

Closed unloading hoppers with water sprinkling arrangement have been provided for unloading of limestone and coal & pet coke.

Bag filters have been provided at all material transfer points.

All conveyor belts are covered.

All movement area is cemented and sweeping is being done by vacuum sweeping machine.

3. Industries will submit the target date to enhance the utilization waste material by April 2003.

Fly ash is used for making of PPC.

Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore.

4. NCBM will carry out a study on hazardous waste utilization in cement kiln by December 2003.

CPCB & RSPCB permissions have been obtained foruse of Paint sludge, ETP sludge and Phosphate sludge of automobile industries. CETP Sludge of Pali, Chemical Gypsum, Tyre chips, Solid mix waste and liquid mix waste, oil soaked cotton and grinding waste, Oily rags and incineration ash

5. Cement industries will carry out feasible study and submit target dates to CPCB co-generation of power by July-2003.

All kilns are attached with waste heat recovery system.

xvii Third Party Monitoring of air pollution shall be furnished as part of compliance report.

Complying with. Third party Monitoring report of air pollution is enclosing as annexure-3.

xviii All the commitments made to the public during the Public Hearing / Public Consultation meeting shall be satisfactorily implemented and a separate budget for implementing the same shall be allocated and information submitted to the Ministry's Regional Office.

∑ Status of Public Hearing recommendation is attached herewith as annexure-6

xix At least 5 % of the total cost of the project shall be earmarked towards the Enterprise Social Commitment (ESC) based on local needs. The proponent shall prepare a detailed CSR Plan for every next 5 years for the existing-cum-expansion project, which includes village-wise, sector-wise (Health, Education, Sanitation, Health, Skill Development and infrastructure requirements such as strengthening of village roads, avenue plantation, etc) activities in consultation with the local communities and administration. The CSR Plan will include the

∑ CSR plan for next 5 year has been submitted on 18/9/2015. ∑ Company is engaged in extensive social welfare works under

CSR activities. Total expenses on social welfare activities for the FY 15-16 was INR 461.50 lacs for all units of cement, power and mining.

Page 6: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

amount of 2% retain annual profits as provided for in Clause 135 of the Companies Act, 2013 which provides for 2% of the average net profits of previous 3 years towards CSR activities for life of the project. A separate budget head shall be created and the annual capital and revenue expenditure on various activities of the Plan shall be submitted as part of the Compliance Report to Regional Office. The details of the CSR Plan shall also be uploaded on the company website and shall also be provided in the Annual Report of the company.

xx Risk and Disaster Management Plan along with the mitigation measure shall be prepared and a copy submitted to the Ministry’s Regional Office, SPCB and CPCB within 3 months of issue of environment clearance letter.

∑ Risk and Disaster Management Plan has been submitted on 18/09/2015.

xxi To educate the workers, all the work places where dust may cause a hazard shall be clearly indicate as dust exposure area through the use of display signs which identifies the hazard and the associate health effects.

∑ Training programmes is being organized for workers on regular basis.

∑ Signs board have been displayed at all health associated risk area.

∑ Adequate PPE’s such as ear muffs / ear plugs, helmet, dust mask and shoes have been provided to workers to avoid the health hazard.

xxii Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, Safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project.

∑ All necessary facilities such as toilets, drinking water, medical health, fuel etc. has been provided to construction labors.

General Conditioni The project authorities must strictly adhere to

the stipulations made by the Rajasthan Pollution Control Board and the State Government.

∑ Yes, we are complying with all the stipulation made by the RSPCB and state govt.

ii No further expansion or modification of the plant shall be carried out without prior approval of the Ministry of Environment, Forest and Climate Change (MoEF&CC).

∑ Yes for further expansion, prior approval will be obtained from MOE&F.

iii Efforts should be made to achieve power consumption of 70 units/tonne for Portland Pozzolona Cement (PPC) and 95 unit/tonnefor Ordinary Portland Cement (OPC) production and thermal energy consumption of 670 Kcal/Kg of clinker.

∑ Separate energy management cell has been established to monitor power & fuel consumption.

∑ All suitable measure like VFD, high efficient motors have been adopted to reduce power consumption.

iv At least four ambient air quality monitoring stations should be established in the downward direction as well as where maximum ground level concentrations of PM10, PM2.5, SO2, NOx, are anticipated in consultation with the SPCB. Data on ambient air quality and Stack emission shall be

∑ Ambient air quality monitoring is being monitored at the four location of the plant boundary.

∑ Complying with the National Ambient Air Quality Emission Standards issued by the Ministry.

∑ Monitoring results of ambient air quality at plant boundary are enclosing as annexure 7.

∑ Stack monitoring results are enclosing as annexure 1.

Page 7: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

regularly submitted to this Ministry including its Regional Office at Lucknow and the SPCB/CPCB once in six months.

∑ Six monthly compliance report is being submitted on regular basis to the Ministry of RO office of the MOEF/CPCB and RPCB.

v Industrial waste water shall be properly collected treated so as to conform to the standards prescribed under GSR 422 (E) dated 19th May, 1993 and 31 December, 1993 or as amended from time to time. The treated waste water shall be utilized for plantation purpose.

∑ No waste water is being generated from the dry cement manufacturing process.

∑ RO reject water is utilizing in synthetic gypsum manufacturing.∑ Domestic waste water generated from office toilets, mess and

guest house is being treated in STP, and treated water is used for plantation.

vi The overall noise levels in and around the plant area shall be kept well within the standards (85 dBA) by providing noise control measures including acoustic hoods, silencers, enclosures etc. On all sources of noise generation. The ambient noise levels should conform to the standards prescribed under EPA Rules, 1989 viz. 75 dBA (daytime) and 70 dBA (nighttime).

∑ Overall noise level in and around the plant area are well within the prescribed standards of 85 dB (A).

∑ Ambient noise levels at the plant boundary are well within the standards prescribed under EPA Rules viz 75 dB (A) (Day time) and 70 dB (A) (Night time.) monitoring results are enclosing as annexure 8.

vii Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act.

∑ Well-equipped Occupational Health Management Center has been established.

∑ Occupational Health Surveillance programme have been carried out on regular basis and record of the same is maintained as per Factories Act.

viii The company shall develop rain water harvesting structures to harvest the rain water for utilization in the lean season besides recharging the ground water table.

∑ Rain water collection pits have been developed at the following locations to use for plant & mining activities and to recharge the ground water.

Sr. No.

Structure Water storage Capacity in KL

1. Harvesting Pit-1 at Mines 9000002. Harvesting Pit-2 at Mines 40000

3.Harvesting Pit-3 near plant gate

147000

4.Harvesting Pit-4 in Colony near Vill. Bhagatpura

40000

∑ Following rain water harvesting measures have been developed outside the plant premises.

S.NO. Watershed development & Construction of Anicuts

Year 2015-20161. Construction of anicut in Roopnagar(Ras)

villageYear 2010-20111 Construction of anicut in Bagatpura village2 Construction of anicut in Bhimgarh village

3 Construction of anicut in Kanyakhedi village4 Rooftop water harvesting in 12 schools

5 Construction of Rapat (Nimbeti to Jawangarh village)

Year 2009-20106 Watershed development project for all

villages7 Small check dam/Anicut, Village Nimbeti

8 Construction of anicut in Nimbeti river

Page 8: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

9 Construction of anicut in Kheda Village

10 Construction of anicut in Bhimgarh Village11 Pal construction at Anicut Nimbeti riverYear 2008-2009

12 Construction/Repairing of anicut in Nimbeti village

13 Jawangarh Anicut

14 Bhairav Ji Dhani Anicut Jawangarh Anicut

∑ Artificial recharge structures (de-silting & filter pits) have been provided with following dug wells and bore wells inside the plant premises to recharge the ground water.

ix The project proponent shall also comply with all the environmental protection measures and safeguard recommended in the EIA/EMP report. Further, the company must undertake socio-economic development activities in the surrounding villages like community development programmes, educational programmes, drinking water supply and health care etc.

∑ Complying with EIA/EMP study report.

x Requisite funds shall be earmarked towards capital cost and recurring cost/annum for environment pollution control measures to implement the conditions stipulated by the Ministry of Environment, Forests and Climate Change (MoEF&CC) as well as the State Government. An implementation schedule for implementing all the conditions stipulated herein shall be submitted to the Regional Office of the Ministry at Lucknow, The funds so provided shall not be diverted for any other purpose.

∑ All the pollution control measures have been implemented. ∑ The last three years recurring cost for the environment pollution

control is given as below-Description 2013-14 2014-15 2015-16

Plant790.52 Lacs

719.94 Lacs 830.85 Lacs

Mines 153.34 Lacs 232.32 Lacs

Total 790.52 Lacs 873.28 Lacs 1063.17 Lacs

xi A copy of clearance letter shall be sent by the proponent to concerned Panchayat, ZilaParishad / Municipal Corporation, Urban Local Body and the local NGO, if any, from whom suggestions / representations, if any, were received while processing the proposal. The clearance letter shall also be put on the web site of the company by the proponent.

∑ Copy of environment clearance letter has been sent on 12.9.2015 to the followings:-

∑Gram Panchayat, Ras∑Gram Panchayat, Butiwas∑Nagar Palika, Jaitaran∑Zila Parishad, Pali

∑ EC letter has been placed on our website:-www.shreecement.in

xii The project proponent shall upload the status of compliance of the stipulated environment clearance conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of the MOEF&CC, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; PM, SO2, NOx (ambient levels as well as stack emissions) or critical sectorial parameters, indicated for the projects shall be monitored and displayed at a convenient location near the main gate of the company in the public

∑ Status of compliance of the stipulated environment clearance conditions, including results of monitored data are available on company's web site and have been displayed at the main gate.

∑ Emission levels are being submitted on regular basis to ministry, CPCB and SPCB.

Page 9: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

domain.xiii The project proponent shall also submit six

monthly reports on the status of the compliance of the stipulated environmental conditions including results of monitored data (both in hard copies as well as by e-mail) to the respective Regional Office of MOEF, the respective Zonal Office of CPCB and the SPCB. The Regional Office of this Ministry at Lucknow/CPCB/RSPCB shall monitor the stipulated conditions.

∑ Compliance of the stipulated environment clearance conditions, including results of monitored data are being submitted on six monthly basis to the Ministry of Environment and Forests, its Regional Office, Lucknow, Central Pollution Control Board and State Pollution Control Board.

xiv The environmental statement for each financial year ending 31st March in Form-V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental conditions and shall also be sent to the respective Regional Offices of the MOEF&CC at Lucknow by e-mail.

∑ Every year in the month of September, Environment statement isbeing submitted to the concerned authorities.

∑ Environment Statement & EC compliance have also been placed on the website:-www.shreecement.in

xv Project Proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the RSPCB and may also be seen at the Website of the Ministry of Environment, Forests and Climate Change (MoEF&CC) at http:/envfor.nic.in. This should be advertised within seven days from the date of issue of the clearance letter at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the Regional office at Lucknow.

∑ Advertisement has been given in two local newspapers widely circulated in the region namely, Dainik Bhaskar and DainikNavjyoti on 18/09/2015. Copy has been submitted on 18/09/2015.

xvi The Project Authorities shall inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work.

∑ The date of commissioning of various units is given as below:Cement plant Unit-III : 2005Cement plant Unit-IV : 2007Clinker Unit-V : 2007Clinker Unit-VI : 2008Clinker Unit-VII : 2009 Clinker Unit-VIII : 2010 Clinker Unit-IX : 2013 Clinker Unit -X : 2014Ras New Cement Unit : 2014CPP 80 MW : 2007 –2008CPP 100 MW : 2010Waste heat recovery power plant : 2010Synthetic Gypsum Plant : 2015Nimbeti Limestone mine : Since 1997

Page 10: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Annexure 1

Stack Emission Monitoring Data: (All Values in mg/Nm3)

Units Location of Stack Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16

Cement PlantUnit-III

Raw mill & Kiln ESP Stack 22 18 25 31 36 37Coal mill Bag House Stack 10 12 15 14 15 12

Cooler ESP Stack 12 10 12 13 19 16Cement mill Bag House Stack 17 10 11 20 16 10

Cement PlantUnit-IV

Raw mill & Kiln ESP Stack 19 17 29 30 34 36Coal mill Bag House Stack 13 12.2 11 12 25 18

Cooler ESP Stack 15 8.9 12 9 18 11Cement mill Bag House Stack 17 10 17 11 16 19

Cement PlantUnit-V

Raw mill & Kiln Bag House Stack

13 15 13 14 16 25Coal mill Bag House Stack 11 12 17 10 17 10

Cooler ESP Stack 16 11 15 13 15 18

Cement PlantUnit-VI

Raw mill & Kiln ESP Stack 21 12.4 15 16 15 18Coal mill Bag House Stack 16 10 20 10 13 13

Cooler ESP Stack 12 18 15 14 10 15

Cement PlantUnit-VII

Raw mill & Kiln ESP Stack 20 20 26 26 14 24Coal mill Bag House Stack 12 13 11 18 19 12

Cooler ESP Stack 16 24 18 11 22 10

Cement PlantUnit-VIII

Raw mill & Kiln ESP Stack 26 28 19 28 25 32Coal mill Bag House Stack 17 10 21 12 11 10

Cooler ESP Stack 13 17 18 24 20 16

Cement PlantUnit-IX

Raw mill & Kiln Bag House Stack 18 12 12 23 15 18

Coal mill Bag House Stack 14 14 19 12 16 13Cooler ESP Stack 12 12 10 11 10 11

Cement PlantUnit-X

Raw mill & Kiln Bag House Stack 19 12 10 19 19 25

Coal mill Bag House Stack 17 11 16 15 15 18Cooler ESP Stack 13 12 17 13 13 12

RNCU(VRM) Cement mill Bag House Stack 20 13 12 15 20 15RNCU(Ball

Mill)Cement mill Bag House Stack 13 11 18 14 15 17

Synthetic Gypsum

Mixer and Den Three Stage Wet Scrubber 16 NR NR 15 13 NR

CaptivePower Plant

Boiler-II & III ESP Stack NR 25 NR NR 16 22Boiler- IV & V ESP Stack 24 26 28 32 25 28Boiler- VI & VII ESP Stack 29 33 31 30 29 23

Page 11: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Annexure 2Fugitive Emission :-( All Values in µg/m3)

Location

Month

Gypsum storage

Lime stone stock pile

Coal storage area

Fly ash siloPacking plant

III & IVPacking plant

RNCU

Norms 5000 5000 2000 5000 5000 5000

Apr-16 3925 3689 1256 3600 4100 -

May-16 3125 3500 1220 3536 3812 -

Jun-16 3225 4125 1583 4589 4590 -

Jul-16 4335 4218 1622 4510 4485 4578

Aug-16 4215 4138 1534 4429 4268 4394

Sep-16 4118 4015 1492 4224 4168 4139

Annexure 4

(STP Treated Water Quality)

S. No. Month→ Parameter ↓

Limits Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16

1 Total Suspended Solids 100 mg/l 60.1 58.3 56.5 57.8 55.4 56.8

2 pH* 5.5-9.0 7.2 7.1 6.9 6.9 7.0 7.2

3 Oil and Grease** 10 mg/l 0.1 0.1 0.1 0.7 0.9 0.8

4 Total Residual Chlorine 1.0 mg/l 0.3 0.5 0.2 0.3 0.3 0.4

5 Ammonical Nitrogen (as N) 50 mg/l 16.3 15.2 13.2 14.2 13.5 12.9

6 BOD 3days 27°C 30 mg/l 10.3 10.2 9.5 10.1 10.5 11.8

7 Sulphide(as S) 2.0mg/l 0.3 0.1 0.1 0.3 0.4 0.4

8 Chlorides1000

mg/l73.5 80.2 71.5 73.5 75.4 72.8

10 COD 250 mg/l 80.5 79.5 77.5 81.2 78.4 70.4

Page 12: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Annexure 5Ground water level & quality monitoring

Ground water level in meter below ground level (Year-2013)

S.No Location of well Season Winter (Jan.,13)

Pre-Monsoon (May,13)

Monsoon(August, 13)

Post-Monsoon(Nov,13)

1 B/W Near Old Mines Office (Within Plant Area)North Side

14.8 18.3 17.3 18.2

2 O/W JassaNath Ji ki Mandi (Outside plant Area)East Side 14.5 18.0 19.8 20.2

3 Open Well # 9 Stacker & reclaimer area West side 16.3 20.6 19.4 20.2

4 Open Well # 2 Near mess area South side 15.7 19.2 18.6 19.5

S.N

Location of Well

Bore Well within Plant Area Near Old Mines Office North Side

Open Well outside plant Area JassaNath Ji ki Mandi East Side

SeasonParameters

Winter (Jan.,13)

Pre-Monsoon (May,13)

Monsoon(August,

13)

Post-Monsoon(Nov,13)

Winter (Jan.,13)

Pre-Monsoon (May,13)

Monsoon(August,

13)

Post-Monsoon(Nov,13)

1 pH 7.24 7.37 7.09 7.52 7.13 7.18 7.21 7.192 Turbidity

(NTU)3.6 4.5 4.2 3.5 3.50 2.54 3.25 3.44

3 Total Hardness mg/l

421 426 382 381 362 353 371 358

4 Alkalinity mg/l

233 211 209 236 221 231 204 216

5 Iron mg/l

0.51 0.28 0.23 0.28 0.40 0.39 0.41 0.34

6 Chloride mg/l

405 364 334 349 246 284 275 268

7 TDS mg/l

1168 1232 1198 1264 774 825 963 934

8 Calcium mg/l

114 119 115 123 97 96 98 99

9 Magnesium mg/l

49 40 39 40 29 31 35 33

10 Sulphate mg/l

63 73 72 65 61 58 62 65

11 Nitrate mg/l

8.2 14 15 13 3 8 17 14

12 Fluoride mg/l

1.21 1.13 1.2 1.17 0.87 0.95 1.1 1.2

S.N

Location of Well

Open Well # 9 Stacker & reclaimer area West side

Open Well # 2 Near mess area South side

SeasonParameters

Winter (Jan.,13)

Pre-Monsoon (May,13)

Monsoon(August,

13)

Post-Monsoon(Nov,13)

Winter (Jan.,13)

Pre-Monsoon (May,13)

Monsoon(August,

13)

Post-Monsoon(Nov,13)

1 pH 7.15 7.52 7.28 7.13 7.21 7.27 7.85 7.452 Turbidity

(NTU)4.4 3.5 3.50 2.54 3.25 3.44 2.70 2.72

3 Total 386 388 361 353 371 358 374 357

Page 13: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Hardness mg/l

4 Alkalinity mg/l

209 236 221 231 204 216 226 231

5 Iron mg/l

0.23 0.28 0.40 0.39 0.41 0.34 0.25 0.28

6 Chloride mg/l

334 349 286 284 275 268 356 341

7 TDS mg/l

1198 1264 774 825 963 934 1207 1169

8 Calcium mg/l

115 123 97 96 98 99 135 124

9 Magnesium mg/l

45 41 39 41 35 33 43 42

10 Sulphate mg/l

72 65 61 58 62 65 73 76

11 Nitrate mg/l

15 13 3 8 17 14 10.6 10.8

12 Fluoride mg/l

1.2 1.17 0.87 0.95 1.1 1.2 1.24 1.18

Ground water level & quality monitoringGround water level in meter below ground level (Year-2014)

S.No Location of well Season Winter (Jan.,14)

Pre-Monsoon (May,14)

Monsoon(August, 14)

Post-Monsoon(Nov,14)

1 B/W Near Old Mines Office (Within Plant Area) North Side

18.8 20.4 16.5 18.0

2 O/W JassaNathJikiMandi (Outside plant Area)East Side 21.4 23.4 16.3 11.9

3 Open Well # 9 Stacker & reclaimer area West side 19.6 21.2 16.9 19.0

4 Open Well # 2 Near mess area South side 20.4 22.8 16.2 19.2

S.N

Location of Well

Bore Well within Plant Area Near Old Mines Office North Side

Open Well outside plant Area JassaNath Ji kiMandi East Side

SeasonParameters

Winter (Jan.,14)

Pre-Monsoon (May,14)

Monsoon(August,

14)

Post-Monsoon(Nov,14)

Winter (Jan.,14)

Pre-Monsoon (May,14)

Monsoon(August,

14)

Post-Monsoon(Nov,14)

1 pH 7.75 7.54 7.85 7.45 7.35 7.42 7.52 7.622 Turbidity

(NTU)3.40 2.80 2.70 2.72 3.40 2.85 2.78 2.74

3 Total Hardness mg/l

345 366 374 357 352 357 365 360

4 Alkalinity mg/l

227 230 226 231 217 241 231 234

5 Iron mg/l

0.31 0.27 0.25 0.28 0.21 0.37 0.39 0.32

6 Chloride mg/l

365 368 356 341 296 276 279 283

7 TDS mg/l

1254 1266 1207 1169 967 1024 1056 1042

8 Calcium mg/l

127 122 135 124 105 109 99 43

9 Magnesium 48 46 43 42 39 41 44 43

Page 14: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

mg/l10 Sulphate

mg/l64 69 73 76 68 55 66 69

11 Nitrate mg/l

8.9 9.4 10.6 10.8 11.5 10.5 11.2 10.8

12 Fluoride mg/l

1.24 1.23 1.24 1.18 1.05 1.12 1.13 1.2

S.N

Location of Well

Open Well # 9 Stacker & reclaimer area West side

Open Well # 2 Near mess area South side

SeasonParameters

Winter (Jan.,14)

Pre-Monsoon (May,14)

Monsoon(August,

14)

Post-Monsoon(Nov,14)

Winter (Jan.,14)

Pre-Monsoon (May,14)

Monsoon(August,

14)

Post-Monsoon(Nov,14)

1 pH 7.28 7.32 7.15 7.18 7.85 7.63 7.26 7.292 Turbidity

(NTU)2.4 2.06 2.10 2.08 2.97 2.56 2.54 2.84

3 Total Hardness mg/l

538 489 338 356 412 502 398 403

4 Alkalinity mg/l

290 285 208 209 276 784 265 238

5 Iron mg/l

0.29 0.33 0.32 0.38 0.38 0.36 0.34 0.28

6 Chloride mg/l

298 295 291 286 287 275 265 249

7 TDS mg/l

1305 1264 853 1025 815 985 862 874

8 Calcium mg/l

144 153 95 106 97 132 146 109

9 Magnesium mg/l

36 37 29 37 31 32 37 31

10 Sulphate mg/l

82 79 62 68 87 81 79 86

11 Nitrate mg/l

4 3 2 3 5 4 3 2

12 Fluoride mg/l

1.08 1.04 0.79 0.98 0.84 0.95 0.68 1.04

Ground water level & quality monitoring

Ground water level in meter below ground level (Year-2015)

S.No Location of well Season Winter (Jan.,15)

Pre-Monsoon (May,15)

Monsoon(August, 15)

Post-Monsoon(Nov,15)

1 B/W Near Old Mines Office (Within Plant Area)North Side

18.2 20.4 17.2 18.7

2 O/W JassaNathJikiMandi (Outside plant Area) East Side

20.4 22.6 18.6 14.2

3 Open Well # 9 Stacker & reclaimer area West side 17.9 20.1 16.1 18.2

4 Open Well # 2 Near mess area South side 18.6 21.4 17.2 20.2

Page 15: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

S.N

Location of Well

Bore Well within Plant Area Near Old Mines Office North Side

Open Well outside plant Area JassaNath Ji kiMandi East Side

SeasonParameters

Winter (Jan.,15)

Pre-Monsoon (May,15)

Monsoon(August,

15)

Post-Monsoon(Nov,15)

Winter (Jan.,15)

Pre-Monsoon (May,15)

Monsoon(August,

15)

Post-Monsoon(Nov,15)

1 pH 7.46 7.21 7.19 7.36 7.51 7.20 7.18 7.412 Turbidity

(NTU)2.83 3.25 3.44 3.29 2.83 4.1 4.6 4.20

3 Total Hardness mg/l

362 371 358 456 349 413 375 439

4 Alkalinity mg/l

235 204 216 231 238 214 218 231

5 Iron mg/l

0.29 0.41 0.34 0.36 0.34 0.21 0.25 0.28

6 Chloride mg/l

328 275 268 305 256 350 355 298

7 TDS mg/l

1156 963 934 1025 1082 1225 1215 1243

8 Calcium mg/l

118 98 99 370 113 117 114 350

9 Magnesium mg/l

42 35 33 86 38 38 37 89

10 Sulphate mg/l

58 62 65 54 54 71 73 68

11 Nitrate mg/l

9.8 17 14 16.0 10.3 11 17 18.0

12 Fluoride mg/l

1.19 1.1 1.2 1.15 1.21 1.12 1.1 1.2

S.N

Location of Well

Open Well # 9 Stacker & reclaimer area West side

Open Well # 2 Near mess area South side

SeasonParameters

Winter (Jan.,15)

Pre-Monsoon (May,15)

Monsoon(August,

15)

Post-Monsoon(Nov,15)

Winter (Jan.,15)

Pre-Monsoon (May,15)

Monsoon(August,

15)

Post-Monsoon(Nov,15)

1 pH 7.26 7.42 7.26 7.32 7.21 7.26 7.38 7.512 Turbidity

(NTU)2.85 2.92 2.96 3.20 3.25 2.65 2.81 2.63

3 Total Hardness mg/l

362 386 391 462 371 374 368 587

4 Alkalinity mg/l

256 281 208 229 204 198 207 204

5 Iron mg/l

0.29 0.36 0.40 0.35 0.41 0.38 0.36 0.32

6 Chloride mg/l

372 363 352 269 275 359 364 268

7 TDS mg/l

1102 1096 986 997 963 1065 987 1036

8 Calcium mg/l

123 164 108 363 98 105 121 485

9 Magnesium mg/l

36 42 46 99 35 41 46 102

10 Sulphate mg/l

71 62 68 58 62 61 70 56

11 Nitrate mg/l

9.5 14 19 16.0 17 9.8 12 13.0

12 Fluoride mg/l

1.1 1.2 1.25 1.1 1.1 1.05 1.2 1.1

Page 16: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Annexure 6Public Hearing Compliance of Public Hearing held on 18/02/2014

S. No.

Activities Action undertaken Fund Allocation (Rs. In lac)

Action Taken Expenditure Incurred (Rs. In Lac)

1. Plantation in nearby area

5,000 trees will be planted in nearby area.

5.0 12,870 plants has been planted. Fodder Seeds and 7 orchards were developed

3.59

2. Increase of availability of ambulance

Three ambulance available at the site

1.0 144 visits for Ambulance camp and 34 time’s ambulance services for delivery have been provided.

13.27

3. Increase of drinking water supply in summer season.

Additional 5 Nos. of water tanks will be provided

5.0 674 Nos. waterTankers & Construction of Water tanks & Kheli..

4.21

4. More efforts on control of dust emission and vibration.

ÿ Installation of high efficient Bag house, ESPs and Bag filters to meet emission level

< 50mg/Nm3.

ÿAll movement area is cemented.

ÿCompletion of railway line shortly to reduce the road traffic density.

ÿ Better housekeeping.ÿ Regular water spray on haul

road and proper maintenance

Cost has already included in project cost.

Good housekeeping is being maintained

Part of project cost.

5. More employment to local people

∑ Out of Total 1817 Employees 1411 employee are from Rajasthan & 85 are from Pali district.

Out of Total 1965 workers 1349 workers are from Pali district.

- Regular training is given to the local villagers. Skilled development trainings have been provided to 47 persons and expenditure of Rs. 2.4 lacs has been incurred so far.

2.4

6. Investment in irrigation for the Development of Agriculture

Distribute better quality seeds, training of farmers by agriculture experts and financial aid for water sprinkling system.

5.0 Rs. 17 lacs has been incurred on distribution of better quality seeds, training of farmers by agriculture experts and financial aid for water sprinkling system etc.

17.0

Total 16.0 40.47

7. CSR activities Health & Family Welfare Programmes, Education Promotion Programmes, Women Empowerment & Development Programme, Contribution in Religious & Social Programmes, Community Infrastructure Development Projects, Agriculture & land development, community development project & Natural resource management

Rs. 254.32 Lacs proposed for year 2016 -17(Rs. 461.50 lacs incurred during 2015-16.)

Page 17: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Annexure 7

Ambient Air Quality Monitoring Data :-( All Values in µg/m3)

Location

Near Main Gate Near MessTowards Stacker &

ReclaimerTowards Vill: Khera &

Jawangarh

MonthPM 2.5

PM 10

SO2 NOx PM 2.5

PM 10

SO2 NOx PM 2.5

PM 10

SO2 NOx PM 2.5

PM 10

SO2 NOx

Apr-16 20.3 38.7 8.6 10.7 21.8 40.9 9.2 11.2 27.6 39.3 8.5 10.5 23.3 39.2 8.8 10.8

May-16 31.2 51.4 8.4 9.8 34.5 49.9 8.5 10.3 36.0 50.8 8.1 9.7 32.0 49.3 8.6 10.0

Jun-16 33.9 56.5 11.3 10.9 40.4 55.0 9.5 11.4 41.4 51.8 9.9 10.8 32.1 53.9 10.4 11.1

Jul-16 33.8 51.6 11.2 11.0 39.1 51.5 10.4 11.5 40.4 49.1 10.4 11.1 33.8 50.3 10.4 11.1

Aug-16 27.6 46.5 9.3 10.9 26.4 45.0 9.9 11.4 27.4 46.0 9.4 10.8 25.8 43.9 9.5 11.0

Sep-16 28.4 47.0 10.3 10.5 27.0 45.9 11.2 11.3 27.8 46.6 10.5 10.8 25.4 44.4 10.6 10.8

Annexure 8

Noise level within Plant Area: all values in dB (A)

Ambient noise level at Plant Boundary (Common for Cement plant & Power plant): all values in dB (A)

S.No MonthLocation Apr-2016 May-2016 June-2016 July-2016 Aug-2016 Sept-2016

1 Raw Mill Area 79.2 78.2 80.6 78.5 78.7 79.6

2 Coal Mill Area 77.7 75.8 77.6 78.0 76.1 75.5

3 Cooler Area 79.6 77.9 78.1 80.9 78.6 79.6

4 Cement Mill Area 75.0 77.6 76.9 77.9 80.2 79.0

5 Compressor House 81.3 81.0 80.7 81.6 82.0 82.3

6 Packing Plant Area 71.4 72.8 69.6 69.6 72.3 72.6

7 Boiler Area 80.2 78.9 80.0 79.9 78.3 79.0

8 Turbine House Area 79.8 79.1 78.9 78.1 79.1 79.6

Location Near Main Gate Near MessTowards

Stacker & ReclaimerTowards Vill :

Khera & JawangarhMonth Day Night Day Night Day Night Day NightApr-16 59.6 50.7 62.1 53.6 61.3 52.2 62.8 51.6May-16 60.1 49.6 65.3 52.3 60.0 51.6 67.5 52.2Jun-16 71.1 61.2 69.5 55.2 72.2 54.2 65.3 55.3

Jul-16 72.1 60.8 70.4 56.4 73.1 55.2 66.4 55.4

Aug-16 72.1 59.4 70.5 58.4 71.5 55.4 70.9 56.1

Sep-16 73.1 61.1 71.1 57.1 72.4 54.4 67.2 55.0

Page 18: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Ambient Air Quality  MonitoringTest Report No. : Issue Date 01/07/2016EK0/EV-AA/111/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

Sample Drawn on 20/06/2016 To 21/06/2016

Ambient Air

EPEPL(Mr. Harish Kumar)Sample Drawn by

Plant Boundary Near Main GateSampling LocationSOP-AAQ/15Sampling Plan & Procedure

24.0 Hrs.Sampling Time38.0Ambient Temprature (deg ºC)1.1Average Flow Rate of SPM (m³/min)1.0Average Flow Rate of Gases (lpm.)ClearWeather Conditions

Remark (if any) NA

PARAMETERS.No. ResultsTest Methods LIMIT AS PER EPA*

Units

Particulate Matter (PM10)1 82.3IS:5182 (P-23) 100.0µg/m3

Particulate Matter (PM2.5)2 54.1SOP-AAQ/89/01 60.0µg/m3

Sulphur dioxide (as SO2)3 13.3IS:5182 (P-2) Improved West & Geake

80.0µg/m3

Nitrogen Dioxide (as NO2)4 25.4IS:5182 (P-6) 80.0µg/m3

Arsenic (as As)5 <0.1SOP-AAQ/89/03 6.0ng/m3

Mercury (as Hg)6 <0.1SOP-AAQ/89/04 -µg/m3

*Details as per EPA-1986 National Ambient Air Quality Standards,date 18.11.2009

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 1/1

For EKO PRO ENGINEERS PVT. LTD

Page 19: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Ambient Air Quality  MonitoringTest Report No. : Issue Date 01/07/2016EK0/EV-AA/112/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

Sample Drawn on 20/06/2016 To 21/06/2016

Ambient Air

EPEPL(Mr. Harish Kumar)Sample Drawn by

Plant Boundary Near MessSampling LocationSOP-AAQ/15Sampling Plan & Procedure

24.0 Hrs.Sampling Time38.0Ambient Temprature (deg ºC)1.1Average Flow Rate of SPM (m³/min)1.0Average Flow Rate of Gases (lpm.)ClearWeather Conditions

Remark (if any) NA

PARAMETERS.No. ResultsTest Methods LIMIT AS PER EPA*

Units

Particulate Matter (PM10)1 78.2IS:5182 (P-23) 100.0µg/m3

Particulate Matter (PM2.5)2 52.3SOP-AAQ/89/01 60.0µg/m3

Sulphur dioxide (as SO2)3 10.9IS:5182 (P-2) Improved West & Geake

80.0µg/m3

Nitrogen Dioxide (as NO2)4 22.1IS:5182 (P-6) 80.0µg/m3

Arsenic (as As)5 <0.1SOP-AAQ/89/03 6.0ng/m3

Mercury (as Hg)6 <0.1SOP-AAQ/89/04 -µg/m3

*Details as per EPA-1986 National Ambient Air Quality Standards,date 18.11.2009

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 1/1

For EKO PRO ENGINEERS PVT. LTD

Page 20: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Ambient Air Quality  MonitoringTest Report No. : Issue Date 01/07/2016EK0/EV-AA/113/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

Sample Drawn on 21/06/2016 To 22/06/2016

Ambient Air

EPEPL(Mr. Harish Kumar)Sample Drawn by

Plant Boundary Towards Stacker & ReclaimerSampling LocationSOP-AAQ/15Sampling Plan & Procedure

24.0 Hrs.Sampling Time38.0Ambient Temprature (deg ºC)1.1Average Flow Rate of SPM (m³/min)1.0Average Flow Rate of Gases (lpm.)ClearWeather Conditions

Remark (if any) NA

PARAMETERS.No. ResultsTest Methods LIMIT AS PER EPA*

Units

Particulate Matter (PM10)1 71.1IS:5182 (P-23) 100.0µg/m3

Particulate Matter (PM2.5)2 49.2SOP-AAQ/89/01 60.0µg/m3

Sulphur dioxide (as SO2)3 9.26IS:5182 (P-2) Improved West & Geake

80.0µg/m3

Nitrogen Dioxide (as NO2)4 24.9IS:5182 (P-6) 80.0µg/m3

Arsenic (as As)5 <0.1SOP-AAQ/89/03 6.0ng/m3

Mercury (as Hg)6 <0.1SOP-AAQ/89/04 -µg/m3

*Details as per EPA-1986 National Ambient Air Quality Standards,date 18.11.2009

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 1/1

For EKO PRO ENGINEERS PVT. LTD

Page 21: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Ambient Air Quality  MonitoringTest Report No. : Issue Date 01/07/2016EK0/EV-AA/114/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

Sample Drawn on 21/06/2016 To 22/06/2016

Ambient Air

EPEPL(Mr. Harish Kumar)Sample Drawn by

Plant Boundary Towards Khera & JawangarhSampling LocationSOP-AAQ/15Sampling Plan & Procedure

24.0 Hrs.Sampling Time38.0Ambient Temprature (deg ºC)1.1Average Flow Rate of SPM (m³/min)1.0Average Flow Rate of Gases (lpm.)ClearWeather Conditions

Remark (if any) NA

PARAMETERS.No. ResultsTest Methods LIMIT AS PER EPA*

Units

Particulate Matter (PM10)1 74.3IS:5182 (P-23) 100.0µg/m3

Particulate Matter (PM2.5)2 46.5SOP-AAQ/89/01 60.0µg/m3

Sulphur dioxide (as SO2)3 10.7IS:5182 (P-2) Improved West & Geake

80.0µg/m3

Nitrogen Dioxide (as NO2)4 18.5IS:5182 (P-6) 80.0µg/m3

Arsenic (as As)5 <0.1SOP-AAQ/89/03 6.0ng/m3

Mercury (as Hg)6 <0.1SOP-AAQ/89/04 -µg/m3

*Details as per EPA-1986 National Ambient Air Quality Standards,date 18.11.2009

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 1/1

For EKO PRO ENGINEERS PVT. LTD

Page 22: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Stack Emission  Analysis

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/110/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 29/06/2016

RESULTS

23/06/201630.0Time of Sampling (minutes)

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-SE/09

Sample Drawn on 22/06/2016Stack Emission

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

Raw Mill & Kiln Stack Attached with Bag HouseSource of Emission-CapacityNormalOperating LoadAs per requirementNormal Operation ScheduleMetal/CircularType of Stack5.0Diameter of Stack (meter)150.0Height of Stack from Ground Level (meter)-Height of Stack from Roof Level (meter)30.0 from Ground LevelHeight of Sampling Location (meter)Pet CokeType of Fuel Used-Fuel Consumed per Hour37.0Ambient Temperature (ºC)96.0Stack Temperature (ºC)4.8Average Velocity of Fuel Emission (m/sec)22.9Average Flow Rate (lpm)Bag Filter HouseControl Measures (if any)

Remark (if any) NA

Unit-IXSampling Location

PARAMETERS.No. ResultsTest Methods LIMITS AS PER EPA*

Units

Particulate Matter (as PM)1 19.7IS : 11255 (P-1) 30.0mg/Nm³

Sulphur Dioxide (as SO2)2 NDIS : 11255 (P-2) 100.0mg/Nm³

Oxides of Nitrogen (as NOx)3 752.9IS : 11255 (P-7) 800.0mg/Nm³

Mercury (as Hg)4 <0.01ICP-MS -mg/Nm³

Arsenic (as As)5 NDICP-MS -mg/Nm³

Authorized Signatory

Page No. 1/2

For EKO PRO ENGINEERS PVT. LTD

Page 23: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/110/230616

* Details as per EPA-1986

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 2/2

For EKO PRO ENGINEERS PVT. LTD

Page 24: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Stack Emission  Analysis

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/111/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 29/06/2016

RESULTS

23/06/201630.0Time of Sampling (minutes)

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-SE/09

Sample Drawn on 21/06/2016Stack Emission

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

Coal Mill Stack Attached with Bag HouseSource of Emission-CapacityNormalOperating LoadAs per requirementNormal Operation ScheduleMetal/CircularType of Stack2.0Diameter of Stack (meter)63.0Height of Stack from Ground Level (meter)-Height of Stack from Roof Level (meter)15.0 from Ground LevelHeight of Sampling Location (meter)-Type of Fuel Used-Fuel Consumed per Hour37.0Ambient Temperature (ºC)66.0Stack Temperature (ºC)4.2Average Velocity of Fuel Emission (m/sec)23.7Average Flow Rate (lpm)Bag Filter HouseControl Measures (if any)

Remark (if any) NA

Unit-IXSampling Location

PARAMETERS.No. ResultsTest Methods LIMITS AS PER EPA*

Units

Particulate Matter (as PM)1 23.8IS : 11255 (P-1) 30.0mg/Nm³

Authorized Signatory

Page No. 1/2

For EKO PRO ENGINEERS PVT. LTD

Page 25: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/111/230616

* Details as per EPA-1986

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 2/2

For EKO PRO ENGINEERS PVT. LTD

Page 26: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Stack Emission  Analysis

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/112/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 29/06/2016

RESULTS

23/06/201630.0Time of Sampling (minutes)

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-SE/09

Sample Drawn on 21/06/2016Stack Emission

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

Cooler Stack Attached with ESPSource of Emission-CapacityNormalOperating LoadAs per requirementNormal Operation ScheduleMetal/CircularType of Stack4.3Diameter of Stack (meter)60.0Height of Stack from Ground Level (meter)-Height of Stack from Roof Level (meter)15.0 from Ground LevelHeight of Sampling Location (meter)-Type of Fuel Used-Fuel Consumed per Hour37.0Ambient Temperature (ºC)52.0Stack Temperature (ºC)1.32Average Velocity of Fuel Emission (m/sec)21.7Average Flow Rate (lpm)ESPControl Measures (if any)

Remark (if any) NA

Unit-IXSampling Location

PARAMETERS.No. ResultsTest Methods LIMITS AS PER EPA*

Units

Particulate Matter (as PM)1 19.2IS : 11255 (P-1) 30.0mg/Nm³

Authorized Signatory

Page No. 1/2

For EKO PRO ENGINEERS PVT. LTD

Page 27: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/112/230616

* Details as per EPA-1986

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 2/2

For EKO PRO ENGINEERS PVT. LTD

Page 28: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Stack Emission  Analysis

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/113/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 29/06/2016

RESULTS

23/06/201630.0Time of Sampling (minutes)

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-SE/09

Sample Drawn on 20/06/2016Stack Emission

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

Raw Mill & Kiln Stack Attached with Bag HouseSource of Emission-CapacityNormalOperating LoadAs per requirementNormal Operation ScheduleMetal/CircularType of Stack5.0Diameter of Stack (meter)150.0Height of Stack from Ground Level (meter)-Height of Stack from Roof Level (meter)30.0 from Ground LevelHeight of Sampling Location (meter)Pet CokeType of Fuel Used-Fuel Consumed per Hour37.0Ambient Temperature (ºC)94.0Stack Temperature (ºC)3.2Average Velocity of Fuel Emission (m/sec)23.5Average Flow Rate (lpm)Bag Filter HouseControl Measures (if any)

Remark (if any) NA

Unit-XSampling Location

PARAMETERS.No. ResultsTest Methods LIMITS AS PER EPA*

Units

Particulate Matter (as PM)1 20.9IS : 11255 (P-1) 30.0mg/Nm³

Sulphur Dioxide (as SO2)2 NDIS : 11255 (P-2) 100.0mg/Nm³

Oxides of Nitrogen (as NOx)3 756.3IS : 11255 (P-7) 800.0mg/Nm³

Mercury (as Hg)4 <0.01ICP-MS -mg/Nm³

Arsenic (as As)5 NDICP-MS -mg/Nm³

Authorized Signatory

Page No. 1/2

For EKO PRO ENGINEERS PVT. LTD

Page 29: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/113/230616

* Details as per EPA-1986

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 2/2

For EKO PRO ENGINEERS PVT. LTD

Page 30: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Stack Emission  Analysis

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/114/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 29/06/2016

RESULTS

23/06/201630.0Time of Sampling (minutes)

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-SE/09

Sample Drawn on 21/06/2016Stack Emission

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

Coal Mill Stack Attached with Bag HouseSource of Emission-CapacityNormalOperating LoadAs per requirementNormal Operation ScheduleMetal/CircularType of Stack2.0Diameter of Stack (meter)63.0Height of Stack from Ground Level (meter)-Height of Stack from Roof Level (meter)15.0 from Ground LevelHeight of Sampling Location (meter)-Type of Fuel Used-Fuel Consumed per Hour37.0Ambient Temperature (ºC)65.0Stack Temperature (ºC)4.9Average Velocity of Fuel Emission (m/sec)23.6Average Flow Rate (lpm)Bag Filter HouseControl Measures (if any)

Remark (if any) NA

Unit-XSampling Location

PARAMETERS.No. ResultsTest Methods LIMITS AS PER EPA*

Units

Particulate Matter (as PM)1 25.7IS : 11255 (P-1) 30.0mg/Nm³

Authorized Signatory

Page No. 1/2

For EKO PRO ENGINEERS PVT. LTD

Page 31: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/114/230616

* Details as per EPA-1986

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 2/2

For EKO PRO ENGINEERS PVT. LTD

Page 32: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Stack Emission  Analysis

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/115/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 29/06/2016

RESULTS

23/06/201630.0Time of Sampling (minutes)

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-SE/09

Sample Drawn on 21/06/2016Stack Emission

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

Cooler Stack Attached with ESPSource of Emission-CapacityNormalOperating LoadAs per requirementNormal Operation ScheduleMetal/CircularType of Stack4.3Diameter of Stack (meter)60.0Height of Stack from Ground Level (meter)-Height of Stack from Roof Level (meter)15.0 from Ground LevelHeight of Sampling Location (meter)-Type of Fuel Used-Fuel Consumed per Hour37.0Ambient Temperature (ºC)54.0Stack Temperature (ºC)1.24Average Velocity of Fuel Emission (m/sec)22.5Average Flow Rate (lpm)ESPControl Measures (if any)

Remark (if any) NA

Unit-XSampling Location

PARAMETERS.No. ResultsTest Methods LIMITS AS PER EPA*

Units

Particulate Matter (as PM)1 17.8IS : 11255 (P-1) 30.0mg/Nm³

Authorized Signatory

Page No. 1/2

For EKO PRO ENGINEERS PVT. LTD

Page 33: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 30/06/2016EK0/EV-SE/115/230616

* Details as per EPA-1986

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.

**End of Report**

4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.5. Responsibility of the Laboratory is limited to the invoiced amount only.

Authorized Signatory

Page No. 2/2

For EKO PRO ENGINEERS PVT. LTD

Page 34: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Water Sample  Analysis

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/103/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

1.0 LitreSample Quantity

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-W/66

Sample Drawn on 22/06/2016

Ground Water (P1)

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

NormalEnvironmental Condition

Remark (if any) NA

B/W Near Old Mines Office (Within Plant Area)Sampling Location

PARAMETERS.No. ResultTest Methods Units

PermissibleAcceptable

IS: 10500 : 2012 (Limits)

pH1 7.25IS : 3025 (P-11) - No relaxation6.5-8.5

Total Hardness (as CaCO3)

2 420.0IS : 3025 (P-21) mg/L 600.0200.0

Calcium (as Ca)3 95.0IS : 3025 (P-40) mg/L 200.075.0

Iron (as Fe)4 <0.1IS : 3025 (P-53) mg/L No relaxation0.3

Chloride (as Cl)5 320.7IS : 3025 (P-32) mg/L 1000.0250.0

Fluoride (as F)6 <1.0IS : 3025 (P-60) mg/L 1.51.0

Total Dissolved Solids7 1024.0IS : 3025 (P-16) mg/L 2000.0500.0

Total Suspended Solids8 <5.0IS : 3025 (P-17) mg/L --

Magnesium (as Mg)9 44.5IS : 3025 (P-46) mg/L 100.030.0

Manganese (as Mn)10 <0.1IS : 3025 (P-59) mg/L 0.30.1

Sulphate (as SO4)11 169.7IS : 3025 (P-24) mg/L 400.0200.0

Nitrate (as NO3)12 3.92IS : 3025 (P-34) mg/L No relaxation45.0

Mercury (as Hg)13 <0.001IS : 3025 (P-48) mg/L No relaxation0.001

Arsenic (as As)14 <0.005IS : 3025 (P-37) mg/L 0.050.01

Total Alkalinity (as CaCO3)

15 320.0IS : 3025 (P-23) mg/L 600.0200.0

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 1/2

Page 35: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/103/230616

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.

Sample received for biological tests will be destroyed after 7 days from the date of issue of test report.5. Responsibility of the Laboratory is limited to the invoiced amount only.

**End of Report**

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 2/2

Page 36: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Water Sample  Analysis

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/104/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

1.0 LitreSample Quantity

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-W/66

Sample Drawn on 22/06/2016

Ground Water (P2)

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

NormalEnvironmental Condition

Remark (if any) NA

O/W Jassanath Ji Ki Mandi (Outside Plant Area)Sampling Location

PARAMETERS.No. ResultTest Methods Units

PermissibleAcceptable

IS: 10500 : 2012 (Limits)

pH1 7.34IS : 3025 (P-11) - No relaxation6.5-8.5

Total Hardness (as CaCO3)

2 448.0IS : 3025 (P-21) mg/L 600.0200.0

Calcium (as Ca)3 98.6IS : 3025 (P-40) mg/L 200.075.0

Iron (as Fe)4 <0.1IS : 3025 (P-53) mg/L No relaxation0.3

Chloride (as Cl)5 402.8IS : 3025 (P-32) mg/L 1000.0250.0

Fluoride (as F)6 <1.0IS : 3025 (P-60) mg/L 1.51.0

Total Dissolved Solids7 1209.0IS : 3025 (P-16) mg/L 2000.0500.0

Total Suspended Solids8 <5.0IS : 3025 (P-17) mg/L --

Magnesium (as Mg)9 49.1IS : 3025 (P-46) mg/L 100.030.0

Manganese (as Mn)10 <0.1IS : 3025 (P-59) mg/L 0.30.1

Sulphate (as SO4)11 192.3IS : 3025 (P-24) mg/L 400.0200.0

Nitrate (as NO3)12 4.65IS : 3025 (P-34) mg/L No relaxation45.0

Mercury (as Hg)13 <0.001IS : 3025 (P-48) mg/L No relaxation0.001

Arsenic (as As)14 <0.005IS : 3025 (P-37) mg/L 0.050.01

Total Alkalinity (as CaCO3)

15 348.0IS : 3025 (P-23) mg/L 600.0200.0

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 1/2

Page 37: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/104/230616

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.

Sample received for biological tests will be destroyed after 7 days from the date of issue of test report.5. Responsibility of the Laboratory is limited to the invoiced amount only.

**End of Report**

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 2/2

Page 38: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Water Sample  Analysis

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/105/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

1.0 LitreSample Quantity

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-W/66

Sample Drawn on 22/06/2016

Ground Water (P3)

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

NormalEnvironmental Condition

Remark (if any) NA

O/W # 9 Stacker & Reclaimer area (Within Plant Area)Sampling Location

PARAMETERS.No. ResultTest Methods Units

PermissibleAcceptable

IS: 10500 : 2012 (Limits)

pH1 7.17IS : 3025 (P-11) - No relaxation6.5-8.5

Total Hardness (as CaCO3)

2 409.0IS : 3025 (P-21) mg/L 600.0200.0

Calcium (as Ca)3 105.0IS : 3025 (P-40) mg/L 200.075.0

Iron (as Fe)4 <0.1IS : 3025 (P-53) mg/L No relaxation0.3

Chloride (as Cl)5 339.7IS : 3025 (P-32) mg/L 1000.0250.0

Fluoride (as F)6 <1.0IS : 3025 (P-60) mg/L 1.51.0

Total Dissolved Solids7 1130.0IS : 3025 (P-16) mg/L 2000.0500.0

Total Suspended Solids8 <5.0IS : 3025 (P-17) mg/L --

Magnesium (as Mg)9 35.7IS : 3025 (P-46) mg/L 100.030.0

Manganese (as Mn)10 <0.1IS : 3025 (P-59) mg/L 0.30.1

Sulphate (as SO4)11 140.9IS : 3025 (P-24) mg/L 400.0200.0

Nitrate (as NO3)12 5.28IS : 3025 (P-34) mg/L No relaxation45.0

Mercury (as Hg)13 <0.001IS : 3025 (P-48) mg/L No relaxation0.001

Arsenic (as As)14 <0.005IS : 3025 (P-37) mg/L 0.050.01

Total Alkalinity (as CaCO3)

15 402.0IS : 3025 (P-23) mg/L 600.0200.0

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 1/2

Page 39: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/105/230616

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.

Sample received for biological tests will be destroyed after 7 days from the date of issue of test report.5. Responsibility of the Laboratory is limited to the invoiced amount only.

**End of Report**

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 2/2

Page 40: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Water Sample  Analysis

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/106/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

1.0 LitreSample Quantity

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-W/66

Sample Drawn on 22/06/2016

Ground Water (P4)

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

NormalEnvironmental Condition

Remark (if any) NA

O/W # 2 Near Mess Area (Within Plant Area)Sampling Location

PARAMETERS.No. ResultTest Methods Units

PermissibleAcceptable

IS: 10500 : 2012 (Limits)

pH1 7.39IS : 3025 (P-11) - No relaxation6.5-8.5

Total Hardness (as CaCO3)

2 458.0IS : 3025 (P-21) mg/L 600.0200.0

Calcium (as Ca)3 85.0IS : 3025 (P-40) mg/L 200.075.0

Iron (as Fe)4 <0.1IS : 3025 (P-53) mg/L No relaxation0.3

Chloride (as Cl)5 324.8IS : 3025 (P-32) mg/L 1000.0250.0

Fluoride (as F)6 <1.0IS : 3025 (P-60) mg/L 1.51.0

Total Dissolved Solids7 1034.0IS : 3025 (P-16) mg/L 2000.0500.0

Total Suspended Solids8 <5.0IS : 3025 (P-17) mg/L --

Magnesium (as Mg)9 59.8IS : 3025 (P-46) mg/L 100.030.0

Manganese (as Mn)10 <0.1IS : 3025 (P-59) mg/L 0.30.1

Sulphate (as SO4)11 139.5IS : 3025 (P-24) mg/L 400.0200.0

Nitrate (as NO3)12 4.96IS : 3025 (P-34) mg/L No relaxation45.0

Mercury (as Hg)13 <0.001IS : 3025 (P-48) mg/L No relaxation0.001

Arsenic (as As)14 <0.005IS : 3025 (P-37) mg/L 0.050.01

Total Alkalinity (as CaCO3)

15 340.0IS : 3025 (P-23) mg/L 600.0200.0

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 1/2

Page 41: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Test Report No. : Issue Date 01/07/2016EK0/EV-WA/106/230616

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.

Sample received for biological tests will be destroyed after 7 days from the date of issue of test report.5. Responsibility of the Laboratory is limited to the invoiced amount only.

**End of Report**

Authorized Signatory

For EKO PRO ENGINEERS PVT. LTD

Page No. 2/2

Page 42: SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN · Lead Zinc slag of Hindustan Zinc Limited is used as alternative raw material in place of iron ore. 4. NCBM will carry out a study on

Petcoke Sample  Analysis

Test Report No. : Issue Date 01/07/2016EK0/EV-SL/102/230616

TEST REPORT

Sample Description

Sample Received on

23/06/2016 To 30/06/2016

RESULTS

23/06/2016

500 gmSample Quantity

Shree Cement LimitedBangaur CityP.O RAS- 306107Tehsil- Jaitaram

Issued To

Distt- Pali (Rajasthan)

Analysis Duration

SOP-S/50

Sample Drawn on 22/06/2016

Pet Coke

EPEPL(Mr. Harish Kumar)Sample Drawn by

Sampling Plan & Procedure

NormalEnvironmental Condition

Remark (if any) NA

NASampling Location

PARAMETERS.No. ResultsTest Methods CPCB Limit for direct landfill 

disposal

Units

Chromium Total (as Cr)1 1.82ICP-MS -mg/kg

Lead (as Pb)2 4.05ICP-MS -mg/kg

Mercury (as Hg)3 <0.01ICP-MS -mg/kg

Arsenic (as As)4 <0.1ICP-MS -mg/kg

Notes :1. The results given above are ralated to the tested sample, as received  & mentioned parameters.

The customer asked for the above tests only.2. This test report will not be generated again, either wholly or in part, without written permission of the Laboratory.3. This test report will not be use for any publicity/legal purpose.4. This test samples will be disposed off after two weeks from the date of issue of test report, unless until specified by the customer.

Sample received for biological tests will be destroyed after 7 days from the date of issue of test report.5. Responsibility of the Laboratory is limited to the invoiced amount only.

**End of Report**

Authorized Signatory

Page No. 1/1

For EKO PRO ENGINEERS PVT. LTD


Recommended