Executive Summary
0
SUMMARY ON
ENVIRONMENTAL IMPACT ASSESSMENT
REPORT
OF
Expansion of Ferro Alloys unit
at
Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Shri Girija Alloy & Power (I) Pvt. Ltd.
Submitted to
ANDHRA PRADESH POLLUTION CONTROL BOARD
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
1
1.0 PROJECT DESCRIPTION
Shri Girija Alloy & Power (I) Pvt. Ltd. is an existing Ferro alloy & Power plant situated at Sy.
Numbers 148 P, 149 P, 151, 152 P, 153 P, 162 P, 164, 355 P, 397 P, 400 P, 428 P,
Peddapuram Village, Peddapuram Mandal, East Godavari District, Andhra Pradesh.
Now we propose to enhance the production of existing ferro alloy products and produce
other ferro alloy products, noble ferro alloys and calcium aluminate based synthetic slag by
proposing 6 x 9 MVA, 8 x 400 Kg Crucibles & 3 x 500 KVA Submerged Electric Arc Furnace.
Proposed expansion will be taken up in the existing plant premises of 150 acres only.
As per the Ministry of Environment, Forest & Climate Change (MOEF & CC), New Delhi
notification, dated 14th September, 2006 and its subsequent amendments, all Primary
metallurgical processing industries are classified under Category ‘A’. The Ministry of
Environment, Forest & Climate Change, New Delhi has accorded Terms of Reference (TOR)
for the proposed expansion project vide letter no. J-11011/679/2009- IA II (I) dated 20th
March, 2017. The EIA Report has been prepared by incorporating the TOR stipulated by the
Expert Appraisal Committee of MoEF & CC.
Pioneer Enviro Laboratories & Consultants Private Limited, Hyderabad, which is accredited
by NABET, Quality Council of India, vide certificate No. NABET/ EIA/ 1619/ RA 026, for
preparing EIA report for Metallurgical Unit, have prepared Draft Environmental Impact
Assessment (EIA) report for the proposed expansion project by incorporating the TOR
approved by Ministry of Environment, Forest & Climate Change, New Delhi. The report
contains detailed description of the following:
Characterization of status of environment with in an area of 10 km radius from the plant
site for major environmental components including air, water, noise, soil, flora, fauna
and socio-economic environment.
Assessment of air emissions, liquid waste and solid waste from the proposed expansion
project along with the noise level assessment.
Environmental Management Plan comprising of emission control measures proposed to
be adopted in the expansion project, solid waste management, Greenbelt development.
Post Project Environmental Monitoring & Budget for Environmental Protection
Measures.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
2
2.0 Plant Configuration and Production Capacity
The following table furnishes the existing and proposed units along with production capacities
S.No Unit Existing Proposed Production Capacity
After proposed expansion
Unit Production
capacity Unit
Production capacity
1. Ferro Manganese (High carbon / medium carbon / low carbon) SEAF -
5 X 9 & 1 X 5.4 MVA
36,000 TPA (120 TPD)
SEAF - 4 x 9 MVA
1,20,000 TPA (400 TPD)
(or)
1,56,000 TPA (520 TPD)
2. Silico Manganese (High carbon / medium carbon / low carbon)
72,000 TPA (240 TPD
85,000 TPA (283 TPD
(or)
1,57,000 TPA (523 TPD)
3. Ferro Chrome (High carbon / medium carbon / low carbon)
85,000 TPA (283 TPD)
85,000 TPA (283 TPD)
4. Ferro Silicon (High carbon / medium carbon / low carbon)
-- -- SEAF – 2 x 9 MVA
25,000 TPA (83 TPD)
25,000 TPA (83 TPD)
5. Low carbon Ferro chrome -- --
Crucibles – 8 x 400 Kg
3,600 TPA (12 TPD)
3,600 TPA (12 TPD)
6. Ferro Molybdenum -- -- 3,600 TPA (12 TPD)
3,600 TPA (12 TPD)
7. Ferro Titanium -- -- 3,600 TPA (12 TPD)
3,600 TPA (12 TPD)
8. Ferro Vanadium -- -- 3,600 TPA (12 TPD)
3,600 TPA (12 TPD)
9. Calcium Aluminate based Synthetic slag -- -- SEAF – 3 x 500 KVA
15,000 TPA (50 TPD)
15,000 TPA (50 TPD)
10. Power generation -- 108 MW -- 108 MW
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
3
1.2 Raw Materials
The following will be the raw material requirement for the proposed expansion project:
Raw Material Quantity
(TPA) Sources Mode of Transport
Ferro alloys
Manganese Ore 4,41,000 Imported / indigenous from
Karnataka / Orissa / Madhya
Pradesh / Andhra Pradesh
Sea, rail, road
Chrome Ore 1,95,500 Sea, rail, road
Coke 1,14,320 Imported / Indigenous /
Singareni Colleries / imported Sea, road Coal 1,59,975
Charcoal 40,000
Quartz 1,05,250 Andhra Pradesh Rail, road
Dolomite 82,000 Andhra Pradesh Rail, road
Mill Scales 10,000 Andhra Pradesh Rail, road
EC paste 7,815 Andhra Pradesh Rail, road
Magnesite 5100 Andhra Pradesh Rail, road
Ferro manganese slag 34,000 In plant generation conveyor
Noble Ferro alloys
Chrome Ore 7,059 Import & Indigenous – Orissa Sea, rail, road
Aluminimum Telic 5,690 Import -Dubai Sea, Road
Flourspar 630 Import – China Sea, Road
Ferrosilicon 1,525 Captive
Ilmenite 3,727 Indigenous - Orissa / Kerala Road
Iron Nails 1,680 Indigenous – Andhra Pradesh Road
lime 784 Indigenous – Gujarat Road
mill scale 5,690 Indigenous – Andhra Pradesh Road
Sodium Nitrate 530 Indigenous – Gujarat Road
rutile 508 Import & Indigenous – Orissa
/ Kerala
Sea, Road
V2O
5 4,000 Import Sea, Road
MO3
(Moly Oxide) 3,600 Import Sea, Road
Calcium aluminate based Synthetic slag
Hydrated Lime 9,000 Indigenous – Rajasthan Road
Bauxite 4,500
Indigenous - Chhattisgarh /
Orissa
Road
Aluminium telic 900 Import Sea
Aluminium catalyst 600 Indigenous / Gujarat Road
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
4
1.3 Manufacturing Process
1.3.1 Ferro alloys
Ferro manganese or silicon-manganese will be produced using manganese ore as main raw
material in a sub-merged arc furnace using reducer (Coke) under high voltage. Similarly
Ferro silicon will be produced using Quartz as main raw material and Ferro chrome using
Chrome ore as raw material.
Ferro Chrome Recovery unit The slag generated during Ferro chrome manufacturing will be sent to Ferro chrome
recovery unit. Ferro chrome will be recovered through process of crushing, screening and
jigging.
Noble Ferro alloys Noble Ferro alloys are manufactured through Alumino Thermit Process. Alumino thermic
process aims at the production of Ferro Alloys from the oxides of elements by reduction
with Aluminum powder using exothermic heat of the reaction for smelting purpose.
Calcium Aluminate based Synthetic slag Calcium Aluminate based Synthetic Slag is made of select raw material of Calcium and
Aluminium, blended at a proper proportion, ground to powder, pelletized after churning,
sintered or melted in kiln.
1.4 Water Requirement
Total water requirement after expansion will be 1400 m3/day. Water required for the
expansion project will be sourced from Samalkot canal. Approval from the Irrigation
department for drawing 1400 m3/day of water has already been obtained.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
5
The following is the break-up of the water requirement for proposed expansion project.
WATER REQUIREMENT (For Expansion)
S.No. Details of water requirement Quantity in (m3/day)
1. Make-up water for cooling 96
2. Domestic 10
Total 106
1.4 Waste Water Generation
There will be not be any effluent generation from the proposed expansion as closed circuit
system will be followed in the Ferro alloy unit. The only source of effluent generation will
be sanitary waste water of 8 KLD will be treated in septic tank followed by sub-surface
dispersion trench. In the existing plan also zero effluent discharge is being maintained.
The following will be the total wastewater & it’s break-up.
WASTE WATER GENERATION (Expansion)
S.No. Source Generation (m3/day)
1. Sanitary Wastewater 8
Total 8
1.5 Wastewater Characteristics
PARAMETER Sanitary waste water
pH 7.0 – 8.5
BOD (mg/l) 200 – 250
COD (mg/l) 300 – 400
TDS (mg/l) 800 – 900
2.0 DESCRIPTION OF ENVIRONMENT
Base line data has been collected on ambient air quality, water quality, noise levels, flora
and fauna and socio economic details of people within 10 km radius of the plant.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
6
2.1 Ambient air quality
Ambient air quality was monitored for PM2.5, PM10, SO2, NOx & CO at 8 stations including
plant site during October 2016 to December 2016. The following are the concentrations of
various parameters at the monitoring stations:
Parameter Concentration
PM2.5 : 18.9 to 36.4 g/m3
PM10 * : 32.4 to 65.8 g/m3
SO2 : 9.8 to 16.3 g/m3
NOX : 11.7 to 20.4 g/m3
CO : 360 to 680 g/m3
2.2 Water Quality
2.2.1 Surface Water Quality
Samalkot canal (5.2 Kms.) is flowing within 10 Km. radius of the plant site. Two nos. of
Surface water samples have been collected, one from upstream & other on downstream of
Samalkot canal w.r.t the plant site to assess surface water quality. The analysis of samples
shows that all the parameters are in accordance with BIS-2296 specifications.
2.2.2 Ground Water Quality
8 No. of ground water samples from open wells / bore wells have been collected from the
nearby villages to assess ground water quality impacts and analyzed for various Physico-
Chemical parameters. The analysis of samples shows that all the parameters are in
accordance with BIS: 10500 specifications.
2.3 Noise Levels
Noise levels were measured at 8 locations during day time & Night time. The noise levels at
the monitoring stations are ranging from 46 dBA to 64.6 dBA.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
7
3.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES
3.1 Prediction of impacts on air quality
The likely emissions from the proposed project are PM10, NOx & CO. The predictions of
Ground level concentrations have been carried out using Industrial Source Complex (ISC-3)
model. Meteorological data such as wind direction, wind speed, max. and min.
temperatures collected at the site have been used as input data to run the model.
Net Resultant maximum ground level concentrations during operation of expansion project
Item PM10
(g/m3)
NOX
(g/m3)
CO
(g/m3)
Maximum baseline conc. in the study area 65.8 20.4 680
Maximum predicted incremental rise in
concentration due to emission from proposed
expansion project
1.2 12.3 --
Maximum predicted incremental rise in
concentration due to vehicular emissions
0.7 5.3 3.5
Net resultant concentrations during operation of
the plant
67.7 38 683.5
National Ambient Air Quality Standards 100 80 2000
The predicted results show that the net resultant concentration (max. baseline conc. +
max. incremental rise in conc.) of PM10, NOx and CO are well within the National Ambient
Air Quality Standards after commissioning of proposed expansion project. Hence there will
not be any adverse impact on air environment due to the proposed expansion project.
3.2 Prediction of impacts on noise quality
The major sources of noise generation in the proposed expansion project will be DG sets.
The ambient noise levels will be within the standards prescribed by MoEF i.e. the noise
levels will be less than 75 dBA during day time and less than 70 dBA during night time. 50.0
acres (inclusive of existing) of extensive greenbelt already developed which helps to
further attenuate the noise levels. Hence there will not be any adverse impact due to noise
on population in surrounding areas due to the proposed expansion project.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
8
3.3 Prediction of impacts on Water Environment
Water drawl permission already obtained for entire quantity from State Irrigation
Department. There will be not be any effluent generation from the proposed expansion as
closed circuit system will be followed in the Ferro alloy unit. The only source of effluent
generation will be sanitary waste water which will be treated in septic tank followed by
sub-surface dispersion. In the existing plant, zero discharge is being maintained and will be
continued even after expansion.
Hence there will not be any adverse impact on water environment due to the proposed
expansion project.
3.4 Prediction of Impacts on Land Environment
There will not be any effluent generation from the proposed expansion as closed circuit
system will be adopted in the ferro alloy unit. Sanitary waste water generated will be
treated in septic tank followed by subsurface dispersion.
All the required air pollution control systems will be provided to comply with CPCB / APPCB
norms. All solid wastes will be disposed / utilized as per CPCB / APPCB norms. 50.0 Acres
(inclusive of existing) of greenbelt has already been developed as per guidelines. Hence
there will not be any adverse impact on land environment due to the proposed expansion
project.
3.5 Socio - Economic Environment
There will be lot of opportunities in employment to local people during construction as
well as in operation phase. There will be further upliftment in Socio Economic status of the
people in the area. 2.5% of expansion project cost will be allocated for CSR activities.
Hence there will be further development of the area due to the proposed expansion
project.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
9
4.0 ENVIRONMENTAL MONITORING PROGRAMME
In the existing plant online stack monitoring has been provided. Ambient Air Quality, Sack
monitoring & effluent analysis will be carried out regularly as per CPCB norms and the
analysis reports will be submitted to Ministry of Environment & Forest, Chennai & APPCB
regularly. Online stack monitoring facility will be provided o furnace stacks.
5.0 ADDITIONAL STUDIES
No Rehabilitation and Resettlement is involved in the proposed project. Hence no R & R
study has been carried out.
6.0 PROJECT BENEFITS
With the establishment of the proposed expansion project employment potential will
increase. Land prices in the area will further increase. The economic status of the people in
the area will improve due to the proposed expansion project. CSR activities will be taken
up as per norms. Periodic medical checkups will be carried out. Top priority will be given to
locals in employment.
7.0 ENVIRONMENT MANAGEMENT PLAN
7.1 Air Environment
The following are air emission control systems proposed in the proposed expansion
project:
S.No. Source Control Equipment Maximum Particulate emission at the outlet
1. Submerged Electric Arc Furnace (6 x 9 MVA)
Fume extraction & cleaning system
With bagfilters 50 mg/Nm3
2. Crucibles (8 x 400 Kg)
Fume extraction & cleaning system
With bagfilters 50 mg/Nm3
3. Submerged Electric Arc Furnace (3 x 500 KVA)
Fume extraction & cleaning system
With bagfilters 50 mg/Nm3
The following air pollution control systems/ measures are proposed in the Plant:
All conveyors will be completely covered with G.I. sheets to control fugitive dust.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
10
All bins will be totally packed and covered so that there will not be any chance for dust
leakage.
All the dust prone points material handling systems will be connected with de-dusting
system with bag filters.
All discharge points and feed points, wherever the possibility of dust generation is there a
de-dusting suction point will be provided to collect the dust.
Raw material unloading areas will be provided with dust suppression system
Greenbelt developed will help in attenuating air emissions further
7.2 Water Environment
There will be not be any effluent generation from the proposed expansion as closed circuit
system will be followed in the Ferro alloy unit. The only source of effluent generation will
be sanitary waste water which will be treated in septic tank followed by sub-surface
dispersion.
7.3 Noise Environment
The major sources of noise generation in the proposed project will be DG sets. Acoustic
enclosure will be provided to the DG set. All the machinery will be manufactured in
accordance with MoEF&CC norms on Noise levels. The employees working near the noise
generating sources will be provided with earplugs. The extensive greenbelt developed
within the plant premises will help in attenuating the noise levels further.
7.4 Land Environment
There will be not be any effluent generation from the proposed expansion as closed circuit
system will be followed in the Ferro alloy unit. The only source of effluent generation will
be sanitary waste water which will be treated in septic tank followed by sub-surface
dispersion. All the required Air emission control systems will be installed and operated to
comply with MOEF&CC / CPCB / APPCB norms. Solid wastes will be disposed off as per
norms. Extensive greenbelt has been developed in the plant premises. Hence there will not
be any impact on land environment due to the proposed expansion project.
Shri Girija Alloy & Power (I) Pvt. Ltd.
Expansion of Ferro Alloy unit Peddapuram Village & Mandal,
East Godavari District, Andhra Pradesh
Executive Summary
11
Solid waste generation and disposal
S.No Waste / By product Quantity (TPA)
Method of disposal
1. Ferro Manganese slag 96,000 Will be used in manufacture of Silico manganese as it contains high MnO2.
2. Silico Manganese slag 1,02,000
Will be utilized in road construction / land filled
3. Ferro Chrome slag
1,02,000
Will be utilized in road construction / land filled
4. Ferro Silicon slag
10,000
Will be utilized in road construction / land filled
5. Low carbon Ferro chrome
slag
6,426 Once the product is manufactured, TCLP test will be conducted for the slag and will be used for landfill / as per outcome of TCLP test sent to TSDF.
6. Ferro Molybdenum slag 3,600
7. Ferro Titanium slag 3,960
8. Ferro Vanadium slag 3,960
7.5 Greenbelt Development
Greenbelt of 50.0 acres (inclusive of existing) has already been developed in the site
premises.
Capital cost for environment protection for the proposed expansion project will be Rs. 13.0