PROJECT SITE:
E. PRESIDENT ST.
GOEB
EL A
VE.
HARR
Y TR
UMAN
PKW
Y.
E. GWINNETT ST.
PENN
SYLV
ANIA
AVE
.
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
1
A
2 3 4 5
B
C
D
WWW.LS3P.COM
SAVANNAH, GEORGIA 31401
TEL. 912.695.2111 FAX 912.298.0206
321 WEST CONGRESS STREET SUITE 301
5201-163640
11.18.2016
JJM
JTH
COPYRIGHT 2016
ALL RIGHTS RESERVED
PRINTED OR ELECTRONIC DRAWINGS
AND DOCUMENTATION MAY NOT BE
REPRODUCED IN ANY FORM WITHOUT
WRITTEN PERMISSION FROM LS3P
ASSOCIATES LTD.
MEMBERS OF THE AMERICAN INSTITUTE
OF ARCHITECTS
NO. DESCRIPTION DATE INITIAL
FACILITY# - 625-4066
OFFICE UPGRADES
CONSTRUCTION DOCUMENTS
SHUMAN
ELEMENTARY
SCHOOL
415 GOEBEL AVENUE
SAVANNAH, GA 31404
HOME OF THE SCHOLARS
415 GOEBEL AVENUESAVANNAH, GEORGIA 31401
COVER SHEET
G000
PIN: 2-0040-10-003
CONSTRUCTION SET 02/01/2017
SHUMAN ELEMENTARY SCHOOLOFFICE UPGRADES / RENOVATIONS
OWNER: SAVANNAH - CHATHAM COUNTY PUBLIC SCHOOL SYSTEMKEVIN RALSTON208 BULL STREETSAVANNAH, GEORGIA 31401(P) 912-395-1259(E) [email protected]
FACILITY# 625-4066FTE - 746
SCCPSS PROJECT NUMBER - BID C17-15
SHEET NUMBER SHEET NAMESHEET ISSUE
DATECURRENT SHEETRELEASE DATE
COVER SHEETGENERAL NOTES
FLOOR PLANSFINISH SCHEDULE & DETAILSCABINETRY ELEVATIONS & DETAILS
G000G001
A101A201A202
ARCHITECT: LS3P ASSOCIATES LTD.NEIL DAWSON, AIA321 W. CONGRESS STREET, SUITE 301SAVANNAH, GEORGIA 31401(P) 912-695-2111(E) [email protected]
MAIN ENTRY
KEY PLAN
KEY PLAN
FIRE MARSHAL CERTIFICATION
GENERAL
ARCHITECTURAL
RUCTION
DRAWING INDEX
PROJECT AREA:
ADMINISTRATION OFFICE
& NEW SECURITY WALL
MEDIA
CENTER
CAFETERIA
DEDUCTIVE ALTERNATES
ALTERNATE NO. 1 (DEDUCTIVE): THE LVT FLOORING SCHEDULED IN ADMINISTRATION CORRIDOR 106 AND
BREAKROOM 108 SHALL BE MODIFIED TO VCT.
SECURED ENTRY CORRIDOR
ROOMNUMBER ROOM NAME MATERIAL
101
FINISH SCHEDULE
BASE
FLOOR
MATERIAL
WALLS
N E S W
CEILING
MATERIAL HEIGHT REMARKS
001
WAITING AREA
ACT-0*
ACT-0
TERR-0 PT-0 / (PT-4 @STOREFRONT*)
PT-0 PT-0 PT-0
LVT-1 RB-1 PT-1 PT-1 PT-1 PT-2
*REPLACE CLG. TILES AS NEEDED FOR NEW SCHED. WORK,PAINT EXIST. ADMIN. H.M. STOREFRONT AS INDICATED-
102 ADMINISTRATION103104105106107108
DATA CLERKPRINCIPALFIRE ALARMCORRIDORCONFERENCEBREAK ROOM
109 CORRIDOR LVT-1 RB-1
LVT-1 / CPT-1 RB-1CPT-1CPT-1
RB-1RB-1RB-1RB-1RB-1RB-1
LVT-1LVT-1**CPT-1LVT-1**
PT-1 PT-1 PT-1 PT-2PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-2
ACT-0ACT-0ACT-0ACT-0ACT-0ACT-0ACT-0ACT-0
-
-**SEE SPEC. 01 23 00 ALTERNATE #1
-
-
---------
**SEE SPEC. 01 23 00 ALTERNATE #1
110 WORK ROOM111
WOMEN112MEN113
VESTIBULE VCT-0 RB-1RB-1
TILE BS-0TILE BS-0
PT-3PT-3
PT-3PT-3
PT-3PT-3
PT-3PT-3
ACT-0ACT-0ACT-0ACT-0
VCT-0
TILE-0TILE-0
PT-3 PT-3 PT-3 PT-3PT-1 PT-1 PT-1 PT-1 -
---
RB-1
----
--
-
OPENOPEN
7'-0
"2"
±2'
-6" V
.I.F.
1"
±9'
-9" V
.I.F.
±2'-512"
EQ. (±5'-5" V.I.F.) 10"512" 6'-6" EQ. (±5'-5" V.I.F.)10" 51
2"
±19'-11" V.I.F.
2" 2" 2"±2'-512" 2" 3'-0" 2"3'-0"2"
OPEN
±2'-512"2"2" ±2'-512" 2"
6"
1'-0
"2'
-6"
7'-0
"2"
±2'
-6" V
.I.F.
1"
2"
HEIG
HT O
F H.
M.
HORI
Z. M
ULLI
ON
TOM
ATCH
EXI
STIN
G
2" ±5'-1" V.I.F. 2" 2" 6'-2" 2"
3'-6
"
2"±5'-1" V.I.F.2"
PILASTER W/IMPACT GYP. WRAP
H.M.STOREFRONT W/LAMINATED SAFETY
GLAZING, TYP
COLUMN W/IMPACT GYP. WRAP
SOLID CORE WD.SECURITY DOOR W/NARROW VISION LITE
GC TO COORDINATE ALLROUGH-IN REQUIREMENTS FOROWNER PROVIDED EQUIPMENTPRIOR TO FRAMING WALL
CL
G1 G1
G1 G1G2 G2
G1
G1 G1
G1
A5A201
POWER SUPPLY & CONTROLLERFOR ACCESS CONTROL MOUNTED
ABOVE ACT CEILING
1/2" DOOR UNDERCUT
REMOVABLEMULLION
HARDWAREAS SCHED.
2"
FLOOR BASE AS SCHED. BELOW H.M.STOREFRONT & AT BASE OF COLUMNS
/ PILASTERS, CONTRACTOR TOCOORD. HEIGHT & REVEAL OF BASE
BELOW H.M. STOREFRONT TO MATCHEXISTING CONDITION AT OFFICE
STOREFRONT & SEE SECTION
PAIR OF DOORS & DOORFRAME BY OWNER / G.C.
INSTALLED. DOOR BYOWNER TO INCLUDE
REMOVABLE MULLION,REMOTE ENTRY & CARD
READER, G.C. TO COORD.
H.M. STOREFRONT W/ LAMINATEDSAFETY GLAZING AS SCHED.
F.R.T. WD. SHIM AS NEEDED
EXISTING TERRAZOFLOORING TO REMAIN
NOTE: ALL WOOD FRAMING,BLOCKING / NAILERS &STRUCTURAL WD. PANELS TOBE FIRE RETARDANT TREATEDWOOD (F.R.T.), TYP.
2"2"
D5A201
RESILIENT FLOOR BASE AS SCHED.OVER IMPACT GYP (PAINTED BLACK)
COLUMN BEYOND W/ IMPACT GYP.WRAP BEYOND
MTL. STUD FRAMING BELOW H.M.STOREFRONT TO MATCH EXISTING
CONTRACTOR TO COORD. HEIGHT & REVEAL OF BASEBELOW H.M. STOREFRONT TO MATCH EXISTINGCONDITION AT OFFICE STOREFRONT, TYP.
HEIG
HT O
F H.
M. H
ORI
Z. M
ULLI
ON
TO M
ATCH
EXI
STIN
G
3"MIN.
10" 512"±5'-5" V.I.F.
6"
4"EQ
.EQ
.
6" MTL. STUD WALL FRAMING,EXTEND STUDS & SECURE TOBOTTOM OF STRUCTURE ABOVE
H.M. STOREFRONT W/LAMINATED SAFETYGLAZING AS SCHED.
H.M. FRAME & SOLID COREWD. SECURITY DOOR W/
NARROW VISION LITE
MAINTAIN CLEARANCE FORREQUIRED ELECTRICAL DEVICE(CENTERED ON COLUMN)
COLUMN W/ IMPACT GYP. WRAP
F.R.T. WD. SHIMS, TYP.
MTL. DRYWALL CORNER BEAD, TYP.
MODIFY EXISTING CEILING GRID ASREQUIRED FOR LIMITS OF NEWCONSTRUCTION & PROVIDE NEW CEILINGTILES AT RECONFIGURED GRID LOCATIONTO MATCH EXISTING
COLUMN BEYOND W/ IMPACT GYP.WRAP BEYOND
PROVIDE STOPS IN H.M.STOREFRONT TO ALLOW FORFUTURE GLAZING
H.M. STOREFRONT W/LAMINATED SAFETYGLAZING AS SCHED.7'
-0"
2"±
2'-6
" V.I.
F.1"
±9'
-9" V
.I.F.
METAL STUD HEADER
6" MTL. STUD FRAMING @ 24"O.C., EXTEND STUDS & SECURE TOBOTTOM OF STRUCTURE ABOVE
ACCESS CONTROL POWERSUPPLY, CONTROLLER, &POWER (FROM NEAREST
AVAILABLE PANEL /CIRCUIT) BY OWNER. GC
TO COORD. ALL ROUGH-INREQUIREMENTS FOR
OWNER PROVIDEDEQUIPMENT PRIOR TO
FRAMING WALL
OPENING IN H.M. STOREFRONT,SEE ELEVATION
BRACE AT 4'-0" O.C.
1. PROVIDE ADA-COMPLIANT FLOOR THRESHOLDS AT ALL FLOORING TRANSITIONS, TYP.2. ALL H.M. FRAMES IN PROJECT AREA TO BE PREPPED & REPAINTED (PT-4), TYP.3. ALL FINISHES SHOULD BE SUBMITTED FOR OWNER APPROVAL PRIOR TO ORDERING
GENERAL FINISH NOTES
LEGEND / FINISH SELECTIONS
MATERIAL BASIS OF DESIGNMANUFACTURER
PRODUCT / COLLECTION COLOR
VCT (VCT-1)**SEE SPEC. 01 23 00 ALTERNATE #1
VCT (VCT-0)
LVT (LVT-1)
EXISTING TO REMAINTHE AZROCK COLLECTIONSTANDARD PRICE T.B.D.
- -
TANDUS CENTIVA VENUE SERIES (QUICKSHIP)CARPET (CPT-0) EXISTING TO REMAIN - -CARPET (CPT-1) SHAW CONTRACT GROUPBROADLOOM HOMAGE
T.B.D.
T.B.D.
BASE (BS-0) EXIST. TO REMAIN - -RESILIENT BASE (RB-1) JOHNSONITE 4" WALL BASE T.B.D.
T.B.D.PLASTIC LAMINATE (PL-1)SOLID SURFACE (SS-1)
ADMIN. WALL PAINT (PT-1)ADMIN. ACCENT WALL PAINT (PT-2)TOILET WALL PAINT (PT-3)H.M. DOOR FRAMES PAINT (PT-4)CABINETRY REVEAL PAINT (PT-5)ACOUSTIC CEILING TILE (ACT-0)
T.B.D.
T.B.D.T.B.D.T.B.D.T.B.D.T.B.D.
HARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMS
EXIST. TO REMAIN -
CORIAN PRIVATE COLLECTION ("D")WILSONART STANDARD LAMINATE
-
TERRAZZO (TERR-0) EXISTING TO REMAIN - -
TILE (TILE-0) EXISTING TO REMAIN - -
PAINT (PT-0) EXISTING TO REMAIN - -
1. REFER TO MANUFACTURER'S SPECIFICATIONS FOR ROUGH OPENING REQUIREMENTS.2. G.C. TO FIELD-VERIFY ALL DIMENSIONS PRIOR TO ORDERING DOORS.3. PROVIDE TEMPERED GLAZING AS REQUIRED BY CODE. SEE DOOR TYPES / GLAZING SCHEDULE FOR TEMPERED LOCATIONS OF GLAZING IN DOORS, TYP.4. SEE PLANS FOR SWING INDICATIONS.5. G.C. TO COORD. SHOP DRAWINGS FOR ALL DOORS AND GLAZING W/ ARCHITECT / OWNER PRIOR TO FABRICATION.6. SEE SPECIFICATIONS FOR DOOR HARDWARE SCHEDULE
GENERAL DOOR NOTES:
DOOR SCHEDULE
DOORNUMBER NOMINAL SIZEROOM NAME TYPE REMARKSDESCRIPTION MANUF. MODEL NO.
102A
001A
RECEPTION
SECURED ENTRY CORRIDOR
3'-0" X 2'-6" GATE AT RECEPTION CABINETRYB
(2) 3'-0" X 7'-0" SOLID CORE WD. SECURITY DOOR W/ NARROW VISION LITEA
-
- - 001A DOOR & H.M. FRAME BY OWNER; G.C. TO PAINT FRAME, STAIN &VARNISH PAIR OF DOORS TO MATCH EXISTING INT. DOORS & COORD. /INSTALL. DOOR HARDWARE BY OWNER TO INCLUDE REMOTE ENTRY & CARDREADER; GC TO COORD. ALL ROUGH-IN REQUIREMENTS FOR OWNERPROVIDED EQUIPMENT PRIOR TO FRAMING WALL.
HARDWARE
B
A
- 2" SOLID CORE DR. FINISH VENEER TO MATCH CASEWORK
GATE
A
3'-0" 2" 3'-0"
7'-0
"
3'-0"
2'-2
"4"
B
2'-6
"
GLAZING SCHEDULE
G2:G1: 1/4" CLEAR TEMPERED / .030 PVB LAYER / 1/4" CLEAR TEMPERED
1/4" CLEAR TEMPERED
1. CONTRACTOR TO FIELD-VERIFY ALL DIMENSIONS PRIOR TO ORDERING DOORS.2. CONTRACTOR TO COORD. SHOP DRAWINGS / SAMPLES FOR GLAZING W/ ARCHITECT /
OWNER PRIOR TO FABRICATION.
GENERAL GLAZING NOTES:
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
1
A
2 3 4 5
B
C
D
WWW.LS3P.COM
SAVANNAH, GEORGIA 31401
TEL. 912.695.2111 FAX 912.298.0206
321 WEST CONGRESS STREET SUITE 301
5201-163640
11.18.2016
JJM
JTH
COPYRIGHT 2016
ALL RIGHTS RESERVED
PRINTED OR ELECTRONIC DRAWINGS
AND DOCUMENTATION MAY NOT BE
REPRODUCED IN ANY FORM WITHOUT
WRITTEN PERMISSION FROM LS3P
ASSOCIATES LTD.
MEMBERS OF THE AMERICAN INSTITUTE
OF ARCHITECTS
NO. DESCRIPTION DATE INITIAL
FACILITY# - 625-4066
OFFICE UPGRADES
CONSTRUCTION DOCUMENTS
SHUMAN
ELEMENTARY
SCHOOL
415 GOEBEL AVENUE
SAVANNAH, GA 31404
HOME OF THE SCHOLARS
FINISH SCHEDULE
& DETAILS
A201
NTS
FINISH SCHEDULE
1-1/2" = 1'-0"
SECTION OF SECURITY WALL
1/2" = 1'-0"
H.M.STOREFRONT ELEVATION AT SECURITY WALL
PLAN SECTION OF SECURITY WALL
NTS
FINISH SELECTIONS & FINISH NOTES
A3
C1
A5
1-1/2" = 1'-0"
D5
A1
NTS
DOOR SCHEDULE & NOTES
B1
1/4" = 1'-0"
DOOR TYPES
C3
NTS
GLAZING SCHEDULE & NOTES
D3