+ All Categories
Home > Documents > ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

Date post: 18-Jan-2016
Category:
Upload: cornelius-gibbs
View: 218 times
Download: 1 times
Share this document with a friend
Popular Tags:
13
ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soma
Transcript
Page 1: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

ShuttleTrack

Product Launch

May 6, 2003

Krishnan Sriram & Salil Soman

Page 2: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

ShuttleTrack

• Spring 2002 iCampus Project• Set out to Provide Real Time Tracking

information on MIT’s SafeRide van service• Now provides tracking of all MIT shuttle

services (SafeRide, TechShuttle, Charter Serices)

• Official Launch of Services to MIT Community Today (5/6/03)

Page 3: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

Outline

• ShuttleTrack Demo

• Project timeline

• System overview

Page 4: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

Outline

• ShuttleTrack Demo

• Project timeline

• System overview

Page 5: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

Demo

• Route Map

• Stop Map

• Text Version

• Update Information

• Feedback Form

Page 6: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

Outline

• ShuttleTrack Demo

• Project timeline

• System overview

Page 7: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

What Have We Been Doing?

• Spring 2002 – – Experimented several communication

strategies– Designed system components– Setup development environment

• Summer ’02 – – Installed communication hardware [cdpd] – Created system Back End

Page 8: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

What Have We Been Doing?• Fall ’02

– Expanded tracking to all MIT shuttles – Expanded functionality of back end– Addressed Issues of Hardware Damage

• IAP ’03– Developed Front End, van Polling software, and Stop

Detection Algorithm

• Spring ’03 – Continued Development of Front End and Back End– Installed steel safety cases and reinstalled hardware

into vans– Developed Custom GIS Maps with accurate Lat/Long

Coordinates of Stops Recorded in System

Page 9: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

System Overview

Looking Under the Hood

Page 10: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

System Overview

GPS/CDPD Modems on Vans

Van Polling Windows Service

SQL Server

Admin Page

Web service

Web Service Client

UDP Packets Over Internet

Stop detection

Arrival Estimation

Back End

Front End

GPS Position

Page 11: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

System Overview

GPS/CDPD Modems on Vans

Van Polling Windows Service

SQL Server

Admin Page

Web service

Web Service Client

UDP Packets Over Internet

Stop detection

Arrival Estimation

Back End

Front End

GPS Position

Page 12: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

Acknowledgements

• Andrew Chen (’02)• Genevieve T Cuevas(’03)

•Terran Melconian(’99)• William Hall(PhD’00)• Sarah Williams• Dan Sheehan• Erik Koplovsky

Programmers

System Design Team

Technical Advisors

• John McDonald• Phillip Long• Stephen Immerman

Institute Advisors

• Wyan-Ching Mimi Lee(G)• Ryan Tam(G)• Cordy Crockett(SM’02)• Ging Ging Liu(SM’02)• Nina Menezes(PhD’02)

Page 13: ShuttleTrack Product Launch May 6, 2003 Krishnan Sriram & Salil Soman.

And of Course...

MIT Graduate Student Council

&

MIT-Microsoft iCampus Alliance


Recommended