Rail Opportunities
Presented by Sam McKinley, Planner
First Step
• Ohio Hub– Governor’s
Priority– Need to
have a plan for connections
• Oasis Line– Looks to be
the farthest along
Active Rail Lines
Abandoned Rail ROW
Population Density
Methodology• Line choice
– Where would a good route be?– Abandoned 1st, Active 2nd
• Analysis– ROW Market Value, per Auditor– Population w/in ½ Mile– NBD w/in ¼ Mile– Line Length
Proposal
Analysis
Conclusions• ROW cost for Wasson east of I-71 is
only $887,000• I-71 ROW expense is almost all due to
Gilbert Ave. development• Serves 7 Cincinnati NBDs• Tri-County line also has low ROW costs• After that, they’re pretty similar in
ROW costs, and people & NBDs served• Much more thorough analysis needed• The devil is REALLY in the details