001 / 2 General Notes
- Bridge inventoried from south to north. This is an annual routine underwater inspection. Only the concreteabutments, pier walls, and channel elements were observed during this inspection.- There are no significant changes since the 2014 underwater inspection.
012-38
/ 2 Reinforced Concrete Deck/Slab 8444 sq ft 1665 6320 400 59
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- The deck soffit and fascia exhibits widespread areas of cracking up to 1/8" w and scaling, some with minorefflorescence, delaminations, and spalling up to 20' l x 6" h x 4" d with exposed and corroded reinforcing steel.Notable examples are listed below:Span 1 Girders 4 and 5 concrete haunch over Abutment 1 exhibits incipient spalling to 1’ L X 3” H; which isbroken-off at girder line.- Span 1 girder concrete haunch at Girder 2 exhibits spalling/incipient spalling along the entire Girder 2 length.
- Span 1 Bay 9 soffit exhibits spalling up to 1' diameter x 6" d with exposed and corroded rebar with up to 10%section loss at Diaphragm 2, with areas of scaling and delamination intermittently along the bay.
- Span 1 Girder 2 haunch, Span 3 Girder 2 haunch, and Span 2 Girder 2 haunch at Diaphragm 2 in Bay 1 exhibitsspalling up to 7'8" l x 13" w x 5" d with heavily corroded rebar exhibiting section loss, extending north from Pier 2.The haunch section from this spall to intermediate Diaphragm 1 has random delaminations and exposed rebarlikely due to insufficient cover during construction. A similar spalling is exhibited by Pier 1 up to 5'6" l x 1'2" w x1-1/2" d with exposed rebar and up to 25% section loss.
- Span 2 Bay 2, the deck soffit exhibits a 6" w x full width (between girders 2 and 3) area of delamination just northof intermediate #1.
- Span 2 left sidewalk soffit at midspan exhibits a 2'4" l x 9" w x 3" d spall with exposed rebar and a corroded andperforated 2" diameter utility conduit.
- Abutment 2 northeast and northwest corners of overhang exhibit 1/4" w cracking and open spalling/delaminationup to 2' l x 1'6” w with exposed and corroded rebar.
- Deck fascia in Span 3 exhibits horizontal cracks up to 1/4" w with edge spalling and 1/32" wide map cracking at <1' spacing along entire east side. East fascia exhibits spalling/incipient spalling measuring 72" l x 16" h x 13" wide,some with exposed and corroded rebar and up to 15% section loss.
- Span 3 left sidewalk soffit exhibits spalling up to 2'2" l x 7" w x 3-1/2" d with exposed rebar and up to 25% sectionloss.
107 / 2 Steel Open Girder/Beam 1362 ft 1017 75 150 120
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- The concrete fascia inserts along the length of Girders 1 and 10 exhibits shear cracks to 1/4" w, with separationand spalling. Separation along Girder 1 of Span 1 at Abutment 1 is up 1/4" w and along Girder 1 of Span 3 atAbutment 2 is up to 1" w. Associated spalling up to 12'6” L x 7" W x 5" D with no exposed rebar at the west end ofGirder 1 near Abutment 1.
- Girders exhibit areas of minor to complete paint failure with associated moderate to severe corrosion and pitting,particularly Girder 2 in all three spans.
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Element Condition Values
- The concrete fascia inserts along the length of Girders 1 and 10 exhibits shear cracks to 1/4" w, with separationand spalling. Separation along Girder 1 of Span 1 at Abutment 1 is up 1/4" w and along Girder 1 of Span 3 atAbutment 2 is up to 1" w. Associated spalling up to 12'6” L x 7" W x 5" D with no exposed rebar at the west end ofGirder 1 near Abutment 1.
- Girders exhibit areas of minor to complete paint failure with associated moderate to severe corrosion and pitting,particularly Girder 2 in all three spans.
210 / 2 Reinforced Concrete Pier Wall 128 ft 0 86 26 16
- The upstream nose of Pier 1 exhibits a crack that is up to 1/4" wide with an area of associated map crackingextending from approximately 3' below the top of pier wall to the channel bottom.- The upstream nose of Pier 1 exhibits a 1.5' H x wall width (32") x 6" D void/area of section loss with no exposedreinforcing steel, beginning 6.5’ below the top of the pier and extending downward (refer to Photo 9).- The upstream nose of Pier 1 exhibits a seam of section loss 3' W x 4" H x 2" D. The seam is locatedapproximately 1' below area of section loss described above. There is no exposed reinforcing steel at the seam ofsection loss.- Pier 2 exhibits a seam of heavier scaling on the north face, 5' downstream of the upstream nose, that measures 2'L x 4" H x 2" D at approximately 1.5' above the waterline.- The upstream nose of Pier 2 exhibits an area of section loss that is 8" in diameter x 1-1/2" deep with no exposedreinforcing steel, located 9.5’ below the top of the pier, with adjacent voids up to 1-1/2" deep.- The upstream nose of Pier 2 exhibits widespread cracks up to 1/4" wide with associated voids and seaming up to1" deep, beginning at the top of the pier and extending downward. The Pier 2 downstream nose exhibits a similarcondition, but to a lesser extent, extending from 3' below the top of the cap to the channel bottom. Downstreamnose cracks are typically up to 1/8" wide.- Piers walls exhibit widespread vertical cracks up to 1/8" wide and horizontal cracks up to 3/16" wide with smallareas of associated incipient spalling. Most of the wider cracks in the pier walls are located beneath bearing areasand at the pier noses.-Pier walls exhibit heavy concrete scaling from the high water mark down. Scaling is typically 1/2" deep with amaximum penetration of up to 1-1/2" at the upstream nose of Pier 2.
215 / 2 Reinforced Concrete Abutment 135 ft 0 114 21
- The abutment backwalls exhibit widespread vertical cracks up to 1/8" wide and horizontal cracks up to 3/16" widewith associated map cracking up to 1/8" wide, and with most of the cracks are located beneath bearing areas (referto Photo 8).- Abutment 2 backwall at the east and west ends exhibits large areas of open/incipient spalling up to full height x 1'W x 3" D, with exposed and corroded reinforcing steel having up to 10% section loss, along the abutment/retainingwall juncture construction joint. A few of the exposed reinforcing steel bars have been broken/cut off (refer to Photo11).- The abutment backwalls exhibit scaling typically 1/4" deep with areas up to 1/2" deep from the high water markdown to the waterline.
220 / 2 Reinforced Concrete Pile Cap/Footing 4 each 3 1
-There was a void in the Abutment 1 footing, 40” L x 6” W x 3” D, along the interface with the backwall and footinglocated beneath Girders 4 and 5.- Refer to Element 690 for footing exposure details.
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Element Condition Values
331 / 2 Reinforced Concrete Bridge Railing 269 ft 200 50 15 4
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
-Bridge railing exhibits vertical cracking to 1/8" w and open/incipient spalling to 2’8” L X 7” W x 5” H along the topvertical section, some with exposed and corroded rebar, with section loss up to 5%.
- Abutment 1 southwest light pole pilaster and Abutment 2 northeast light post pilaster exhibit incipient spalling to 2'h x 3' w at the base and the underside of the base exhibit extensive open incipient spalling.
- Left parapet over span 1 exhibits inward rotation up to 3/4".
- The top face and lower south end at sidewalk juncture of the northwest pilaster exhibits open/incipient spalling to4' l x 7-1/2" w x 6" d, no exposed rebar, with a vertical crack on the east face up to 3/4" w and an associated edgespalling along the crack.
- Patched areas of span 2 left side at mid span exhibits delamination and bulging with newly formed incipientspalling.
- Span 3 right parapet exhibits 8 locations of open spalling up to 1'3" h x 3-1/2" w x 1-3/4" d with exposed andcorroded rebar, no section loss, incipient spalling, and cracking up to 1/8" w.
- The inboard face of the left parapet at the north end below the top stem exhibits spalling up to 1'3” L X 5” H x1-1/2" D with exposed and corroded rebar, no section loss.
515 / 2 Steel Protective Coating 1362 ft 1021 72 149 120
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- Girder and diaphragms exhibit areas of minor to complete paint failure with associated corrosion and pitting of theunpainted areas, particularly Girder 2 in all three spans.
516 / 2 Concrete Coating 1 lumpsum
0 1
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- Paint finish on the left curb over Span 1 exhibits minor blistering.
517 / 2 Graffiti 1 lumpsum
1
- Minor graffiti on the concrete railings, Pier 1 wall, and Pier 2 wall.
605 / 2 Concrete Curbs 272 ft 0 272
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- The curbs exhibit moderate density cracking to 1/32" w and isolated edge spalling to 15" l x 6" w x 2" d
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Element Condition Values
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- The curbs exhibit moderate density cracking to 1/32" w and isolated edge spalling to 15" l x 6" w x 2" d
620 / 2 Concrete Sidewalks 272 ft 0 136 136
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- The sidewalk top surface exhibits map cracking to 1/32" w at < 1' spacing, with isolated cracks to 1/8" w, andintermittent areas of delamination/incipient spalling, some around the northeast manhole cover, spalling up to 15"diameter and moderate scaling on the left sidewalk up to 1/4" d.
645 / 2 Deck Lighting System 8 each 8
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
-No significant deficiencies to report.
650 / 2 Utilities 10 each 9 1
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- A water main in Bay 1 exhibits extensive damage to its insulation.- Two 2" diameter utility pipes in Bay 9 Span 3 Panel 1 are broken with advanced deterioration and exposedcables.
652 / 2 Asphaltic Plug Expansion Joints 121 ft 91 0 30
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- Asphaltic plug joints exhibit surface abrasion, edge adhesion failure, and cracking to 1/4" w.
660 / 2 Steel Diaphragms 90 each 89 1
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- Diaphragm #3 in Bay 6 of Span 1 is missing a rivet head at the southeast end.
680 / 2 Reinforced Concrete Retaining Walls 280 ft 271 8 1
- Southwest wingwall exhibits a spall that measures 12" W x 12" H x 3" D with one exposed reinforcing steel barwith up to 30% section loss. Spall is located at the waterline (refer to Photo 10).- Southwest wingwall exhibits vertical cracks up to 1/16" wide and 1/64" wide map cracking at less than 1' spacingwith associated delamination.- 04/16/2015 Inspection Note: Southeast wingwall exhibits a 15" L x 16.5" H x 1.25" D area of spalling andassociated delamination just below the railing with no exposed reinforcing steel.
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Element Condition Values
with up to 30% section loss. Spall is located at the waterline (refer to Photo 10).- Southwest wingwall exhibits vertical cracks up to 1/16" wide and 1/64" wide map cracking at less than 1' spacingwith associated delamination.- 04/16/2015 Inspection Note: Southeast wingwall exhibits a 15" L x 16.5" H x 1.25" D area of spalling andassociated delamination just below the railing with no exposed reinforcing steel.
690 / 2 Substructure Scour and Erosion 4 each 2 2
- Along the upstream end of Pier 1, the footing is exposed over a length of approximately 6’ located 6’ to 12’downstream of the upstream nose, with no vertical exposure.- Abutment 1 exhibits areas of exposed footing from Girder 1 through 6. Vertical footing exposure is as follows:
Location 2015 Vertical Exposure 2014 Vertical ExposureGirder 1 6" 12"Girder 2 Top of footing 6"Girder 3 Top of footing 12"Girder 4 Top of footing 14"Girder 5 3" 12"Girder 6 3" Top of footingGirder 7 Not exposed Top of footing
- The flow is directed towards Pier 1 at a slight skew resulting in a scour depression that extends approximately 6’out from the upstream nose and along the south face for approximately 15'. The scour depression is up to 3’ deepat the southwest quadrant of Pier 1. - At Pier 2, there is a minor scour depression at the upstream nose with a 5’ radius x 1’ deep.-The channel bottom material consists of silt and smaller rock and is still susceptible to scour and removal duringperiods of high flow.
694 / 2 Debris on Seats 4 each 0 4
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
- The abutment and pier bearings are packed with drift, debris, and bird excrement which may restrict their propermovement.
700 / 2 Channel Scour 1 lumpsum
1
- The channel bottom material is susceptible to scour and removal during periods of high flow.- At Abutment 1, the channel bottom consists of cobble and rock up to 18” diameter with sand infill.- Refer to Element 690.
701 / 2 Channel Embankment Erosion 1 lumpsum
1
- No significant deficiencies.
702 / 2 Channel Aggradation 1 lumpsum
1
- At low water, there is an aggraded island along the downstream north side of Pier 2 that extends into thedownstream channel, as well as small bars along the north channel wall.- Due to aggradation, the extent of footing exposure at Abutment 1 has decreased slightly since the 2014inspection.
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Element Condition Values
- At low water, there is an aggraded island along the downstream north side of Pier 2 that extends into thedownstream channel, as well as small bars along the north channel wall.- Due to aggradation, the extent of footing exposure at Abutment 1 has decreased slightly since the 2014inspection.
703 / 2 Channel Drift 1 lumpsum
1
- No significant deficiencies.
704 / 2 Channel Vegetation 1 lumpsum
0 1
- Minor vegetation, bushes and small diameter trees on the south upstream bank and on the small bars ofaggraded material along the north channel wall.
720 / 2 Concrete Channel Lining 200 lumpsum
165 35
- 04/16/2015 Inspection Note: Minor cracking up to 1/16" wide with spalls on the north concrete channel wall.
721 / 2 Flexible/Semi-Flexible Channel Lining 1 lumpsum
1
- Channel lining consist of grouted riprap just upstream and downstream of Abutment 1.-No significant deficiencies.
771 / 2 Asphalt Concrete Approach Pavement 1 lumpsum
1
**UNDERWATER INSPECTION TO ASSESS SCOUR/SUBMERGED SUBSTRUCTURE ELEMENTS ONLY -ELEMENT NOT RATED. THE CS RATING AND COMMENTS ARE FROM THE 04/16/2015 INSPECTIONREPORT.**
-Approach pavement exhibits cracks to 1/4" wide and minor wheel path abrasion.
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Element Condition Values
Waterway Measurements Referenced from:
Waterway measurements were taken along the upstream (west) fascia of the bridge and referenced from the top,outer edge of the bridge rail.
DATE:
LOCATION WATERLINE MUDLINE MUDLINE MUDLINE
9/19/2015 4/16/2015 9/7/2014
Abut 1 17.5' 19.0' 18.9' 19.0'
Mid-Span 1 17.5' 21.9' 22.5' 21.8'
Pier 1* 18.8' 22.1' 22.9' 21.6'
Mid-Span 2 18.0' 18.5' 18.5' 18.1'
Pier 2* 19.1' 19.6' 19.8' 19.7'
Mid-Span 3 Dry 16.8' 16.8' 16.6'
Abut 2 Dry 15.9' 16.9' 15.7'
NOTE: * Measurement taken from top of lamp post pedestal.Date 9/18/11 4/18/12 9/6/12Location Mudline Mudline MudlineAbut 1 18.2' 19.2' 19.0'Midspan 1 22.3' 22.3' 22.1'Pier 1 21.8' 23.2' 23.2'Midspan 2 18.2' 18.2' 18.2'Pier 2 18.3' 19.8' 19.2'Midspan 3 16.7' 16.8' 16.8'Abut 2 16.0' 16.1' 15.9'
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Waterway Measurement Report
Photo 1: West Elevation, Looking Northeast.
B 303
09/19/2015
Bridge No.:
Date:
Photo 2: South Approach, Looking Northwest.
B 303
09/19/2015
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 3: Overall Upstream Channel, Looking West.
B 303
09/19/2015
Bridge No.:
Date:
Photo 4: Overall Downstream Channel, Looking East.
B 303
09/19/2015
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 5: Overall Abutment 1, Looking Southeast.
B 303
09/19/2015
Bridge No.:
Date:
Photo 6: Overall Pier 1 North Face, Looking Southwest.
B 303
09/19/2015
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 7: Overall Pier 2 South Face, Looking Northeast.
B 303
09/19/2015
Bridge No.:
Date:
Photo 8: Typical Cracking at Abutment 1, Looking South.
B 303
09/19/2015
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 9: Area of Section Loss at the Upstream Nose of Pier 1, Looking East.
B 303
09/19/2015
Bridge No.:
Date:
Photo 10: Spall at the Southwest Wingwall, Looking Southwest.
B 303
09/19/2015
Bridge No.:
Date:
State of Nevada
Department of Transportation
State of Nevada
Department of Transportation
Photo 11: Area of Section Loss at Abutment 2 Northwest Wingwall Joint, Looking North.
B 303
09/19/2015
Bridge No.:
Date:
CriticalityTiming Item Code Description UnitsStd.Unit
CostQuantity Unit Cost Total Cost
3 - Perform action within next 2 years
2 - Major 7500075100075SQFTRepair Spalls in
Concrete SuperstructureSuper13
•Repair spalls along deck soffit, fascia and haunches.Notes:
2 - Major 900030030300CUYDFill Scour HoleChan43
•Place designed scour countermeasures at Abutment 1 and Pier 1.Notes:
CriticalityTiming Item Code Description UnitsStd.Unit
CostQuantity Unit Cost Total Cost
4 - Perform action when time and moneypermit
1 - Minor 001--LSClean Debris from
Abutment/Pier SeatSub204
Notes:
1 - Minor 2505505LINFTSeal Crack in Asphalt
Wearing SurfaceR114
•Seal cracks in approach pavementNotes:
1 - Minor 27225225121225LINFTRemove and Replace
Expansion Joint(Asphaltic Plug Joint)
D44
•Replace asphaltic plug joints.Notes:
1 - Minor 001--LSSubstructure Graffiti
EradicationSub214
•Eradicate graffiti on concrete railings, Pier 2 wall, and Pier 1 wall.Notes:
1 - Minor 001--LSRepair/Maintain
Utility/Utility SupportsD364
•Repair broken 2" diameter utility pipes in Bay 9 Span 3 Panel 1.•Repair damaged insulation to water main in Bay 1.
Notes:
2 - Major 4600023200023SQFTRepaint Portion of Steel
SuperstructureSuper84
•Clean and paint corroding girders and diaphragms.Notes:
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Maintenance Inspection Work Items and Costs Report
2 - Major 001--LSRepair Spalled
Substructure ConcreteSub44
•Repair spalling on pier walls, wingwalls, and abutments.Notes:
1 - Minor 163203054430LINFTRepair Spalled CurbD384
•Seal cracks in concrete curb and sidewalkNotes:
1 - Minor 319521315213LINFTRepair/Replace
Concrete Bridge RailingD314
•Repair spalls in concrete bridge railingNotes:
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Maintenance Inspection Work Items and Costs Report
Underwater Elements Inspected and Inspected FrequencyElements Inspected Inspection Frequency
1 Abutment 1 12
2 Pier 1 12
3 Pier 2 12
4 Abutment 2 12
Inspection Procedures Used
Inspection Results
-Perform underwater inspection of two reinforced concrete abutments and two reinforced concrete pier walls routinelyevery 12 months.-Diving Mode: Water depth is shallow, perform U/W inspection by wading if water depth is <3 ft. Otherwise useappropriate diving equipment.-Diver Access Location: Southwest embankment.-Boat Required: No-Other Access Equipment Needed (i.e. ladder, rope, etc.): N/A-Anticipated Stream Flow: Weak (0-0.5kn)-Anticipated Maximum Water Depth: 3 ft-Adjust Dive Tables for Elevation: Yes-If yes, Approximate Elevation: 4,500-List unique structural details that would impact inspection: N/A-List any adjacent/nearby water control structures: Damming for bridge replacement approximately 300 yardsdownstream. Grouted riprap spillway approximately 300' upstream of bridge.-Level III inspection tools required (Ultrasonic Thickness Gauge, core drill, etc.): N/A-Take sounding from top of masonry pedestrian rail on the west (upstream) side of bridge.-Check channel bottom around abutments and piers for scour.-Check abutments and piers for new deficiencies and/or changes in pre-existing deficiencies.-Check channel for debris/obstructions.-Check embankment/slope protection condition.
* For inspection results, see commentary contained within the Element Level Inspection Report
Bridge Number B 303
SR 660 SIERRA ST Over TRUCKEE RVRBridge Location
Inspection Date 09/19/2015
Underwater Inspection Procedures Report
75A. Type Of Work
2007
3 (On Free Road)
1 (1-way traffic)
9. Location
39 ° 31 ' 28.71 "
17. Longitude
41. Posting Status A (Open)
0
5 (Waterway)
0 (No median)
0 (None)
44B. Appr. Span Design
11. Milepoint
RENO
0.000
60600 (Reno)
02 (District 02)
329 (Nevada)
7. Facility Carried
1291. Frequency
93A. FC Inspection Date
09/19/2015
30. Year of ADT
Structure Inventory and Appraisal
Bridge No.: B 303
3. County 031 (Washoe)
6. Feature Intersected TRUCKEE RVR
2. District
98A. Border Bridge Code (Not Applicable)
99. Border Bridge No.
43A. Main Span Material 4 (Steel continuous)
43B. Main Span Design 02 (Stringer/Multi-beam or Girder)
45. No. of Spans Main Unit 3
44A. Appr. Span Material 0 (Other)
00 (Other)
46. No. of Appr. Spans 0
107. Deck Type
108A. Wearing Surface
48. Length Max Span
49. Structure Length
34. Skew 15 degrees
50. Curb/Sdwk Width LT
51. Width Curb to Curb
32. Appr. Roadway Width
33. Median
35. Structure Flared
10. Min Vertical Clearance
0
47. Horiz. Clearance
99.99 ft.
53. Min. Vert. Clearance Over
55A. Min. Lat. Underclear Right
56. Min. Lat. Underclear Left
38. Navigation Control 0 (No navigation control on waterway (bridge permit not required))
111. Pier Protection
39. Vertical Clearance
40. Horiz. Clearance
16. Latitude
N (Feature not a highway or railroad)
90. Inspection Date 04/16/2015
92A. FC Frequency
93B. UW Inspection Date
92B. UW Frequebcy 12
93C. SI Date
92C. SI Frequency
58. Deck 3 (Serious Condition (primary structure affected))
59. Superstructure 5 (Fair Condition (minor section loss))
60. Substructure 4 (Poor Condition (advanced deterioration))
61. Channel/Channel Prot 4 (Protect. serverly undermined.. sev. damage)
62. Culvert N (Not Applicable)
67. Struc Eval 4 (Meets minimum tolerable limits)
68. Deck Geometry 9 (Superior to present desirable criteria)
69. Underclearance,Vert & Horiz
N (Not applicable)
71. Waterway Adequacy 6 (Occasional Overtopping of Approaches)
72. Approach Alignment 8 (Equal to present desirable criteria)
36A. Bridge Railings 0 (Does not meet acceptable standards/safety feature is required)
36B. Transitions 0 (Does not meet acceptable standards/safety feature is required)
36C. Approach Guardrail 0 (Does not meet acceptable standards/safety feature is required)
36D. Approach GuardRail Term 0 (Does not meet acceptable standards/safety feature is required)
113. Scour Critical Bridges 3 (Foundations unstable for scour conditions)
31. Design Load 4 (M 18 / H 20)
64. Operating Rating 47.2
66. Inventory Rating 28.1
70. Posting 5 (Equal to or above legal loads)
27. Year Built 1937
106. Year Reconstructed 0000
42A. Type of Service On 5 (Highway-pedestrian)
28A. Lanes On 2
29. Avg Daily Traffic 7300
109. Truck ADT 3 %
19. Detour Length
112. Bridge Length Y
26. Functional Class 16 (Urban)
100. STRAHNET 0 (Not a STRAHNET route)
101. Parallel Structure N (No parallel structure)
102. Direction of Traffic
22. Owner 04 (City or Municipal Highway Agency)
21. Maintenance Resp 04 (City or Municipal Highway Agency)
37. Historical Significance 2 (Eligible for National Register)
65. Rating Method 1 (Load Factor (LF))
28B. Lanes Under
2014
8. Structure No. B 303
SR 660 SIERRA ST
63. Rating Method 1 (Load Factor (LF))1. State Code
1510000005. Inventory Route
4. Place Code
12. Base Hwy Network 0 (Inventory Route is not on the Base Network)
13A. LRS Inv Route
13B. Subroute No.
98B. % Responsibility
6 (Bituminous)
1 (Concrete Cast-in-Place)
108B. Deck Membrane
0 (None)108C. Deck Protection
RT
N (Feature not a highway or railroad)54A. Min. Vert. Underclear
54B. Min. Vert. Underclear
55B. Min. Lat. Underclear Right
116. Min Nav Vert Clear
42B. Type of Service Under
31 (Replacement)
1 (Work to be done by contract)75B. Work Done By
$ 793094. Bridge Impr Cost
76. Len of Struc Impr
95. Rdwy Impr Cost $ 790
96. Total Proj Cost $ 8720
97. Year of Impr Cost
114. Future ADT 8910
115. Year Future ADT 2034
20. Toll
103. Temp Structure
104. Hwy Sys Inv Route 0 (Structure/Route is NOT on NHS)
105. Fed Lands Hwys 0 (Not Applicable)
110. Desig National Net 0 (Inventory route not on network)
0 ft.
1.9
44.0 ft.
0.0 ft.
0.0 ft.
43.9 ft.
50.9 ft.
136.2 ft.
7.87 ft.
7.87 ft.
44.0 ft.
52. Deck Width Out to Out 62.0 ft.
328 ft.
0 ft.
0 ft.
0 ft.
167.97696
201. Contract Number 493,2896
202. Seismic Risk
203. Structure Name
204. Culvert Barrel Height
205. Culvert Barrel Width
206. Culvert Barrel Length
207. Total Deck Area 8444 sq ft.
92A-1. FC Required
92B-1. UW Required
92C-1. SI Required
N
Y
N
Last Modified: 12/01/2015
208. Last AccessRequired Inspection Date
209. Access RequiredInspection Frequency
04/16/2015
12
210. Date of Next AccessRequired
04/16/2016
211. Bridge InventoryDirection
South to North
119 ° 48 ' 49.7 "
SD:FO:ERRORSufficiency Rating: