+ All Categories
Home > Documents > Silverlake Integrated Crew Management System (iCMS) · Silverlake Integrated Crew Management System...

Silverlake Integrated Crew Management System (iCMS) · Silverlake Integrated Crew Management System...

Date post: 13-Dec-2018
Category:
Upload: phungliem
View: 242 times
Download: 1 times
Share this document with a friend
2
Silverlake Integrated Crew Management System (iCMS) iCMS MODULES PRIMARY FEATURES CEM – Maintain basic crew information CREW ENTITY Maintain crew movement MANAGEMENT Maintain crew skill Maintain crew leave Maintain and monitor validity of crew documents (passport, visa, etc.) CTM – Flight download and �light management CREW TRACKING Create pairing through Graphical Gantt Chart Pairing Editor (VPE) AND MONITORING Assign crew duty through Graphical Gantt Chart Crew Roster Editor (VRE) Monitor crew duty acknowledgement Generate pre-�light document Parameterised rule values (CAP371 compliant) Calculate and monitor crew �lying and duty hours Rules validation Publish roster to CII CII – Real-time crew roster information CREW INTERNET Crew duty sign-on INFORMATION Leave application and status Duty acknowledgement Display important messages and information (crew roster revised details, message, etc.) Crew documents and skill information Crew hours information CPG – Optimise seasonal and monthly pairing generation CREW PAIRING Graphical Gantt Chart Pairing Editor (VPE) GENERATION Parameterised rule values (CAP371 compliant) Allow multiple pairing group generation for what-if scenario CDA – Optimise crew duty roster generation CREW DUTY Graphical Gantt Chart Crew Roster Editor (VRE) ASSIGNMENT Automated standby duty generation Parameterised rule values (CAP371 compliant) CTO – Maintain training course and syllabus CREW TRAINING Schedule and assign crew training AND OPERATIONS Monitor and maintain training attendance and result Monitor and maintain crew skill CMP – Con�igurable variables to perform scenario-based CREW MANPOWER calculations to aid decision making PLANNING This solution offers the ability to rapidly generate multiple manpower scenarios that facilitates significantly shorter turnaround times when responding to business changes. All phases of crew management operations, such as long-term manpower planning, crew pairing, crew scheduling, crew tracking and handling of roster disruptions are addressed. iCMS is designed to ensure flexibility, robustness and scalability to accommodate every unique requirement. iCMS is an integrated and comprehensive solution that supports the end-to-end crew management needs of airlines, cruise and shipping industries.
Transcript
Page 1: Silverlake Integrated Crew Management System (iCMS) · Silverlake Integrated Crew Management System (iCMS) iCMS MODULES PRIMARY FEATURES CEM – Maintain basic crew information CREW

Silverlake Integrated Crew Management System (iCMS)

iCMS MODULES PRIMARY FEATURES

CEM – Maintain basic crew informationCREW ENTITY Maintain crew movementMANAGEMENT Maintain crew skill

Maintain crew leave Maintain and monitor validity of crew documents (passport, visa, etc.)

CTM – Flight download and �light managementCREW TRACKING Create pairing through Graphical Gantt Chart Pairing Editor (VPE)AND MONITORING Assign crew duty through Graphical Gantt Chart Crew Roster Editor (VRE)

Monitor crew duty acknowledgement Generate pre-�light document Parameterised rule values (CAP371 compliant) Calculate and monitor crew �lying and duty hours Rules validation Publish roster to CII

CII – Real-time crew roster informationCREW INTERNET Crew duty sign-onINFORMATION Leave application and status

Duty acknowledgement Display important messages and information (crew roster revised details, message, etc.) Crew documents and skill information Crew hours information

CPG – Optimise seasonal and monthly pairing generationCREW PAIRING Graphical Gantt Chart Pairing Editor (VPE)GENERATION Parameterised rule values (CAP371 compliant)

Allow multiple pairing group generation for what-if scenario

CDA – Optimise crew duty roster generationCREW DUTY Graphical Gantt Chart Crew Roster Editor (VRE)ASSIGNMENT Automated standby duty generation

Parameterised rule values (CAP371 compliant)

CTO – Maintain training course and syllabusCREW TRAINING Schedule and assign crew trainingAND OPERATIONS Monitor and maintain training attendance and result

Monitor and maintain crew skill

CMP – Con�igurable variables to perform scenario-based CREW MANPOWER calculations to aid decision makingPLANNING

This solution offers the ability to rapidly generate multiple manpower scenarios that facilitates signifi cantly shorter turnaround times when responding to business changes. All phases of crew management operations, such as long-term

manpower planning, crew pairing, crew scheduling, crew tracking and handling of roster disruptions are addressed. iCMS is designed to ensure fl exibility, robustness and scalability to accommodateevery unique requirement.

iCMS is an integrated and comprehensive solution that supports the end-to-end crew management needs of airlines, cruise and shipping industries.

Page 2: Silverlake Integrated Crew Management System (iCMS) · Silverlake Integrated Crew Management System (iCMS) iCMS MODULES PRIMARY FEATURES CEM – Maintain basic crew information CREW

Ad

her

e to

ind

ust

ry

trai

nin

g re

qu

irem

ents

an

d s

tan

dar

ds

En

sure

cre

w a

re

vali

d a

nd

cu

rren

t

Bu

ild

ing

opti

mal

set

of p

airi

ngs

Co

st e

ffec

tive

Req

uir

emen

t an

dre

sou

rce

fore

cast

ing

Ad

min

iste

r cr

ew in

form

atio

nM

anag

e cr

ew

mov

emen

t

Lon

g-te

rm a

nd

shor

t-te

rm r

esou

rce

Cre

w e

mp

ower

men

tan

d e

nga

gem

ent

An

yw

her

e, a

ny

tim

e

Op

tim

ise

crew

ro

ster

w

hic

h s

atis

�ies

bu

sin

ess

rule

s an

d c

onst

rain

ts

Rea

l tim

e cr

ew

trac

kin

g an

d a

lert

s

Cre

w n

oti�

icat

ion

an

d

dis

rup

tion

rec

over

y

iCM

S

RES

OU

RCE

MA

NA

GEM

ENT

(CEM

)

RO

STER

ING

(CD

A)

PAIR

ING

GEN

ERA

TIO

N(C

PG)

POR

TAL

(CII)R

ESO

UR

CEPL

AN

NIN

G(C

MP)

TRA

ININ

G(C

TO)

TRA

CK

ING

AN

DM

ON

ITO

RIN

G

(CTM

)

iCM

S


Recommended