Date post: | 03-Jun-2018 |
Category: |
Documents |
Upload: | nguyen-quang-huy |
View: | 223 times |
Download: | 0 times |
of 46
8/12/2019 Simdiary2011 Hong W09
1/46
Important note: When you do next week's Diary, save and re-nameCtrl+j to clear To-Do List contents and press Ctrl+i
1.1 color codes:
Boxes with this colour means you should enter the rele
Boxes with this colour means data-entry is not required
1.2 Task No.:
(a) Each task should be allocated a Task Number for easy identification
(b) Below is the convention of numbering the Task Number:
(c) Task No. in To-Do List should be unique
Important note: Please do not insert or delete any rows or columns
1.3 Task Description
(a) Generally, the duration to complete a task should be about 1-3 hours.
(b) Big task should be broken down into smaller tasks with each not more than 2 hours to complete.(c) Task description should be as brief as possible.
2.1 Each week, you are to fill up next week's (W + 1) Week No. in F3 of the "to_do_ list" Worksheet. Eg if
week ( W+1) is Week No. 43, then type 43 in F3
2.2 The "From" & "To" dates in G4 & H4 (covering Monday to Sunday of the week) will be filled automatic
2.3 Enter the no. of days of work for the week as per contract and the relevant days deductibles in K5 to
holidays and others) and also the no. of contract working hours per day in K2 and the Net Contract Ho
2.4 Enter the tasks to be done in the box designated for W+1 and W+2 respectively
2.5 Data to be entered are:
(a) Task No.(b) Task Description
1. Data entry rules
2. To-Do-List
Week No. Task No.
XX YY
03 08
Example: WK No.3, Task No.8
8/12/2019 Simdiary2011 Hong W09
2/46
(a) VA = Task that adds value to your scope of work
(b) NVA = Task that does not added value to the socpe of work as per your JD
NVAM = Non valude added meetingNVAT = Non valude added task
NVAP = Personal activity
NVAO = Other non valude added activity
Important note: If not sure which NVA to select, select NVAT
2.6 Priority code (according to urgency of task completion) of each task to be entered:
(a) H = High priority
(b) M = Medium priority
(c) L = Low priority
3.1 The Diary consists of 6 separate boxes. Each box represent one day from Monday to Saturday. Once
have entered the Week No.in F3 of "to_do_list" worksheet, the respective dates and week days will b
3.2 Schedule the tasks from the To-Do List to the respective time and days in the Diary.
3.3 Each week, you should schedule tasks as stated in Week W+1 of the To-Do List only.
3.4 After each task is done, you should enter the actual duration and date involved.
Other relevant data in the Diary will be populated automatically.
4.1 Save the file to a new file name
4.2 You can manually delete all the completed/scheduled tasks in the To-Do List o
4.3 Alternatively, you may press Ctrl+j to clear all contents in To-Do List and press Ctrl+i to clear all conte
4.4 Copy the planned tasks in last week's W+2 and paste to the empty space in W+1 To-Do List
4.5 Add any other new tasks in W+1 To-Do List and also update the Contract Hours section
4.6 Sort the new To-Do List in W+1 by due date (Column G)
4.7 List new planned tasks in W+2 To-Do List and also the Contract Hours section
4.8 Schedule the tasks in 4.6 above to the Diary
5.1 Status of Tasks Planned:
3. Diary
5. KPI's (These will be updated automatically)
4. Weekly maintenance
8/12/2019 Simdiary2011 Hong W09
3/46
5.2 Task Completion Rate = No. of tasks completed/No. of tasks planned * 100 (Measuring the % task co
5.3 Plan Loading Rate = Total planning hours/Total contract hours * 100 (Measuring the % of planned hou
Note: The rule of thumb optimum % is around 60 - 70%, balance of your time could be spent to suppo
5.4 Actual Loading Rate = Total actual hours/Total contract hours * 100 (Measuring the % of actual hours
Note: If the Actual Loading Rate is higher than 100%, this reflects that you're working longer hours tha
5.5 %VA Workload = Total VA hours/Total VA and NVA hours * 100 (Measuring the %VA workload perfor
5.6 Unplanned Tasks
(a) % of unplanned tasks to contract hours = No. of unplanned tasks/Total contract hours * 100
(b) % unplanned - VA = No. of "Value-Added" unplanned tasks/Total unplanned tasks * 100
(c) % unplanned - NVA = No. of "Non-Value-Added" unplanned tasks/Total unplanned tasks * 100
5.7 Total VA/NVA hours and % incurred for the week
5.8 Summary of time consumed in NVA activities for the week
5.9 HR will extract the Plan Loading Rate (5.3), Total VA/NVA (5.7) and Summary of NVA activities (5.8) f
7.1 This Reminder section gives the following reminder alerts:
(a) If due date past today, alert is "Overdue!"(b) If due date is today, alert is "Due today!"
(c) If due date is within n days of due date, alert is "Do now!"
(d) If due date is more than n (no. of pre-alert days)
days from due date - no alert (blank)
n=no of days (from 3 to 7 days) in advance to give the alert. User to click cell O64 & choose option
Note: This Reminder has no linkage to the To-Do-List or Diary
6. Reminder in To-Do-List (Optional)
8/12/2019 Simdiary2011 Hong W09
4/46
8/12/2019 Simdiary2011 Hong W09
5/46
you've
filled automatically.
ts in the Diary
8/12/2019 Simdiary2011 Hong W09
6/46
pletion at end of each week; target is to achieve 100%)
rs as compared to contract hours available for the week)
rt functional/cross functional unplanned tasks
spent as compared to contract hours available for the week)
n you've planned to complete your tasks.
med in a week; the higher the % the better time utilized in your work)
r further VA/NVA and Workload Analyses
8/12/2019 Simdiary2011 Hong W09
7/46
Owne Today is:
Task
No.Task Description VA/NVA?
Priority
(H/M/L)
Duration
(Hr)901 901 Follow up Outsourcing VA M 2.00
902 902 Transfer material to Suppliers VA M 1.50
903 903 Check invoice VA M 1.00
904 904 Check Material shortage VA M 2.00905 905 SIM dainary VA M 0.50
906 906 Check Material shortage 1 VA M 2.00
907 907 SSA report VA M 1.00
908 908 OTD meeting VA M 1.00
909 909 Check invoice 1 VA M 2.00
910 910 Follow up Outsourcing 2 VA M 2.00
911 911 Consumption VA M 0.50
912 912 Pull in 1 VA M 2.00
913 913 Follow up outsourcing 3 VA M 2.00914 914 Pull in 2 VA M 2.00
915 915 Check shortage material 2 VA M 2.00
916 916 Pull in 3 VA M 2.00
Nguyen Thi Hong
To-Do List for (W + 1) Week No. 9
8/12/2019 Simdiary2011 Hong W09
8/46
Total: 25.50
Task
No.Task Description VA/NVA?
Prioirty
(H/M/L)
Duration
(Hours)
1001
1002
10031004
1005
1006
1007
1008
1009
1010
1011
10121013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
10291030
To-Do List for (W + 2) Week No. 10
8/12/2019 Simdiary2011 Hong W09
9/46
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
10461047
1048
1049
1050
Total: 0.00
8/12/2019 Simdiary2011 Hong W09
10/46
Contract Hrs/Day 8.5
To Contract Hrs/Wk Gross Leave Travel P/Holidays6/Mar/11 42.50 42.50 0.00 0.00 0.00
No. of days 5 0 0 0
Due Date Time Completed?
28/Feb/11 8:00 28/Feb/11 #
28/Feb/11 10:00 28/Feb/11 #
28/Feb/11 13:00 28/Feb/11 #
28/Feb/11 14:00 28/Feb/11 #1/Mar/11 8:00 1/Mar/11 #
1/Mar/11 9:00 1/Mar/11 #
1/Mar/11 13:00 1/Mar/11 #
1/Mar/11 14:00 1/Mar/11 #
1/Mar/11 15:00 1/Mar/11 #
2/Mar/11 8:00 2/Mar/11 #
2/Mar/11 10:00 2/Mar/11 #
2/Mar/11 13:00 2/Mar/11 #
3/Mar/11 8:00 3/Mar/11 #3/Mar/11 13:00 3/Mar/11 #
4/Mar/11 8:00 4/Mar/11 #
4/Mar/11 13:00 4/Mar/11 #
0
0
0
0
0
0
0
0
0
0
0
0
0
00
0
0
0
0
0
0
0
00
6/Mar/14Excluding lunch and tea brea
From28/Feb/11
JanJan 2011
Sun Mon Tue Wed Thu Fri
26 27 28 29 30 31
2 3 4 5 6 7
9 10 11 12 13 14
16 17 18 19 20 21
23 24 25 26 27 28
30 31 1 2 3 4
8/12/2019 Simdiary2011 Hong W09
11/46
0
0
0
0
0
0
16
Contract Hrs/Day 8.5
To Contract Hrs/Wk Gross Leave Travel P/Holidays
42.50 42.50 0.00 0.00 0.00
No. of days 5 0 0
Due Date Time Status Due DateReminder
13/Mar/11
Excluding lunch and tea
From
7/Mar/11
8/12/2019 Simdiary2011 Hong W09
12/46
8/12/2019 Simdiary2011 Hong W09
13/46
Others0.00
0
s
2011
Sat
1
8
15
22
29
5
8/12/2019 Simdiary2011 Hong W09
14/46
Others
0.00
0
Alert 5
breaks
8/12/2019 Simdiary2011 Hong W09
15/46
8/12/2019 Simdiary2011 Hong W09
16/46
Owner: Today is:
Time Plan VA/NVA? Actual
8:00 901 Follow up Outsourcing Fol 2.00 VA 2.00
8:30
9:00
9:30
10:00 902 Transfer material to Suppliers Tra 1.50 VA 1.50
10:30
11:00
11:30
12:00
12:30
13:00 903 Check invoice Ch 1.00 VA 1.00
13:30
14:00 904 Check Material shortage Ch 2.00 VA 2.00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:0018:30
19:00
19:30
20:00
20:30
21:00
6.50 6.50 6.50
6/Mar/14
Task No. & Description
S
Monday, February 28, 2011
Nguyen Thi Hong
Unplanned Tasks
Total:
8/12/2019 Simdiary2011 Hong W09
17/46
0.00
Time Plan VA/NVA? Actual
8:00 910 Follow up Outsourcing 2 Fol 2.00 VA 2.008:30
9:00
9:30
10:00 911 Consumption Co 0.50 VA 0.50
10:30
11:0011:30
12:00
12:30
13:00 912 Pull in 1 Pul 2.00 VA 2.00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:004.50 4.50 4.50
Wednesday, March 02, 2011
Task No. & Description
Total:
Total:
8/12/2019 Simdiary2011 Hong W09
18/46
0.00
Time Plan VA/NVA? Actual
8:00 915 Check shortage material 2 Ch 2.00 VA 2.00
8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00 916 Pull in 3 Pul 2.00 VA 2.00
13:3014:00
14:30
15:00
15:30
16:00
16:30
17:00
17:3018:00
18:30
19:00
19:30
20:00
20:30
21:00 4 00 4 00 4 00Total:
Friday, March 04, 2011
Task No. & Description
Total:
8/12/2019 Simdiary2011 Hong W09
19/46
14:00
15:00
0.00Total:
8/12/2019 Simdiary2011 Hong W09
20/46
Comp Date Time Plan VA/NVA? Actual
28/Feb/11 8:00 905 SIM dainary SI 0.50 VA 0.50
8:30
9:00 906 Check Material shortage 1 Ch 2.00 VA 2.00
9:30
28/Feb/11 10:00
10:30
11:00
11:30
12:00
12:30
28/Feb/11 13:00 907 SSA report SS 1.00 VA 1.00
13:30
28/Feb/11 14:00 908 OTD meeting OT 1.00 VA 1.00
14:3015:00 909 Check invoice 1 Ch 2.00 VA 2.00
15:30
16:00
16:30
17:00
17:30
18:0018:30
19:00
19:30
20:00
20:30
21:00
6.50 6.50 6.50
IM Diary for W9
Total:
Tuesday, March 01, 2011
Task No. & Description
Unplanned Tasks
8/12/2019 Simdiary2011 Hong W09
21/46
0.00 0.00
Comp Date Time Plan VA/NVA? Actual
2/Mar/11 8:00 913 Follow up outsourcing 3 Foll 2.00 VA 2.00 8:30
9:00
9:30
2/Mar/11 10:00
10:30
11:0011:30
12:00
12:30
2/Mar/11 13:00 914 Pull in 2 Pul 2.00 VA 2.00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
4.00 4.00 4.00
Thursday, March 03, 2011
Total:
Task No. & Description
Total:
8/12/2019 Simdiary2011 Hong W09
22/46
0.00 0.00
Comp Date Time Plan VA/NVA? Actual
4/Mar/11 8:00
8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
4/Mar/11 13:00
13:3014:00
14:30
15:00
15:30
16:00
16:30
17:00
17:3018:00
18:30
19:00
19:30
20:00
20:30
21:00
0 00 0 00 0 00
Task No. & Description
Saturday, March 05, 2011
Total:
Total:
8/12/2019 Simdiary2011 Hong W09
23/46
0.00 0.00Total:
8/12/2019 Simdiary2011 Hong W09
24/46
Comp Date
1/Mar/11
1/Mar/11
1/Mar/11
1/Mar/11
1/Mar/11
Jan 2011Jan 2011
Mon Tue Wed Thu Fri Sat Sun
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6
8/12/2019 Simdiary2011 Hong W09
25/46
0.00
Comp Date
3/Mar/11
3/Mar/11
8/12/2019 Simdiary2011 Hong W09
26/46
0.00
Comp Date
8/12/2019 Simdiary2011 Hong W09
27/46
0.00
8/12/2019 Simdiary2011 Hong W09
28/46
Task No. Task Description A/NVA rity(H/M/ uration(Hr) Due Date Time
901 Follow up Outsourcing VA M 2.00 28/Feb/11 8:00 AM
902 Transfer material to Suppl VA M 1.50 28/Feb/11 10:00 AM
903 Check invoice VA M 1.00 28/Feb/11 1:00 PM
904 Check Material shortage VA M 2.00 28/Feb/11 2:00 PM
905 SIM dainary VA M 0.50 1/Mar/11 8:00 AM
906 Check Material shortage 1 VA M 2.00 1/Mar/11 9:00 AM
907 SSA report VA M 1.00 1/Mar/11 1:00 PM908 OTD meeting VA M 1.00 1/Mar/11 2:00 PM
909 Check invoice 1 VA M 2.00 1/Mar/11 3:00 PM
910 Follow up Outsourcing 2 VA M 2.00 2/Mar/11 8:00 AM
911 Consumption VA M 0.50 2/Mar/11 10:00 AM
912 Pull in 1 VA M 2.00 2/Mar/11 1:00 PM
913 Follow up outsourcing 3 VA M 2.00 3/Mar/11 8:00 AM
914 Pull in 2 VA M 2.00 3/Mar/11 1:00 PM
915 Check shortage material 2 VA M 2.00 4/Mar/11 8:00 AM
916 Pull in 3 VA M 2.00 4/Mar/11 1:00 PM0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
KPI for We
Status of Tasks Planned
8/12/2019 Simdiary2011 Hong W09
29/46
0.00 12:00 AM
0.00 12:00 AM
0.00 12:00 AM
Total: 25.5
8/12/2019 Simdiary2011 Hong W09
30/46
Completed? Week No. 9 10
28/Feb/11 No. of Planned Tasks 16 0
28/Feb/11 Completed Tasks 16 0
28/Feb/11 Task Completion Rate 100.0% 0.0%
28/Feb/11 Total Planning Hours 25.50 0.00
1/Mar/11 Weekly Contract Hours 42.50 42.50
1/Mar/11 Plan Loading Rate 60.0% 0.0%
1/Mar/11 Actual Loading Rate 60.0%1/Mar/11
1/Mar/11 % VA Hrs/Ttl Planned & Unplanned Hrs 100.0%
2/Mar/11
2/Mar/11
2/Mar/11 Week No. 9
3/Mar/11 No. of Unplanned Tasks 0
3/Mar/11 Unplanned Hours Used 0.00
4/Mar/11 % to Contract Hours 0.0%
4/Mar/11 VA Unplanned Tasks 0NVA Unplanned Tasks 0
% Unplanned - VA 0.0%
%Unplanned - NVA 0.0%
Total VA Hours 25.50 100.0%
Total NVA Hours 0.00
Total VA + NVA Hours 25.50 100.0%
NVA Meeting 0.00 #DIV/0!
NVA Task 0.00 #DIV/0!
NVA Personal 0.00 #DIV/0!NVA Others 0.00 #DIV/0!
ek No. 9
Task Planning & Completion Efficiency
4
5
3
2 2
4
5
3
2 2
1
2
3
4
5
6
No. of tasks
8/12/2019 Simdiary2011 Hong W09
31/46
16
8/12/2019 Simdiary2011 Hong W09
32/46
9
100.0%
25.5
42.5
25.5
0.0
Note: Do not "copy" then
"paste" directly into SIM
Diary Tracking file. Pls
choose "Paste special"
then "Paste value"
Last SIM diary updated
This week SIM diary update
Total Planning Hours
Weekly contract hours
Total VA Hours
Task Completion Rate
Total NVA Hours
Copy to SIM Diary Tracking
Week No.
8/12/2019 Simdiary2011 Hong W09
33/46
8/12/2019 Simdiary2011 Hong W09
34/46
From To From To
Monday Sunday Monday Sunday1 3/Jan/11 9/Jan/11
2 10/Jan/11 16/Jan/11
3 17/Jan/11 23/Jan/11
4 24/Jan/11 30/Jan/11
5 31/Jan/11 6/Feb/11
6 7/Feb/11 13/Feb/11
7 14/Feb/11 20/Feb/11
8 21/Feb/11 27/Feb/11
9 28/Feb/11 6/Mar/1153 27/Dec/10 2/Jan/11 10 7/Mar/11 13/Mar/11
11 14/Mar/11 20/Mar/11
12 21/Mar/11 27/Mar/11
13 28/Mar/11 3/Apr/11
14 4/Apr/11 10/Apr/11
15 11/Apr/11 17/Apr/11
16 18/Apr/11 24/Apr/11
17 25/Apr/11 1/May/11
18 2/May/11 8/May/11
19 9/May/11 15/May/11
20 16/May/11 22/May/11
21 23/May/11 29/May/11
22 30/May/11 5/Jun/11
23 6/Jun/11 12/Jun/11
24 13/Jun/11 19/Jun/11
25 20/Jun/11 26/Jun/11
26 27/Jun/11 3/Jul/1127 4/Jul/11 10/Jul/11
28 11/Jul/11 17/Jul/11
29 18/Jul/11 24/Jul/11
30 25/Jul/11 31/Jul/11
31 1/Aug/11 7/Aug/11
32 8/Aug/11 14/Aug/11
33 15/Aug/11 21/Aug/11
34 22/Aug/11 28/Aug/11
35 29/Aug/11 4/Sep/1136 5/Sep/11 11/Sep/11
37 12/Sep/11 18/Sep/11
38 19/Sep/11 25/Sep/11
39 26/Sep/11 2/Oct/11
40 3/Oct/11 9/Oct/11
41 10/Oct/11 16/Oct/11
42 17/Oct/11 23/Oct/11
43 24/Oct/11 30/Oct/11
44 31/Oct/11 6/Nov/11
2010 2011
Wk No. Wk No.
8/12/2019 Simdiary2011 Hong W09
35/46
49 5/Dec/11 11/Dec/11
50 12/Dec/11 18/Dec/11
51 19/Dec/11 25/Dec/11
52 26/Dec/11 1/Jan/12
8/12/2019 Simdiary2011 Hong W09
36/46
Items Elementary Task
8/12/2019 Simdiary2011 Hong W09
37/46
Last update:
1/Jan/11Day
Date
Day
Date
Day
Date
Mon Mon Mon
Tue Tue 1 Tue 1
Wed Wed 2 Public Holiday Tet Holiday Wed 2
Thu Thu 3 Public Holiday Tet Holiday Thu 3
Fri Fri 4 Public Holiday Tet Holiday Fri 4
Sat 1 Public Holiday Tet Holiday Sat 5 Public Holiday Tet Holiday Sat 5
Sun 2 Sun 6 Public Holiday Tet Holiday Sun 6
Mon 3 Mon 7 Public Holiday Tet Holiday Mon 7
Tue 4 Tue 8 Tue 8
Wed 5 Wed 9 Send/Sbmt rprt DLP Wed 9
Thu 6 Thu 10 Thu 10
Fri 7 Fri 11 Fri 11
Sat 8 Sat 12 Sat 12
Sun 9 Sun 13 Sun 13
Mon 10 Mon 14 Mon 14
Tue 11 Tue 15 Tue 15
Wed 12 Wed 16 Wed 16
Thu 13 Thu 17 Thu 17
Fri 14 Fri 18 Fri 18
Sat 15 Sat 19 Sat 19
Sun 16 Sun 20 Sun 20
Mon 17 Mon 21 Mon 21
Tue 18 Tue 22 Tue 22
Wed 19 Wed 23 Wed 23
Thu 20 Attend training Offside meeting Thu 24 Mnthly meetin SuggEvaluation Thu 24
Fri 21 Attend training Offside meeting Fri 25 Mnthly meetin SPS Plus meeting w aL Fri 25
Sat 22 Attend training Offside meeting Sat 26 Sat 26
Sun 23 Sun 27 Sun 27
Mon 24 Mon 28 Mon 28 Mnthly meetin
Tue 25 Tue Tue 29 Mnthly meetin
Wed 26 Wed Wed 30
Thu 27 Thu Thu 31
January February
8/12/2019 Simdiary2011 Hong W09
38/46
Fri 28 Fri Fri
Sat 29 Sat Sat
Sun 30 Sun SunMon 31 Mon Mon
Tue
Business Travel
SPS Review
SPS Mock Audit
SPS Audit
Mnthly meetin
Send/Sbmt rprt
Attend training
Give training
Public Holiday
On leave
Other
8/12/2019 Simdiary2011 Hong W09
39/46
Day
Date
Day
Date
Day
Date
Mon Mon Mon
Tue Tue Tue
Wed Wed Wed 1
Thu Thu Thu 2
Fri 1 Fri Fri 3
Sat 2 Sat Sat 4
Sun 3 Sun 1 Public Holiday National Labor day Sun 5
Mon 4 Mon 2 Mon 6
Tue 5 Tue 3 Tue 7
Wed 6 Wed 4 Wed 8
Thu 7 Thu 5 Thu 9 Send/Sbmt rprt
Fri 8 Send/Sbmt rprt Quarterly Sugg submit Fri 6 Fri 10
Sat 9 Send/Sbmt rprt SPS Plus Sat 7 Sat 11
Sun 10 Sun 8 Sun 12
Mon 11 On leave Private Mon 9 Mon 13 Other
Tue 12 Public Holiday King's day Tue 10 Send/Sbmt rprt SPS Plus Tue 14 Other
Wed 13 Wed 11 Wed 15 Other
Thu 14 Thu 12 Thu 16
Fri 15 Fri 13 Fri 17
Sat 16 Sat 14 Sat 18
Sun 17 Sun 15 Sun 19
Mon 18 Mon 16 Mon 20
Tue 19 Tue 17 Tue 21
Wed 20 Wed 18 Wed 22
Thu 21 Thu 19 Thu 23
Fri 22 Fri 20 Fri 24 Mnthly meetin
Sat 23 Sat 21 Sat 25
Sun 24 Sun 22 Sun 26
SuggEvaluation Mon 25 Mnthly meetin SuggEvaluation Mon 23 Mon 27
SPS Plus review w aLong Tue 26 Tue 24 Mnthly meetin SuggEvaluation Tue 28
Wed 27 Wed 25 Mnthly meetin SPS Plus review w aL Wed 29Thu 28 Thu 26 Thu 30
March April May
8/12/2019 Simdiary2011 Hong W09
40/46
Fri 29 Mnthly meetin SPS Plus review w aLong Fri 27 Fri
Sat 30 Public Holiday Independence Day Sat 28 Sat
Sun Sun 29 SunMon Mon 30 Mon
Tue 31
8/12/2019 Simdiary2011 Hong W09
41/46
Day
Date
Day
Date
Day
Date
Mon Mon 1 Mon
Tue Tue 2 Tue
Wed Wed 3 Wed
Thu Thu 4 Thu 1
Fri 1 Fri 5 Fri 2
Sat 2 Sat 6 Sat 3
Sun 3 Sun 7 Sun 4
Mon 4 Mon 8 Mon 5
Tue 5 Tue 9 Tue 6
Wed 6 Wed 10 Wed 7
SPS Plus Thu 7 Thu 11 Thu 8
Fri 8 Send/Sbmt rprt Quarterly Sugg submit Fri 12 Fri 9
Sat 9 Send/Sbmt rprt SPS Plus Sat 13 Sat 10
Sun 10 Sun 14 Sun 11
APP review Mon 11 Mon 15 Mon 12
APP review Tue 12 Tue 16 Tue 13
APP review Wed 13 Wed 17 Wed 14
Thu 14 Thu 18 Thu 15
Fri 15 Fri 19 Fri 16
Sat 16 Sat 20 Sat 17
Sun 17 Sun 21 Sun 18
Mon 18 Mon 22 Mon 19
Tue 19 Tue 23 Tue 20
Wed 20 Wed 24 Wed 21
Thu 21 Thu 25 Thu 22
SPS plus review w aL Fri 22 Fri 26 Fri 23
Sat 23 Sat 27 Sat 24
Sun 24 Sun 28 Sun 25
Mon 25 Mon 29 Mon 26
Tue 26 Tue 30 Tue 27
Wed 27 Wed 31 Wed 28Thu 28 Thu Thu 29
June July August
8/12/2019 Simdiary2011 Hong W09
42/46
Fri 29 Mnthly meetin SPS review w aL Fri Fri 30
Sat 30 Sat Sat
Sun 31 Sun SunMon Mon Mon
8/12/2019 Simdiary2011 Hong W09
43/46
Day
Date
Day
Date
Day
Date
Mon Mon Mon
Tue Tue 1 Tue
Wed Wed 2 Wed
Thu Thu 3 Thu 1
Public Holiday Victory Day Fri Fri 4 Fri 2
Sat 1 Sat 5 Sat 3
Sun 2 Sun 6 Sun 4
Mon 3 Mon 7 Mon 5Tue 4 Tue 8 Tue 6
Wed 5 Wed 9 Wed 7
Thu 6 Thu 10 Thu 8
Fri 7 Fri 11 Fri 9
Sat 8 Sat 12 Sat 10
Sun 9 Sun 13 Sun 11
Mon 10 Mon 14 Mon 12
Tue 11 Tue 15 Tue 13
Wed 12 Wed 16 Wed 14
Thu 13 Thu 17 Thu 15
Fri 14 Fri 18 Fri 16
Sat 15 Sat 19 Sat 17
Sun 16 Sun 20 Sun 18
Mon 17 Mon 21 Mon 19
Tue 18 Tue 22 Tue 20
Wed 19 Wed 23 Wed 21
Thu 20 Thu 24 Thu 22
Fri 21 Fri 25 Fri 23
Sat 22 Sat 26 Sat 24
Sun 23 Sun 27 Sun 25
Mon 24 Mon 28 Mon 26
Tue 25 Tue 29 Tue 27
Wed 26 Wed 30 Wed 28
Thu 27 Thu Thu 29
NovemberSeptember October
8/12/2019 Simdiary2011 Hong W09
44/46
Fri 28 Fri Fri 30
Sat 29 Sat Sat 31
Sun 30 Sun SunMon 31 Mon Mon
Tue
8/12/2019 Simdiary2011 Hong W09
45/46
Day
Mon
Tue
Wed
Thu
Fri
Sat
Sun
MonTue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
December
8/12/2019 Simdiary2011 Hong W09
46/46
Fri
Sat
SunMon