Waterpower XIII July 29-31, 2003, Buffalo, New York USA SIMULATION OF TRANSIENT PHENOMENA IN FRANCIS TURBINE POWER PLANTS: HYDROELECTRIC INTERACTION Christophe NICOLET Prof. François AVELLAN EPFL / Laboratory for Hydraulic Machines, Lausanne, Switzerland Philippe ALLENBACH Dr. Alain SAPIN Prof. J.-Jacques SIMOND EPFL / Electrical Machines Laboratory, Lausanne, Switzerland Dr. Sonia KVICINSKY Marcus CRAHAN Power Engineering Costa Mesa, California ABSTRACT Models of hydraulic components based on impedance method have been implemented in a software called “SIMSEN”. This tool allows the simultaneous solution of the electrical, hydraulic, mechanic and control equations ensuring a proper interaction between the four parts of a system. In this paper the interaction between hydraulic and electric part of 2 Francis turbines power plant is investigated by comparing the simulation results obtained with and without coupling hydraulic and electric phenomena. Using hydraulic, electric and hydroelectric simulation models, total load rejection, earth fault, out of phase synchronization and load variation have been investigated. Hydroelectric simulations offer the advantage to enable to study the coupling of hydraulic and electric parts and to optimize regulators parameters in interconnected mode. NOMENCLATURE Term Symbol Definition Term Symbol Definition Piezometric head H H = z + p/(ρg) [m] Hydraulic resistance R R = R’ . dx [s/m 2 ] Flow rate Q [m 3 /s] Hydraulic inductance L L = L’ . dx [s 2 /m 2 ] Wave speed a [m/s] Hydraulic capacitance C C = C’ . dx [m 2 ] Cross section area A [m 2 ] Rated head h h = H/H R Friction factor λ [-] Rated torque β β = T/ T R [-] Singular losses coefficient K [-] Static turbine characteristic θ θ = tan -1 (υ/ α) Electrical resistance R e [ohm] Rated flow υ υ = Q/Q R [-] Electrical inductance L e [H] Rated rotating speed α α = ω/ω R [-] Electrical capacitance C e [F] Density ρ [Kg/m 3 ] Rotating speed ω [rad/s] Mechanical inertia I [Kg . m 2 ] Torque T [Nm] Guide vane opening degree y [-]
Transcript
Page 1: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

SIMULATION OF TRANSIENT PHENOMENA IN FRANCIS TURBINE POWER PLANTS: HYDROELECTRIC INTERACTION

Christophe NICOLET Prof. François AVELLAN

EPFL / Laboratory for Hydraulic Machines, Lausanne, Switzerland

Philippe ALLENBACH Dr. Alain SAPIN Prof. J.-Jacques SIMOND

EPFL / Electrical Machines Laboratory, Lausanne, Switzerland

Dr. Sonia KVICINSKY Marcus CRAHAN

Power Engineering Costa Mesa, California

ABSTRACT

Models of hydraulic components based on impedance method have been implemented in a software called “SIMSEN”. This tool allows the simultaneous solution of the electrical, hydraulic, mechanic and control equations ensuring a proper interaction between the four parts of a system. In this paper the interaction between hydraulic and electric part of 2 Francis turbines power plant is investigated by comparing the simulation results obtained with and without coupling hydraulic and electric phenomena. Using hydraulic, electric and hydroelectric simulation models, total load rejection, earth fault, out of phase synchronization and load variation have been investigated. Hydroelectric simulations offer the advantage to enable to study the coupling of hydraulic and electric parts and to optimize regulators parameters in interconnected mode.

NOMENCLATURE

Term Symbol Definition Term Symbol Definition

Piezometric head H H = z + p/(ρg) [m] Hydraulic resistance R R = R’. dx

[s/m2]

Flow rate Q [m3/s] Hydraulic inductance L L = L’.dx

[s2/m2]

Wave speed a [m/s] Hydraulic capacitance C C = C’. dx

[m2] Cross section area A [m2] Rated head h h = H/HR Friction factor λ [-] Rated torque β β = T/ TR [-] Singular losses coefficient K [-] Static turbine

characteristic θ θ = tan-1(υ/ α)

Electrical resistance Re [ohm] Rated flow υ υ = Q/QR [-] Electrical inductance Le [H] Rated rotating

speed α α = ω/ωR [-]

Electrical capacitance Ce [F] Density ρ [Kg/m3]

Rotating speed ω [rad/s] Mechanical inertia I [Kg.m2]

Torque T [Nm] Guide vane opening degree y [-]

Page 2: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 2

INTRODUCTION

The operation of an hydroelectric power plant is subject to several transient phenomenon due to group star-up and shut-down, modification of operating point, earth fault, out of phase synchronization during start-up, emergency stop and so on. In order to ensure the safety of the power plant and to optimize operation parameters, a simulation model of the power plant is requested to investigate all the worst cases. The simulation of the dynamic behavior is usually performed separately for the hydraulic and electric part of the power plant allowing to determine the set of parameters related to the security of each part. Afterwards control command parameters have to be calculated considering the operation stability. However, it requires a full model of the power plant taking into account the hydraulic, electric, mechanical and control device components.

The EPFL Laboratory for Electrical Machines –LME– has developed a software called SIMSEN (Ref. 7, Ref. 8) for the simulation of electrical power networks systems in transient or steady state modes and adjustable speed drive systems. This software is based on a modular structure which enables to consider systems with arbitrary topology. It is composed of units, each representing a specific element in the network: electrical machine, mechanical system taking into account mechanical masses connected with damping and springs, transformers, voltage supplies, transmission lines, loads, static converters, controllers, semi-conductor. Each unit includes a set of differential equations based on the network element model. An original algorithm has been developed to generate a global set of differential equations solved by fourth order Runge-Kutta procedure. The variable time-step used for the integration of the governing equations allows to detect the exact sequence of events such as on-off switching of semi-conductors or circuit-breakers phase on-off switching.

To be able to study the dynamic behavior of a whole hydroelectric power plant including electrical, hydraulic and control components, a hydraulic extension has been developed and implemented in SIMSEN (Ref. 5 and Ref. 6). This development is the result of the collaboration between the LME and the EPFL Laboratory for Hydraulic Machines. The extension includes the models of pipe, valve, surge tank and Francis turbine. To fit to the formalism of this software the impedance method (Ref. 1, Ref. 2 and Ref. 9) has naturally been chosen for the modeling of the hydraulic components. Thus, the corresponding governing equations can be implemented easily and the hydraulic extension benefits from the arbitrary topology feature allowing to model complex piping systems. Another advantage is the possibility to study hydraulic installations on their own or with the inclusion of both control devices and electrical units. The modeling of the hydraulic components is presented in Table 1.

This paper deals with the simulation of the transient behavior of a 2 Francis turbines power plant using 3 models (hydraulic, electric and hydroelectric). The hydroelectric model is the coupling of the hydraulic and the electric models. Four cases have been simulated: total load rejection, earth fault, out of phase synchronization and load variation. For each case, one performed comparison between results obtained with the hydraulic, electric and hydroelectric models.

Page 3: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 3

Component Electrical equivalent Equation set

2

1 2c cdH dHdx a C Q Q

gA dt dt⋅ = = −

11 122R

dx QH Q RQ

DgAλ

∆ = =

2 2L

dQ dQdxH LgA dt dt

∆ = =

( ) cco

cpccpc Q

gAQK

HH 22=−

cc

c QdtdHzA =)(

co

pcc gA

LL =

22)(υα

βθ+

=BW

22)(υα

θ+

= hWH

( )1tan υθ α−=

∫=I

It dx

xgAL

)(1

R/2 Lh/2 Lh/2

C

Rh

R/2

H1 Hc

Q1 Q2 H2

Datum.

Q1 Q2 D, a, λ

dx H1 H2

Hc

Datum

Hpc Q1

Qc

Q2

Lpc

Hydraulic grade line

Kpc

Ac(z)

Aco

I

Tm , ω

y I

Ht + HrI-1 Lt Rt HtQ

WH = WH(ω,Q,y)

Hpc

Rc

Lc

Cc

Qc

Q2 Q1

Hc

HLc

HRc

Rv

( )22 ( ) ( )v

v vd G

QH Q

g C s A s∆ =Rv

∆Hv

Qv

s 0

1

Qv

Hydraulic grade line

∆Hv

Datum

Rc

Cc

Datum

Page 4: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 4

Table 1 Modeling of the hydraulic components using impedance method.

Page 5: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 5

CASE STUDY The system that has been investigated comprises a tank, a gallery, a surge tank, 2 Francis turbines of 86 MW and 2 generators connected to a 205 kV network (Fig. 1). The data corresponding to this example are presented in Table 2 and the characteristic curves of the turbines are presented in Fig. 2 with Sutter representation (Ref. 4). The transient behavior of the power plant is simulated using the hydraulic model, the electric model and a hydroelectric model in which both models are integrated.

Gallery Surge Tank Pipe Turbines Generators

L = 4000 m

D = 10 m

λ = 0.03

a = 1000 m/s

A(z<77) = 700 m2

A(77<z<87) =

400 m2

A(z>87) = 700 m2

L = 125 m

D = 5.5 m

λ = 0.02

a = 1250 m/s

HtR = 82 m

nR = 200 rpm

QtR = 114 m3/s

TtR = 4.11e 6 Nm

It+g = 1.767e6 Kgm2

Sn = 98 MVA

Un = 17.5 kV

Table 2 Characteristics of the power plant.

1

1

2

3

4

Page 6: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 6

Fig. 1 Modeling of the power plant with SIMSEN including two Francis turbines coupled to generators.

Using the 3 simulation models established with SIMSEN, four transient cases have been investigated allowing for a comparison between electric/hydraulic and hydroelectric simulation results under the following conditions:

- total load rejection (1) (hydraulic and hydroelectric models)

- earth fault (2) (electric and hydroelectric models)

- out of phase synchronization (3) (hydroelectric model)

- load rejection and acceptance (4) (hydroelectric model)

The trijunction, which distributes the flow rate to the turbines, has been modeled by three singular losses parameterized using a coefficient function of the the flow rate repartition beetween the three branches. The losses coefficients are taken from Ref. 3.

PID controllers have been used for:

- rotational speed regulation acting on the field voltage of the generators

- rotational speed regulation acting on the guide vane opening degree of Francis turbine in isolated production mode

- power regulation acting on the guide vane opening degree of Francis turbine in interconnected production mode

Fig. 2 Characteristics WB and WH of the turbines.

Total load rejection The first investigation concerned total load rejection where the circuit-breaker between the

y : opening degree y : opening degree

Turbine 1 inlet piezometric head H/Htot

Surge tank level z/Htot

n/nR Turbine 1

Surge tank inlet discharge Q/Qtot

T/TR Turbine 1

Page 7: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 7

transformer and the generator is switched off. Simultaneously, the distributor of the two Francis turbines are closed in 7 seconds linearly. The evolution of the main variables during and after the total load rejection is presented in Fig. 3 and Fig. 4.

Fig. 3 Evolution of the main variables of the power plant during total load rejection for the two turbines.

Fig. 4 Evolution of the turbine 1 variables during total load rejection

At the outset, the electromagnetic torque of the generators drops to zero instantaneously, as a result the rotational speed of the groups increases. The closure of the distributor reduces the hydraulic torque quickly limiting the rotational speed. The distributor closure induces a Waterhammer effect in the adduction part of the power plant and a mass oscillation between the reservoir and the surge tank. Moreover, the effect of non-uniform surge tank cross-section is properly taken into account. This simulation demonstrates the capability of hydraulic modeling to reproduce mass oscillation and Waterhammer effects. The same simulation has been performed considering the hydraulic model alone and assuming that the electromagnetic torque drops instantaneously to zero at t = 1s. The comparison between the hydraulic and hydroelectric simulation results are shown in Fig. 5. The two most important parameters affected by this transient disturbance are the maximum speed and the maximum pressure at the turbine inlet. The results are almost identical for the two simulations.

z/Htot

T/TR

n/nR

Qt/QR

Qst/Qtot

Hinlet/Htot

y/ymax

Page 8: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 8

Fig. 5 Comparison of the evolution of the turbine 1 rotational speed n and turbine 1inlet piezometric head H obtained with two simulations: simulation with hydraulic model and simulation with the hydroelectric model.

Earth fault Here, the effect of an earth fault occurring between the generator and the transformer of group 1 is evaluated using both the electric and hydroelectric simulation models. Depending on the duration of the fault, the synchronization is maintained or lost after the fault is removed. The Fig. 6 presents a comparison of simulation results obtained using the two models, for a duration inferior and superior to the critical time tc. tc is underestimated by 2% using the electric model in which the turbine torque is assumed constant. The discrepancy between results is due to the action of the turbine power regulator.

Fig. 6 Comparison of the effect of an earth fault on group 1 with a duration under and over critical time tc obtained

with two simulations: simulation with electric model and simulation with the hydroelectric model. Out of phase synchronization Three conditions are required for the success of the synchronization of the generator to the power network during the group start-up. The frequency, the phase and the magnitude have to match the corresponding network conditions before the closure of the circuit-breaker. The worst synchronization cases occurs when the the generator and the network are 120° and 180° degrees out of phase. Fig. 7, Fig. 8 and Fig. 9 present the effects of such wrong synchronization on the group 1. Fig. 8 presents the effect of group 1 120° out of phase situation on group 2.

Page 9: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 9

Fig. 7 Evolution of the electromagnetic torque, the head of the turbine and rotational speed of the group number 1 during synchronization fault of 120° electrical degree.

Fig. 8 Effects of 120° out of phase fault of the group 1 on the group 2. In the case of a 120° out of phase synchronization, the closure of the circuit-breaker induces a strong fluctuation of the electromagnetic torque that produces rotational speed variations. This results in the action of the speed regulator on the guide vane opening degree. Both effects contribute to turbine 1 inlet pressure variations. In addition, the first electromagnetic torque peak produces a free torsional vibrations at 63 Hz in the sytem constituted of turbine 1 inertia and stifness of its connecting shaft. This dynamic response of the structure is observable on the turbine 1 pressure and evidences the coupling between hydraulic and mechanical parts. Group 2 is also affected by the fault on group 1: through the pressure and discharge fluctuations; and also by the current fluctuations in the electrical lines producing electromagnetic torque fluctuations.

The 180° out of phase synchronization produces stronger current variations that result in disturbances in the overall installation.

nt1/nR

Ht1/HR

Ttem1/TR

Ht2/HR

nt2/nR Tem2/TR

Page 10: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 10

Fig. 9 Evolution of the electromagnetic torque, the head of the turbine and rotational speed of group 1 due to 180° out of phase synchronization.

Load rejection and acceptance Using the hydroelectric model, a load rejection and acceptance has been simulated taking into consideration the power regulator for the hydraulic part and the rotational speed regulator for the electrical part. The power consign first decreases from 73% down to 24% in 3 seconds and after 8 seconds increases up to 68% in 3 seconds. Fig. 10 presents the evolution of the variables of the installation during those variations. The hydroelectric model allows to optimize the control command in interconnected mode. Such an optimization is not possible when only one part of the model is taken into account. Using the hydroelectric model, it is also possible to assess the operating stability of the power plant taking into account the hydroelectric coupling effects.

Fig. 10 Evolution of group 1 variables during a successive load rejection and acceptance.

Ttem1/TR

ib1/in

Ht1/HR

nt1/nR

Ht1/HR

nt1/nR

Qt1/QR

yt1/ymax

Tt1/TR

Tem1/TR

Page 11: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 11

CONCLUSION

The transient behavior of a 2 Francis turbine power plant has been investigated using 3 models: hydraulic, electric and hydroelectric. Four disturbance cases have been simulated: total load rejection, earth fault, out of phase synchronization and load variation. A comparison of the simulations results using different models evidenced benefits of hydroelectric modeling.

The simulation of the three most critical transient phenomenon using decoupled models gave good agreements especially regarding prediction of the highest amplitudes of rotational speed, pressure, current and so on. This is mainly due to the difference of time scale of each part. In first approximation, for hydraulic transient behavior simulation, electrical phenomenon could be assumed to be instantaneous, while during electrical transient calculation the hydraulic variables could be taken constant.

However, simulation with hydroelectric model offers the 2 following advantages:

• It enables to analyze in details the coupling between hydraulic, electric, mechanic and control parts. This is particularly convenient in the case of islanded and isolated production conditions where there is strong interactions between the electric and hydraulic parts.

• In the field of control command, regulator parameter set requires an optimization. Control algorithm could be coded, and converted in dll format and then validated by simulation using SIMSEN. This allows testing new control strategies before their implementation in the control devices for interconnected production mode.

Finally, SIMSEN offers the advantage of allowing the development of electric and hydraulic models using the same tool. After determining a design ensuring safety with electric and hydraulic models on their own, these could be coupled for the stability assessment and the regulator parameters optimization.

REFERENCES

Ref. 1 FOX, J. A., 1989, “Transient flow in pipes, open channels and sewers”. Ellis Horwood Limited, Chichester.

Ref. 2 JAEGER, C., 1977, "Fluid transients in hydro-electric engineering practice ". Glasgow: Blackie.

Ref. 3 IDEL'CIK, I. E, 1969, "Mémento des pertes de charge. Coefficients de perte de charge singulières et de pertes de charge par frottement ". Paris : Eyrolles.

Ref. 4 MARCHAL, M., FLESH G. AND SUTER P., 1965, “The Calculation of Waterhammer problems by Means of the Digital Computer”. Proc. Int. Symp. Waterhammer Pumped Storage Projects, ASME, Chicago.

Ref. 5 NICOLET, C., AVELLAN, F., PRENAT, J. E., SAPIN, A., SIMOND, J. J., 2001, "A new tool for the simulation of dynamic behaviour of hydroelectric power plants ". 10th International meeting of the work group on the behaviour of hydraulic machinery under steady oscillatory conditions, Trondheim, Norway, June 26-28 2001.

Ref. 6 NICOLET, C. , ALLENBACH, P. , SAPIN, A. , SIMOND, J.-J. , AVELLAN, F. ; 2002, "New Tools for the Simulation of Transient Phenomena in Francis Turbine Power Plants ".

Page 12: simulation of transient phenomena in francis turbine power plants

Waterpower XIII July 29-31, 2003, Buffalo, New York USA

19.09.2003 12

Proceedings of the 21st IAHR Symposium on Hydraulic Machinery and Systems, Lausanne, Switzerland, 9-12 September 2002, pp. 519-528.

Ref. 7 SAPIN, A., 1995, “Logiciel modulaire pour la simulation et l’étude des systèmes d’entraînement et des réseaux électriques”. PhD thesis, EPFL, These n°1346.

Ref. 8 SIMOND, J.-J., SAPIN A., ALLENBACH P., 2002, Simulation des réseaux et des systèmes d'entraînements électriques. Bulletin SEV/VSE 2002 Nr.7.

Ref. 9 WYLIE, E. B. & STREETER, V.L., 1993, “Fluid transients in systems”. Prentice Hall, Englewood Cliffs, N.J.

AUTHORS Christophe Nicolet, PhD student, is doing his PhD work on the subject of hydro-acoustic modeling of Francis turbine at the EPFL Laboratory for Hydraulic Machines in Lausanne, and is involved in the development of the SIMSEN hydraulic extension. Francois Avellan, Prof., is director of the EPFL Laboratory for Hydraulic Machines in Lausanne, and is supervising the research and the collaboration with industry in field of hydraulic machines. Philippe Allenbach, PE, is research assistant at the EPFL Electrical Machines Laboratory, and is in charge of the development of the software SIMSEN. Alain Sapin, PhD, is power production manager at EEF in Fribourg and has developed the software SIMSEN in the framework of its PhD Thesis at the EPFL Electrical Machines Laboratory in Lausanne. Jean-Jacques Simond, Prof. , is director of the EPFL Electrical Machines Laboratory in Lausanne, and is supervising the research and the collaboration with industry in field of electrical machines. Sonia Kvicinsky, PhD, is principal scientist/engineer at Power Engineering in Costa Mesa, and is responsible of projects in the field of hydraulic machines. Marcus Crahan, PE, is director of Power Engineering and has designed and supervised numerous turbine generator upgrade and diagnostic programs.