Ali Sheikholeslami, P.E.
East Bay Municipal Utility District
CA-NV AWWA Conference, Rancho Mirage, CAOctober 23, 2018
Simultaneous Replacement of Two WTPs’ Obsolete Air-fed Ozone Systems
with Oxygen-fed Systems to Address Challenging T&O Issues
Accurate Project Budget
2
Presentation Overview
• Overview of EBMUD and Sobrante and Upper San Leandro (USL) WTPs
• Project background and goal
• Project’s tasks responsibilities
• Scope, schedule, and cost
• Lessons learned
3
East Bay Municipal Utility District
Service Area: San Francisco East Bay, 330 sq. miles
Water Customers: 1.4M
Water Source: Mokelumne River watershed (90%), Pardee & Camanche Reservoir, 5 local reservoirs
Water Treatment Plants: 5+1
Pressure Zones: 122
Pipes: 4,200 miles
Pumping Plants: 135
Distribution Reservoirs: 1644
East Bay Municipal Utility District
5
Sobrante and USL WTPs –Conventional Plants with Ozone
Upper San Leandro
WTP
Sobrante WTP
6
Treatment Process Schematic
Rapid Mix
Sedimentation Filtration
Anthracite/sand dual media
Cl
Intermediate Ozone
Contactor
Flocculation
Ammonia
Cl
Alum
+PolyOzone H2O2
Chlorine CT Disinfection
Aeration
7
Sobrante and USL WTPs
• Design flow rates – Max. 60 MGD
• Seasonal WTPs – Out of service Nov.-Mar.
• Original ozone system installed 1991 for T&O o Three 750 lb/day air-fed ozone generators
o Ozone concentration 2.2% max.
o Max. ozone dose 3 mg/L
o Settled-water (intermediate) ozone contactor with diffuser system – HRT 11 min max. flow
8
9
Original Ozone Air Fed System
Air Compressors Refrigerated Dryers Filters & Desiccant Dryers
GeneratorsCooling Water System
Air
10
Original Ozone System Issues
• Lack of technical support
• High O&M costso System specific energy -15 kW-hr/lb O3
oAir-prep system maintenance
oUnreliable PSUs, control system
o Power harmonic issues at Sobrante WTP
• Limited ozone capacity to deal with major T&O events
10
Sobrante WTP Raw Water Geosmin/MIB Data 2009-2015
11
Sobrante & USL WTPs Ozone System Improvements Project
• Project goals
o Increase ozone capacity to deal with T&O
o Reduce O&M costs by increasing efficiency and reliability
o Reliable technical support
• Best alternative
o Install high-efficiency oxygen-fed generators
12
Project’s Team
13
• Design Consultant and Engineering Services during construction – Carollo Engineers
• Ozone System Supplier – Suez Treatment Technology
• General Contractor – Overaa Construction
• Construction PM – EBMUD, Brown & Caldwell
• Commissioning & Startup – EBMUD
• Control Systems Integration - EBMUD
Scope of Work at Sobrante WTP
14
Scope of Work at USL WTP
15
New Ozone Process Schematic
16
LOX System
• Two 20,000 gallons LOX storage tanks, two vaporizers, associate piping, electrical and civil work
17
Ozone Generation System
• Three 1750 lb/day ozone generators
• Maximum production 3500 ppd, 7.0 mg/L at 60 mgd @ 10%
• Power supply units (PSUs), master ozone controller panel
• Open and closed cooling water systems
• Supplemental nitrogen
• Ozone system piping, electrical/controls cable & conduit
18
Ozone Generation Building Modifications
• New fire rated separation walls
• New floors
• MCCs
• HVAC
• Fire alarms & sprinkler system
• Emergency generators
19
Ozone Generation System
20
21
22
23
Ozone Contactors Modifications
• New ozone contactor slide gates with electrical actuators
• New diffuser system
• Exterior seal for contactors
24
Ozone Destruct Modifications
25
26
Hydrogen Peroxide System
• One 6,000-gal. aluminum storage tank
• Secondary containment
• 5 metering pumps with carry water
• Double contained HDPE buried piping
27
Hydrogen Peroxide System
28
Ozone Control System Block Diagram
29
Ozone Generator Control Panels
Ozone Destruct
LOX PLC
Master Ozone Control Panel
To DCS
Auxiliary Equipment
Existing Control System
• PLCs and Moore controllers
• SCADA and operator interfaces
• Limited support and programming knowledge
30
New Honeywell Experion Distributed Control System (DCS)
• Install servers & software
• Install fiber optics cable and conduits
• Program & build screens
31
Overall Project Schedule
• Planning Phase – 2014
• Design Phase – May 2015 to Jan. 2017
• Ozone Equipment o Board contract award – May 2016
o Final ozone system submittals – June 2017
o Ozone equipment delivery – Nov./Dec. 2017
• Construction Phase o Board contract award – April, 2017
o Notice to Proceed – June 1, 2017
o Sobrante WTP Ready for Service – June 1, 18 ( rev. to July 1, 2018)
o USL WTP Ready for Service – July 1, 18 (rev. to Aug. 1, 2018)
32
Sobrante WTP Schedule Challenge
• Sobrante WTP Ozone Ready-for-Service date slipped by six weeks
oMCC refurbishing
oAuxiliary systems HVAC, fire alarms, instrumentation
oCoordination between MOCP and auxiliary system programing
• District installed a temporary PAC feed system to deal with potential T&O events
33
Project Cost
Phase Description Cost in $M
Design Design Consultant $3.4
District $1.2
Total Design $4.6
Construction Contract $34
Ozone Equipment $5.5
CM, Design Consultant (training, O&M, SOPs)
$5.1
DCS Control System (hardware, software, programming)
$2
District O&M Support, Training, etc. $1.3
Total Construction $47.9
Total $52.5
34
Project Success
• Pre-purchase of ozone system equipment and assign it to contractor
• Good teamwork under tremendous pressure
• Negotiated addition of a second electrical subcontractor
• No recordable incidents
• Sobrante is producing water and ozone system is performing as designed
35
Lessons Learned
• Have more stringent QA/QC process to review design drawings and specifications
• Do not construct two major WTPs projects concurrently
• Do not underestimate difficulty of treatment plan rehab work
36
• Pay attention to the auxiliary systems
• Streamline fabrication witness process
• A new MCC may have been faster and easier than refurbishing an old MCC
• Plan for operation without ozone (powdered activated carbon)
37
Lessons Learned
Acknowledgment
• EBMUD Project Team
• CM - Jimi Yoloye, Tim Karlstrand, Chris Shumate, Brett Margosian, Alisa Askins, Karl Tingwald, Joseph Patton, Ray N. Vanover, Joseph K. Kacyra, Samuel Abraham, Joseph Patton, Norm Settle (B&C), Carlos Garcia(B&C)
• O&M - Daniel Gill, Bryan Miller, Danielle Roybal-Alviz, Davis Gluchowaski, Ted Lam, Lisa Toth
• Engineering - Serge Terentieff, Michael Hartlaub, Alex Borys, Besnik Miftari, Hsini Wu, Chris Farajian, Jakira Jekayinfa-Brown, Justin Young, Angela Curtis, Noorun Nahar, Mykel Morgan
• Carollo Engineers Project Team – Chris Cleveland, Scott Weddle, Ashritha Banapuram, Ron Joost,
• Overaa Team - Jeff Naff, Mike Childs, Leah King, Bill Price, Mark Hunter, Malynda Lestrange, Danny Holdren, Michael Bailey
38