● History of construction.● Stone.● Cement.● Mortar.● Concrete.● Plaster.● Ceramics.● Building constuction phases. (1-32)

Page 3: Sin título 1 (copia)

History of construction● The history of

construction is a complex subject encompassing the history of building materials, the history of engineering, the history of building techniques, economic and social history of builders and workmen, the history of construction machinery and temporary works etc etc.

Page 4: Sin título 1 (copia)

History of construction

Each of these has a complex literature devoted to it, but it perhaps worth providing the briefest of

summaries here in the hope that others will start new more detailed pages.

Page 5: Sin título 1 (copia)

Stone

● Stone is a natural material we extract from quarries.● Stone walls are a kind of masonry construction which

have been made for thousands of years. First they were constructed by farmers and primitive people by piling loose field stones in what is called a dry stone wall, then later with the use of mortar and plaster especially in the construction of city walls, castles, and other fortifications prior to and during the Middle Ages.

Page 6: Sin título 1 (copia)

Cement

● In the most general sense of the word, a cement is a binder, a substance that sets and hardens independently, and can bind other materials together.

Page 7: Sin título 1 (copia)

Cement● Cement is a construction material , a mix of pulverized

natural soil with small amount of portland cement and water, usually processed in a tumble, compacted to high density. Hard, semi-rigid durable material is formed by hydration of the cement particles.

● Soil cement is frequently used as a construction material for pipe bedding, slope protection, and road construction as a subbase layer reinforcing and protecting the subgrade. It has good compressive and shear strength, but is brittle and has low tensile strength, so it is prone to forming cracks.

Page 8: Sin título 1 (copia)

Concrete● Concrete is a composite

construction material composed of cement (commonly Portland cement) and other cementitious materials such as fly ash and slag cement, aggregate (generally a coarse aggregate made of gravels or crushed rocks such as limestone, or granite, plus a fine aggregate such as sand), water, and chemical admixtures.

Page 9: Sin título 1 (copia)

Concrete

● Concrete solidifies and hardens after mixing with water and placement due to a chemical process known as hydration. The water reacts with the cement, which bonds the other components together, eventually creating a robust stone-like material. Concrete is used to make pavements, pipe, architectural structures, foundations, motorways/roads, bridges/overpasses, parking structures, brick/block walls and footings for gates, fences and poles.

Page 10: Sin título 1 (copia)

Plaster● Plaster is a soft solid , that we

normally use for aesthetic purposes, to cover brick walls wich have a rough surface

● Plaster comes from gypsum. We extract gypsum from the quarry , and then grind it. When ground gypsum is mixed with water, it becomes a paste and we can spread it on interior walls .

Page 11: Sin título 1 (copia)

Plaster

● Advantages :● Gives a smooth surface

and has a nice finish.● It's easy to work with.● It's a good sound and

thermal insulator.● It's resitant to fire.

● Disadvantages:● It's weak.● It absorbs water.

Page 12: Sin título 1 (copia)

Ceramics● Itś the oldest artificial

material.● Firstly it was used for pottery,

but now we use it in construction, for example, for making bricks to make walls.

● Bricks have the advantadge of beign cheap and durable, and they require very little maintenance.

Page 13: Sin título 1 (copia)

Ceramics

A ceramic is an inorganic, non-metallic solid prepared by the action of heat and subsequent

cooling. Ceramic materials may have a crystalline or partly crystalline structure, or may be amorphous . Because most common ceramics are crystalline, the definition of ceramic is often restricted to inorganic

crystalline materials, as opposed to the non-crystalline glasses.

Page 14: Sin título 1 (copia)

Types of construction● In general, there are three types of

construction:● 1. Building construction● 2. Heavy / civil construction● 3. Industrial construction● Each type of construction project

requires a unique team to plan, design, construct, and maintain the project.

Page 15: Sin título 1 (copia)

Building construction phases

In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.

Page 16: Sin título 1 (copia)

Building construction phases

For the successful execution of a project, effective planning is essential. Those involved with the design and execution of the infrastructure in question must consider the environmental impact of the job, the successful scheduling, budgeting, construction site safety, availability of building materials, logistics, inconvenience to the public caused by construction delays, and bidding, etc.

Page 17: Sin título 1 (copia)

Phase 1● 1 Choose Your New

House Building Site● When prospecting for

a building site to build your new house choose the site with the assistance of a general contractor, real estate agent, architect, or engineer.

Page 18: Sin título 1 (copia)

Phase 2

● 2 Have Your Design● Design your house

building plans for your house.

● The architectural team will draw up your home plans to meet state and local regulations.

Page 19: Sin título 1 (copia)

Phases 3 and 4

● 3 Review the House Plans● The architect reviews the

home building plans and schedules with the clients.

● 4 Obtain Permits● The architect or home

builder applies for the necessary building permits

Page 20: Sin título 1 (copia)

Phases 5 and 6● 5 Land Clearing● The excavator uses heavy

equipment to clear the land of trees, shrubbery, and brush and a driveway access is created to your home building site.

● 6 House Layout (trazado)● A general contractor or engineer

layouts out the home location.

Page 21: Sin título 1 (copia)

Phases 7 and 8● 7 Installation of Septic, Well and

other Utilities Begins● Utility installation often begins

now although your project coordinator may leave these items toward the end of the home construction.

● 8 Excavation● Excavators and heavy equipment

begin the excavation preparing the land for the footings.

Page 22: Sin título 1 (copia)

Phases 9 (1 and 2)● 9 House Footings● The general contractor or the mason contractor

pours the footings. In heavy populated areas your footing contractor may be a subcontractor for the foundation wall contractor.

● 9 Foundation Walls● Two common foundation wall types are block

foundation and poured concrete foundation walls. Your concrete floor is commonly poured after the forms are stripped for the foundation walls.

Page 23: Sin título 1 (copia)

Phases 10 and 11● 10 Back-fill● The excavator back-fills after the

foundation walls are poured. Some contractors prefer to have the floor joists set prior to this back-fill to tie the walls together.

● 11 House Floor Framing● Carpenters or a framing crew frame

the floor joists and apply decking material to the floor joists.

Page 24: Sin título 1 (copia)

Phases 12 and 13

12 Wall Framing

Carpenters or framers build exterior walls. Interior walls are often constructed at this stage although the interior partition walls may also be built after the roof is framed.

13 Roof Framing

The carpenter now frames the roof complete with sheathing. The walls may also be sheathed at this point if they were not sheathed during the wall framing stage. Decorative rakes and fascia boards may be added at this stage if adding a little extra style to your home is desired.

Page 25: Sin título 1 (copia)

Phases 14 and 15● 14 Framing Inspection● Your building inspector inspects all phrases of

construction at this point. Be sure to review the inspection schedule with your local building inspector as there may be many additional inspections required prior to this.

● 15 Roofing● When the home is ready for the roofing, the general

contractor or the roofing contractor apply the shingles. Asphalt, fiberglass, cedar, and slate shingles are options with metal shingles and metal panels becoming increasingly popular.

Page 26: Sin título 1 (copia)

Phase 16

● 16 Window and Exterior Door Installation

● Carpenters now install your windows and exterior doors. If you choose to go with an exterior (rigid) insulation to increase the R-value of your home this will be installed after the window and exterior door installation.

Page 27: Sin título 1 (copia)

Phase 17

● 17 Siding Installation● The builder or siding

contractor now applies the siding for your new home. Popular options include vinyl, aluminum, and cedar siding. When incorporating vinyl and cedar siding adding a decorative shake style siding for the gables is becoming increasingly popular.

Page 28: Sin título 1 (copia)

Phases 18 and 19

● 18 HVAC Work● HVAC (Heating, Ventilation and Air

Conditioning) is now installed. In some areas the HVAC contractor may be the same as the plumbing contractor.

● 19 Plumbing Installation● At this point in the construction process the

plumber installs the rough plumbing.

Page 29: Sin título 1 (copia)

Phases 20 and 21

● 20 Electrical● The electrical contractor now installs the rough electrical

work including the breaker panel, wiring and boxes.●

● 21 Insulation● The insulation contractor or the general contractor

insulates the walls. The ceiling is also insulated in vaulted areas if there is no attic access to this area. The ceiling is more commonly insulated after the drywall stage with blown in insulation.

Page 30: Sin título 1 (copia)

Phase 22

● 22 Drywall Installation

● A drywall contractor which may be your general contractor now installs your drywall. Drywall is also commonly referred to as Sheetrock or gypsum wall board.

Page 31: Sin título 1 (copia)

Phase 23

● 23 Drywall Finishing● The drywallers tape the

joints with drywall compound after the drywall is installed. They then apply up to 2 additional coats of drywall compound over the tape and corner beads.

Page 32: Sin título 1 (copia)

Phases 24 and 25

● 24 Painting● Wall painting may be accomplished at this stage,

or be completed after the finish trim installation.●

● 25 Cabinet and Finish Trim Installation● The finish carpenter now installs the cabinets and

trim boards including the baseboard and window casing. Decorative crown moldings remain popular in kitchen and dining rooms.

Page 33: Sin título 1 (copia)

Phase 26● 26 Flooring

Installation● There are many

popular flooring styles to choose from. Having a variety of finished floor styles is very common with the flooring styles including laminate, vinyl, hardwood, and tile flooring.

Page 34: Sin título 1 (copia)
Page 35: Sin título 1 (copia)

Phases 27 and 28

● 27 Finish Plumbing● The finish plumbing

includes setting the sink, bath fixtures, showers, tubs, and toilets.

● 28 Finish Electrical● The electrician

completes the finish electrical work at this time including installing the outlets, switches, and light fixtures.

Page 36: Sin título 1 (copia)

Phases 29 and 30

● 29 Finish HVAC● The cover plates are

now installed over the registers and air returns for the HVAC system. If a fireplace is desired in your home your HVAC contractor often installs fireplaces with the quote for the HVAC work.

● 30 Final Concrete Work

● The driveway and final concrete work include the sidewalks, optional concrete front porch, garage floor, and pads for hot tubs.

Page 37: Sin título 1 (copia)

Phase 31

● 31 Deck● Deck construction now takes

place by the general contractor. Hot tubs are often incorporated into deck designs. Be sure to discuss the potential placement of a hot tub onto your deck with your contractor as the immense weight requires additional framing stipulations.

Page 38: Sin título 1 (copia)

Phase 32

● 32 Landscaping● The

landscapers plant shrubs and trees with the grass or sod for your new lawn to add a finishing touch.