“Practical Pavement Management with Micro PAVER” Presented By: KMS & Associates, Inc.
Transcript
Page 1: Sistema de gestión de pavimentos

“Practical Pavement Management with Micro PAVER”

Presented By:KMS & Associates, Inc.

Page 2: Sistema de gestión de pavimentos
Page 3: Sistema de gestión de pavimentos

What is Micro Paver?Developed by the Army Corps in the late 70’sOptimizes funds allocated for M&RUtilizes the PCI methodologyPCI became an ASTM standard in 1999Most widely used system in the world.Continually funded and updated by the CorpsRecommended and promoted by the American

Public Works Association (APWA)

Page 4: Sistema de gestión de pavimentos

1. Inventory

2. Inspection

3. Reporting

4. Modeling

5. Condition Analysis

6. M&R Planning

The Pavement Management Process

Page 5: Sistema de gestión de pavimentos

Inventory HierarchyNETWORKCity of Marco

Island

BRANCHSan Marco

Section 01

Sample # 2568

Section 02

Sample # 2679

BRANCHWillow Brook

Ln.

Section 01

Section 02

Section 03

Section 04

Section 05

BRANCHSunset Point

Section 01

Section 02

Section 03

Section 04

Page 6: Sistema de gestión de pavimentos

NetworkNetwork Definition

Example of a typical network

�����

����

� � �� �������

Page 7: Sistema de gestión de pavimentos

BranchBranch Definition

Example of a typical branch

�����

�����������

Page 8: Sistema de gestión de pavimentos

SectionSection Definition

Example of a Typical Section

�����

�����������

Page 9: Sistema de gestión de pavimentos

Inspection Process

DetermineSample Units

Identify Distresses

RecordDistresses

CalculatePCI

• Representative

• House Number

• 2500 SF Area

• Asphalt Distress Manual

• Concrete Distress Manual

• Distress Type

• Severity Level

• Quantity

• Determinededuct values

• Compute PCI for each sample

• Average PCI' s for section condition

Page 10: Sistema de gestión de pavimentos
Page 11: Sistema de gestión de pavimentos
Page 12: Sistema de gestión de pavimentos

PCI Range Treatment

95 - 90 Rejuvenating Seal

90 - 80 Single Micro-surfacing orSurface Treatment

80 - 70 Overlay or Double Micro-surfacing + Crack Seal

70 - 50 Overlay or Double Micro-surfacing + Crack Seal + Leveling

50 - 30 Mill & Asphalt overlay + SAMI

30 - 0 Full Depth Reclamation

Page 13: Sistema de gestión de pavimentos

How do I know how much money it will take to keep my network at an

acceptable level of service?

Page 14: Sistema de gestión de pavimentos

M & R PlansRun M&R plans to illustrate current and future pavement conditions at various levels of spending.

Page 15: Sistema de gestión de pavimentos

What If ScenariosWhat if I want to maintain my current condition?What if I want to achieve a better overall condition?How many years will it take to get there?What if I spend more money now?What if I spend more later?What roads should I spend the money on?

Page 16: Sistema de gestión de pavimentos

$1 Million/Year Budget

Page 17: Sistema de gestión de pavimentos

$3 Million/Year Budget

Page 18: Sistema de gestión de pavimentos

Once I know how much money our agency needs, will the “powers that be” agree?

Page 19: Sistema de gestión de pavimentos

Section By Condition At Last InspectionS

ectio

ns

Condition at Last Insp

0

1000

2000

3000

4000

5000

Failed Serious Very Poor Poor Fair Satisfactory Good

Page 20: Sistema de gestión de pavimentos

Pinellas County Highway Zone by ConditionW

t Avg

Con

ditio

n (P

CI)

Zone

0

20

40

60

80

100

N SE SW

Page 21: Sistema de gestión de pavimentos
Page 22: Sistema de gestión de pavimentos

GIS Reports

Page 23: Sistema de gestión de pavimentos

“Why Spend Money Managing Roadways When I Could Spend the Money Paving

Roadways?”

Page 24: Sistema de gestión de pavimentos
Page 25: Sistema de gestión de pavimentos

Pavement Management Cycle

Page 26: Sistema de gestión de pavimentos

Contact Information

Florida OfficeBob Siffert

4683 SW 102nd Lane Rd.Ocala, FL 34476

Toll Free: (866) 562-5524Fax: (352) 861-9796

Email: [email protected]

Ohio OfficeJim Golden

336 Pebble Creek Dr.Dublin, OH 43017

Toll Free: (800) 450-4514Fax: (614) 764-8811

Email: [email protected]

Website: http://micropaver.net

Page 27: Sistema de gestión de pavimentos
Page 28: Sistema de gestión de pavimentos

Recommended