CUSTOMER SERVICE, WORKROOM AND CHECKOUT POWER PLAN
AutoCAD SHX Text
ELECTRICAL PANEL SCHEDULES
AutoCAD SHX Text
ELECTRICAL RISER DIAGRAM AND NOTES
AutoCAD SHX Text
LIFE SAFETY PLAN
AutoCAD SHX Text
EXISTING FIXTURE PLAN
AutoCAD SHX Text
EXTERIOR ELEVATIONS
AutoCAD SHX Text
REVISED FIXTURE PLAN
AutoCAD SHX Text
DELI/BAKERY FIXTURE PLAN
AutoCAD SHX Text
FLOOR PLAN
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
G1.01
AutoCAD SHX Text
P1.01
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
E1.01
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text
E0.01
AutoCAD SHX Text
G1.02
AutoCAD SHX Text
E4.02
AutoCAD SHX Text
E6.01
AutoCAD SHX Text
E6.04
AutoCAD SHX Text
G1.03
AutoCAD SHX Text
A0.02
AutoCAD SHX Text
A1.01
AutoCAD SHX Text
A2.01
AutoCAD SHX Text
A4.01
AutoCAD SHX Text
A1.03
AutoCAD SHX Text
FLOOR FINISH PLAN
AutoCAD SHX Text
A1.05
AutoCAD SHX Text
1. THE GENERAL CONTRACTOR SHALL THE GENERAL CONTRACTOR SHALL DOWNLOAD THEIR DRAWINGS & SUPPORT PACKAGE (PROJECT MANUAL, REFRIGERATION SUMMARY AND ASBESTOS SURVEY VIA WWW.PMWEB.COM. FOR QUESTIONS OR SUPPORT CONTACT: STACEY EFIRD AT PHONE #704-310-2990 OR [email protected] 2. THE GENERAL CONTRACTOR MUST PROVIDE A CLEANUP PERSON ONCE THE SALES FLOOR WORK HAS STARTED TO DO NOTHING BUT CLEAN, MOP, DUST, ETC. THIS PERSON MUST BE IDENTIFIED TO THE CONSTRUCTION SUPERVISOR, STORE MANAGER AND CONSTRUCTION SPECIALIST. DAILY LIST MAY BE PROVIDED. CONSTRUCTION RELATED CLEANING ONLY. 3. THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE THE CURRENT ASBESTOS SURVEY REPORT PROVIDED BY FOOD LION TO FAMILIARIZE THEMSELVES WITH ANY ASBESTOS CONTAMINATION CONTAINED IN THE PROJECT. ALL HANDLING, ABATEMENT OR REMOVAL OF ASBESTOS SHALL BE IN COMPLETE COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS. 4. THE GENERAL CONTRACTOR SHALL ASSURE THAT ANY ASBESTOS ABATEMENT AREA WILL NOT BE OCCUPIED UNTIL ALL RESPONSE ACTIONS HAVE BEEN COMPLETED AND FINAL LEVELS FOR RE-OCCUPANCY OF THE ABATEMENT AREA SHALL BE 0.01 OR FEWER ASBESTOS FIBERS PER CUBIC CENTIMETER IF DETERMINED BY PHASE CONTRAST MICROSCOPY ANALYSIS (PCM) OR 70 OR FEWER ASBESTOS FIBERS PER SQUARE MILLIMETER IF DETERMINED BY TRANSMISSION ELECTRON MICROSCOPY ANALYSIS (TEM). 5. GENERAL CONTRACTOR SHALL VIDEO TAPE OR PHOTOGRAPH EXISTING EXTERIOR CONDITIONS AT STORE PRIOR TO ANY WORK BEGINNING. THIS SHOULD ESPECIALLY INCLUDE THE CONDITIONS OF THE ROOF AND ASPHALT DRIVES AND PARKING AREAS. ANY BACKCHARGES BY THE LANDLORD THAT CANNOT BE PROVEN FALSE BY EXISTING PHOTOGRAPHS WILL BE PAID BY THE GENERAL CONTRACTOR. 6. THE GENERAL CONTRACTORS ARE NOW RESPONSIBLE FOR MAINTAINING PERSONNEL AT ALL TIMES ON THE JOB SITE. THERE MUST BE A JOB SUPERINTENDENT AND LEAD CARPENTER ASSIGNED TO ONE JOB AND HAVE BOTH DAY AND NIGHT COVERAGE. THIS WILL ENSURE ALL DELIVERIES ARE BEING ACCEPTED BY SOMEONE FROM THE GENERAL CONTRACTOR. 7. GENERAL CONTRACTOR MUST INSURE THAT THEY AND ALL SUBS RELATED TO THE REMODEL; RECEIVE A COPY OF THE REFRIGERATION SUMMARY, ASBESTOS SURVEY, SPECIFICATION BOOK, ETC. SO THE SUB CAN RESEARCH AND INCORPORATE A PRICE APPROPRIATELY FOR THE WORK TO INCLUDE LABOR AND MATERIAL. 8. GENERAL CONTRACTOR TO VERIFY WITH LOCAL AUTHORITIES AND OBTAIN/PURCHASE ANY NOISE ORDINANCE PERMITS REQUIRED. 9. GENERAL CONTRACTOR IS RESPONSIBLE FOR PICKING UP PERMIT AND PAYING FOR ANY OUTSTANDING FEES RELATED WITH THE PERMIT. THE ARCHITECTS WILL SUBMIT DRAWINGS FOR PERMITTING AND PAY FOR THE PERMIT REVIEW FEE ONLY.
ARCHITECTURAL: EXTERIOR: EXISTING EIFS TO BE PAINTED. EXISTING FOOD LION EXTERIOR FACADE SIGNAGE IS TO BE REPLACED WITH NEW SIGNAGE, PROVIDE NEW CHANGEABLE SIGNS ON EACH SIDE OF THE ENTRY, ADD A DECAL SIGN IN THE FRONT WINDOW, SIGNAGE WILL BE PERMITTED SEPARATELY. INTERIOR: REPLACE PART OF THE EXISTING CHECKOUTS ENDS WITH NEW ONES, RELOCATE SERVICES EQUIPMENT ALONG FRONT WALL, REMODEL WORK ROOM, NEW PAINT FINISHES IN MOST AREAS OF STORE, PROVIDE NEW WALK OFF CARPET IN VESTIBULE, SOME NEW AND RELOCATED LIGHTING, ADD MISC EQUIPMENT IN THE LOUNGE, AND DEPARTMENT MANAGERS OFFICE AND ASSOCIATES TRAINING ROOM. MATERIALS ANTICIPATED TO BE USED ARE: METAL STUDS, GWB, PAINT, MARLITE, VCT AND CERAMIC WALL TILE. PLUMBING: INSTALL A NEW MISTING SYSTEM FOR PRODUCE CASES AND NEW EYE WASH IN THE MEAT PREP AND DELI-BAKERY PREP AREAS. ELECTRICAL: ADD SOME NEW SALES AREA LIGHTS, INSTALL NEW CIRCUITS FOR ASSOCIATE TRAINING ROOM, LOUNGE AND WORK ROOM, RELOCATE EQUIPMENT ALONG FRONT WALL OF STORE.