AREA 10 CENTRAL PUMPING STATION CONNECTION TO A10N DRAINAGE NETWORK S269 WATLING STREET WATLING STREET SITE ACCESS ROAD THE HIGH STREET F-P S S S S S S S S S C C C C C PE C C C C C C C B D B B D A A C C G H I E F J KSDH1 OCDH1 OCDH3 KSDH3 KSDG6 OCDG6 OCDG7 KSDG7 OCDI10 KSDI11 OCDI12 KSDI12 KSDF14 OCDF14 OCDF17 KSDF17 KSDE20 OCDE20 OCDJ22 OCDJ24 KSDJ24 A C KSDJ22 KSDE19 OCDE18 6 EXISTING HIGHWAY LAND REQUIRED FOR S278 WORKS PROPOSED LAND TO BE ADOPTED BY MKC APPROXIMATE SITE BOUNDARY HIGHWAY DRAINAGE HIGHWAY GULLY & CONNECTION EXISTING HIGHWAY GULLY TO BE RETAINED DRAINAGE EASEMENTS NEW BUS SHELTER MKC TO CONFIRM SUPPLIER TOUCAN SIGNAL AND PEDESTRIAN DEMAND UNIT MOVA/VA LOOP DETECTOR 2m TRAFFIC SIGNAL POLE 4.2m TRAFFIC SIGNAL POLE PEDESTRIAN DEMAND UNIT ON CROSSING DETECTOR KERBSIDE DETECTOR TACTILE ROTATING CONE 3 ASPECT PRIMARY SIGNAL HEAD 3 ASPECT SECONDARY SIGNAL HEAD C Printed on ___% Post-Consumer Recycled Content Paper ISO A1 594mm x 841mm KEY PLAN CONSULTANT AECOM Colmore Building Colmore Circus Queensway Birmingham, B4 6AT 0121 262 1900 tel www.aecom.com CLIENT Redlawn Land Limited PROJECT Milton Keynes Western Expansion Area PROJECT NUMBER 60555498 0 12.5 25 1:500 m PLAN Scale 1:500 I/R DATE DESCRIPTION ISSUE/REVISION P1 22.07.2019 ISSUED FOR APPROVAL P2 06.08.2019 REVISED TO CLIENT COMMENTS P3 02/10/2019 DRAINAGE HIGHWAY ADDED P4 16/10/2019 UPDATED TO MKC COMMENTS P5 22/10/2019 UPDATED TO MKC COMMENTS C1 14/11/2019 FOR CONSTRUCTION ISSUE C2 18/11/2019 STREET LIHGTING ADDED Last saved by: GABRIELA.SONDEJ(2019-11-14) Last Plotted: 2019-11-18 SHEET TITLE JUNCTION 26 LAND DEDICATION PLAN SHEET NUMBER 60555498-SHT-00-JCT26-C-01001 Project Management Initials: Designer: Checked: Approved: JS JS AF Filename: T:\470XXXXX-\MILTON KEYNES WEA\TECHNICAL\WORK PHASE\WESTERN EXPANSION\SHEETS\60555498-SHT-00-JCT26-C-01001.DWG THIS DRAWING IS TO BE USED ONLY FOR THE PURPOSE OF ISSUE THAT IT WAS ISSUED FOR AND IS SUBJECT TO AMENDMENT DO NOT SCALE FROM THIS DRAWING. ONLY USE PRINTED DIMENSIONS. ALL DIMENSIONS ARE IN MILLIMETERS. ALL CHAINAGES, LEVELS AND COORDINATES ARE IN METERS UNLESS DEFINED OTHERWISE N KEY DRAWINGS SUBJECT TO APPROVAL FROM MILTON KEYNES COUNCIL CONSTRUCTION STAGE DRAWING: THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLY AND MUST NOT BE READ AS AN INSTALLATION DRAWING. FOR INSTALLATION DETAILS REFER TO SUB-CONTRACTORS FINAL INSTALLATION DRAWINGS. STREET LIGHTING BGS203 DW 4000 16LED VMX.L124.V4.D4D4 LED C.12000LM - 4000K EXISTING COLUMN TO BE TRANSFERRED WITHIN 2M
Transcript
AREA 10 CENTRAL
PUMPING STATION
CONNECTIONTO A10N
DRAINAGENETWORK
S269
WATLING STREET
WATLING STREETSITE A
CCES
S ROAD
THE HIGH STR
EET
F
-P
S
S
S
S
S
S
S
S
S
C
C
C
C
C
PE
C
C
C
C
C
C
C
B
D
B
B
D
A
A
C
C
G
H
I
EF
J
KSDH1 OCDH1
OCDH3
KSDH3
KSDG6
OCDG6
OCDG7KSDG7
OCDI10
KSDI11
OCDI12
KSDI12
KSDF14OCDF14
OCDF17KSDF17
KSDE20
OCDE20
OCDJ22
OCDJ24
KSDJ24
A
C
KSDJ22
KSDE19
OCDE18
6
EXISTING HIGHWAY LAND
REQUIRED FOR S278 WORKS
PROPOSED LAND TO BE ADOPTED BY MKC
APPROXIMATE SITE BOUNDARY
HIGHWAY DRAINAGE
HIGHWAY GULLY & CONNECTION
EXISTING HIGHWAY GULLY TO BE
RETAINED
DRAINAGE EASEMENTS
NEW BUS SHELTER
MKC TO CONFIRM SUPPLIER
TOUCAN SIGNAL AND PEDESTRIANDEMAND UNIT
MOVA/VA LOOP DETECTOR
2m TRAFFIC SIGNAL POLE
4.2m TRAFFIC SIGNAL POLE
PEDESTRIAN DEMAND UNIT
ON CROSSING DETECTOR
KERBSIDE DETECTOR
TACTILE ROTATING CONE
3 ASPECT PRIMARY SIGNAL HEAD
3 ASPECT SECONDARY SIGNAL HEAD
C
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 5
94
mm
x 8
41
mm
KEY PLAN
CONSULTANT
AECOM
Colmore Building
Colmore Circus Queensway
Birmingham, B4 6AT
0121 262 1900 tel
www.aecom.com
CLIENT
Redlawn Land Limited
PROJECT
Milton Keynes
Western Expansion
Area
PROJECT NUMBER
60555498
0 12.5 25
1:500
m
PLAN
Scale 1:500
I/R DATE DESCRIPTION
ISSUE/REVISION
P1 22.07.2019 ISSUED FOR APPROVAL
P2 06.08.2019 REVISED TO CLIENT COMMENTS
P3 02/10/2019 DRAINAGE HIGHWAY ADDED
P4 16/10/2019 UPDATED TO MKC COMMENTS
P5 22/10/2019 UPDATED TO MKC COMMENTS
C1 14/11/2019 FOR CONSTRUCTION ISSUE
C2 18/11/2019 STREET LIHGTING ADDED
La
st sa
ve
d b
y: G
AB
RIE
LA
.S
ON
DE
J(2
01
9-1
1-1
4) L
ast P
lo
tte
d: 2
01
9-1
1-1
8
SHEET TITLE
JUNCTION 26
LAND DEDICATION PLAN
SHEET NUMBER
60555498-SHT-00-JCT26-C-01001
Pro
je
ct M
an
ag
em
en
t In
itia
ls:
De
sig
ne
r:
Ch
ecke
d:
Ap
pro
ve
d:
JS
JS
AF
File
na
me
: T
:\4
70
XX
XX
X-\M
IL
TO
N K
EY
NE
S W
EA
\T
EC
HN
IC
AL
\W
OR
K P
HA
SE
\W
ES
TE
RN
E
XP
AN
SIO
N\S
HE
ET
S\6
05
55
49
8-S
HT
-0
0-JC
T2
6-C
-0
10
01
.D
WG
THIS DRAWING IS TO BE USED ONLY FOR THE
PURPOSE OF ISSUE THAT IT WAS ISSUED FOR
AND IS SUBJECT TO AMENDMENT
DO NOT SCALE FROM THIS DRAWING. ONLY USE
PRINTED DIMENSIONS.
ALL DIMENSIONS ARE IN MILLIMETERS. ALL
CHAINAGES, LEVELS AND COORDINATES ARE IN
METERS UNLESS DEFINED OTHERWISE
N
KEY
DRAWINGS SUBJECT TO APPROVAL
FROM MILTON KEYNES COUNCIL
CONSTRUCTION STAGE DRAWING:THIS DRAWING IS FOR DESIGN INTENT PURPOSES ONLYAND MUST NOT BE READ AS AN INSTALLATION DRAWING.FOR INSTALLATION DETAILS REFER TOSUB-CONTRACTORS FINAL INSTALLATION DRAWINGS.