+ All Categories
Home > Documents > (Site B6) Cheung Sha Wan

(Site B6) Cheung Sha Wan

Date post: 14-Feb-2017
Category:
Upload: hoangdien
View: 222 times
Download: 0 times
Share this document with a friend
8
* Conversion factor from internal floor area to gross floor area is 1.3333. Cheung Sha Wan “OU(B)” Area 1 (Site B6) Cheung Sha Wan Area (Plan B6) : “OU(B)” Zone (in ha) (about) 2009 2014 Difference ^ 17.54 17.51 -0.03 # No. of Private Industrial Buildings : 2009 2014 Difference ^ Occupied 102 100 -2 Wholly vacant - - - Under renovation - - - Tot al 102 100 -2 Other Building(s)/Site(s) : 2009 2014 Difference ^ Private Commercial/Office 6 8 +2 Residential 5 5 - Religious institution 1 1 - Electricity sub-station 1 - -1 Work-in-progress 4 3 -1 Government Sitting out area 1 1 - Refuse collection point 1 1 - Temporary works area (Drainage Services Department (DSD)) 1 1 - Temporary godown/ warehouse 1 1 - ^ Survey undertaken in January 2014. # Involving a site of electricity sub-station at the junction of Castle Peak Road/Tai Nam West Street rezoned to “G/IC” in September 2010. Details of Private Industrial Buildings Total No. of Private Industrial Buildings : 100 Total No. of Units Involved : 5,705 Total GFA* Involved (about) : 1,563,609m 2 No. of Sample Units Surveyed : 3,647 (63.9%) Total GFA * Involved (about) : 1,170,646m 2 (74.9%) No. of Buildings Occupied Wholly vacant Under renovation Tot al No. of Storeys 1 - 7 storeys 4 - - 4 8 - 19 storeys 74 - - 74 20 storeys or above 22 - - 22
Transcript
Page 1: (Site B6) Cheung Sha Wan

* Conversion factor from internal floor area to gross floor area is 1.3333. Cheung Sha Wan “OU(B)” Area 1

(Site B6) Cheung Sha Wan

Area (Plan B6) :

“OU(B)” Zone (in ha) (about)

2009 2014 Difference ^ 17.54 17.51 -0.03#

No. of Private Industrial Buildings :

2009 2014 Difference ^ Occupied 102 100 -2 Wholly vacant - - - Under renovation - - - Total 102 100 -2

Other Building(s)/Site(s) : 2009 2014 Difference ^ Private Commercial/Office 6 8 +2 Residential 5 5 - Religious institution 1 1 - Electricity sub-station 1 - -1 Work-in-progress 4 3 -1 Government Sitting out area 1 1 -

Refuse collection point 1 1 - Temporary works area

(Drainage Services Department (DSD))

1 1 -

Temporary godown/ warehouse

1 1 -

^ Survey undertaken in January 2014. # Involving a site of electricity sub-station at the junction of

Castle Peak Road/Tai Nam West Street rezoned to “G/IC” in September 2010.

Details of Private Industrial Buildings

Total No. of Private Industrial Buildings : 100 Total No. of Units Involved : 5,705 Total GFA* Involved (about) : 1,563,609m2

No. of Sample Units Surveyed : 3,647 (63.9%) Total GFA* Involved (about) : 1,170,646m2

(74.9%)

No. of Buildings

Occupied Wholly vacant

Under renovation Total

No. of Storeys 1 - 7 storeys 4 - - 4 8 - 19 storeys 74 - - 74 20 storeys or above 22 - - 22

Page 2: (Site B6) Cheung Sha Wan

* Conversion factor from internal floor area to gross floor area is 1.3333. Cheung Sha Wan “OU(B)” Area 2

Land Ownership (as at end June 2014) Single 18 - - 18 Multiple 82 - - 82 Building Age (as at end March 2014) < 15 years 3 - - 3 15 – 29 years 33 - - 33 30 years or above 64 - - 64 Building Condition Good 17 - - 17 Fair 72 - - 72 Poor 11 - - 11

Surrounding Land Uses : Residential and commercial developments, government, institution and

community uses (including cooked food centre, school and hospital), open spaces, petrol filling stations and trunk roads (including Ching Cheung Road and Tsing Sha Highway).

Vacancy Rate (based on GFA*) PlanD’s Area Assessments

“OU(B)” Zone 2009 Area Assessments Survey in 2013-14 Territorial 8.4% 6.0% Kowloon 9.1% 6.4% Cheung Sha Wan 6.5% 4.1%#

# Survey undertaken in January 2014. Derived from R&VD’s Raw Data

“OU(B)” Zone 2008 2009 2010 2011 2012 2013 Territorial 5.9% 5.3% 5.5% 5.6% 4.8% 5.5% Kowloon 6.4% 5.4% 5.7% 5.2% 4.8% 5.1% Cheung Sha Wan 4.8% 5.2% 5.5% 4.2% 4.2% 3.4%

Take-up (derived from R&VD’s raw data and based on BD’s Monthly Digests)

“OU(B)” Zone 2008 2009 2010 2011 2012 2013 Territorial (m2 -166,430 )* 4,831 225,015 -87,256 53,699 -85,817 Kowloon (m2 -78,096 )* 37,781 104,504 -13,452 -76,985 -58,740 Cheung Sha Wan (m2)* 11,675 -11,395 21,908 40,472 -15,053 7,011

Page 3: (Site B6) Cheung Sha Wan

* Conversion factor from internal floor area to gross floor area is 1.3333. Cheung Sha Wan “OU(B)” Area 3

Subdivision of Units Types of Units Units GFA*

No. % m % 2 Non-subdivided Units 5,314 93.1 1,360,354 87.0 Subdivided Units 391 # 6.9 203,255 13.0 Total 5,705 1,563,609

# Among the 391 subdivided units, 325 units (about 83.1%) were divided into two to five subunits each, involving a total GFA of about 156,369m2 (about 76.9%). 41 units (about 10.5%) were divided into six to ten subunits each, involving a total GFA of about 24,319m2 (about 12.0%). 12 units (about 3.1%) were divided into 11 to 15 subunits each, involving a total GFA of about 10,956m2 (about 5.4%). Seven units (about 1.8%) were divided into 16 to 20 subunits each, involving a total GFA of about 7,388m2 (about 3.6%). Five units (about 1.3%) were divided into 21 to 25 subunits each, involving a total GFA of about 3,347m2 (about 1.7%). The remaining one unit (about 0.3%) was divided into 26 subunits, involving a total GFA of about 876m2

(about 0.4%).

Predominant Uses

2009 2014^ GFA* (m2 % ) GFA* (m2 % )

Manufacturing/Workshop 58,786 3.7 73,120 4.7 Warehouse/Storage 317,825 20.0 207,672 13.3 Office 803,914 50.5 742,059 47.5 Others 70,717 # 4.4 156,747 10.0 Vacant 103,362 6.5 63,467 4.1 Under Renovation 14,678 0.9 18,469 1.2 Non-response 222,255 14.0 302,074 19.3 Total 1,591,536 1,563,609

^ Survey undertaken in January 2014. # The other uses identified in the 2014 survey were mainly showroom, shop and services, eating place,

research and development or testing centre and religious institutions, taking up about 2.7%, 2.6%, 1.0%, 1.0% and 0.6% of the GFA respectively. Domestic use and training centre or educational institutions also take up about 0.4% of the GFA each.

Comparison of Industrial Buildings in Nearby “OU(B)”, “R(A)” and “CDA” Areas

Subject “OU(B)”

Area

Nearby “R(A)” Area

Nearby “R(E)” Area#

Nearby “CDA”

^ Area

Overall

& GFA*

(m2%

) GFA*

(m2%

) GFA*

(m2%

) GFA*

(m2%

) GFA*

(m2%

) Manufacturing/Workshop 73,120 4.7 439 2.5 3,362 4.0 - - 76,921 4.2 Warehouse/Storage 207,672 13.3 13,430 75.1 16,064 19.2 139,936 91.8 377,102 20.7 Office 742,059 47.5 1,673 9.4 22,044 26.3 - - 765,776 42.1 Others 156,747 10.0 997 5.6 5,041 6.0 - - 162,785 9.0 Vacant 63,467 4.1 645 3.6 13,239 15.8 3,206 2.1 80,557 4.4 Under Renovation 18,469 1.2 169 0.9 3,181 3.8 - - 21,819 1.2 Non-response 302,074 19.3 538 3.0 20,875 24.9 9,266 6.1 332,753 18.3 Total 1,563,609 17,891 83,807 152,408 1,817,713

# Involving three private industrial buildings in the nearby Cheung Sha Wan/Lai Chi Kok “R(A)” area (Site C5) (Plan B6).

^ Involving six private industrial buildings in the nearby Cheung Sha Wan “R(E)” area (Site D5) (Plan B6).

& Involving two private industrial buildings in the nearby Cheung Sha Wan/Lai Chi Kok “CDA” area (Site E5) (Plan B6).

Page 4: (Site B6) Cheung Sha Wan

* Conversion factor from internal floor area to gross floor area is 1.3333. Cheung Sha Wan “OU(B)” Area 4

Business Nature and No. of Workers in Occupied Non-subdivided Units Business Nature Occupied

Non-subdivided Units GFA* No. of Workers

No. % m % 2 No. % Manufacturing 671 # 17.5 211,401 20.2 6,833 22.0 Non-manufacturing 3,165 ^ 82.5 836,919 79.8 24,248 78.0 Total 3,836 1,048,320 31,081

# The largest manufacturing business is manufacturing of wearing apparel (in terms of both number of units and GFA) (based on the Hong Kong Standard Industrial Classification Version 2.0 adopted by the Census and Statistics Department).

^ The largest non-manufacturing business is import/export, wholesale and retail trades (in terms of both number of units and GFA) (based on the Hong Kong Standard Industrial Classification Version 2.0 adopted by the Census and Statistics Department).

Area Assessment

The area (about 17.5 ha) involves 100 private industrial buildings and eight commercial/office developments. The area is a vibrant industrial/business district. Adjacent to the “OU(B)” area is a commercial/office development under “Commercial(4)” zone at Cheung Sha Wan Road. When compared with the 2009 Area Assessments, the total industrial GFA in the area has only slightly decreased from about 1.59 million m2 to about 1.56 million m2

due to the demolition of four industrial buildings but completion of two new industrial buildings. In terms of height, 74 buildings have 8-19 storeys, 22 have 20 storeys or above, and the remaining four have 1-7 storeys. In terms of condition, 72 buildings are in fair condition, 17 are in good condition and the remaining 11 are in poor condition. In terms of age, 64 buildings are 30 years and above, 33 are 15-29 years and the remaining three are only 3-5 years. In terms of ownership, 82 buildings are under multiple ownership, while the remaining 18 are under single ownership.

The updated overall vacancy rate is 4.1%, which is lower than the 6.5% identified in 2009. Such vacancy is also relatively lower than the territorial figure of 6.0% for all “OU(B)” areas and the average of 6.4% for the six areas in Kowloon. About 6.9% of the units are divided into subunits, occupying about 13.0% of the GFA. In terms of usage, Office is still the largest user, occupying about 47.5% of the GFA which is slightly lower than the 50.5% in 2009. Warehouse/Storage is still the second largest user, taking up about 13.3% of the GFA which is much lower than the 20.0% in 2009. The GFA for “Other Uses” has been more than doubled from about 4.4% in 2009 to about 10.0% in 2014. The major types of uses include showroom, shop and services, eating place and research and development/testing centre, all of which constitute about 7.3% of the GFA. Manufacturing/Workshop is the fourth largest user, occupying about 4.7% of the GFA which is slightly higher than the 3.7% in 2009. If taking into account the 100 industrial buildings in the subject “OU(B)” area and the total of 11 industrial buildings in the nearby Cheung Sha Wan/Lai Chi Kok “R(A)” area, Cheung Sha Wan “R(E)” area and Cheung Sha Wan/Lai Chi Kok “CDA” area together, the overall vacancy is about 4.4%. Office is still the largest user, occupying about 42.1% of the GFA.

Page 5: (Site B6) Cheung Sha Wan

* Conversion factor from internal floor area to gross floor area is 1.3333. Cheung Sha Wan “OU(B)” Area 5

The second largest user is still Warehouse/Storage, occupying about 20.7% of the GFA. The third largest user is “Other Uses” accounting for about 9.0% of the GFA. Manufacturing/Workshop only takes up about 4.2% of the GFA. In terms of employment, about 31,081 workers are estimated to be engaged in the occupied units of the industrial buildings in the area, including about 6,833 workers (22.0%) in the manufacturing business and about 24,248 workers (78.0%) in the non-manufacturing business. The overall figure accounts for about 17.7% of the total of 175,980 persons engaged (other than those in the civil service) in various business/industries in the Sham Shui Po District identified by C&SD in June 2014. Since the completion of the 2009 Area Assessments, the following new development/redevelopment/wholesale conversion projects have been identified in the area (Plan B6):

(a) completion of two new commercial/office developments at 483A Castle Peak Road

and 10 Cheung Yue Street with the latter redeveloped from a 32 years old industrial building found in 2009 Area Assessments;

(b) completion of two new industrial buildings at 932 Cheung Sha Wan Road and 77 Wing Hong Street;

(c) two sites at 17 Cheung Shun Street and 59-63 Wing Hong Street/92 King Lam Street under works in progress for a new commercial/office development (with the former having approval and lease modification executed for redevelopment of previous industrial building under revitalisation measures);

(d) one site at 680 Castle Peak Road under works in progress for a new industrial development;

(e) building plan approvals for redevelopment of two existing industrial buildings at 495 Castle Peak Road and 9 Cheung Yee Street into a new industrial building and a new commercial development respectively;

(f) planning approvals obtained for redevelopment of existing industrial buildings at 838 Lai Chi Kok Road, 7 Wing Hong Street and 609 Tai Nan West Street for hotel use; and

(g) four sites with approvals for wholesale conversion of the existing industrial buildings at 788 and 924-926 Cheung Sha Wan Road, 15 Cheung Shun Street and 9 Cheung Yee Street for commercial/office uses under revitalisation measures with related special waiver executed.

Given the above, in particular the signs of transformation in the area as shown in the above new development/redevelopment/wholesale conversion projects, the low and decreasing vacancy rate of the existing industrial buildings, and their relatively high and stable percentage of GFA for non-industrial use (about 57.5% for Office and “Other Uses” in total as compared with 54.9% in 2009), it is considered that the area should be retained as “OU(B)” to continue facilitating the land use restructuring.

Recommendation

To retain the area as “OU(B)”.

Page 6: (Site B6) Cheung Sha Wan

WING HONG STREET

CH

EU

NG

FA

T S

TR

EET

FAT T

SEU

NG

STR

EET

FUK

WIN

G STREET

SHUN NING ROAD

CH

EU

NG

WA

H S

TR

EET

CASTLE PEA

K RO

AD

PO O

N RO

AD

HIN

G W

AH

STR

EET

UN

CHA

U STREET

CHEU

NG

SHA

WA

N RO

AD

HANG CHEUNG STREET

FORTU

NE STREET

PRA

TA

S ST

REET

FAT T

SEU

NG

STR

EET

TO

NK

IN S

TR

EE

T

LAI CHI KOK ROAD

WEST KOW

LOON CORRIDOR

YIN

G W

A ST

50

100

2030

20

50

30

WING TAK RD

BUTTERFLYVALLEY

INTERCHANGE

CHING CHEUNG ROAD

WING

MIN

GST

BUTTE

RFL

YV

ALLE

YR

D

FUK

WA

STKING LAM STREET

ME

I LA

I RO

AD

CASTLE PEAK ROAD

WING HONG STREET

TU

NG

CH

AU

WE

ST

ST

RE

ET

CAS

TL

EP

EA

K

RO

AD

TA

I NA

N W

ES

T S

TR

EE

T

CHEUNG

YU

ES

TCHEUNG SHA WAN ROAD

KWAI CHUNG ROADCHEUNG SHA WAN ROAD

CHEUNG SHUN STREET

LAI CHI KOK ROAD

CH

EU

NG

LA

I ST

CHEUNG YEE STREET

CH

EU

NG

SH

A W

AN

PA

TH

BR

OA

DW

AY

LAI CHI KOK ROAD

BR

OA

DW

AY

HIN

G W

AH

ST

WES

TK

OW

LO

ON

CO

RRI

DOR

PO

LU

N S

TR

EE

T

SHAM SHINGROAD

LAIHONG

STREET

LAI FA

T ST

HO

I LA

I STR

EET

SHAM M

ONG ROAD

FA

T T

SEU

NG

ST W

EST

LIN CHEUNG ROAD

WEST KOWLOON HIGHWAY

ý

S/K5/35

S/K20/30

S/K16/16

S/KC/28

G/IC

OU

CDA

O

G/IC

G/IC

G/IC

R(A)7

R(A)11

R(A)4

G/IC

O

R(A)8

R(A)9

G/IC

R(A)3

R(A)3

G/IC

O

G/IC

C(1)

R(A)

R(A)1

GB

G/IC

G/IC G/IC

O

O

G/IC

G/IC

G/IC

O

OU

OU

C(4)

O

O

G/IC

OU

O

O

OU

GB

O

R(A)2

G/IC

R(A)8

R(A)8

GB

R(A)9

R(A)8

R(A)

R(A)7

R(A)8

R(E)2

R(A)8

R(E)2

G/IC(4)

R(A)

R(E)

G/IC

R(A)7

R(A)8

R(A)8

R(A)8

OU

R(E)1

O

G/IC

R(A)8

R(A)8

G/IC

R(A)8

R(A)8

G/IC

G/IC

R(A)8

GB

G/IC

R(A)

R(A)8

R(A)

R(A)8

R(A)8

R(A)8

R(A)

R(A

)8

R(A

)8

R(E)1

G/IC

G/IC

R(A)7

R(A)8

R(A)8

C(3)

G/IC

R(A)8

G/IC

R(A)8

C(5)

G/IC

O

G/IC

O

R(A)

G/IC

R(A)

G/IC

O

R(A)

OU

G/IC

GB

G/IC

G/IC

G/IC

G/IC

G/IC G/IC

G/IC

R(A)CDA

G/IC

G/IC

CDAG/IC

O

G/IC

C(2)

R(A)7

O

G/IC

G/ICG/IC

OU

O

GB

GB

CHEUNG SHA WAN

Sham

Shu

i Po

Spor

ts G

roun

d

Hong Kong Industrial Centre

Cheung Sha Wan Plaza

RCP

Church& Office

Roman Catholic Cemetery

Caritas Medical Centre

CFC

ESS

PFS

ESS

Vacant

SecondarySchool

PrimarySchool

PrimarySchool

H.K.I.V.E.

ESS

PFS

SewagePumpingStation

IndoorSports Centre

WIP

Warehouse

PoliceStation

TempCar Park

Warehouse

Temp. WholesalePoultry Market

Sitting-outArea

WIP

WIP

DSD’sWorksArea

ESS

PFS

H.K.I.V.E.

PFS

ServiceReservoir

Lai Chi KokReception

Centre

Jao TsungAcademy

PFS

ESS

SecondarySchool

PrimarySchool

PrimarySchool Primary

School

SecondarySchool

PrimarySchool

SecondarySchool

SecondarySchool

CASTLE PEAK ROAD

CHEUNG SHA WAN ROAD

CH

EU

NG

LA

I ST

LAI CHI KOK ROAD

CHEUNG SHA WAN ROAD

KWAI CHUNG ROAD

CH

EU

NG

WA

H S

TR

EET

LA

I CH

I KO

K R

OA

D

HIN

G W

AH

STR

EET

ME

I LA

I RO

AD

FUK

WA

STR

EET

TA

I NA

N W

ES

T S

T

TU

NG

CH

AU

WE

ST

ST

CHEUNG SHUN ST

CHEUNG YEE ST

ESS

SecondarySchool

ESS

ESS

Primary andSecondary

School

ESS

SecondarySchool

SecondarySchool

SecondarySchool

Fire Station

PoliceStation

Bus Depot

Cheung Sha WanSewage Pumping Station

and Pumping Station

Clinic

Community Centre

Swimming Pool

SecondarySchool

CA

ST

LE

PE

AK

RO

AD

BU

TTER

FLY

VA

LLEY

RD

FUK

WIN

G ST

WING MING ST

CHEUNG YU

E S

T

CH

EU

NG

SHA

WA

N R

OA

D

UN

CH

AU

STR

EET

FA

T T

SEU

NG

ST W

EST

SHA

M M

ON

G R

OA

D

SHAM SHING ROAD

LA

I H

ON

G S

TR

EET

WEST

KO

WLO

ON

CO

RR

IDO

R

FA

T T

SEU

NG

STR

EET

TO

NK

IN S

TR

EET

CA

STLE PE

AK

RO

AD

WING HONG STREET

PO O

N R

OA

D

Wan

g C

heo

ng B

uildin

g

(Gover

nm

ent W

areh

ouse

)

Wan

g C

heo

ng F

acto

ry E

stat

e

Warehouse

KING LAM ST

WING HONG ST

ServiceReservoir

CHING C

HEUNG RD

Private Residential

Industrial/Office

GIC

Works in ProgressWIP

Land Use Plan

SCALE 1 : 5 000

Plan No.

Date :

PLANNING DEPARTMENT

M/HOLS/15/27

Record of Application as at 31.3.2014

* Plan B6

Cheung Sha Wan

Industrial (Flatted Factories)

Temporary Use/Structure

Open Space

Land Use Pattern

Storage

OZP Nos. S/K5/35, S/K16/16, S/K20/30 and S/KC/28

*

* *

*

Boundary of " OU(B) " Zone

(See

Plan D5)

(See

Plan E2)

(See

Plan D5)

(See

Plan C5)

(See

Plan C5)

(See

Plan C5)

Commercial/Office

(note : the classification of occupied building is based on R&V Dept. data only)

Source : R&V Dept. and PlanD’s Survey (as as 1.2014)

Special Wavier Executed for Wholesale Conversion and

Redevelopment with Lease Modification Executed (as at 4.2014)

Proposed Developments with Building Plans Approved (as at 4.2014)

*

*

**

Industrial Buildings within " R(A) ",

" R(E) " and " CDA " Zones

21.7.2015

A/K5/540 (24.10.03)

for Hotel

for Hotel

A/K5/526 (7.11.03)

for Hotel

for Hotel

A/K5/530 (29.8.03)

A/K5/580 (15.12.04)

for Hotel

A/K5/541 (27.2.04)

for Hotel

A/K5/705 (17.6.11)

for Hotel

A/K5/661 (5.12.08)

for Hotel

A/K5/517 (7.2.03)

A/K5/527 (10.10.03)

A/K5/561 (1.4.04)

A/K5/578 (7.12.04)

Approved Application (date of meeting)A/K5/540 (24.10.03)

for Hotel

A/K5/729 (25.1.13)

A/K5/742 (7.3.14)

for Hotel

A/K5/553 (16.4.04)

for Hotel

*

*

*

Page 7: (Site B6) Cheung Sha Wan

CHING C

HEUNG ROAD

CASTLE PEAK ROAD

KING LAM STREET

WING HONG STREET

CHEUNG SHA WAN ROAD

CH

EU

NG

LA

I ST

LAI CHI KOK ROAD

CHEUNG SHA WAN ROAD

KWAI CHUNG ROAD

CH

EU

NG

WA

H S

TR

EET

LA

I CH

I KO

K R

OA

D

HIN

G W

AH

STR

EET

ME

I LA

I RO

AD

FUK

WA

STR

EET

TA

I NA

N W

ES

T S

T

TU

NG

CH

AU

WE

ST

ST

CHEUNG SHUN ST

CHEUNG YEE ST

CA

ST

LE

PE

AK

RO

AD

BU

TTER

FLY

VA

LLEY

RD

FUK

WIN

G ST

WING MING ST

CHEUNG YU

E S

T

CH

EU

NG

SHA

WA

N R

OA

D

UN

CH

AU

STR

EET

FA

T T

SEU

NG

ST W

EST

SHA

M M

ON

G R

OA

D

SHAM SHING ROAD

LA

I H

ON

G S

TR

EET

WEST

KO

WLO

ON

CO

RR

IDO

R

FA

T T

SEU

NG

STR

EET

TO

NK

IN S

TR

EET

CA

STLE PE

AK

RO

AD

WING HONG STREET

PO O

N R

OA

D

WING HONG STREET

CH

EU

NG

FA

T S

TR

EET

FAT T

SEU

NG

STR

EET

FUK

WIN

G STREET

SHUN NING ROAD

CH

EU

NG

WA

H S

TR

EET

CASTLE PEA

K RO

AD

PO O

N RO

AD

HIN

G W

AH

STR

EET

UN

CHA

U STREET

CHEU

NG

SHA

WA

N RO

AD

HANG CHEUNG STREET

FORTU

NE STREET

PRA

TA

S ST

REET

FAT T

SEU

NG

STR

EET

TO

NK

IN S

TR

EE

T

LAI CHI KOK ROAD

WEST KOW

LOON CORRIDOR

YIN

G W

A ST

50

100

2030

20

50

30

WING TAK RD

BUTTERFLYVALLEY

INTERCHANGE

CHING CHEUNG ROAD

WING

MIN

GST

BUTTE

RFL

YV

ALLE

YR

D

FUK

WA

STKING LAM STREET

ME

I LA

I RO

AD

CASTLE PEAK ROAD

WING HONG STREET

TU

NG

CH

AU

WE

ST

ST

RE

ET

CAS

TL

EP

EA

K

RO

AD

TA

I NA

N W

ES

T S

TR

EE

T

CHEUNG

YU

ES

TCHEUNG SHA WAN ROAD

KWAI CHUNG ROADCHEUNG SHA WAN ROAD

CHEUNG SHUN STREET

LAI CHI KOK ROAD

CH

EU

NG

LA

I ST

CHEUNG YEE STREET

CH

EU

NG

SH

A W

AN

PA

TH

BR

OA

DW

AY

LAI CHI KOK ROAD

BR

OA

DW

AY

HIN

G W

AH

ST

WES

TK

OW

LO

ON

CO

RRI

DOR

PO

LU

N S

TR

EE

T

SHAM SHINGROAD

LAIHONG

STREET

LAI FA

T ST

HO

I LA

I STR

EET

SHAM M

ONG ROAD

FA

T T

SEU

NG

ST W

EST

LIN CHEUNG ROAD

WEST KOWLOON HIGHWAY

ý

Plan No.

Date :

PLANNING DEPARTMENT

M/HOLS/15/27Survey Sheets No. 11-NW-7B, 7D, 8A, 8B, 8C, 8D,

9A, 9C, 12B, 13A, 13B and 14A

Plan B6aSCALE 1 : 5 000

Land Ownership

Cheung Sha Wan

Land Ownership

Government Land

Single

Boundary of " OU(B) " Zone

Multiple

Source : Land Ownership recorded from Land Registry (as at 6.2014)

21.7.2015

Page 8: (Site B6) Cheung Sha Wan

CHING C

HEUNG ROAD

CASTLE PEAK ROAD

KING LAM STREET

WING HONG STREET

CHEUNG SHA WAN ROAD

CH

EU

NG

LA

I ST

LAI CHI KOK ROAD

CHEUNG SHA WAN ROAD

KWAI CHUNG ROAD

CH

EU

NG

WA

H S

TR

EET

LA

I CH

I KO

K R

OA

D

HIN

G W

AH

STR

EET

ME

I LA

I RO

AD

FUK

WA

STR

EET

TA

I NA

N W

ES

T S

T

TU

NG

CH

AU

WE

ST

ST

CHEUNG SHUN ST

CHEUNG YEE ST

CA

ST

LE

PE

AK

RO

AD

BU

TTER

FLY

VA

LLEY

RD

FUK

WIN

G ST

WING MING ST

CHEUNG YU

E S

T

CH

EU

NG

SHA

WA

N R

OA

D

UN

CH

AU

STR

EET

FA

T T

SEU

NG

ST W

EST

SHA

M M

ON

G R

OA

D

SHAM SHING ROAD

LA

I H

ON

G S

TR

EET

WEST

KO

WLO

ON

CO

RR

IDO

R

FA

T T

SEU

NG

STR

EET

TO

NK

IN S

TR

EET

CA

STLE PE

AK

RO

AD

WING HONG STREET

PO O

N R

OA

D

WING HONG STREET

CH

EU

NG

FA

T S

TR

EET

FAT T

SEU

NG

STR

EET

FUK

WIN

G STREET

SHUN NING ROAD

CH

EU

NG

WA

H S

TR

EET

CASTLE PEA

K RO

AD

PO O

N RO

AD

HIN

G W

AH

STR

EET

UN

CHA

U STREET

CHEU

NG

SHA

WA

N RO

AD

HANG CHEUNG STREET

FORTU

NE STREET

PRA

TA

S ST

REET

FAT T

SEU

NG

STR

EET

TO

NK

IN S

TR

EE

T

LAI CHI KOK ROAD

WEST KOW

LOON CORRIDOR

YIN

G W

A ST

50

100

2030

20

50

30

WING TAK RD

BUTTERFLYVALLEY

INTERCHANGE

CHING CHEUNG ROAD

WING

MIN

GST

BUTTE

RFL

YV

ALLE

YR

D

FUK

WA

STKING LAM STREET

ME

I LA

I RO

AD

CASTLE PEAK ROAD

WING HONG STREET

TU

NG

CH

AU

WE

ST

ST

RE

ET

CAS

TL

EP

EA

K

RO

AD

TA

I NA

N W

ES

T S

TR

EE

T

CHEUNG

YU

ES

TCHEUNG SHA WAN ROAD

KWAI CHUNG ROADCHEUNG SHA WAN ROAD

CHEUNG SHUN STREET

LAI CHI KOK ROAD

CH

EU

NG

LA

I ST

CHEUNG YEE STREET

CH

EU

NG

SH

A W

AN

PA

TH

BR

OA

DW

AY

LAI CHI KOK ROAD

BR

OA

DW

AY

HIN

G W

AH

ST

WES

TK

OW

LO

ON

CO

RRI

DOR

PO

LU

N S

TR

EE

T

SHAM SHINGROAD

LAIHONG

STREET

LAI FA

T ST

HO

I LA

I STR

EET

SHAM M

ONG ROAD

FA

T T

SEU

NG

ST W

EST

LIN CHEUNG ROAD

WEST KOWLOON HIGHWAY

ý

Plan No.

Date :

PLANNING DEPARTMENT

M/HOLS/15/27

SCALE 1 : 5 000

and Building age as at 3.2014

Building Age, Number of Storeys and Building Conditions

Cheung Sha WanSurvey Sheets No. 11-NW-7B, 7D, 8A, 8B, 8C, 8D,

9A, 9C, 12B, 13A, 13B and 14A

14

4317

43

10

4321

37

29

710

43

10

5128

15

10

52

13

34

11

35

9

51

17

229

52

21

17

29

5

14

23

12

42

37

1727

15

12

33

18

21

13

34

14

32

17

22

12

44

30

15

14

25

14

26

13

29

13

32

18

2018

21

9

53

6

49

27

15

7

53

14

31

13

24

13

31

12

34

12

32

33

16

20

19

11

44

21

17

9

53

6

57

6

57

6

57 6

57

15

42

14

47

23

30

9

52

12

48

11

33

13

36

9

51

34

1537

18

9

5322

22

6

55

29

17

7

55

11

42

12

41

10

43

12

41

17

32

13

41

12

37

14

3712

43

23

18

13

28

11

30

19

2012

3420

22

26

6

15

19

13

36

26

18

13

27

14

36

13

34

14

36

12

36

23

16

14

35

14

37

33

9

13

37

14

36

12

35

14

29

20

10

13

37

13

37

14

36

32

17

29

<112

3721

1811

35

13

37

12

35

32

12

13

32

29

3

27

3

32

3

Source : Survey undertaken by PlanD (as at 1.2014)

Plan B6b21.7.2015

Good

Fair

Building Condition

Building Age (Years)

Number Of Storeys

Poor

43

Boundary of " OU(B) " Zone

10

Total No. of Units : 5,705

Total No. of Industrial Buildings : 100

Total Area : 17.51 ha


Recommended