+ All Categories
Home > Documents > SITE PLANretirementstyle.co.za/wp-content/uploads/2018/03/Rubicon-Site-Plan.pdfcarports c a r-p o r...

SITE PLANretirementstyle.co.za/wp-content/uploads/2018/03/Rubicon-Site-Plan.pdfcarports c a r-p o r...

Date post: 30-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
s t op stop stop stop s t op s t op s t op DESCRIPTION: PROJECT NAME: THE COPYRIGHT ACT (98 OF 1978) COPYRIGHT VESTED WITH THE ARCHITECTS IN TERMS OF MESS'S KLIPKOPPIE DEVELOPMENTS DU PREEZ STREET ORCHARDS SUB'B ERF 3361 NELSPRUIT EXTENSION 29 NEW RUBICON RETIREMENT VILLAGE D E P A R T E M E N T / C L I E N T Collfin Property Group Mess,s Klipkoppie Developments SACAP SCALE DRAWN CHECKED JB JB 7656 DATE DRAWING No. Rev. accordingly before any work is put in hand. Engineer and all foundations and/or bearing surfaces are to be designed * A proper geotechnical soil investigation need to be done by a qualified Engineer's drawings, specifications and instructions. work are to be in accordance with SABS 1200 as per a Registered * All structural work / components, foundations and civil engineering with accuracy level 2 (as min.) of SABS 0155. * Figured dimensions enjoy preference to scale. Building work to comply and Local Authority By-Laws and/or regulations. relevant SABS specifications, National Building Regulations (SANS 10400) * All material and methods of construction to be in accordance with the is put in hand. Refer all discrepancies to the author for clearing. * All dimensions and heights are to be checked on site before any work construction related activities on site * Comply with relevant OSH Act Safety and Health requirements for all said parties are aware of site circumstances if they commence work. conditions on site before work is put in hand. It is accepted that * Contractors and sub-contractors should avail themselves of existing and true to ensure proper storm water run-off over the entire site. the site after completion. Finish the new or exist. ground level even * Keep the site clean at all times and remove all building rubble from damage to existing components / structures of employer & neighbours, etc. * All new work to be done in such a manner to minimise dust, noise and to be done by a Regist.Surveyor before any building work is put in hand. A proper survey of the site to determine exact falls & boundaries need * Establish a site datum level and maintain for duration of the Contract. * Expansion joints in the structure per Eng. spec. & drwg's. if required. 13/01/14 15 30/06/08 06 Add leisure centre block A and block B Add screen walls & stairs between units in centre blocks 06 30/06/08 16/08/11 27/08/08 17/07/08 02/07/08 02/07/08 07 08 09 10 11 Revised Unit layout; Centre Block & South Blocks Change screen wall layout units 49-52: Entrance gate layout Add Leisure Centre residential Block C Change A2 unit #55 to double garage; adjust dimensions Change & adjust Leisure Centre Block A Fire Stair 14/01/13 12 Revised Site Sub-Division as per Land Surveyor 27/12/06 14 Revise Unit Types on Stands 18 - 23 & 85 - 86 Add Fire Hydrant detail per 2008 approved Building Plans SITE DEVELOPMENT PLAN LAYOUT 1110/01sd 04/09/14 17 Revised Existing and New Unit Layout; Revised Schedules 10/09/14 18 Revised Existing and New Unit Layout; Revised Schedules c a r po r t K1 ce ce S m S K 3 K 3 m PROPOSED BUSINESS STAND SCALE 1:400 SITE PLAN D Du P r eez S t r ee t 20 m 4 3 FUTURE DEVELOPMENT AFTER APPROPRIATE ZONING APPROVAL Main Entrance M a nho l e 3 500b u il d i ngli n e 124 870 y a r d y a r d y a r d p a ti o p a ti o p a ti o p a ti o ca r po r t y a r d p a r k i ng p a r k i ng A2 dg 55 garage 57 58 K1m S 59 60 Sm 56 A2 62 K1m K1 61 garage ca r- po r t g a r a g e g a r a g e Office Security patio patio patio patio patio patio Port 2 Re 80 g a r a g e ca r- po r t g a r a g e 77 78 FH p a r k i ng 91 r o a d a s p e r e ng T1 T1m T1m T1 T1m 92 93 T1 T1m 90 89 88 19 20a 22 23 24 C E 2292 BLOCK F 18 Garages 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 33 34 39 69 70 71 Emergency L o a d i ng L o a d i ng Ga r a g e Ga r a g e Ga r a g e Ga r a g e Ga r a g e Ga r a g e Garage Garage Garage ca r po r t ca r po r t conc. block paving road as per eng 35 36 37 38 32 ca r po r t poo l s p a s h Ge n - Se t BLOCK B LEISURE CENTRE BL OCK E BLOCK D Re 84 111 112 113 114 115 116 117 patio patio patio patio patio patio yard yard 1 / 2991 16 17 18 19 20 21 C B 114 230 10 6 5b 40 41 42 43 44 45 46 47 48 Eme r g e n c y Eme r g e n c y FH 49 87 65 66 67 68 69 patio 5a 11 8 7 4 3 2 1 A Port 1 50 55 56 57 58 59 60 61 62 63 64 51 52 53 54 BLOCK A LEISURE CENTRE 36 9 38 37 K 1 m p a ti o p a ti o g a r a g e doub l e p a ti o p a ti o p a ti o p a ti o 39 K 1 40 K 1 m K 4 K 4 m 41 42 43 44 46 45 K4 K4m K4 K4m K1 K1m p a ti o p a ti o p a ti o p a ti o patio patio patio patio patio patio patio patio patio patio patio patio g a r a g e g a r a g e g a r a g e g a r a g e g a r a g e g a r a g e g a r a g e g a r a g e g a r a g e g a r a g e 41 42 43 44 69 70 73 74 75 76 77 78 79 80 81 82 83 84 1 2 3 4 5 6 paving Area Refuse deck deck deck deck deck deck 85 Erf 3362 Service Entrance 294 380 Erf 3361 Re 80 21a 22a 24a 25 26 G J K 23a D E 20b 22b 1 2 3 4 5 6 7 72 73 74 75 BLOCK C LEISURE CENTRE Erf 3360 247 270 3000 building line 23 22 21 20 19 18 Re 80 carports ca r- po r t ca r- po r t g a r a g e g a r a g e J7 J7m J3c J3c m J3a J3a m g a r a g e g a r a g e C conc. block paving road as per eng yard yard 16 patio F2 J1m 12 F2 g a r a g e patio 9 yard 15 J3 ca r- po r t ca r- po r t J3m 14 J1 13 ca r- po r t J3 11 10 J3m ca r- po r t g a r a g e g a r a g e F2m g a r a g e patio 8 g a r a g e 7 J2 J2m 6 g a r a g e 5 patio g a r a g e F2 yard 1 2 3 5 garage garage 79 g a r a g e F2m g a r a g e patio 17 yard yard yard yard yard yard yard yard yard patio patio patio patio patio patio patio patio patio patio patio patio patio patio R/ 2991 Erf 3411/8 85 86 yard yard yard patio patio patio g a r a g e g a r a g e g a r a g e ca r po r t J1m J1 J1m 27 26 Re 82 B P r ud e n ti a l C it r u s E s t a t e s 131 J U P o r t i on 13 S ou t h A fr i ca n 48 660 p a ti o g a r a g e F 2 32 yard yard yard yard patio patio patio patio g a r a g e g a r a g e g a r a g e ca r po r t ca r po r t J7 m J3a J1 J1m 31 30 29 28 35 F 2b p a ti o p a ti o p a ti o g a r a g e g a r a g e g a r a g e d o ub l e 33 34 11 g a r a g e g a r a g e y a r d y a r d R R m R e 80 A yard yard 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 y a r d y a r d J3a J3a m patio patio patio patio patio patio patio patio patio patio patio T1 Laundry Admin Offices Lounge Resident Lift Stair Stair Kitchen Servery Dining Room Staff Toilets patio patio patio patio patio patio patio patio patio patio patio patio patio patio Stair Stair Stair Lift Lobby En t r a n ce Entrance 4 19 02/07/15 PHASE 1 PHASE 2 PHASE 3 PHASE 4 Open Open PHASE 5 101 100 99 98 97 96 95 102 103 104 105 106 107 108 109 patio c on c . b l o c kp a v i ng 94 FH 71 72 T1m 110 patio patio patio patio patio patio patio patio patio 12 11 10 9 8 7 ca r po r t s T1 T1m T1 T1m T1m T1m T1 T1 T1m T1 T1m T1m T1 T1m T1 y a r d yard yard yard y a r d yard yard yard yard yard 75 F4 F4m F4 F4m F4 75.1 75.2 75.4 75.5 75.3 75.6 75.7 75.9 75.8 75.10 F3 F3m F3 F3m F3 02/07/15 20 Revised Colour of Development Phases Simplify layout with block indications only 28/06/17 21 ADD Phase 5 Development comprising 26 units 269 Pleiades Avenue, Waterkloof Ridge, PO Box 25040, Monument Park, Pretoria, 0105. +27 12 347 0333 [email protected] 86 87 89 90 88 94 95 91 92 93 F4 F4m F3 F3m 118 PHASE 6 23 16 August 2017 F4 F4m F3 F3m F4 F4m F3 F3m 3000 3000 3000 3000 3600 3600 3550 1450 2000 2000 1000 600 25/07/17 22 Revise Phase 5 Development comprising 26 units 27/11/13 13 Add New Units 18 - 23, 85 - 94 and Carport ADD Phase 6 Development comprising 19 units 16/08/17 23
Transcript
Page 1: SITE PLANretirementstyle.co.za/wp-content/uploads/2018/03/Rubicon-Site-Plan.pdfcarports c a r-p o r t c a r-p o r t g a r g e g a r g e J7 J7m J3c J3c m J3a J3a m g a r a g e g a a

sto

p

stop stop stop

sto

p

sto

psto

p

DESCRIPTION:PROJECT NAME:THE COPYRIGHT ACT (98 OF 1978)

COPYRIGHT VESTED WITH THE ARCHITECTS IN TERMS OF

MESS'S KLIPKOPPIE DEVELOPMENTS

DU PREEZ STREET ORCHARDS SUB'B

ERF 3361 NELSPRUIT EXTENSION 29

NEW RUBICON RETIREMENT VILLAGE

D E P A R T E M E N T / C L I E N T

Collfin Property Group

Mess,s Klipkoppie Developments

SACAP

SCALE

DRAWN

CHECKEDJB

JB

7656DATE

DRAWING No.

Rev. accordingly before any work is put in hand.

Engineer and all foundations and/or bearing surfaces are to be designed

* A proper geotechnical soil investigation need to be done by a qualified

Engineer's drawings, specifications and instructions.

work are to be in accordance with SABS 1200 as per a Registered

* All structural work / components, foundations and civil engineering

with accuracy level 2 (as min.) of SABS 0155.

* Figured dimensions enjoy preference to scale. Building work to comply

and Local Authority By-Laws and/or regulations.

relevant SABS specifications, National Building Regulations (SANS 10400)

* All material and methods of construction to be in accordance with the

is put in hand. Refer all discrepancies to the author for clearing.

* All dimensions and heights are to be checked on site before any work

construction related activities on site

* Comply with relevant OSH Act Safety and Health requirements for all

said parties are aware of site circumstances if they commence work.

conditions on site before work is put in hand. It is accepted that

* Contractors and sub-contractors should avail themselves of existing

and true to ensure proper storm water run-off over the entire site.

the site after completion. Finish the new or exist. ground level even

* Keep the site clean at all times and remove all building rubble from

damage to existing components / structures of employer & neighbours, etc.

* All new work to be done in such a manner to minimise dust, noise and

to be done by a Regist.Surveyor before any building work is put in hand.

A proper survey of the site to determine exact falls & boundaries need

* Establish a site datum level and maintain for duration of the Contract.

* Expansion joints in the structure per Eng. spec. & drwg's. if required.

13/01/14 1530/06/08 06 Add leisure centre block A and block B

Add screen walls & stairs between units in centre blocks 0630/06/08

16/08/11

27/08/08

17/07/08

02/07/08

02/07/08 07

08

09

10

11 Revised Unit layout; Centre Block & South Blocks

Change screen wall layout units 49-52: Entrance gate layout

Add Leisure Centre residential Block C

Change A2 unit #55 to double garage; adjust dimensions

Change & adjust Leisure Centre Block A Fire Stair

14/01/13 12 Revised Site Sub-Division as per Land Surveyor

27/12/06 14 Revise Unit Types on Stands 18 - 23 & 85 - 86

Add Fire Hydrant detail per 2008 approved Building Plans

SITE DEVELOPMENT PLAN LAYOUT

1110/01sd

04/09/14 17 Revised Existing and New Unit Layout; Revised Schedules

10/09/14 18 Revised Existing and New Unit Layout; Revised Schedules

carp

ort

K1

ce

ce

SmS K3 K3m

PROPOSED BUSINESS STAND

SCALE 1:400

SITE PLAN

D

Du Pre

ez Street 20

m

43

FUTURE DEVELOPMENT AFTER

APPROPRIATE ZONING APPROVAL

MainEntrance

Manhole

3500 building line

124 8

70

yard yard yard

patiopatio

patio patio

carp

ort

yard

parkin

g

parkin

g

A2 dg

55

garage

57 58

K1m S

59 60

Sm

56

A2

62

K1mK1

61

garage

car-

port

gara

ge

gara

ge

Office

Security

patio

patio

patio patio patio patio

Port 2

Re 80

gara

ge

car-

port

gara

ge

7778

FH

parkin

g

91

road as p

er eng

T1 T1m

T1mT1 T1m

92

93

T1

T1m

90

8988

19 20a

22 23 24

C

E

2292 BLOCK F

18

Garages

8910111213141516171819202122232425262728

29 30 31 33 34

39

69

70

71

Emergency

Loadin

g

Loadin

g

Gara

ge

Gara

ge

Gara

ge

Gara

ge

Gara

ge

Gara

ge

Garage

Garage

Garage

carp

ort

carp

ort

conc. block paving

road as per eng

35363738

32

carp

ort

pool

splash

Gen-S

et

BLOCK B LEISURE CENTRE

BL

OC

K E

BLOCK D

Re 84

111 112

113 114 115 116 117

patio patio

patio patio

patiopatio

yard

yard

1/2

991

16 17 18 19 20 21

C

B

114 2

30

1065b

404142434445464748

Em

erg

ency

Em

erg

ency

FH

49

87

65 66 67 68 69

patio

5a 11874321

A

Port 1

50

55 56 57 58 59 60 61 62 63 64

5152

5354

BLOCK A LEISURE CENTRE

36

9

3837K1m

patio

patio

gara

ge

double

patiopatio

patiopatio

39

K1

40

K1m

K4 K4m41 42

43 444645

K4 K4mK4 K4mK1 K1m

patiopatio

patiopatio

patio patio

patio patiopatio patio

patio patiopatio patio

patio patio

gara

ge

gara

ge

gara

ge

gara

ge

gara

ge

gara

ge

gara

ge

gara

ge

gara

ge

gara

ge

41

4243

44

69

70

73

74

75

76

77

78

79

80 81 82 83 84

1 2 3 4 5 6

paving

Area

Refuse

deckdeck deck

deck deck

deck

85

Erf 3362

Service

Entrance

294 380

Erf 3361Re 80

21a 22a 24a 25 26

G

J

K

23a

D

E

20b

22b

1234567

72

73

74

75

BLOCK C LEISURE CENTRE

Erf 3360

247 270

3000 building line

23 22 21 20 19 18

Re 80

carports

car-

port

car-

port

gara

ge

gara

ge

J7 J7mJ3c J3c

mJ3a J3a

m

gara

ge

gara

ge

C

conc. block paving

road as per eng

yard

yard

16

patio

F2

J1m

12F2

gara

ge

patio

9

yard

15

J3

car-

port

car-

port

J3m

14

J1

13

car-

port

J3

11 10

J3m

car-

port

gara

ge

gara

ge

F2m

gara

ge

patio

8

gara

ge

7

J2 J2m

6

gara

ge

5

patio

gara

ge

F2

yard

1 2

35

garage

garage

79

gara

ge

F2m

gara

ge

patio

17

yard yardyard yard

yard yard

yard yard

yard

patio patiopatio patio

patiopatio

patio patio patio patio patio patiopatio patio

R/2

991

Erf 3411/8

85 86

yardyardyard

patiopatiopatio

gara

ge

gara

ge

gara

ge

carp

ort

J1mJ1 J1m

27 26 Re 82

BPrudential Citrus Estates 1

31 JUPortion 13 South African

48 660

patio

gara

ge

F2

32yardyardyardyard

patiopatio

patiopatio

gara

ge

gara

ge

gara

ge

carp

ort

carp

ort

J7m

J3a J1 J1m

31 30 29 28

35

F2b

patio

patiopatio

gara

ge

gara

ge

gara

ge

double

3334

11

gara

ge

gara

ge

yardyard

R Rm

Re 80

A

yard yard

67

89

1011

12131415161718192021

22

23

242526272829

303132

3334

3536

3738

39

40

4546

4748

49 50 51 5253 54 55 56 57 58 59 60 61 62

63

64 65 66 67 68

yard

yard

J3a J3am

patio patio

patio patio

patio

patio patio

patio

patio

patiopatioT1

Laundry

Admin Offices

Lounge

Resident

Lift

Stair

Stair

Kitchen Servery

Dining Room

StaffToilets

patio patio patio patio

patio patio patio patio

patio patio patio patio

patio

patio

Stair

Stair

Stair

Lift

Lobby

Entrance

Entrance

4

1902/07/15

PHASE 1

PHASE 2

PHASE 3

PHASE 4

Open Open

PHASE 5

101 10099 98

97 96

95

102 103 104 105 106107 108

109

patio

conc. block p

avin

g

94

FH

71

72

T1m

110

patiopatio patio

patio patiopatio patio

patio patio

12

11

10

9

8

7

carp

orts

T1T1mT1T1mT1m

T1mT1T1

T1m T1T1m T1m

T1 T1mT1

yard

yard

yardyard

yard

yardyard yard

yard yard

75

F4 F4m F4 F4mF4

75.1 75.2 75.4 75.575.3

75.6 75.7 75.975.8 75.10

F3 F3m F3 F3mF3

02/07/15 20 Revised Colour of Development Phases

Simplify layout with block indications only

28/06/17 21 ADD Phase 5 Development comprising 26 units

269 Pleiades Avenue,

Waterkloof Ridge,

PO Box 25040,

Monument Park,

Pretoria, 0105.

+27 12 347 0333

[email protected]

86

87

89 9088

949591 92

93

F4 F4m

F3 F3m

118

PHASE 6

23

16 August 2017

F4 F4m

F3 F3m

F4 F4m

F3 F3m

3000

3000

3000

3000

3600

3600

3550

1450

2000

2000

1000

600

25/07/17 22

Revise Phase 5 Development comprising 26 units27/11/13 13 Add New Units 18 - 23, 85 - 94 and Carport

ADD Phase 6 Development comprising 19 units

16/08/17 23

Recommended