© Crown copyright, All rights reserved. 2014 License No. EK001-20140601. Contains Ordnance Survey data © Crown copyright and database right 2014. Not to be used for navigation.
SCALE: @ A3
Source: Global Land Cover Facility, www.landcover.org.
TITLE:
Docu
ment
Path:
C:\G
IS D
ata\Pr
ojects
\Trito
n Kno
ll Cab
le 20
13-14
\Trito
n Kno
ll Elec
trical
Syste
m Po
st PE
I\Map
s\LCG
Mmap
s\201
5_04
_GoB
e_TK
ES_L
CGMF
igure2
.mxd
Coordinate System: British National GridProjection: Transverse MercatorDatum: OSGB 1936Units: Meter
E
C
D
55000036
0000 1:27,000
0 0.4 0.8
Kilometres /
Notes:-This map contains data from the following sources-Ordnance Surevy (2014)
01
Chk App
02/04/2015 First Draft LL SL SL
Rev Date Description Drn
Triton Knoll Electrical System
REV 01
LegendProposed DevelopmentBoundaryLincolnshire Coastal GrazingMarsh - Burgh le MarshTarget AreaExisting grassland withincreased sensitivity
Figure 5Triton Knoll Site SelectionLCGM Sensitive Habitats
© Crown copyright, All rights reserved. 2014 License number 0100031673Contains Ordnance Survey data © Crown copyright and database right 2014
Figure 6-4Triton Knoll Site SelectionReview of recommended changes to cable route15 of 48
SCALE: @ A3
Source: Global Land Cover Facility, www.landcover.org.
TITLE:
Doc
um
en
t P
ath
: \\
S0
60
A0
36
1\M
ap
s_o
ffsh
ore
\Pro
jec
tSpe
cifi
cMa
ps
\Ma
jorP
roje
cts
\15
_U
K_
Tri
ton
Kn
oll\
06
_In
terc
on
ne
ctio
n\0
2_R
WE
\03
_O
ns
ho
re_
Ca
ble
\TK
_11
90
_R
8 -
Tri
ton
Kn
oll
Site
Se
lect
ion
Re
view
of
req
ue
ste
d ch
an
ge
s to
ca
ble
ro
ute
.mx
d
Coordinate System: British National GridProjection: Transverse MercatorDatum: OSGB 1936Units: Meter
Fo
r C
on
tinu
atio
n S
ee
Sh
ee
t N
o.
15
Fo
r Co
ntin
ua
tion
Se
e S
he
et N
o. 1
3
Cu
t L
ine
Cu
t Lin
e
Cu
t L
ine
Cu
t Lin
e
For Continuation See Sheet No. 14 Cut LineCut LineFor Continuation See Sheet No. 15 Cut LineCut Line
Fo
r C
on
tinu
atio
n S
ee
Sh
ee
t N
o.
16
Cu
t L
ine
Cu
t L
ine
Fo
r Co
ntin
ua
tion
Se
e S
he
et N
o. 1
5C
ut L
ine
Cu
t Lin
e
#*
#*
#*16.1
15.1
14.1
81
Pp
8886
6184 10 1112
271811 33292515
DefBarn
5.1m2.7m
3.0m
House
House
TrackDairy
Drain
Drain
Drain
Drain
Drain
Drain
ElijahsStables
Hayloft
Lavender
1.22m RH
Jockhedge MARSH LANE
Burgh Marsh
Pine Cottage
Common Drain
Playing Field
WAINFLEET ROAD
Strawberry Field
Catchwater Drain861
CD
888684
102925
1511
Sl
CD
CD
FB
Def
LOW
Def
Pond
Pond
2.7m
2.4m
2.7m
Pond
Pond
Pond
LANE
TreeFarm
4.5m
Post
5.2m
5.5m
5.5m
TrackDrain
Drain
Acres
Drain Drain
Drain
DrainDrain
Drain
DrainDrain
DrainDrain
Drain
Drain
Track
Drain
Drain
Drain
Track
Drain
Drain
Drain
Drain
Drain
Drain
Drain
DrainDrain
Drain
Drain
Track
Drain
Drain
DrainDrain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Country
Lavender
1.22m RH
1.22m RH
Ward Bdy
Marshlea
LOW LANE
JockhedgeCroft End Southview
Croft End
HIGH LANE
Croft End
MARSH LANE
JOCK HEDGE
Burgh MarshCommon Drain
Common Drain
Bland's Farm
Playing Field
BILLGATE LANE
Belmont HouseLong Plantation
Beechwood House
Jockhedge Drain
Elmtree Cottage
Catchwater Drain
550000
Legend:
1:5.000
0 0,1 0,2
Kilometres /
Notes:-This map contains data from the following sources-Ordnance Survey
08
Chk App
16.04.2015 Eighth Draft NW FR KGC
Rev Date Description Drn
Triton Knoll Electrical System
REV 08
Final Application BoundaryProposed Development Boundary
Temporary Construction Compound (TCC)
Change request reason
") Archaeology
") Archaeology Drainage and Ecology
") Archaeology Ecology and Land-use
") Archaeology and Ecology
") Archaeology and Land-use
") Drainage
") Drainage Ecology and Land-use
") Drainage and Land-use
") Ecology
") Ecology and Land-use
") Ecology and Tourism
") Engineering
") Engineering Land-use and Utilities
") Engineering and Land-use
") Land-use
") Land-use and Utilities
") Utilities
Change Request Amended
* Change Request Made
( Change Request Not Made
+ TBC
Previous Cable CorridorPEI Assessment Version of Cable Route
Cable Route consulted on - October 2014
Cable Route consulted on- Spring 2014
Initial 60m-wide Cable Route- October 2013
Previous TCC and Track LocationsTemporary Construction Compounds - October 2014
Temporary Construction Compounds - Spring 2014
Temporary construction compound access track - October 2014
ConstraintsPond habits avoided where possible
Treelines and woodland habit avoided where possible
Archaeological features avoided where possible
Lincolnshire Coastal Grazing Marsh Target Area
Triton Knoll Electrical System Triton Knoll Offshore Wind Farm Limited
13
SITE 7: COASTAL GRAZING MARSH LAND “SITE 6” ( SITE E IN THE OUTLINE CMS)
7.1 Mitigation measures for this site are not yet agreed due to uncertainty with regards to the reinstatement of foot drains above the cables.
7.2 Proposed mitigation measures for this site (see Figure 5 of document reference 8.7.1 Outline Construction Method Statement for the location), which are set out in in Appendix 1 of Appendix 17 of the Applicant’s response to Deadline 2 include;
Measures to be implemented to ensure that in-filled material does not become a preferential drainage pathway (i.e. clay stanks, geosynthetic clay liners, plugs in duct ends) specified by a drainage engineer at detailed design phase;
Trench infill specification to be confirmed as being equally or less permeable than surrounding soils;
Haul road (~340m) to be constructed of temporary panels laid on surface without soil stripping; Soil storage areas to be covered by bog mats or geotextile to retain grassland below (i.e. no soil stripping). Soil stripping only to take place in areas in which cables are to be buried;
To enable remaining grassland to be managed appropriately, livestock will be granted access to cross the Order Limits (through gated access in fences) when it is possible to be safely and carefully managed. Grass sward within the Order Limits will be managed appropriately using mechanical measures (e.g. grass mowing, strimming etc.);
Use netting or other barrier to screen the working area from surrounding area if required (to be determined by the ECoW);
To schedule the works appropriately to minimise impacts to wintering/breeding birds and to avoid times of inundation;
To reinstate the same surface area of scrapes/blind ended ditches as currently in place, with the aim of maintaining the same layout if possible;
To discharge any water pumped from excavations to scrapes/blind ended ditches should this be determined as a benefit to biodiversity; and
Restore the site once cable ducts and cables have been installed (i.e. topsoil reinstated and seeded soon after construction in section is complete. An
Triton Knoll Electrical System Triton Knoll Offshore Wind Farm Limited
14
appropriate seed mix will be used to maintain or enhance current floral composition in discussion with the landowner). If a haul road is required at a later date the temporary track way is to be used.
Drive to Site 8.
Westhouses Road Crossing
7.3 The cable route in this location (and where applicable the amendments that were made to the route during the design stage, prior to the submission of the application) are shown in Figure 6-4, Map 30 of 48 of document reference 8.17.
Documents provided for this section
Figure 5 of document reference 8.7 Figure 6-4, Map 30 of 48 of document reference 8.17
© Crown copyright, All rights reserved. 2014 License No. EK001-20140601. Contains Ordnance Survey data © Crown copyright and database right 2014. Not to be used for navigation.
SCALE: @ A3
Source: Global Land Cover Facility, www.landcover.org.
TITLE:
Docu
ment
Path:
C:\G
IS D
ata\Pr
ojects
\Trito
n Kno
ll Cab
le 20
13-14
\Trito
n Kno
ll Elec
trical
Syste
m Po
st PE
I\Map
s\LCG
Mmap
s\201
5_04
_GoB
e_TK
ES_L
CGMF
igure2
.mxd
Coordinate System: British National GridProjection: Transverse MercatorDatum: OSGB 1936Units: Meter
E
C
D
55000036
0000 1:27,000
0 0.4 0.8
Kilometres /
Notes:-This map contains data from the following sources-Ordnance Surevy (2014)
01
Chk App
02/04/2015 First Draft LL SL SL
Rev Date Description Drn
Triton Knoll Electrical System
REV 01
LegendProposed DevelopmentBoundaryLincolnshire Coastal GrazingMarsh - Burgh le MarshTarget AreaExisting grassland withincreased sensitivity
Figure 5Triton Knoll Site SelectionLCGM Sensitive Habitats
© Crown copyright, All rights reserved. 2014 License number 0100031673Contains Ordnance Survey data © Crown copyright and database right 2014
Figure 6-4Triton Knoll Site SelectionReview of recommended changes to cable route30 of 48
SCALE: @ A3
Source: Global Land Cover Facility, www.landcover.org.
TITLE:
Doc
um
en
t P
ath
: \\
S0
60
A0
36
1\M
ap
s_o
ffsh
ore
\Pro
jec
tSpe
cifi
cMa
ps
\Ma
jorP
roje
cts
\15
_U
K_
Tri
ton
Kn
oll\
06
_In
terc
on
ne
ctio
n\0
2_R
WE
\03
_O
ns
ho
re_
Ca
ble
\TK
_11
90
_R
8 -
Tri
ton
Kn
oll
Site
Se
lect
ion
Re
view
of
req
ue
ste
d ch
an
ge
s to
ca
ble
ro
ute
.mx
d
Coordinate System: British National GridProjection: Transverse MercatorDatum: OSGB 1936Units: Meter
For Continuation See Sheet No. 29 Cut LineCut LineFor Continuation See Sheet No. 30 Cut LineCut Line
Fo
r Co
ntin
ua
tion
Se
e S
he
et N
o. 3
0C
ut L
ine
Cu
t Lin
e
Fo
r C
on
tinu
atio
n S
ee
Sh
ee
t N
o.
31
Cu
t L
ine
Cu
t L
ine
!(
#*
!(30.1
29.5
17
FB
FB
FB
PW
1813
CR
CD
CD
ETL
Red
The
The
The
The
The
The TCB
ETL
Old
DefDef Def
Def
Park
2.4m3.3m
Edge
3.2m
2.2m
3.1m
3.0m
Farm
2.4m
Fold
Mead
Roof3.4m
Hall
Firs
Farm
3.1m
2.0m 2.5m
3.6m
3.1m
2.1m
Drain
Drain
Track
Track
Drain
Track
Drain
Drain
Oscar
Drain
Drain
Horse
Tuson
Shoes
House
White
Drain
Drain
Crest
Drain
Drain
Drain
Drain
Drain
Drain
Drain
House
AcresAnley
Drain
DrainDrain
Drain
Neals
Drain
Drain
DrainDrain
DrainDrain
DrainDrain
Drain
Drain
Drain
Drain
Drain
Drain
Drains
Shalom
Sluice
Anchor
Jonwen
Bridge
Bridge
Caravan
Vandans
Welltop
Willows
Polders
Cottage
Cottage
Jasmine
Sukiska
Cottage
Gay-nor
Shelter
Shelter
Oak Tree
Hyperion
Maybelle
Drifters
Rosewood
Dilhorne
Pantiles
Ward Bdy
Path (um)
OozlebankPath (um)
Northolme
MAIN ROAD
Tennant's
Pump House
Mill Drain
Old School
WESTHOUSES
Mill Drain
Mill Drain
TRADER BANK
The HolliesThe Beeches
The Bungalow
Rose Cottage
Shillingbury
April Cottage
Cherry Corner
Sibsey Fen Side
Last Peg Cottage
Northlands Bridge
Stone Bridge Drain
Tennants Bridge Cottage
West Fen Catchwater DrainEast Fen Catchwater Drain
Legend:
1:5.000
0 0,1 0,2
Kilometres /
Notes:-This map contains data from the following sources-Ordnance Survey
08
Chk App
16.04.2015 Eighth Draft NW FR KGC
Rev Date Description Drn
Triton Knoll Electrical System
REV 08
Final Application BoundaryProposed Development Boundary
Temporary Construction Compound (TCC)
Change request reason
") Archaeology
") Archaeology Drainage and Ecology
") Archaeology Ecology and Land-use
") Archaeology and Ecology
") Archaeology and Land-use
") Drainage
") Drainage Ecology and Land-use
") Drainage and Land-use
") Ecology
") Ecology and Land-use
") Ecology and Tourism
") Engineering
") Engineering Land-use and Utilities
") Engineering and Land-use
") Land-use
") Land-use and Utilities
") Utilities
Change Request Amended
* Change Request Made
( Change Request Not Made
+ TBC
Previous Cable CorridorPEI Assessment Version of Cable Route
Cable Route consulted on - October 2014
Cable Route consulted on- Spring 2014
Initial 60m-wide Cable Route- October 2013
Previous TCC and Track LocationsTemporary Construction Compounds - October 2014
Temporary Construction Compounds - Spring 2014
Temporary construction compound access track - October 2014
ConstraintsPond habits avoided where possible
Treelines and woodland habit avoided where possible
Archaeological features avoided where possible
Lincolnshire Coastal Grazing Marsh Target Area
Triton Knoll Electrical System Triton Knoll Offshore Wind Farm Limited
15
SITE 8: SIBSEY MEMORIAL
8.1 The cable route is 220 m from the war memorial as shown in Figure 6-4, Map 31 of 48 of document reference 8.17.
Documents provided for this section
Figure 6-4, Map 31 of 48 of document reference 8.17
© Crown copyright, All rights reserved. 2014 License number 0100031673Contains Ordnance Survey data © Crown copyright and database right 2014
Figure 6-4Triton Knoll Site SelectionReview of recommended changes to cable route31 of 48
SCALE: @ A3
Source: Global Land Cover Facility, www.landcover.org.
TITLE:
Doc
um
en
t P
ath
: \\
S0
60
A0
36
1\M
ap
s_o
ffsh
ore
\Pro
jec
tSpe
cifi
cMa
ps
\Ma
jorP
roje
cts
\15
_U
K_
Tri
ton
Kn
oll\
06
_In
terc
on
ne
ctio
n\0
2_R
WE
\03
_O
ns
ho
re_
Ca
ble
\TK
_11
90
_R
8 -
Tri
ton
Kn
oll
Site
Se
lect
ion
Re
view
of
req
ue
ste
d ch
an
ge
s to
ca
ble
ro
ute
.mx
d
Coordinate System: British National GridProjection: Transverse MercatorDatum: OSGB 1936Units: Meter
Fo
r Co
ntin
ua
tion
Se
e S
he
et N
o. 3
0C
ut L
ine
Cu
t Lin
e
Fo
r C
on
tinu
atio
n S
ee
Sh
ee
t N
o.
31
Cu
t L
ine
Cu
t L
ine
For Continuation See Sheet No. 31 Cut LineCut Line
For Continuation See Sheet No. 32 Cut LineCut Line
!(
!(31.2
31.1
TCC 14
CD
GP
CDDef
Def
Def
Farm
Tank
2.6m
2.0m
1.9m
Pond
3.1m
Tanks
Drain
DrainDrain
Drain
Drain
Drain
Drain
Drain
Drain
DrainDrain
Drain
Drain
Drain
Drain
Track
Drain
Drain
Drain
Drain
Drain
Drain
DrainBridge
BishopsCottage
Mill Drain
STAUNT ROAD
STAUNT ROAD
Bishops Farm
War Memorial
ED & Ward Bdy
ED & Ward Bdy
ED & Ward Bdy
Tennants Bridge Cottage
Legend:
1:5.000
0 0,1 0,2
Kilometres /
Notes:-This map contains data from the following sources-Ordnance Survey
08
Chk App
16.04.2015 Eighth Draft NW FR KGC
Rev Date Description Drn
Triton Knoll Electrical System
REV 08
Final Application BoundaryProposed Development Boundary
Temporary Construction Compound (TCC)
Change request reason
") Archaeology
") Archaeology Drainage and Ecology
") Archaeology Ecology and Land-use
") Archaeology and Ecology
") Archaeology and Land-use
") Drainage
") Drainage Ecology and Land-use
") Drainage and Land-use
") Ecology
") Ecology and Land-use
") Ecology and Tourism
") Engineering
") Engineering Land-use and Utilities
") Engineering and Land-use
") Land-use
") Land-use and Utilities
") Utilities
Change Request Amended
* Change Request Made
( Change Request Not Made
+ TBC
Previous Cable CorridorPEI Assessment Version of Cable Route
Cable Route consulted on - October 2014
Cable Route consulted on- Spring 2014
Initial 60m-wide Cable Route- October 2013
Previous TCC and Track LocationsTemporary Construction Compounds - October 2014
Temporary Construction Compounds - Spring 2014
Temporary construction compound access track - October 2014
ConstraintsPond habits avoided where possible
Treelines and woodland habit avoided where possible
Archaeological features avoided where possible
Lincolnshire Coastal Grazing Marsh Target Area
Triton Knoll Electrical System Triton Knoll Offshore Wind Farm Limited
16
SITE 9: TKOWFL ONSHORE SUBSTATION
9.1 The TKOWFL Onshore Substation site, located to the right hand side of the Bicker Fen Wind Farm can be viewed on the left from North Drove if you continue on past Longhedge Drove.
9.2 Please refer to the photomontages attached which show the site:
Existing in Plate 1-2-6a Volume 5, Annex 2.2, Photomontages - Part 5 Boston Plates 1-2-6 to 1-2-11c, (document reference 6.2.5.2.2) of the ES,
At Year 1 with no mitigation on Plates 1-2-6b of Volume 5, Annex 2.2, Photomontages - Part 5 Boston Plates 1-2-6 to 1-2-11c, of the ES, and
At Year 15 with the proposed planting in Plate 1-2-6c of Volume 5, Annex 2.2, - Part 5 Boston Plates 1-2-6 to 1-2-11c, of the ES.
From this location you can also see the NGET substation site. Please refer to Plate 1-3-5 of Volume 5, Annex 2.2, Photomontages - Part 6 Bicker Fen Plates 1-3-1 to 1-3-7 of the ES which shows where the substation will be sited.
9.3 An indicative layout of the TKOWFL substation is shown on Figure 1-4 in Volume 3, Chapter 1, Onshore Project Description of the ES (document reference 6.2.3.1).
Documents provided for this section
Plate 1-2-6a – 1-2-6c of Volume 5, Annex 2.2 of the ES
Plate 1-3-5 of Volume 5, Annex 2.2 of the ES
Figure 1-4 in Volume 3, Chapter 1 of the ES