Six Year Capital Facili�es Plan 2017-2023 North Thurston Public Schools | No. 003 June 2017 www.nthurston.k12.wa.us
Transcript
  • Six Year Capital Facili�es Plan 2017-2023North Thurston Public Schools | No. 003

    June 2017www.nthurston.k12.wa.us

  • 1

    CAPITAL FACILITIES PLAN 2017-2023

    North Thurston Public Schools Board of Directors

    Chuck Namit, President

    Graeme Sackrison, Vice President

    Marcia Coppin

    Dave Newkirk

    Mel Hartley

    Dr. Debra Clemens, Superintendent

    Monty Sabin, Assistant Superintendent of Operations

    The North Thurston Public Schools Capital Facilities Plan was prepared with the help of

    the following individuals:

    Staff Mike Laverty, Construction and Design

    Dean Martinolich, Construction and Design

    Jeff Greene, Planning Consultant

    Debbie Cannon, Capital Projects

    Paula Leenstra, Capital Projects

    Amanda Miller, Construction and Design

    The Capital Facilities Plan was adopted by the North Thurston Public Schools Board of

    Directors on June 6, 2017. If you have questions or would like additional information,

    please contact the Construction & Design Department at 412-4500 or visit NTPS website

    at www.nthurston.k12.wa.us.

  • 2

    If you have driven by any of our schools lately, you have probably witnessed some level of our ongoing facility improvements! As part of the 2014 “Neighborhood School Improvements, Technology and Safety Upgrades” bond, all of our schools are undergoing varying levels of improvements. The $175 million investment (along with an additional $50 million from the state) is providing district-wide facility upgrades, more classroom space for our growing student population, and more jobs in our community. Since construction work began, we have successfully completed our transition to a 6-8 middle school model at each of our middle schools! Construction of Salish Middle School at 8605 Campus Glenn Dr. NE. has a neighborhood feel; the school provides a wonderful learning environment for our students and is becoming a community hub for our residents. Other highlights from the 2014 Bond include:

    Modernization of Evergreen Forest Elementary; roof replacement at Komachin Middle School and instructional and HVAC improvements at River Ridge High School;

    Pleasant Glade Elementary’s modernization is planned and bids will be opened in February of 2018;

    North Thurston is taking shape with Phase I completed, including a new gym, new classrooms and other upgrades. Phase II has started and will be in full swing throughout the summer;

    Safety, security and health upgrades at all our schools continue, including new cameras, alarms, and automatic door locks;

    Technology upgrades district-wide, including new computers, increased bandwidth and updated science labs;

    Improvements to all schools, including replacing deteriorating roofs, floors and heating systems; This Capital Facilities Plan is updated annually to keep our community informed of our progress. It is a detailed road map to ensure our future success. As the largest and most diverse district in Thurston County, we remain committed to transparency, financial accountability and high expectations for our students and staff. We are committed to providing quality, safe and secure neighborhood schools for all our students with the best possible learning environments for kids. As Superintendent, I will help ensure that the public is kept current on the progress of our facility projects as we aim to stay “on time and on budget.” You may recall that this year our School Board also passed an amended bond resolution to ensure that the bond dollars are aligned with the expenditures voters approved and patrons expected. You can see ongoing updates of our Capital Facilities plan on our website. Our schools are a significant part of your community. We welcome you to stop by and attend a school play, concert or athletic event. Each year, thousands of citizens use our schools, swimming pools and athletic fields for recreation, sports and community meetings. We are proud to be a community asset for everyone in Lacey and the surrounding area. Thank you for your continued support! Sincerely,

    Debra J. Clemens, PhD Superintendent

    http://www.nthurston.k12.wa.us/bondconstruction.

  • 3

    North Thurston Public Schools 2017 Capital Facilities Plan

    INDEX

    ACKNOWLEDGEMENT PAGE 1

    MESSAGE FROM SUPERINTENDENT 2

    INDEX 3

    FAST FACTS ABOUT NORTH THURSTON PUBLIC SCHOOLS 5

    DISTRICT MISSION 8

    HISTORY OF NORTH THURSTON SCHOOL DISTRICT 10

    SIX YEAR CAPITAL FACILITIES PLAN - EXECUTIVE SUMMARY 13

    I. SUMMARY 15

    II. STUDENT ENROLLMENT TRENDS AND PROJECTIONS 20

    TABLE 3: Comparison of Student Enrollment Projections 22

    TABLE 4: Projected Student Enrollment by Grade Span 22

    TABLE 5: Year 2023, 2029, and 2037 Projected Enrollment by Grade Span 23

    CHART 1: Historical and Projected Enrollment 25

    TABLE 1: OSPI Projected Enrollment 26

    TABLE FOR CHART 2 27

    CHART 2: Projected Enrollment Trends for 2018-2022

    Grades Reconfigured to K-5, 6-8, 9-12 28

    TABLE FOR CHART 2A 29

    CHART 2A: Projected Enrollment Trends for 2022-2036

    Grades Reconfigured to K-5, 6-8, 9-12 30

    MAP 1: Lacey and UGA Residential Developments 31

    III. DISTRICT EDUCATIONAL PROGRAM STANDARDS 32

    TABLE 9: Year 2014 Average Building Area Per Student 35

  • 4

    North Thurston Public Schools 2017 Capital Facilities Plan

    IV. CAPITAL FACILITIES INVENTORY 36

    TABLE 10: Inventory of Educational Facilities 37

    MAP: NTPS Elementary/Middle/High School Attendance Areas 38

    TABLE 11: Summary of Existing Facilities 39

    V. PROJECTED FACILITY NEEDS (Years 2015-2022) 41

    TABLE 12: Projected Housing Needs 41

    VI. PLANNED FACILITY IMPROVEMENTS 43

    TABLE 13: Growth Related Construction Projects 45

    TABLE 13a: Growth Related Construction Projects (2022 Bond) 45

    TABLE 14: Projected Available Student Capacity 46

    TABLE 15: Facility Maintenance Projects, (2014 Bond) 48

    TABLE 15a: Six-Year Projected Facility Maintenance Plan (2022 Bond) 49

    Capital Projects 6 Year Finance Plan 2017-2023 spreadsheet with no new bond 50

    Capital Projects 6 Year Finance Plan 2017-2023 spreadsheet with 2022 Bond 51

    VII. DISTRICT’S FINANCE PLAN 52 TABLE 16: Capital Finance Plan (No 2022 Bond) 54

    TABLE 16a: Capital Finance Plan (w/ 2022 Bond) 55

    VIII. PROJECTED FACILITY NEEDS (YEARS 2020-2034) 56

    TABLE 17: Long-Range Projection of Unhoused Students 56

    APPENDIX A: 57

    TABLE 18: Mitigation Fee Calculation, Single Family 58

    TABLE 19: Mitigation Fee Calculation, Multi-Family 59

  • 5

    Fast Facts about North Thurston Public Schools

    NORTH THURSTON PUBLIC SCHOOLS: About Our District Being the largest district in the county, North Thurston Public Schools educates approximately 14,500 students each year, with 13 elementary schools, 5 middle schools (including a performing arts magnet school), 3 comprehensive high schools and one high school of choice.

    Our District

    NTPS is Washington's 23rd largest school district, out of 295 total school districts. We currently serve approximately 14,700 students per year. Enrollment at NTPS is

    expected to increase to approximately 16,200 by the year 2024. One hour south of Seattle, NTPS serves Lacey and northeastern Thurston County,

    encompassing 74 square miles. Founded in 1953, NTPS is 13 years older than the City of Lacey. NTPS is the most

    ethnically-diverse school district in the South Sound region, serving African American, Pacific Islander, Asian, Native American, Hispanic and other populations.

    18 Washington Achievement Awards. 6 Schools of Distinction Awards. 100+ National Board Certified Teachers.

    STRATEGIC FRAMEWORK: A simple, practical approach to annual planning. Our approach is both wholesome and grounded in reality. The following elements guided the creation of our framework which includes several key focus areas:

    Make student learning the center of everything we do. Support the needs of the whole child. Strengthen community engagement to support student learning. Develop a trusting work culture through effective leadership and communication. Be fiscally accountable and efficient in the use of public resources.

    Our strategic plan is currently under review with a draft due to the board on June 20, 2017.

    Our Students, Teachers, and Volunteers: The Heart of the District

    Employment

    We are proud to employ approximately 2,800 staff.

    http://www.nthurston.k12.wa.us/22461062417188980/site/default.asp

  • 6

    NTPS also has one of the highest percentage of National Board Certified teachers in the state among larger districts. The majority of our teachers also have advanced degrees.

    Scholarships

    Over $9.4 million in college scholarships were offered last year to our graduating seniors.

    Alumni

    More than 100 North Thurston Public Schools staff members are also NTPS alumni.

    ESL

    Our English as a Second Language (ESL) program serves over 700 students who speak more than 46 different languages at home.

    Volunteers

    Last year, more than 3,000 parent and community volunteers gave nearly 60,000 hours of their time for student support and achievement in our classrooms.

    Our Programs and Classes

    Gifted Education: NTPS offers a self-contained elementary Talented & Gifted program at Lakes Elementary (grades 3-5) and highly capable courses at every middle school.

    Special Education: NTPS offers a continuum of services designed to help our special needs students (birth to age 21), including speech and language therapy, occupational and physical therapy, vision/hard-of-hearing and deaf education, augmentative communication services, and academic and behavioral interventions.

    Advanced Placement: Enrollment in our high school Advanced Placement classes is approximately 1,600 per year, with classes ranging from Physics to World History.

    Career & Technical Education students have work-based learning opportunities and have won numerous state and national awards. They may also take classes at New Market Skills Center in Tumwater or earn college credits through South Puget Sound Community College.

    Visual and Performing Arts: NTPS offers art and music instruction in grades K-12. A large percentage of secondary students also participate in our award-winning performing arts and music programs, including band, orchestra, theatre and choir.

    Activities: NTPS offers a variety of extra-curricular activities and clubs starting in elementary school, including chess, drama, chorus and Kiwanis K-Kids. Secondary clubs are diverse as well, including International, Academic Decathlon, Anime, Social Justice and even Break Dancing clubs.

    Athletics: Each year more than 3,000 secondary students participated in NTPS interscholastic athletic programs.

  • 7

    Our Facilities and Services

    In February 2014, citizens of North Thurston Public Schools overwhelmingly approved a $175 million dollar Neighborhood School Improvements, Technology & Safety Upgrades Bond Measure. This includes modernizations and addition of Pleasant Glade Elementary, plus major upgrades to River Ridge and Komachin. Work of North Thurston High School Phase 1 completed in the summer of 2016. Work of Phase 2 at North Thurston High School is underway. Evergreen Forest Elementary School modernization and addition completed summer of 2016 and new Salish Middle School opened fall of 2016 allowing the final phase of grade reconfiguration to K-5, 6-8, 9-12.

    NTPS buses safely transport approximately 13,160 students each day to and from school. Our mechanics have an exceptional safety record with OSPI and the Washington State Patrol keeping our buses in perfect running order. We have several Bus Drivers that participate in the annual Bus Drivers competition qualifying them for local and state honors.

    NTPS is Thurston County's largest food-service operation, serving approximately 2,500 breakfasts and 7,300 lunches each school day.

    All NTPS facilities - school buildings, playing fields, swimming pools - are used by a wide range of community groups almost every day of the year.

  • 8

    North Thurston Public Schools 2017 Capital Facilities Plan

    District Mission Statement

    COMMITTED TO EXCELLENCE: Providing every student the academic and life skills necessary to

    succeed in a diverse world.

    School Board Priorities

    • Make student learning the center of everything we do • Support the needs of the whole child • Strengthen community engagement to support student learning • Develop a trusting work culture through effective leadership and communication • Be efficient and accountable in the use of public resources

    Portrait of a North Thurston Graduate

    Creative Resilient Critical Thinker Strong Communicator Reflective Self Disciplined Compassionate Globally Aware

  • 9

    North Thurston Public Schools 2017 Capital Facilities Plan

    Facilities Mission Statement North Thurston Public Schools Facilities Department will work to develop collaborative and accountable relationships among our staff, students and the community to ensure a positive and safe learning environment. In support of the district’s mission and priorities, we believe all district facilities shall be:

    Inviting, accessible and welcoming to all Safe, warm and dry Supportive of student learning and the whole child Sustainable, energy efficient and economical Available as community resources Technologically progressive

  • 10

    North Thurston Public Schools 2017 Capital Facilities Plan

    HISTORY OF NORTH THURSTON PUBLIC SCHOOLS

    North Thurston Public Schools, encompassing the northeastern portion of Thurston County, has

    four high schools, four middle schools, and thirteen elementary schools housing over 14,500

    students.

    The district, formed in 1953 with South Bay and Lacey elementary schools, immediately made

    plans for construction of a high school. North Thurston High School opened in September 1955

    with grades 7 through 12, and in December of that year plans were underway for construction of

    Mt. View Elementary school and a five room addition to South Bay Elementary School, both

    completed in 1957.

    Lydia Hawk Elementary School opened its doors in 1959 and Chinook Middle School started

    classes in 1961. Construction of Lakes Elementary School relieved the space crunch when it

    opened in 1964. Nisqually Middle School opened in 1967, with grades six through nine included

    at both middle schools in an attempt to keep up with the continued growth of the district. The old

    Lacey school was closed to students in 1967 and converted into the district office. The new

    Lacey Elementary School opened in 1968 and both Olympic View Elementary School and

    Timberline High School opened in the fall of 1970. That year the ninth grade was included in the

    high schools relieving the squeeze at the middle schools.

    Construction of Evergreen Forest Elementary School began in the summer of 1977 and the

    school opened in September 1978, and construction of Woodland Elementary School began in

    the summer of 1980 and the school opened in September 1981. South Bay Elementary School

    was remodeled and completed in the fall of 1981. Construction also began in the fall of 1981 on

    the new North Thurston High School, with the school opening in the spring of 1983.

    Construction on Meadows Elementary School began in 1985 with school opening in the fall of

    1986, and construction on Pleasant Glade Elementary School began in 1986 with school opening

    in the fall of 1987.

    A new district office facility opened in 1986. Puget Sound High School was established in the

    fall of 1987; a new school building for this alternative school opened in 1990. In the fall of 1990,

    New Century High School, a night high school located on Timberline High School's campus, and

    Seven Oaks Elementary School opened their doors for students. Komachin Middle School and

    Horizons Elementary School opened in the fall of 1992. A new concept in high schools was

    adopted for River Ridge High School which opened in the fall of 1993. New Century High

    School was relocated to this campus. In 1998, New Century High School was relocated to Puget

    Sound High School and in 2000 New Century and Puget Sound were combined as South Sound

    High School.

    A new auditorium opened at North Thurston High School in 1995. Olympic View Elementary

    (1998), Mountain View Elementary (1999), Lakes Elementary (1998), Lydia Hawk Elementary

    (2000), and Lacey Elementary (2002) have undergone substantial modernization projects using

    proceeds of the 1991 Bond. The North Thurston High School Pool underwent modernization in

  • 11

    North Thurston Public Schools 2017 Capital Facilities Plan

    2003. The district continues with major district-wide technology improvements. The district also

    sold the old district office site to QFC in 1999. In 2002, the Administration Offices were

    upgraded, the Bower Center was renovated into a District Technology Center and the Service

    Center was remodeled to accommodate support service departments.

    In 2006, the citizens of North Thurston Public Schools approved a 112 million dollar capital

    facilities bond. The replacement and modernization of Timberline High School began in the

    summer of 2006 and was completed in 2009. A new South Sound High School opened in 2007.

    The old South Sound High School facility was temporarily renamed Horizons Intermediate

    School and for two years housed the 5th and 6th grades of an overcrowded Horizons Elementary.

    When the new Chambers Prairie Elementary was complete and occupied in the fall of 2009, this

    facility was remodeled and commissioned as Aspire Middle School for the Performing Arts. The

    modernization and additions to Nisqually Middle School, Woodland and South Bay Elementary

    Schools were completed in 2009. The modernization and addition of Chinook Middle School

    was completed in 2010. The district is in the process of acquiring sites for new facilities

    anticipated to be required within the next twenty years.

    In February 2014, the citizens of North Thurston Public Schools overwhelmingly approved a

    $175 million dollar capital facilities bond measure. Major projects planned include the

    construction of a new middle school in the Hawks Prairie area, the modernization of Evergreen

    Forest and Pleasant Glade Elementary Schools, and additions to and modernization of North

    Thurston High School. District-wide facility upgrade projects include upgrades of building

    systems at River Ridge High School and Komachin Middle School; as well as district-wide

    safety, security and technology infrastructure improvements. Finally, selected improvements will

    be made at each and every school in the district to address deferred maintenance and/or

    programmatic needs.

    At this juncture, the district is implementing its' 2014 Bond program. The new Salish Middle School opened in the fall of 2016 allowing grade reconfiguration for the remainder of the district. The modernization of Evergreen Forest Elementary started in April of 2015 and was completed last summer. Phase I of the North Thurston High School project completed summer of 2016 and Phase 2 is under construction. In mid-2014, the district acquired a vacant fitness center building across the street from North Thurston High School. After being used for temporary NTHS program space, allowing the compression of the phasing of the NTHS project, shaving a year from the original 4 year schedule, it will be improved to house other district programs. Phase I of the upgrades to the River Ridge High School project is complete. A significant programmatic change, the creation of a STEM program, has become added scope and a high priority for this project. Phase I of the upgrades to Komachin Middle School are complete as well – a full upgrade to the exterior envelop of Komachin Middle School. Another district program addition is the creation of a centralized Early Childhood program, housed in 2 new 8 classroom buildings, one located at Mountain View Elementary and, one at Meadows Elementary. The Mountain View building opened in September 2015 and the Meadows building opened in January 2016. Finally, an assortment of other district wide improvement projects are also scheduled to take place over the summer of 2017.

  • 12

    North Thurston Public Schools 2017 Capital Facilities Plan

    The six year 2017-2023 Capital Facilities Plan is the first in recent years to include additional

    funding from a possible new bond in 2022. In case conditions do not warrant running a bond in

    2022, or if a bond is run and fails, this CFP includes calculations based on only the remaining

    funds from the 2014 bond, as well as calculations including additional new funding if the 2022

    bond passes (Tables 15 and 15a).

    In anticipation of a district wide K-5 and 6-8 grade configuration model in 2016, Chinook

    Middle School transitioned to the 6-8 grade configuration in the fall of 2013. Nisqually followed

    in September of 2014 and Komachin in September of 2016 when Salish Middle School opened.

    Aspire, our magnet middle school for Performing arts offers courses for students 6th through 8th

    grades. Lacey, Pleasant Glade and South Bay transitioned to the K-5 grade configuration model

    in the fall of 2013. Evergreen Forest, Lydia Hawk, Meadows, Olympic View and Seven Oaks

    followed in September of 2014. The remainder of our elementary schools transitioned to K-5 in

    September 2016. Specialist in art, music and PE are provided in each elementary school. North

    Thurston, River Ridge, Timberline and South Sound High schools serve students in grades nine

    through twelve. Twenty-two credits are required for graduation with emphasis on academics, fine

    arts, career exploration and preparation, and physical education. Various vocational learning

    opportunities are offered. Special education programs and services are available to special needs

    students, and the district operates an educational program for hearing impaired students.

    A fleet of over 100 buses transport students to and from school and traveled over 1,000,000 miles

    last school year.

    The district serves over 1.4 million meals every year. In addition, a la carte lunches are offered at

    the high schools and middle schools, and breakfast is offered at all the schools.

    The district employs more than 2000 staff of which 850 are teachers and has an annual budget

    greater than $120 million. It is the largest employer in the City of Lacey and fourth largest in

    Thurston County.

  • 13

    North Thurston Public Schools 2017 Capital Facilities Plan

    SIX YEAR CAPITAL FACILITIES PLAN

    2017-2023

    EXECUTIVE SUMMARY

    The NTPS Capital Facilities Plan is a six year plan intended to be revised each year for the

    succeeding six years.

    The Capital Facilities Plan is developed with the knowledge of the development and population

    implications of the City of Lacey and Thurston County Comprehensive Plans and Generalized

    Land Use Plans. The district is committed to planning in a manner consistent with the

    community’s vision of its future as represented in these and other development policy

    documents. The district uses long-range growth planning and demographic tools to determine

    and respond to the future facility needs for students within its boundaries. Long-range plans and

    acquisitions of sites to meet those long-range plans are required to allow appropriate time for

    prudent facility construction and financial planning.

    The plan assesses the ability of district facilities to assist in the delivery of the educational

    program adopted by the district. Capacity is reviewed and modified periodically as the district

    revises programs, policies, staffing formulas, schedules and as facilities are modified. The plan

    projects future enrollments in order to evaluate the demand for future facilities.

    State funding formulas have a significant impact on capacity. Currently the state is funding all-

    day kindergarten. This has also changed the capacity calculation significantly.

    The Six Year Finance Plan addresses the type of facilities required, and the timing of providing

    those facilities. The plan is constructed in order to minimize long term costs to the district and

    tax rates for its citizens, as well as to maximize state funding assistance and meet enrollment and

    program demands.

    In addition to state and local funding, consistent with Board Policy 9220, other board planning

    policies and district interlocal agreements, the district receives Impact Fees from residential

    developers as adopted by jurisdictions. The funds paid under these agreements are used to pay for

    (1) projects reasonably related to and benefiting the new housing development, (2) projects

    necessary to provide adequate schools or school grounds to serve such new residential housing,

    or (3) projects reasonably necessary to mitigate potentially significant impacts of such new

    housing development on the district’s educational facilities and programs. The district is

    committed to acquiring appropriate residential mitigation from developers consistent with its

    evaluation of the ultimate build-out of the district.

    A 2006 capital facilities bond approved by the citizens of North Thurston Public Schools funded

    modernization and additions to Timberline High School completed in 2009, new Chambers

  • 14

    North Thurston Public Schools 2017 Capital Facilities Plan

    Prairie Elementary School opened in 2009, and new South Sound High School opened in 2007.

    The old South Sound High School was recommissioned as Aspire Middle School and opened in

    the fall of 2009. Modernizations and additions to South Bay and Woodland Elementary Schools

    were completed in 2009. Modernization and additions to Nisqually Middle School were

    completed in 2009 and modernization and additions to Chinook Middle School were completed

    in 2010. Many smaller district projects were also completed using these funds.

    In February 2014, the citizens of North Thurston Public Schools overwhelmingly approved a

    $175 million dollar capital facilities bond measure. NTPS will be able to continue its plan to

    build, modernize, upgrade and maintain district facilities. New Salish Middle School is complete.

    The modernization of Evergreen Forest is complete. North Thurston High School Phase 1 is

    complete and Phase 2 is underway. The modernization of Pleasant Glade Elementary School as

    well as upgrades to River Ridge High School and Komachin Middle School are being planned.

    The district continues to improve its facilities utilizing available resources. Asset Preservation

    thru Infrastructure Maintenance is an ongoing program to protect the public investment of tax

    dollars in North Thurston Public School facilities. To fund the planned and predicted

    maintenance or upgrade of critical building systems, as well as the ability to respond to

    “emergent needs”, requires the regular public support of bonds and levies.

    Further, because these plans are based upon estimates and projections, the district anticipates the

    need to and will continue to evaluate, update, and revise its plans annually. To meet capacity

    gaps at locations with particular demand, the district will utilize portable facilities until such time

    as it is able to replace those temporary facilities with permanent facilities that enable the district

    to fully utilize the space for its educational programming purposes. As necessary, the district will

    also reconsider other programming or planning alternatives to meet student needs.

    In recent years bonds have been passed in 2006 and 2014. To keep property tax assessments as

    level as possible, the district envisions a continuing eight (8) year bond cycle. The district

    expects the next bond would go to the voters in February of 2022.

    The six year 2017-2023 Capital Facilities Plan is the first in recent years to include additional

    funding from a possible new bond in 2022. In case conditions do not warrant running a bond in

    2022, or if a bond is run and fails, this CFP includes calculations based on only the remaining

    funds from the 2014 bond, as well as calculations including additional new funding if the 2022

    bond passes. To provide estimates of future project costs in the plan, representing a positive vote in 2022, an anticipated list of projects: new, modernizations and upgrades had to be developed. This list of projects and its associated costs are very preliminary and based solely upon projections of future needs and costs by the district's Construction and Design Department. This list of projects, and associated costs, is certain to change between now and 2022 and is purely an estimate of the composition of the next bond measure.

  • 15

    North Thurston Public Schools 2017 Capital Facilities Plan

    I. SUMMARY

    Purpose of the Capital Facilities Plan

    This Capital Facilities Plan (CFP) is a six year rolling plan. It is intended to be revised each year

    for the succeeding six years, using the best available information. It provides the District, the

    City of Lacey, Thurston County, the State of Washington, other jurisdictions, and the community

    with a description of facilities which will be needed to accommodate projected student

    enrollment at acceptable levels of service over the next 20 years, and a more detailed schedule

    and financing program for capital improvements over the next six years (2017-2023). This CFP

    has been prepared by North Thurston Public Schools with the input of citizens and staff

    members. This plan was prepared based upon enrollment information available in October 2016.

    This plan is consistent with current North Thurston Public Schools policies and procedures. The

    plan addresses the anticipated capital facility needs through the 2023 school year.

    In accordance with the Growth Management Act, this CFP contains the following required elements:

    An inventory of existing capital facilities owned by NTPS, showing the locations and capacities of the facilities;

    A forecast of the future needs/demand (i.e., student enrollment) for capital facilities owned by NTPS;

    The proposed capacities of expanded or new capital facilities; and A six-year plan for financing capital facilities within projected funding capacities, which

    clearly identifies sources of public money for such purposes.

    This CFP also identifies deficiencies in existing school facilities serving existing development, and the means by which existing deficiencies will be eliminated within a reasonable period of time. North Thurston Public Schools bases its enrollment projections on data from the OSPI as well as growth projections from Thurston Regional Planning Council, state and national census and demographic data. Because school facilities are capital facilities included within coordinated growth planning under the Growth Management Act, the district will provide this CFP to local jurisdictions within the district's boundaries. The district periodically reviews its capacity to house projected student enrollment. Where appropriate, it adjusts its school attendance boundaries in order to match student capacity with projected enrollment.

    This plan consists of a summary of existing school buildings (building and site sizes, and

    addresses), capacity of existing facilities, a list of potential capital projects and a six year finance

    plan for capital projects. The list of potential capital projects includes site acquisition, new

    construction, modernization, preservation of existing facilities through the major repair and

  • 16

    North Thurston Public Schools 2017 Capital Facilities Plan

    upgrade of critical building systems, temporary facilities, and other site modifications as well as

    a rough estimate of the potential cost for each item.

    Overview of North Thurston Public Schools

    North Thurston Public Schools is located in Thurston County, Washington. It is bordered by the

    Nisqually River and Pierce County line on the east and Puget Sound on the north. It encompasses

    nearly all of the City of Lacey Urban Growth Area, portions of the City of Olympia and portions

    of unincorporated Thurston County on the north, east and south borders, serving both urban and

    rural areas.

    Based upon October 2016 enrollment data, North Thurston Public Schools serves a student

    population of over 14,600, with 13 elementary schools, four middle schools, one small special

    focus middle school, three comprehensive high schools and one smaller high school of choice.

    The elementary schools primarily provide educational programs for students in kindergarten

    through grade five. Middle schools serves grades sixth through eighth grade. High schools offer

    educational programming for students in grades nine through twelve.

    As the state provides funding for all day kindergarten, this grade reconfiguration will help

    provide capacity at the elementary grade level to house the additional program.

    Significant Issues Related to Facility Planning for North Thurston Public Schools

    The enrollment projections prepared by North Thurston Public Schools indicate significant

    increases in the enrollment of NTPS in the next twenty (20) years. Increases in enrollment are

    projected at all grade levels within the next six (6) years.

    There is currently plans at the state level to increase the requirements for all-day kindergarten

    and for more extensive pre-school services. These initiatives, if implemented, will significantly

    increase the need for additional elementary school facilities.

    There are discussions at the state level to fund lower class sizes, particularly at K-3 grade levels.

    Any mandate to reduce class size may have significant impacts on the facility needs of the

    district.

    North Thurston Public Schools currently projects that enrollment increases may require

    construction of additions at elementary school and middle school in the next 20 years. This new

    construction will maintain the current educational program grade configuration K-5, 6-8, 9-12

    structure.

    The district is committed to constructing neighborhood schools for elementary schools.

  • 17

    North Thurston Public Schools 2017 Capital Facilities Plan

    The district is committed to maximizing the opportunity for students to walk to school. This

    policy supports the City of Lacey and Thurston County development requirements.

    In cooperation with the City of Lacey, land use policies have been established that plan

    additional elementary school sites as part of residential developments and/or village centers.

    Acquisition of new school sites in advance of enrollment needs is critical to preparing the school

    district to meet the challenge of increasing enrollment. Since it is uncertain how or when land

    will ultimately be developed or how the district may deliver services in the future, the district

    anticipates that it may acquire more sites than the minimum supported by enrollment projections.

    The district currently owns six potential elementary school sites, three potential middle school

    sites and one potential high school site. However, as growth occurs and both development

    regulations and educational programming are modified over time, these sites may not ultimately

    be suitable for development at the time when construction is needed. Sites that become

    unsuitable for development may later be surplused or exchanged for sites more suitable or in

    different geographic locations.

    To address existing facility deficiencies, the district plans to continue its program of preventive

    maintenance and building system upgrade, a.k.a. the Asset Preservation Program (APP). The

    district has also pursued a program of building modernization (funded by the 1991, 2006 and

    2014) bond issues and matching funds provided by the State Construction Assistance Program).

    The district has regularly improved facilities, responding to new programs, technology changes

    and safety concerns using the capital funds generated by bond measures and state assistance, and

    will continue to do so, with the proceeds of the successful 2014 Bond measure. In keeping with

    the recent 8 year bond cycle, the district tentatively plans on running another bond in February

    2022. Proceeds from that bond are reflected in parts of this plan.

    Enrollment changes due to residential development have led the district to make use of

    temporary facilities and to review school attendance boundaries periodically. The district

    believes that the potential to adjust enrollment through future changes in contiguous boundaries

    is limited. Future reliance on more extensive bussing is a more likely scenario, creating increased

    needs for additions to the district’s bus fleet.

    Assumptions

    This plan will help guide the modernization and maintenance of existing facilities as well as the

    development of new facilities. The following assumptions were used in developing this CFP:

    1. The district will continue to seek state and federal money to the maximum extent available to supplement its own financial resources (See Policies 9100 and 9220).

  • 18

    North Thurston Public Schools 2017 Capital Facilities Plan

    2. The state will fund new facilities using the following space allowance:

    Grades K-6 90 square feet per pupil

    Grades 7-8 117 square feet per pupil

    Grades 9-12 130 square feet per pupil

    Classrooms for students 144 square feet per pupil

    with disabilities

    (See WAC 392-343-035)

    3. School design and planning capacity shall be:

    Elementary School - 550 + special education space

    Middle School - 750 + special education space

    High School - 1250 + special education space

    (See Policy 9100)

    4. The Board will continue to provide educational services through temporary facilities or

    rental of facilities as a transitional space to accommodate shifting enrollment (See Policy

    9112).

    5. The district will attempt to acquire building sites in advance of construction needs (See

    Policy 9210).

    6. The district will continue to maintain the district's facilities (See Policy 9300).

    7. Budget recommendations shall be made each year to repair, maintain and recondition

    facilities as warranted to operate facilities in a safe and healthful condition (See Policy

    9300).

    8. To receive approval from OSPI for new facilities the district will attempt to comply with all

    applicable statues and regulations.

    9. The minimum acreage per school site will be 5 usable acres plus one usable acre for each

    100 students, plus an added 5 usable acres if the school includes any grade above grade 6.

    (See WAC 392-342-020). The district ultimately determines the size of site necessary to

    facilitate the educational program that the district chooses to site at a certain location,

    applying the site evaluation criteria set forth in the OSPI School Facilities Manual. Given

    the district’s educational programming standards, the average site acreages by school type

    are: 12 acres for elementary schools; 20 acres for middle schools; and 40 acres for high

    schools. Increasingly stringent environmental regulation, the demands of parents, staff and

    supplementary programs, plus the rising community use of our schools may require the

    acquisition of larger future school sites in order to provide for the traditional school

    program as well as the additional regulation and expectations.

  • 19

    North Thurston Public Schools 2017 Capital Facilities Plan

    10. New sites will not be accepted if the attendance policies for the new site will create a racial

    imbalance within the district (See WAC 392-342-025).

    11. Sites will be accepted only if all local health, zoning, building and other regulations may be

    met.

    12. The district determines educational program standards in accordance with adopted

    policies, other relevant factors, and is not constrained by the state-rated capacity. Primary

    determinants of capacity are building configuration and classroom enrollment policies

    (policy or teacher contracts), and educational programs.

    13. The district believes that reasonable residential mitigation fees voluntarily made by

    developers of new residential housing or Impact Fees imposed by jurisdictions in

    accordance with legal requirements are an appropriate source of funds for (1) projects

    reasonably related to and benefiting the new housing development, (2) projects necessary

    to provide adequate schools or school grounds to serve such new residential housing, or

    (3) projects reasonably necessary to mitigate potentially significant impacts of such new

    housing development on the district's educational facilities and programs. The district

    seeks such residential mitigation fees from all residential developers whose projects are

    anticipated to add students within the district's boundaries (See Policy 9220).

    14. This plan assumes that all district school buildings will be maintained in good repair.

    15. As portions of the district's Strategic Plan are implemented, the district's policies and

    procedures may be amended. As a result, changes may be made to this list of assumptions

    and to this plan.

    16. The draft revised plan will be reviewed by the Board during a public meeting and will be

    adopted or approved by the Board.

  • North Thurston Public Schools 2017 Capital Facilities Plan

    20

    II. STUDENT ENROLLMENT TRENDS AND PROJECTIONS

    Historic Enrollment Trends

    The school district has reviewed historical enrollment trends. Since 1973, district enrollment has

    fluctuated between periods of no enrollment growth and periods of rapid enrollment growth. The

    overall trend has been up as total district enrollment has doubled in forty years. District

    enrollment declined between 1973-1975 before growing about 20% between 1976 and 1981.

    Enrollment declined again between 1981 and 1983 before growing about 50% between 1983 and

    1993. Enrollment declined slightly between 1993 and 2001. Since 2001 enrollment has been

    growing. The district projects that enrollment will continue to increase until the late 2020’s (see

    Chart 1).

    Recent Enrollment Trends

    Elementary enrollment began increasing in 2002, and the increase became apparent in 2004.

    Strong residential development in 2005 through 2007 reinforced the gains in elementary

    enrollment. The economic collapse of late 2008 severely reduced the amount of residential

    development, but district enrollment continued to increase. Residential development is projected

    to increase and to stay elevated over the next fifteen years. The district believes that the

    increased rate of residential development will result in an accelerated rate of increase in district

    enrollment. Enrollment increases in the elementary grades will be followed by increased

    enrollment in the middle and high school grades through the late 2020’s. The growth is

    consistent with the projected growth of the student aged population state-wide due to the echo of

    the baby-boom population (OFM Research Paper No. 30).

    The regions of the district projected to have the greatest increases in residential development are

    those areas where the district anticipates the greatest increases in student enrollment (see map of

    Residential Developments).

    Projected Student Enrollment

    All forecasting is based on the assumption that past trends predict future trends. The shorter the forecast, the more likely that underlying assumption is accurate. Since 2002, the enrollment modeling utilized by North Thurston Public Schools has consistently projected increases in district enrollment. OSPI 2017-2023 Student Enrollment Projection

    OSPI generates enrollment projections for each school district in the state using a six-year

    forecast period. The state office uses the cohort survival methodology to project student

    enrollment for grades 1-12. Kindergarten enrollment is projected using a linear regression

  • North Thurston Public Schools 2017 Capital Facilities Plan

    21

    analysis of actual kindergarten enrollment over the previous six years. This methodology

    assumes that enrollment trends which have occurred over the previous six years will continue

    through the next six years. OSPI updates these projections annually. Due to the incorporation of

    Wa He Lut Indian School enrollment in North Thurston Public Schools reports in 2011, and the

    deletion of this enrollment in 2016, the OSPI projection is distorted. We have removed the data

    and run a “modified” OSPI projection. Based on the modified OSPI enrollment projection, a total

    of 981 (headcount) students would be expected to be added to the district by the year 2023, an

    increase of approximately 6.7% over October 2016 enrollment levels. The OSPI student

    enrollment projections by grade level for the six-year forecast period (2016-2023) are provided

    in Table 1 and Table 3. OSPI’s projections are significant because they are one of the factors in

    determining eligibility for state matching funds.

    NTPS Student Enrollment Projection

    The enrollment projection model adopted by North Thurston Public Schools is different from

    that utilized by OSPI. The district has adopted a model to forecast enrollment.

    The NTPS model uses the same October headcount data utilized by OSPI, but the NTPS model

    also utilizes residential construction data, information about probability of students in residences

    from study of recent NTPS records and a statistical study of national demographic (census) data,

    average family size data from TRPC, birth rates assumptions from analysis of Washington State

    population data, and population projections provided by Office of Financial Management

    (OFM) and TRPC to create a student enrollment projection that is consistent with the planning

    projections with which the district is required to plan. NTPS tests and calibrates its model with

    census data (1990, and 2000), updates from TRPC and OFM, and other demographic information

    as it becomes available. It is adjusted to correspond to the OSPI projections for the next six

    years.

    Charts 2 and 2A and the associated Tables 2 and 2A present the district’s projection. The

    district's projection is compared to OSPI's projection in Table 3 on the following page.

    The NTPS model projects additional 1,417 (headcount) students, a 9.7% growth in school

    enrollment between October 2016 and October 2023. (See Table for Chart 2 and Table 3).

    A moderate rate of residential construction over the next few years is projected to increase enrollment at all grade levels. Beyond the year 2023, enrollment growth is projected to remain flat until 2030 at which point it is expected to decline slightly over the following decade. (See Chart 2A and Table 2A). A comparison of the total enrollment projections through 2023 derived using the forecast methodologies discussed above is provided in Table 3.

  • North Thurston Public Schools 2017 Capital Facilities Plan

    22

    Table 3 Comparison of Student Enrollment Projections

    North Thurston Public Schools 2016-2023

    Projection

    2016

    2017

    2018

    2019

    2020

    2021

    2022

    2023

    Actual Change ’16-‘23

    Percent Change ’16-‘23

    OSPI 14,628 14,735 14,890 14,988 15,189 15,291 15,465 15,609 981 6.7% NTPS 14,628 14,778 15,012 15,225 15,543 15,700 15,904 16,045 1417 9.7%

    The district’s enrollment projection will be used in evaluating near term (six-year) facility needs

    as part of this CFP. Based on the district’s model, student headcount enrollment is projected to

    increase by 657 students at the elementary grade level (K-5), 280 students at middle school (6-8)

    and 480 students at high school (9-12). Projected student FTE enrollment by grade span based on

    the district’s model is provided in Table 4. Grade spans have been reconfigured to K-5, 6-8, 9-

    12 for this table.

    Table 4

    Projected Student Headcount Enrollment by Grade Span

    North Thurston Public Schools 2016-2023

    Grade Span 2016 2017 2018 2019 2020 2021 2022 2023

    Elementary

    (K-5)

    6976 7112 7141 7242 7371 7468 7569 7633

    Middle

    School (6-8)

    3328 3321 3490 3568 3651 3588 3579 3608

    High School

    (9-12)

    4324 4345 4381 4414 4522 4645 4756 4804

    14,628 14,778 15,012 15,225 15,543 15,700 15,904 16,045

    Projected Student Enrollment 2017-2037

    Twenty-year student enrollment projections are used by the district in determining its long-range

    (twenty-year) facility plan.

    Student enrollment projections for the year 2037 are based on the NTPS enrollment model. This

    information is provided in Chart 2A. The total enrollment estimate, using twenty-year population

    projections provided by TRPC, is broken down by grade span to evaluate long-term site

    acquisition needs for elementary, middle, and high school facilities. Projected enrollment by

    grade span for the year 2024, 2030 and 2037 is provided in Table 5.

  • North Thurston Public Schools 2017 Capital Facilities Plan

    23

    Table 5 North Thurston Public Schools

    Year 2024, 2030 and 2037 Projected Headcount Enrollment by Grade Span (Grade Spans are reconfigured)

    Grade Span Projected Student Enrollment 2016 2024 2030 2037 Elementary (K-5) 6976 7661 7196 6919 Middle School (6-8) 3328 3655 3820 3437 High School (9-12) 4324 4872 5052 4815 District Total (K-12) 14,628 16,188 16,068 15,171

    Based on the population projections prepared by TRPC, with grade reconfiguration, NTPS

    estimates that it will construct at least one new elementary school in the next 20 years.

    To house full day kindergarten, approximately two additional kindergarten rooms will be

    required at each elementary school or the capacity equivalent of two additional elementary

    schools will have to be provided. Grade re-configuration provides sufficient capacity to house

    the additional FTE student count initially, deferring the need for an additional elementary school

    until the early 2020’s. Housing the additional kindergarten load may require modernization of

    existing facilities to provide for the program requirements of kindergarten students.

    NTPS studies the number of students residing in new residential developments. The District did

    a study in 2015 on the impact of residential growth on school boundaries. School boundaries

    were adjusted in anticipation of projected growth. A map of Lacey and UGA Residential

    Developments are used to guide property acquisitions. (Map 1)

    This CFP is consistent with the County's allocation of planned urban and rural growth based on

    OFM's 20-year projections. Based on the OFM-projected population growth to be allocated to

    the area served by the district under Thurston County's comprehensive plan for the succeeding

    twenty-year period, the district will serve the educational needs of children in such developments

    by a combination of both existing and additional new facilities (including use of portables to

    meet temporary needs and construction of new or expanded facilities to meet permanent

    educational programming needs).

    Use of Student Enrollment Projections for Capital Facilities Planning

    The district's enrollment projections summarized in this section are used to evaluate future

    school capacity needs. Analysis of future facility and capacity needs is provided in Sections IV-

    VIII of this Capital Facilities Plan.

  • North Thurston Public Schools 2017 Capital Facilities Plan

    24

    Ethnicity and Race Enrollment Trends

    Recently, the number of ethnicity and race classifications has been expanded. There are currently 9 classifications for Hispanic subpopulations, 16 classifications for Asian, and 9 for Pacific Islander and 31 for American Indian. Within a few years our discussion of subpopulations may be revised considerably. During the period covered by this plan, we anticipate continued increase in the number of categories by which we identify ourselves.

  • 25

  • TABLE 1

    GreeneGasaway

    2011 2012 2013 2014 2015 2016 SURVIVAL 2017 2018 2019 2020 2021 2022 2023

    KINDERGARTEN 1096 1186 1146 1130 1127 1145 1.00954902 1147 1158 1169 1180 1191 1203 1214

    GRADE 1 1057 1142 1251 1144 1137 1148 1.02397198 1172 1174 1186 1197 1208 1220 1231

    GRADE 2 1066 1098 1119 1239 1162 1156 1.0083003 1158 1182 1184 1195 1207 1218 1230

    GRADE 3 1133 1079 1117 1079 1256 1205 1.0088958 1166 1168 1193 1195 1206 1218 1229

    GRADE 4 999 1131 1095 1118 1087 1225 0.99933826 1204 1166 1167 1192 1194 1205 1217

    GRADE 5 1129 1016 1141 1081 1110 1097 1.00302347 1229 1208 1169 1171 1196 1197 1209

    TOTAL K-5 6480 6652 6869 6791 6879 6976 7076 7055 7067 7129 7202 7261 7330

    TOTAL K-5 FTE 5932 6059 6296 6226 6316 6404 6503 6477 6483 6539 6606 6660 6723

    TOTAL 1-5 5384 5466 5723 5661 5752 5831 5929 5898 5898 5949 6010 6058 6116

    GRADE 6 1088 1115 1021 1120 1076 1110 0.99389813 1090 1221 1200 1162 1163 1188 1190

    TOTAL K-6 7568 7767 7890 7911 7955 8086 8166 8277 8268 8291 8365 8449 8521

    TOTAL K-6 FTE 7020 7174 7317 7346 7392 7514 7593 7698 7683 7701 7770 7848 7913

    TOTAL 1-6 6472 6581 6744 6781 6828 6941 7019 7119 7099 7111 7174 7247 7306

    GRADE 7 1097 1087 1104 1025 1094 1068 0.99249678 1102 1082 1212 1191 1153 1155 1179

    GRADE 8 1062 1103 1105 1128 1035 1150 1.02094247 1090 1125 1105 1237 1216 1177 1179

    TOTAL 6-8 3247 3305 3230 3273 3205 3328 3282 3428 3517 3591 3533 3520 3548

    TOTAL 7-8 2159 2190 2209 2153 2129 2218 2192 2207 2317 2429 2370 2332 2358

    GRADE 9 1099 1089 1120 1102 1150 1060 1.01635589 1169 1108 1143 1123 1258 1236 1197

    TOTAL 7-9 3258 3279 3329 3255 3279 3278 3361 3315 3460 3552 3627 3568 3555

    GRADE 10 1113 1085 1084 1096 1087 1125 0.98517809 1044 1151 1092 1126 1106 1239 1218

    GRADE 11 1040 1076 1071 1035 1075 1029 0.96722638 1088 1010 1114 1056 1089 1070 1198

    GRADE 12 1072 1086 1103 1115 1118 1110 1.04463164 1075 1137 1055 1163 1103 1138 1118

    TOTAL 9-12 4324 4336 4378 4348 4430 4324 4376 4406 4404 4469 4556 4683 4731

    TOTAL 10-12 3225 3247 3258 3246 3280 3264 3207 3298 3261 3346 3299 3447 3534

    TOTAL K-12 14051 14293 14477 14412 14514 14628 14735 14890 14988 15189 15291 15465 15609

    TOTAL K-12 FTE 13503 13700 13904 13847 13951 14056 14161 14311 14404 14599 14695 14863 15002

    TOTAL 1-12 12955 13107 13331 13282 13387 13483 13588 13732 13820 14009 14100 14262 14395

    26

    NORTH THURSTON PUBLIC SCHOOLS

    DETERMINATION OF PROJECTED ENROLLMENT BY COHORT SURVIVALWITHOUT WA HE LUT

    ACTUAL FTE ENROLLMENT ON OCTOBER 1

    PREPARED APRIL 18, 2017

  • YEAR 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

    KINDERGARTEN 997 995 1083 1096 1186 1146 1130 1127 1145 1175 1208 1237 1254 1276 1290 1275

    GRADE 1 965 1085 1065 1057 1142 1251 1144 1137 1148 1163 1192 1224 1253 1260 1282 1295

    GRADE 2 1086 969 1136 1068 1098 1119 1239 1162 1156 1166 1181 1209 1241 1259 1266 1287

    GRADE 3 1036 1117 1010 1133 1079 1117 1079 1256 1205 1191 1201 1216 1244 1266 1283 1291

    GRADE 4 1068 1053 1139 999 1131 1095 1118 1087 1225 1181 1167 1177 1191 1211 1232 1249

    GRADE 5 1052 1085 1076 1129 1016 1141 1081 1110 1097 1236 1192 1179 1188 1196 1216 1236

    GRADE 6 1059 1023 1104 1088 1115 1021 1120 1076 1110 1098 1235 1192 1179 1181 1188 1208

    GRADE 7 1075 1057 1048 1097 1087 1104 1025 1094 1068 1110 1099 1233 1190 1172 1174 1181

    GRADE 8 1048 1071 1064 1062 1103 1105 1128 1035 1150 1112 1156 1144 1282 1235 1217 1219

    GRADE 9 1081 1068 1121 1099 1089 1120 1102 1150 1060 1179 1141 1185 1173 1309 1262 1243

    GRADE 10 1071 1062 1076 1113 1085 1084 1096 1087 1125 1039 1155 1118 1161 1148 1281 1234

    GRADE 11 1052 1040 1044 1040 1076 1071 1035 1075 1029 1067 987 1096 1061 1099 1086 1211

    GRADE 12 1078 1070 1117 1072 1086 1103 1115 1118 1110 1059 1098 1016 1127 1089 1128 1115

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

    K-5 ELEMENTARY 6204 6304 6509 6480 6652 6869 6791 6879 6976 7112 7141 7242 7371 7468 7569 7633

    6-8 MIDDLE 3182 3151 3216 3247 3305 3230 3273 3205 3328 3321 3490 3568 3651 3588 3579 3608

    9-12 HIGH 4282 4240 4358 4324 4336 4378 4348 4430 4324 4345 4381 4414 4522 4645 4756 4804

    TOTAL HEADCOUNT 13668 13695 14083 14051 14293 14477 14412 14514 14628 14778 15012 15224 15543 15700 15904 16045

    TABLE FOR CHART 2GRADES RECONFIGURED TO K-5, 6-8, 9-12

    WITHOUT WA HE LUT

    27

  • 28

  • YEAR 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038

    KINDERGARTEN 1276 1290 1275 1259 1242 1218 1190 1179 1168 1156 1137 1133 1130 1126 1149 1169 1191 1229

    GRADE 1 1260 1282 1295 1281 1265 1246 1223 1195 1184 1173 1158 1140 1136 1133 1129 1151 1171 1193

    GRADE 2 1259 1266 1287 1300 1286 1269 1250 1227 1199 1189 1175 1161 1143 1139 1136 1132 1154 1174

    GRADE 3 1266 1283 1291 1312 1325 1309 1291 1273 1250 1222 1209 1195 1181 1163 1159 1156 1152 1174

    GRADE 4 1211 1232 1249 1256 1276 1288 1272 1255 1237 1216 1187 1174 1161 1147 1130 1126 1123 1120

    GRADE 5 1196 1216 1236 1253 1260 1279 1290 1275 1258 1240 1217 1188 1176 1163 1149 1132 1128 1125

    GRADE 6 1181 1188 1208 1228 1245 1250 1269 1280 1265 1248 1229 1206 1178 1166 1153 1139 1123 1119

    GRADE 7 1172 1174 1181 1201 1221 1236 1241 1259 1270 1255 1237 1218 1195 1168 1156 1143 1130 1114

    GRADE 8 1235 1217 1219 1226 1246 1266 1281 1287 1305 1317 1300 1281 1262 1238 1210 1196 1185 1171

    GRADE 9 1309 1262 1243 1245 1253 1273 1292 1308 1314 1333 1343 1326 1307 1287 1264 1235 1223 1209

    GRADE 10 1148 1281 1234 1216 1218 1225 1245 1264 1279 1285 1303 1313 1296 1278 1258 1235 1207 1195

    GRADE 11 1099 1086 1211 1168 1150 1152 1158 1177 1195 1209 1213 1230 1240 1224 1207 1188 1167 1141

    GRADE 12 1089 1128 1115 1242 1198 1180 1182 1188 1207 1225 1239 1243 1261 1270 1255 1237 1218 1196

    2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038

    K-5 ELEMENTARY 7468 7569 7633 7661 7654 7608 7516 7404 7297 7196 7084 6992 6927 6871 6851 6866 6919 7014

    6-8 MIDDLE 3588 3579 3608 3655 3711 3751 3791 3825 3840 3820 3766 3705 3635 3572 3519 3480 3437 3404

    9-12 HIGH 4645 4756 4804 4872 4820 4830 4877 4937 4995 5052 5098 5112 5104 5059 4983 4895 4815 4741

    TOTAL HEADCOUNT 15700 15904 16045 16188 16185 16189 16184 16166 16131 16068 15948 15809 15665 15502 15353 15242 15171 15159

    TABLE FOR CHART 2AGRADES RECONFIGURED TO K-5, 6-8, 9-12

    WITHOUT WA HE LUT

    29

  • 30

  • Lakeview Meadows89 Units

    Gateway Residential Div. 170 Lots/36 Remaining

    Burton Ray Gardens30 Lots/23 Remaining

    Lacey Village62 Lots

    The Reserve300 Units

    Britton Place Apartments210 Units

    Deyoe Vista33 Lots/26 Remaining

    Britton Place248 Lots

    Silver Hawk300 Lots (Not UGA)

    Hawks Prairie Phase 3106 Lots

    Hawks Prairie Phase 3 Unit 16106 Lots/54 Remaining

    Vicwood Campus49 Lots

    Nisqually Bend73 Lots

    Steilacoom Ridge298 Lots

    Townhouses at Long Lake43 Units

    Cantergrove76 Lots

    McAllister Spring323 Lots

    McAllister Meadows83 Lots

    Puget Meadows West79 Lots/79 Lots Remaining

    Summerwalk140 Lots

    Horizon Pointe Division 6B31 Lots

    Horizon Pointe 6A38 Lots/38 Remaining

    Campus Estates56 Lots

    Campus Fairways79 Lots/18 Remaining

    Campus Estates Div. 237 Lots/26 Remaining

    Lacey Senior Apartments135 Units

    Freestone Place19 Lots

    Freestone Crossing18 Lots Oak Tree

    1040 Lots

    Campus Peak90 Lots/46 Remaining

    Lacey Multi-Family Apartments488 Units

    Gateway 2 Apartments158 Units

    Abernethy Crossing31 Lots

    Sleater View28 Units

    Oak Springs89 Lots

    Gateway Apartments393 Units

    Gateway Res. Div. 2306 Lots

    Meadows at Morningside86 Lots

    b

    b

    b

    b b

    b

    b

    b

    b

    b

    b

    b

    b

    b

    b

    b b

    b

    b

    b

    b

    bb bb

    b

    b

    b

    b

    b

    b

    b

    b

    b

    b

    b

    b

    b

    ²DevelopmentStatusb Application Submitted

    b Preliminary

    b Final

    Lacey and Urban Growth AreaResidential Development

    0 3,500 7,000 10,500 14,000 17,5001,750Feet

    Updated 3/1/2017

  • 32

    North Thurston Public Schools 2017 Capital Facilities Plan

    III. DISTRICT EDUCATIONAL PROGRAM STANDARDS

    School facility and student capacity needs are determined by the types and amounts of space

    required to accommodate the district's adopted educational programs. The educational program

    standards established by North Thurston Public Schools include grade configuration, optimum

    facility size, class size, educational program offerings, as well as classroom utilization and

    scheduling requirements and use of temporary facilities (portables). These standards are

    established through the instructional plan adopted by the district, the school calendar/schedule,

    teachers' contracts, and organizational structure. These programs or structures are subject to

    change by the district to adjust for changes in the program year, special programs, class sizes, use

    of technology, and other physical aspects of school facilities. The district will periodically

    review its school capacity inventory and adjust for changes to the educational program standards.

    Although North Thurston Public Schools continues to study alternate organizations, calendars

    and schedules, the North Thurston Public Schools believes the adopted organization is

    educationally sound and reflects community values. If alternate organizations, calendars or

    schedules are adopted, the district would revise the capacity calculations.

    Grade Configuration

    North Thurston Public Schools has adopted an organization that houses kindergarten through

    fifth grade in elementary schools, sixth, seventh and eighth grades in middle schools, and ninth

    through twelfth grades in high schools.

    The district changed the grade configuration to K-5 elementary schools and 6-8 middle schools

    throughout the district in the fall of 2016.

    School Schedule/Calendar

    North Thurston Public Schools has adopted a traditional calendar beginning in early September

    and completing in mid June. North Thurston Public Schools has adopted a traditional daily

    schedule with academic classes beginning between 7:30 a.m. and 9:30 a.m. and completing mid-

    afternoon.

    Class Size

    North Thurston Public Schools has class size maximums of 25 for preschool classes, 25 students

    for grades K-3, 30 students for grades 4-6 and 34 students in grades 7-12. District-wide average

    class sizes at all grade levels are lower than the maximum class sizes noted.

    North Thurston Public Schools has temporarily suspended lower class size goals due to reduced

    state funding. In addition, this plan anticipates that full day kindergarten will be funded by the

    state within the next 6 years.

  • 33

    North Thurston Public Schools 2017 Capital Facilities Plan ______________________________

    Currently

    State of Washington is reviewing funding for basic education and new funding models may have

    significant impacts on class size.

    Pre K Enrollment

    The state has started to mandate and fund services for Pre-K students. NTPS has taken initial

    steps to provide suitable facilities to meet this mandate. During the winter of 2015-16 the district

    commissioned a review of its Pre-K program to determine the most effective approach to

    providing facilities for this program. A team of experts from outside the district studied the

    district’s options, focusing on comparing a decentralized model (at existing elementary schools)

    vs a centralized model. The recommendation of the experts favored a centralized model. Given

    the lack of funding currently available to design and build a centralized Pre-K facility, it was

    decided to develop an interim plan for housing these students until such time that funding for a

    centralized facility becomes available. A “Hub” approach was selected, which would be

    represented by semi-centralized facilities, located at Mountain View and Meadows Elementary

    Schools. It was determined that these facilities could adequately house the program until such

    time that a funding measure could be approved by the voters to create one central, district –wide

    Pre-K facility.

    Temporary Facilities (Portable Classrooms)

    Temporary facilities do not allow the full range of educational activities envisioned by NTPS.

    However, temporary facilities play an important role in any given planning period. Temporary

    facilities are needed to prevent the over-building of school facilities, to meet the needs of service

    areas in the district and to cover the gap between the time that families move into new residential

    developments and the date that construction is completed on new permanent school facilities.

    Over time, NTPS seeks to provide permanent capacity to meet enrollment demand in spaces that

    provide for full educational programming.

    Core Facilities and Elective Offerings

    Core facilities, such as the size of a cafeteria or gym, the number of restrooms, or the size and

    number of specialty areas such as shops, often limit enrollment to levels below that expected by

    room occupancy levels. In addition, for secondary schools, occupancy in the classrooms is

    further limited by scheduling constraints and student course selection. For example, secondary

    schools offer a number of elective courses and many elective courses will not attract a full

    classroom of students.

    Additional Non-Program Constraints on Space Requirements

    Government mandates and community expectations may also affect how classroom space is

  • 34

    North Thurston Public Schools 2017 Capital Facilities Plan

    used. Traditional education programs offered by school districts are often supplemented by

    non-traditional, or special programs such as special education, bilingual education, remediation,

    alcohol and drug education, AIDs education, preschool programs, computer lab, music

    programs, and the like. These special or non-traditional programs are factors that have been

    considered in determining the student capacity of school facilities.

    Calculation of Student Capacity

    For funding purposes, the State (OSPI) calculates school capacity by dividing the gross square

    footage of a building by a standard square footage per students established in WAC 392-343-035.

    This statewide standard is a simple and uniform approach to determining school capacity for

    purposes of allocating available State Match Funds to school districts for new construction.

    However, this method is not considered to be an accurate reflection of the actual capacity

    required to accommodate the adopted educational program of North Thurston Public Schools or

    other area school districts. This method does not take into consideration the additional capacity

    considerations described in this section.

    To calculate student capacity, NTPS uses a practical capacity model that factors in the adopted

    local educational program, limitations of existing facilities, and non-program constraints. Under

    this model, the use of each room in each facility is reviewed along with applicable educational

    programming standards. The capacity for each facility is established by multiplying the

    permanent classrooms available by the scheduling limitations on average students per class. It is

    not possible to achieve 100% utilization of regular classrooms as a result of scheduling conflicts

    for student programs, fluctuations in enrollment by school throughout the year, the need for

    specialized rooms for certain programs, and the need for teachers to have a work space during

    planning periods. For every room housing students, a calculation is made assigning a maximum

    number of students per room. The calculation determines the number of students each school can

    accommodate. Core facilities and special use facilities limitations are also considered in this

    assessment of classroom capacity.

    For secondary school classrooms, the calculation also accounts for utilization rates. Based on

    analysis of utilization of its existing secondary schools, NTPS determines a utilization rate for

    secondary school classrooms.

    Calculation of Space Allocation Applying Educational Program Standards

    The district's program results in a different capacity than the state-rated capacity. The district

    builds more space per student than the state-rated formula for funding (WAC 392-343-035)

    provides. According to its educational program standards and non-program constraints, NTPS

    has set the capacity of its facilities. Dividing gross square foot by grade grouping by capacity of

    facilities by grade groupings results in the following average space per student of district

    facilities.

  • 35

    North Thurston Public Schools 2017 Capital Facilities Plan

    Table 9

    North Thurston Public Schools

    Year 2016Average Building Area Per Student

    Grade Span Space per Student

    Elementary (K-5) 91.34 square feet Middle School (6-8) 122.26 square feet High School (9-12) 131.82 square feet

  • 36

    North Thurston Public Schools 2017 Capital Facilities Plan

    IV. CAPITAL FACILITIES INVENTORY

    To determine what facilities will be required to accommodate future demand (student

    enrollment) at acceptable or established local programming standards, NTPS must first establish

    a baseline of facilities available to serve the needs of the district. This section provides an

    inventory of capital facilities owned and operated by NTPS, including permanent schools,

    developed school sites, undeveloped land, and support facilities. School facility capacity was

    determined based on the permanent space required to accommodate the district's adopted

    educational program standards (see Section III). A map showing locations of the district

    developed educational facilities is provided as Map 3.

    Existing Schools

    NTPS currently operates:

    thirteen (13) elementary schools serving grades K-5;

    four (4) standard middle schools serving grades 6-8;

    one (1) magnet middle school serving grades 6-8

    three (3) comprehensive high schools serving grades 9-12;

    one (1) special focus high school serving grades 9-12

    Measures of Capacity

    As discussed in Section IV, NTPS has adopted a space allocation standard that reflects the space

    NTPS has determined as necessary to meet the requirements of its locally adopted educational

    program standards as well as state-established minimums. For this CFP, school capacity was

    determined by applying the district's educational program standards to individual schools in order

    to determine the space requirements of the programs housed in them. It is this capacity

    calculation which is used to establish the district's baseline capacity and determine future

    capacity needs based on projected student enrollment.

    Existing enrollment may be above or below the capacity at which the district rates the permanent

    facility.

    Inventory

    Table 10 identifies the permanent district educational facilities, their district-rated capacities and

    their location. Capacity of educational facilities has been calculated by the Planning Consultant

    based on the educational program standards and space allocation standards described in Section

    III. Capacity as noted represents a calculation of the ability of existing permanent facilities to

    deliver the district's educational program.

  • 37

    North Thurston Public Schools 2017 Capital Facilities Plan

    Table 11 identifies all district owned assets, their year of construction and major renovations.

    TABLE: 10 2017 NTPS INVENTORY OF PERMANENT EDUCATIONAL FACILITIES

    NAME *CAPACITY LOCATION_______________________

    Elementary

    Chambers Prairie 588 6501 Virginia St SE, Lacey 98513

    Evergreen Forest 463 3025 Marvin Road SE, Lacey 98503

    Horizons 641 4601 67th Avenue SE, Lacey 98513

    Lacey (K-5) 533 1800 Homann Drive, Lacey 98503

    Lakes 588 6211 Mullen Road SE, Lacey 98503

    Lydia Hawk 425 7600 5th Street SE, Lacey 98503

    Meadows 629 836 Deerbrush Drive SE, Lacey 98513

    Mt. View 559 1900 College Street SE, Lacey 98503

    Olympic View 502 1330 Horne Avenue NE, Lacey 98516

    Pleasant Glade (K-5) 541 1920 Abernethy Road NE, Lacey 98516

    Seven Oaks 588 1800 Seven Oaks Drive SE, Lacey 98503

    South Bay (K-5) 558 3845 Sleater Kinney NE, Lacey 98506

    Woodland 560 4630 Carpenter Road SE, Lacey 98503

    SUBTOTAL 7175

    Middle

    Aspire 313 5900 54th Avenue SE, Lacey 98513

    Chinook 663 4301 Sixth Avenue NE, Lacey 98516

    Komachin 871 3650 College Street SE, Lacey 98503

    Nisqually 751 8100 Steilacoom Road, Lacey 98503

    Salish 891 8605 Campus Glen Dr. NE, Lacey 98516

    SUBTOTAL 3489

    High School

    North Thurston 1893 600 Sleater Kinney NE, Lacey 98506

    South Sound 272 411 College Street NE, Lacey 98516

    River Ridge 1707 350 River Ridge Dr SE, Lacey 98513

    Timberline 1803 6120 Mullen Road SE, Lacey 98503

    SUBTOTAL 5676

    *Permanent capacity is based upon District capacity standards as described herein.

  • å

    å

    å

    å å

    å

    å

    å

    å

    å

    å å

    å

    å

    åå

    å

    åå

    å

    å

    å

    1

    10 29

    7

    86

    12

    5 3

    4

    11

    13

    PLEASANTGLADEELEMENTARY

    SOUTHBAYELEMENTARY

    OLYMPICVIEWELEMENTARY

    LYDIAHAWKELEMENTARYMEADOWSELEMENTARY

    SEVENOAKSELEMENTARY

    EVERGREENFORESTELEMENTARY

    WOODLANDELEMENTARY

    HORIZONSELEMENTARY

    LAKESELEMENTARY

    MTVIEWELEMENTARY

    LACEYELEMENTARY

    ASPIREMIDDLE

    CHAMBERSPRAIRIEELEMENTARY

    SOUTHSOUNDHIGH

    RIVERRIDGEHIGHNISQUALLYMIDDLE

    CHINOOKMIDDLENORTHTHURSTONHIGH

    KOMACHINMIDDLE

    TIMBERLINEHIGH

    SALISHMIDDLE

    SAN FRANCISCO AVE NE

    37TH AVE SE

    YEW AVE NE

    88THAVE

    SE

    SOUTH

    BAYRD

    NE

    NORTH ST SE

    BIGELOW AVE NE

    PHOENI

    X ST N

    E

    PACIFIC AVE SE

    STEILACOOM RD SE

    LILLY R

    D NE

    4TH AVE E

    15TH AVE NE

    EASTSIDE ST SE

    YELM HWY SE YELM HWY SE

    COLLE

    GE ST

    SE

    HERMAN RD SE

    22ND AVE SE

    48TH AVE SE

    10TH AVE SE

    MARTIN WAY E

    21ST AVE SE

    73RD AVE SE

    OLD 99 HWY SE

    39TH AVE SE

    KINWO

    OD ST

    SE

    24TH AVESE

    12TH AVE NE

    ESKRIDGE BLVD SE

    THURSTON AVE NE

    15TH AVE SE

    SURREY TRCE SE

    HOAD

    LY ST S

    E

    HUSKY WAY SE

    QUINC

    E ST S

    E

    MILLER AVE NE

    27TH AVE SE

    PATTIS

    ON ST

    NE

    PEAR S

    T SE

    CAMPUS GLEN

    DR NE

    TH ORNB

    U RYDR

    SE

    BOSTON HARBOR RDNE

    BRENTWOO DDRSE

    G L ENMO

    REDR

    SE

    8 4THAVE

    SE

    MULLEN RD SE

    18TH AVE SE

    ROYAL ST SE

    26TH AVE NE

    45TH AVE SE

    EAGLE DRNE

    J OHNS O

    N PO IN

    T RD N

    E

    OWL L

    N NE

    MARVI

    N RDN

    E

    48TH WAY NE

    89TH AVE SE JOELLE LN SE

    BAIRD

    RDNE

    14TH AVE SE

    2 8TH AVE SE

    50TH AVE SE

    EVERG REEN VALLEY RD SE

    13TH AVE SEI5 N

    I5 N

    JOHN L

    UHR R

    D NE

    BRIDLE DRSE

    EAGLE DR SE

    SISKIY

    OU ST

    SE

    83RD AVE SE

    65TH AVE SE

    41ST AVE SE41ST LN SE

    15TH AVE SE

    DRAHAM

    RDNE

    CHATH A

    M DR S

    EFI TZ H

    UGH D

    R SE

    MERID

    IANRD

    SE

    29TH AVE SE

    SUMM

    ERWOO

    DDR

    SE

    PLUMMER ST SE

    30TH AVE SE

    SUNSET DR

    SE

    25TH AVE SE

    VALLE Y VI

    EWDR SE

    22ND AVE NE

    RUMA

    C ST S

    E

    E DGE W

    A TER B

    LVDNE

    57TH AVE SE

    HOLLISDR SE

    MI LB A

    N KE D

    RSE

    IN GLE S

    I DED R

    SE 35TH

    LN SE

    DONAVAN DR SE

    HANSEN

    STSE

    VILLAGECIRSE

    RATHB

    UN RD

    SE

    81ST AVE NE

    3RD WAY SE

    8TH AVE NE

    SOUTH STSE

    RUTHCT

    SE52ND AVE SE

    FREDER

    ICK ST

    SE

    42ND AVE SE

    CHOK

    ER ST

    SE

    36TH CTSE

    7TH AVE SE

    58TH AVE NE

    COMPTONBLVD

    SE

    SPENCER AVE NE

    9TH AVE SE

    PENNSYLVA

    NIA

    STSE

    79TH AVESE

    ADEL RD

    SE

    SEVILL

    E DR S

    E

    HOLLY LN SE

    MORSE MERRYMAN RD SE

    47TH AVE NE

    17TH WAY NE

    BOUNDA RYSTSE

    OLDPAC

    IFICHW

    Y SE

    TURNER

    ST NE

    KAPALEA WAY SE

    31ST AVE SE

    36TH AVE SE

    VISTA AVE SE

    STATE AVE NE

    LINDELL RD NE

    PIPERHILL DR SE

    32ND AVE SE

    CLOVER DR SE

    PIONEER AVE NE

    FAIRVI

    EW ST

    SE

    38TH D R

    SE

    LIBBY

    RD NE

    SLEATE

    R KINN

    EY RD

    NE

    55TH AVE SE

    SHADY

    LANE RD

    SE

    27TH LN NE

    LACEY BLVD SE

    CENTRA

    L ST S

    E

    DUTTE

    ROWRD

    SE

    FIR ST

    SE

    61ST AVE SE

    AMANDADR

    NE

    KINGS WAY SE

    54TH CT SE

    CAMERON DR NE

    9TH WAY SE

    QUINAULT DR NE

    6TH AVE SE

    SMITH

    ST SE

    TORDE

    N LN S

    E

    F RIEN D

    L YGR

    O VE R

    D NE

    T HOMSEN RD SE

    36TH AVE NE

    LOG CABIN RD SE

    MARIO

    N ST N

    E

    CASHME

    RE DRN

    E

    HOG U

    MBAY

    RDNE

    8TH WAY SE

    58TH AVE SE

    GLEN TERRADR SE

    DEVOE

    ST NE

    20THAVEN

    E

    57TH WAY SE

    PATTISON LAKEDR SE

    WILSO

    N ST S

    E

    G OLF

    CL UBR

    DSE

    ORBIT

    PL SE

    GARR

    ISON S

    T NE

    STOLL

    RD SE

    KINWO

    OD CT

    SE

    QUINC

    E ST N

    E

    KUHLMAN RD SE

    CITADEL CT SE

    MARIC

    ITE ST

    SE

    WALTH

    EW ST

    SE

    UNION AVE SE

    5TH WAY SE

    HI GHLI

    NED R

    S E

    2 4TH CT SE

    PALOMINO DR SE

    SURREY DR NE

    DERBY LN SE

    DAY DR SE

    PRESTWICK LN SE

    BUTT ONWOOD LN NE

    HOMANNDR

    SE

    78TH AVE NE

    19TH AVE NE

    ORCAS ST NE

    CROW

    E ST S

    E

    LASHI S

    T SE

    LAKE S

    AI NT C

    LAIR

    DR SE

    PLEASA

    NTO

    N CT SE

    HENSLE

    Y ST N

    E

    PINE AVE NE

    GINA CTSE5TH AVE SE

    DIAGONA

    L RD SE

    CARLYON AVE SE

    PENINSULA DRSE

    FIR TREE RD SE

    6TH AVE SE

    9TH AVE SE

    STON EG

    ATEST

    SE

    CE NT RA

    LSTN

    E

    55TH LN SE

    40TH CT NE

    50TH AVE NE

    66TH WAY SE

    SCHOO

    L ST S

    E

    56TH AVE SE

    5TH CT SE

    JUDD ST

    SE

    TIMOTH

    Y ST S

    E

    MIDDLE ST SE

    SYCAMORE ST SE

    HOFFM

    AN RD

    SE

    WHEELER AVE S

    E

    CAMPUS

    PARK D

    RNE

    BURR

    RD SE

    33RD AVE SE

    33RD WAY NE

    22ND AVE SE

    FRON TI ER DR SE

    49TH AV E SE

    METT

    ST NE

    BALUSTRA

    DE BLVD SE

    20TH LN SE

    REHKLA

    U RD S

    E

    20TH AVE SE

    34TH AVE SE

    MORSE RD SE

    GEMIN

    I ST SE

    19TH AVE SE

    KAGY

    ST SE

    PEAR S

    T NE

    26TH AVE SE

    JON CTSE

    12TH AVE SE

    8TH AVE SE

    WALTHEW DR SE

    32ND AVE NE

    COLUMBIA WAY NE

    SWA WA CT SE

    HAWKS PRAIRIE RD NE

    80TH AVE SE

    CLEARBROOKDRSE

    46TH AVE NE

    21ST WAY SE

    CLASSIC DR NE

    83RD AVE SE

    ALD

    ER GLEN DR SE

    W HITMAN LN SE

    SULKY

    DRSE

    INCL I NED

    R SE

    70TH AVE SE

    COLLE

    GE ST

    NE

    8TH CT SE

    71ST AVE SE

    STILLW

    ELL ST

    NE

    H AWKS

    GLEND

    RSE

    MALLARD DR SE

    DAVID STSE

    HAZELWOOD LN SE

    HAMP

    TONSS

    TSE

    27TH AVE SE

    KITTIWAKE DR SE

    GLORY DR SE

    KENTON

    LNSE

    EAG LE LOO PNE

    11TH AVE NE

    DEMAR

    IECTS

    E

    Q UEETS DR N

    E

    BEVERL

    Y DR N

    E

    MCKIN

    LEYST

    N E

    WILDERNESS DR SE

    PINEDROP DR SE

    27TH CT SE

    WHISL

    ER ST

    NE

    GRAVEL L

    N NE

    87TH AVE SE

    74TH AVE SE

    DELOR

    ESDR

    NE

    30TH CT SE

    LEWIS DR NE

    1 1TH L NSE

    LEBAN

    ON ST

    SE

    CRI M SON

    CTSE

    DANA

    STNE

    MONTCLAIR DR SE

    ETHRIDGE AVE NE

    GLASS AVE NE

    D MILLUHR DR NE

    WOODARD BAY RD NE

    PROSPECT AVE NE

    WOOD

    LANDC

    REEKS

    TNE

    25T H LOOP SE

    ONYX

    ST SE

    KERBA

    UGH R

    D NE

    GATEWAY BLVD NE

    44TH CT SE

    PUGET

    RDNE

    REDWO

    ODPL

    SE

    10TH WAY SE

    ANN S

    T NE

    38TH AVE SE

    NORM

    ANDY

    ST SE

    AVERY LN SE

    WEDGE W OOD

    DR SE

    67TH AVE SE

    30TH AVENE

    38TH WAY NE

    ALLEN

    RD SE

    HOLMES ISLAND RD SE

    VANEPP

    SSTS

    E

    11TH AVE SE

    LILAC

    ST SE

    46TH AVE SE

    CAMPUSHIG

    HLANDS

    DR NE

    51ST AVE SE

    56TH AVE NE

    OAK AVE NE

    ALKIST

    NE

    AYER S

    T SE

    GREG

    ORY

    WAYS E

    ZANGLE

    RD NE

    83RD CT NE

    SITKUM DR SE

    WOODSIDE CT NE17TH CT NE

    63RD AVE NE

    86TH AVE SE

    COLE

    CT SE

    7TH AVE SE

    VALE

    CTSE

    ENGLEW

    OOD D

    R SE

    MESPLAY ST SE

    78TH LN SE

    EVERGR

    EENDR

    NE

    OAKLN

    SE

    NEILS

    T NE

    BETTI LN NE

    TALLON LN NE

    61ST AVE NE

    28THLN NE

    BETA

    STS E

    LYBAR

    GER S

    T NE

    PLEASAN T GLADE

    RD NE

    OLYMPIA AVE NE

    38TH LN NE

    TROWBRIDGE AVE SE

    65TH AVE NE

    EASTSI

    DE ST

    NE

    HAIG DR SE

    43RD AVE SE

    40TH AVE SE

    62ND AVE SE

    20TH AVE SE

    ORAN

    GE ST

    SE

    BRUN

    SWICK

    ST SE

    MAGN

    OLIAS

    T SE

    70TH AVE NE

    LOVELY

    LN NE

    CATE FARM DR SE

    54TH AVE SE

    RUN DR SE

    ABIGAILCTNE

    25TH AVE SE

    31ST AVE NE

    THOMP

    SONL

    NS

    E

    16TH AVE SE

    GREE NF

    IE LD C

    T NE

    C OR P O

    RATE C

    ENTER DR SE

    MARIE

    ST SE

    53RD AVE SE

    44TH AVE NE

    DA NICOLN SE

    DOGW

    OOD S

    T SE

    TUCKER

    RD SE

    AXIS S

    T SE

    COUNTR

    Y VIST

    ADR S

    E

    68TH AVE NE

    C OVIN

    GTONC

    T NE

    KENZI S

    T SE

    24TH AVE NE

    CONINE AVE SE

    85TH AVE NE

    BO CT

    SE

    WILLOW

    ST SE

    85TH AVE SE

    FISHTRA

    P RD NE

    10TH AVE NE

    MERIW

    OODD

    RNE

    41ST AVE NE

    36TH LN SE

    INLET DR NE

    17TH AVE SE

    60TH LN SE

    HILL S

    T NE

    BELA IR DR SE

    PRISM

    ST SE

    INLAY

    ST SE

    64TH AVE SE

    76TH AVE NE

    VILLAG

    E ST N

    E

    9TH LN SE

    MUGH

    OST

    SE

    PARK V

    IEW ST

    NE

    BRIGGS LN

    14TH WAY SE

    39TH CT SE

    75TH AVE SE

    12TH CT SE

    WILLOW

    DRNE

    SPRUC

    E ST S

    E

    77TH LNSE

    11TH CT SE

    CHE ST

    NUT H

    I LLD R

    SE

    GLACIS DR NE

    27TH CT NE

    5TH ST SE

    64TH CT SE

    SAWYER

    ST SE

    CHELA

    NLNSE

    LEGAC

    Y DR N

    E

    LISTER

    RD NE

    OTIS

    BEACH

    STN E

    31ST CT NE

    BRITTONPKWY NE

    18TH AVE NE

    36TH LN NE

    GULLHARBO RDRNE

    31ST CT SE

    81ST AVE SE

    ONTAR

    IO ST S

    E

    FULLER LN SE

    YORKSHIRE DR SE

    DAYTON S

    T SE

    KIEL C

    T SE

    16TH LN NE

    88TH A VEN

    E

    62ND AVE SE

    73RD AVE NE

    38TH CT SE

    59TH CT SE

    FREEM