SKODA US’s Proposal for Slovak Nuclear Power I ndustry

Date post: 02-Mar-2022
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
20
(§) Shoor SKODA USs Proposal for Slovak Nuclear Power I ndustry I international Conference „CAN SLOVAKIA SECURE ENERGY SUPPLY AND SUSTAINABLE DEVELOPMENT WITHOUT NUCLEAR ?May 5-6, 2004 Bratislava, Slovakia
Transcript

(§) Shoor

SKODA US’s Proposal for Slovak Nuclear Power I ndustry

I international Conference„CAN SLOVAKIA SECURE ENERGY SUPPLY

AND SUSTAINABLE DEVELOPMENT WITHOUT NUCLEAR ?“

May 5-6, 2004 Bratislava, Slovakia

Company Structure®5H0M

n SKODA JS a.s.n Shareholders* structure:

n On April 23,2004 signed agreement on sale of SKODA JS to the Russia’s heavy machinery group OMZ - Silovyie Machiny (100% )

n 735 employeesn Today - Czech leader in supplies for NPPs

n Subsidiary SKODA, SLOVAKI A, s.r.o. n SKODA JS a.s. - 100% owner

n Main supplier for primary circuit and fuel handling systems for Mochovce 1,2

n 57 employees

(§) ShoorSKODA JS a.s. Revenues 1999 - 2003

Total revenues 315 059 000 EUR (CAS)

Non-nuclear

Nuclear65%

3

(§) ShoorSKODA JS a.s. Revenues 1999 - 2003

Revenues by segment - nuclear only (CAS)

Equipment of WER NPPs

24,6%

NPP Services 6,1%

Engineering38,5%

Spent Fuel Storage 23,1%

4

Skoda js a.s.(§)Shodh

Indicators2001 - 2003 (IAS)

Revenues(thousand EUR)

110 762120 000100 000

80 000 63 149 53 35060 00040 00020 000

5

Skoda js a.s.(§)Shodh

Indicators2001 - 2003 (IAS)

IBT(thousand EUR)

(§) 5homGrowth of Export- Orders Received

2001 2002 2003

/Czech

^Export\X Czech ExportX

yCzech / Rep.

^Expo/\

/ Rep.

46% , 54%

/ Rep./ 27%

73%

/ 23%

77%

yy y y y y

(§) Shodh

n Nuclearn Engineering for the VVER type NPPs

n Equipment for the VVER type NPPs

n Equipment for Western types of NPPs

n Spent fuel storage management

n Services for NPPs

n Oil & Gasn Engineering Oil & Gas

8

^ Three Current Significant Projects

§ Dukovany Nuclear Power Plant I & C Refurbishment(4 x 440 MWe)

§ Customer - CEZ (Czech utility)

§ Main contractor - SKODA JS a s.

§ Contractors-partners: consortium Framatome ANP/ DSS,ZAT Pribram, I &C Energo

§ To be carried out in 2001-2009 during planned outages

9

(§) ShodhSkoda js a.s. Three Current Significant Projects

CRDMs type LKP-M inch electronics for the Ukraine

n References - 600 pcs of LKP drives

n Supplied to NPPs in Central and Eastern Europe

§ Khmelnitski NPP/ Unit 2 - signed 04/ 2003 § Rovno NPP/ Unit 4 - supplied 04/ 2004 § South-Ukrainian NPP/ Unit 3 - signed 04/ 2004

10

Skoda js a.s.®Shodr

Three Current Significant Projects

§ Spent Fuel Transport and Storage Casks

§ More than 200 casks manufactured since 1993§ a long-term agreement with GNB Essen for

supplies of CASTOR® and CONSTOR® type of casks

Skoda js a.s.®Shodr

Proposal for Slovak Nuclear Power I ndustry

Bohunice V-2 NPP Reconstruction

§ I&C System Refurbishment (experience from Dukovany)

§ Technical assistance at uprating (theory, legislative)

§ Special manufacture

§ Special installations

§ Expert activities

12

Proposal for Slovak Nuclear Power 1 ndustry®Shodh

Spent Fuel Dry I nterim Storage

§ Design of the transport cask loading pit modification

§ Design of the CASTOR cask transportation

§ Design of the transport ways

§ Handling procedures

§ Needed calculations

13

Proposal for Slovak Nuclear Power 1 ndustry®Shodh

n Service Activities

§ I n-service inspections

§ Repairs

§ Thermohydraulic measurement

§ Structural safety

§ Calculations

§ Expert activities

§ Testing facilities

Skoda js a.s.(§)Shodh

Proposal for Slovak Nuclear Power I ndustry

n Mochovce NPP/ 3 & 4 Turnkey Completion

15

• BD + DD

Slovak supplies

Czech supplies

Foreign supplies

Original SEa.s.’ supplies

• Project management

• Equipment supplies

• On-site installation

• Start-up

- revision and revamping -equipment- qualification

16

Skoda js a.s®5H0M

n Project financing

n Following Czech banks expressed interest on project financing:

Komercm banka a.s. CSOBCeska export m banka a.s. Citibank a.s.Ceska sporitelna a.s. I nterbanka a.s.Zivnostenska banka a.s.

n Project already discussed with EGAP a.s.

Mochovce NPP/3 & 4 Turn-Key Completion!

17

' Skoda js a.s.

(§)ShodrMochovce NPP/ 3 & 4 Turn-Key Completion

Anticipated financing scheme

Supplemental commercial credit or guarantee

Guarantee Agreement

Supplies

Commercial credit

SuppliesCzech Rep. Exp. Buyer’s credit

Payments to sub-suppliers

Payments to sub-suppliers

Insurance(Refunding)

Credit drawing

BANK POOL

GUARANTEE

EGAP a.s.

BANK

SUB-SUPPLIERS

SUB-SUPPLIERS

SUPPLIERS’CONSORTIUM

INVESTOR

18

Skoda js a.s® Shook

n Arguments supporting Mochovce NPP/ 3 & 4 completion

n VVER NPP with V-213 reactor n Safen Construction managed without problems n Reliable and economical operation

n Mochovce NPP/ 3 & 4n Majority of the mechanical technology already on site n Construction in high progress n Positive results of the feasibility study

n SKODA JS a.s. together with Slovak, Czech and other foreign suppliers due to their erection experience with this NPP type will ensure a speedy and successful completion

Mochovce NPP/3 & 4 Turn-Key Completion]

19

(§)Shoor

Thank you for your attention