12,400sf
40+fume hoods
3+1exhaust fans
PROJECT West Coast Laboratory - Quality Measurements
FEATURESOctane Engine Lab, open floor plan, 100% fresh air HVAC
SIZE COST12,400 square feet $8.01 mm
GOALReplace 50+ year old, existing laboratory w/ modern lab
CLIENTClient name and location withheld due to NDA
The new lab replaced the existing, dated lab and was increased in size due to new regulation and testing requirements. LED lighting throughout provides even illumination for lab tasks. Fume hoods located on perimeter allow for more efficient workflow.
PETROCHEMICALLABORATORY
HOME
4fume hoods
$2.6million
1,400sf lab
PROJECT Gas Processing Refinery - Testing Laboratory
FEATURESBlast-resistant design, wet lab and GC lab, office space
SIZE COST4,000 square feet $2.6 mm
GOALProvide a blast-resistant facility to meet API RP-752
CLIENTClient name and location withheld due to NDA
The existing lab was nearing it’s life-span but was also located close to the process units. The new blast-resistant lab was placed as far away from the blast-radius but still required hardening.
GAS REFINERYLABORATORY
blast-resistant
HOME
42+fume hoods
9,000sf office
16,000sf lab space
PROJECT Gulf Coast Refinery - Quality Measurements Lab
FEATURES42+ Fume Hoods, Hazardous material storage, Office space
SIZE COST25,000 square feet $16 mm
GOALReplace and relocate lab operations to a non-bla st area of the refinery
CLIENTClient name and location withheld due to NDA
Currently in Design | Estimated Construction-late 2019
The existing lab facility was deteriorating, and needed to be replaced. After many assessments, the new lab was placed outside of the blast-risk area to help reduce costs. Multiple lab areas are combined into a large, open space to aid in workflow and visual safety
PETROCHEMICAL LABORATORY
HOME
23+fume hoods
3knock engines
5,900sf lab
PROJECT West Coast - Refining Quality Assurance Lab
FEATURESBlast Resistant, Full Redundancy, HF Lab, Coke Grinding, unique under floor, hidden utility distribution within U-shaped benches
SIZE COST12,100 square feet $6.4 mm
GOALConsolidate process control operations per master plan
CLIENTClient name and location withheld due to NDA
Control building and Lab were relocated to the outter limits of the blast area, but still required hardening. The lab was completed after the control building construction, but foundations were already in place as to minimize control operations.
Finished Interior Photos Not Available to NDA
REFINERYLABORATORY
blast-resistant