Date post: | 26-Feb-2018 |
Category: |
Documents |
Upload: | anjalysinha |
View: | 213 times |
Download: | 0 times |
of 27
7/25/2019 slabs 4th
1/27
ADVANCED BUILDINGCONSTRUCTIONSLABS
SUBMITTED BY11610
11612
11618
11629
11642
7/25/2019 slabs 4th
2/27
SLABSConcrete !"# co$e %n " &"r%et' o( (or$) *+%c+ c"n #e ,%&%,e, %nto t*o c"te-or%e . /rec"t or %n %t)
,e/en,%n- on *+ere t+e concrete *" c"t +ere&er t+e concrete % c"t %t $"' #e re%n(orce, or/retree, Re%n(orce, concrete e tee! #"r to re%t t+e ten%on %n t+e !"# 3retree, concrete+" +%-+ tren-t+ tee! tr"n, c"t %n %t *+%c+ co$/ree t+e concrete "n, $"%$%e t+e #ene5t o(concrete co$/re%&e tren-t+
3rec"t concrete o/t%on "re c"t %n " ("ctor' en&%ron$ent "n, %nc!,e t+e (o!!o*%n- /retree,concrete o/t%on
7 o!!o* core n%t
7 Do#!e:tee n%t7 So!%, concrete n%t7 Be"$ "n, #!oc; !"t !"#
In:%t concrete c"n "!o #e /re tree, "(ter c"t%n- t+e concrete "n, t+% % ;no*n " /ot:ten%on%n- "n, t+e o/t%on %nc!,e
7 >!"t !"#7 One:*"' !"#7 R%##e, !"#
7/25/2019 slabs 4th
3/27
>LAT SLABFlat slabs
>!"t !"# "re +%-+!' &er"t%!e e!e$ent *%,e!' e, %n contrct%on) /ro&%,%n- $%n%$$,e/t+) ("t contrct%on "n, "!!o*%n- !"t !"# /ro&%,e t+e $ot
7/25/2019 slabs 4th
4/27
7/25/2019 slabs 4th
5/27
>!"t !"# "re "//ro/r%"te (or $ot
7/25/2019 slabs 4th
6/27
A
7/25/2019 slabs 4th
7/27
or o$e %te) "
7/25/2019 slabs 4th
8/27
A>>LE SLABRibbed and wae slabs
R%##e, "n, *"=e !"# /ro&%,e " !%-+ter "n, t%er !"# t+"n "n e?%&"!ent !e%#!e
Re!"t%&e!' !%-+t) t+ere(ore !e (on,"t%on cot "n, !on-er /"n "re econo$%c
S/ee, o( contrct%on
>"%r!' !%$
7/25/2019 slabs 4th
9/27
7/25/2019 slabs 4th
10/27
7/25/2019 slabs 4th
11/27
7/25/2019 slabs 4th
12/27
7/25/2019 slabs 4th
13/27
3OST:TENSIONED SLABS
Post-tensioned (PT) slabs
3ot:ten%one, 3T !"# "re t'/%c"!!'
7/25/2019 slabs 4th
14/27
>ILLER SLABS
FLLER SLABS
In " %$/!' //orte, RCC !"#) t+e //er /"rt o( t+e !"# % #Fecte, to co$/re%&e(orce *+%!e t+e !o*er /ort%on % #Fecte, to ten%!e (orce Concrete % &er' -oo, %nco$/re%on *+%!e %t % *e"; %n ten%on ence t+e tee! re%n(orce$ent % /!"ce, %n t+eten%on one T+e concrete %n t+% /ort%on % on!' (or +o!,%n- to-et+er t+e tee!re%n(orce$ent "n, +" no trctr"! /r/oe T+% Hn:/ro,ct%&eH concrete c"n #ere/!"ce, #' " H>%!!erH $"ter%"! *+%c+ *%!! re,ce t+e *e%-+t o( t+e !"# "n, "!o re,cet+e cot #' re,c%n- t+e "$ont o( concrete e, A!o) %nce t+e *e%-+t o( t+e !"# %t+ re,ce,) !eer tee! % "!o re?%re, (or re%n(orce$ent) (rt+er re,c%n- t+e cot
T+ere % no re,cto%n %n t+e trctr"! tren-t+ o( t+e !"# "t "!! "n, %t *%!! "ct " "nor$"! !o", #e"r%n- !"#
Co$$on 5!!er $"ter%"! "re !%-+t *e%-+t $"ter%"! !%;e M"n-"!ore t%!e) c!"' /"n)#r%c;) *"te #ott!e) cocont +e!!) t+er$oco! etc
Re,ce t+e cot o( t+e !"# #' "ron, 2:J0K
Cre"te %nteret%n- ,e%-n "n, /"ttern on t+e ce%!%n-
e!/ %n #etter t+er$"! %n!"t%on o( t+e !"# ,e to t+e "%r /oc;et /reent
Re,ce t+e !o", on t+e (on,"t%on
7/25/2019 slabs 4th
15/27
T+e >%!!er S!"# % eent%"!!' " nor$"! RCC !"# *+ere t+e #otto$ +"!( ten%on concrete/ort%on "re re/!"ce, #' 5!!er $"ter%"! c+ " #r%c;) t%!e) ce!!!"r concrete #!oc;) etc
T+ee 5!!er $"ter%"! "re o /!"ce, " not to co$/ro$%e t+e trctr"! tren-t+) re!t%n re/!"c%n- n*"nte, "n, non:(nct%on"! ten%on concrete) t+ re,c%n- tot"! econo$%c
cot >%!!er S!"# "re "(e) on, "n, /ro&%,e "et+et%c"!!' /!e"%n- /"ttern ce%!%n-*%t+ot " nee, (or /!"ter
T+% %!!er S!"# contrct%on " co$/"re, to t+e
tr",%t%on"! nor$"! RCC !"# co$e "ron, to "//ro%$"te!' 10K to 1K
Filler Slab !sed to add aest"eti# appearan#e
T+e tr",%t%on"! Re%n(orce$ent Br%c; Concrete RBC contrct%on (on, %n n$eroe%t%n- #%!,%n- "ron, Ne/"!) e/ec%"!!' &er' o!, one) % "n e"$/!e o( t+e >%!!er S!"#tec+no!o-') no* "!$ot co$/!ete!' not %n /r"ct%ce
Gener"!!') %t % (on, t+"t $"n' trctr"! en-%neer) "rc+%tect "n, ,e%-ner %n Ne/"!,o not e"%!' "cce/t t+e %,e" o( *"t%n- concrete #e!o* t+e netr"! "% In contr"t)%nter%or ,e%-ner ee$ to "//ro&e t+e %,e" o( >%!!er S!"# #e%n- e, (or "et+et%c"//e"r"nce) "n, ,e%-n c"n #e $"n%/!"te, to (or$ "//ro/r%"te /"ttern (or #ot+
co$$erc%"! " *e!! " re%,ent%"! #%!,%n-
7/25/2019 slabs 4th
16/27
A T'/%c"! >%!!er !"# %n Centre (or De&e!o/$entSt,%e) Tr%&"n,r$
!!er !"# roo( %n- c!"' /"n Re%n(orce$ent ,et"%! c!"' /"n /o%t%Concret%n- >%!!er S!"#
7/25/2019 slabs 4th
17/27
T+% % "n "nc%ent t%$e tec+no!o-' *+%c+ "&e $"ter%"! "n, !"#or cot >%!!er !"#) con$e !econcrete "n, tee! " co$/"re, to con&ent%on"! RCC Re%n(orce, Ce$ent Concrete !"# RCC roo(#eco$e !%-+ter "n, !oo; $ore #e"t%(! ,e to t+e e o( !e:+e"&') !o*:cot 5!!er $"ter%"! c+
" M"n-"!ore t%!e) c!"' /ot "n, #ro;en /%ece o( ce$ent #!oc; T+e !"# 5!!e, *%t+ !%-+ter 5!!er$"ter%"! % ;no*n " t+e 5!!er !"# B' re,c%n- t+e ?"nt%t' "n, *e%-+t o( $"ter%"!) t+e roo(#eco$e !e e/en%&e) 'et ret"%n t+e tren-t+ o( t+e con&ent%on"! !"# T+e $ot /o/!"r 5!!er$"ter%"! % t+e roo5n- t%!e M"n-"!ore t%!e "re /!"ce, #et*een tee! r%# "n, concrete % /ore,%nto t+e -"/ to $";e " 5!!er !"# T+e trctre re?%re !e tee! "n, ce$ent "n, %t % "!o " -oo,+e"t %n!"tor
Ad$anta%es
Con$e !e concrete "n, tee! ,e to re,ce, *e%-+t o( !"# #' t+e %ntro,ct%on o( " !e+e"&') !o* cot 5!!er $"ter%"! !%;e t*o !"'er o( #rnt c!"' t%!e S!"# t+%c;ne $%n%$$ 112$$
En+"nce t+er$"! co$(ort %n%,e t+e #%!,%n- ,e to +e"t:re%t"nt ?"!%t%e o( 5!!er $"ter%"! "n,t+e -"/ #et*een t*o #rnt c!"' t%!e
M";e "&%n- on cot o( t+% !"# co$/"re, to t+e tr",%t%on"! !"# #' "#ot 20K
Re,ce e o( concrete "n, "&e ce$ent "n, tee! #' "#ot 40K
Some o& t"e benefts o& t"ese new te#"nolo%ies are e"!t+%er !%&%n-
Co$(ort"#!e !%&%n-
>%n"nc%"! "&%n-
Le $"%nten"nce "n, +%-+er ,r"#%!%t'
A -oo, te*"r, o( t+e en&%ron$ent
7/25/2019 slabs 4th
18/27
&%e* +o*%n- re%n(orce$nt *%t+ roo( t%!e %n#et*een
'/%c"! cro:ect%on
V%e* o( 5n%+e, ce%!%n-
>%n%+e, >%!!er S!"#
7/25/2019 slabs 4th
19/27
>%!!er !"# roo( An "!tern"t%&e roo5n- tec+no!o-'
A' TR*+,T* T* R FLLER SLAB
>%!!er !"# tec+no!o-' % " %$/!e "n, " &er' %nno&"t%&e tec+no!o-' (or " !"# contrct%on
T+e re"on *+') concrete "n, tee! "re e, to-et+er to contrct RCC !"#) % %n t+e%r %n,%&%,"!/ro/ert%e " e/"r"te #%!,%n- $"ter%"! "n, t+e%r %n,%&%,"! !%$%t"t%on Concrete % -oo, %n
t";%n- co$/re%on "n, tee! % -oo, %n ten%on T+ RCC !"# % " /ro,ct *+%c+ re%t #ot+co$/re%on " *e!! " ten%!e
Fig 1: Simply supported slab cross section
no*%n- t+% $c+ %( *e *"nt to $o&e (rt+er to n,ert"n, t+e >%!!er !"#Ptec+no!o-') *e *%!! +"&e to (rt+er t,' t+e cro ect%on o( " t'/%c"!%$/!' //orte, RCC S!"# Un,er %t o*n !o", "n, "//!%e, !o",) t+e !"#*%!! tr' to #en, " +o*n %n t+e >%-re 1
7/25/2019 slabs 4th
20/27
I( *e re(er >%-re 2) *+%c+ %n,%c"te t+e netr"! "% "n, "!o ten%on concrete %nt+e #otto$ 5#er o( t+e !"# *+%c+ % %n ten%on #t t+e to/ 5#er *%!! #e %nco$/re%on no*%n- t+% $c+ % t+e ;e' to n,ert"n, t+e 5!!er !"#tec+no!o-' Ten%on %n " !"# % on t+e #otto$ 5#er "n, co$/re%on on t+e to/5#er T+"t $e"n %( *e *"nt to o/t%$%e t+e trctre *e c"n re$o&e concrete
(ro$ t+e ten%on one *+ere %t % not $c+ nee,e, T+"t t+e ;e' #e+%n, 5!!er!"# contrct%on
T+% % " &er' cot eect%&e roo5n- tec+no!o-' no*%n- t+e *"' !"# %contrcte, on %te *rt GF"r"t) In,%") %t % not e"' to re$o&e) t+e concrete
(ro$ t+e ten%on one) +ence *e tr' "n, re/!"ce /"rt%"!!' t+"t /"rt o( concrete%n- light weight and low cost fller material T+% $et+o, o( contrct%on %
7/25/2019 slabs 4th
21/27
>%!!er !"# tec+no!o-' % #e%n- e, "cro In,%") #t #t"nt%"! "$ont o( *or; ont+e cce(! /ro$ot%on "n, tr"n(er o( t+% tec+no!o-' *" ,one #' Ar L"r%eB";er %n Sot+ In,%" It % one /!"ce *+ere 5!!er !"# +" croe, t+e #on,"r' o(ree"rc+ "n, contro!!e, %$/!e$ent"t%on to #e%n- one o( t+e re-!"r o/t%on o(contrct%on #' #ot+ -o&ern$ent "n, /r%&"te ector "n, "!o "rc+%tect "n,,e%-ner +"&e #een /ro$ot%n- t+% tec+no!o-'
T+ee 5!!er $"ter%"! "re o /!"ce, " not to co$/ro$%e t+e trctr"! tren-t+)t"#%!%t' "n, ,r"#%!%t') re!t%n- %n re/!"c%n- n*"nte, "n, non:(nct%on"! ten%onconcrete) (ro$ #e!o* "n, t+ resulting in economy o high energy material
consumption and respective cost savings and decreased dead load o the slab
An %ntern"! c"&%t' c"n #e /ro&%,e, #et*een t+e 5!!er $"ter%"! *+%c+ ",, "n etr"",&"nt"-e ot+er t+"n cot "&%n- "n, ener-' "&%n- improved thermal comortor the interiors A!o "n ",,e, ",&"nt"-e o( !o*er ,e", *e%-+t tr"n(erre, to t+e//ort%n- e!e$ent "n, 5n"!!' onto t+e (on,"t%on to (rt+er ",, / cot "&%n-%n ,e%-n o( t+ee e!e$ent
T+ee 5!!er $"ter%"! "re o /!"ce, " not to co$/ro$%e t+e trctr"! tren-t+)t"#%!%t' "n, ,r"#%!%t') re!t%n- %n re/!"c%n- n*"nte, "n, non:(nct%on"! ten%onconcrete) (ro$ #e!o* "n, t+ re!t%n- %n econo$' o( +%-+ ener-' $"ter%"!)con$/t%on "n, con%,er"#!e cot "&%n- "n, ,ecre"e, ,e", !o", o( t+e !"#
Light weight inert and inexpensive materials such as low grade Mangalore tiles Burnt Clay Bricks
7/25/2019 slabs 4th
22/27
Light weight, inert and inexpensive materials such as low grade Mangalore tiles, Burnt Clay Bricks,Hollow Concrete blocks, Stabilied Mud blocks! Hollow Mud blocks, Clay pots, Coconut shells etc" canbe used as #ller materials" $hese materials are laid in the grids o% steel rein%orcement rods andconcreting!concrete topping is done over them"
fig 3: Filler material arrangement$he %ollowing points to be kept in mind %or #ller material selection&'iller material should be inert in nature" (t should not react with concrete or steel in )CC slabconstructed"'iller materials water absorption should be checked %or as it will soak the hydration water %romconcrete"'iller material should be light in weight, so that overall weight o% the slab reduces and also the dead
load onto the %oundations is reduced"'iller material should be low cost so that it cost is much lesser then the cost o% the concrete itreplaces" This is very important to achieve economy.'iller material should be o% a sie and cross*section, which can be accommodated within the spacingo% the rein%orcement and also thickness wise could be accommodated within the cross section o% theslab"Moreover the 'iller slab also provides insulation +compared to a conventional )CC slab %rom the hot
climate outside the building, providing thermal com%ort to the user"'iller material texture should match with the desired ceiling #nish re-uirements so as not to provide
7/25/2019 slabs 4th
23/27
C INSTALLING >ILLER MATERIAL IN TE SLAB
S%e o( t+e 5!!er $"ter%"! *%!! #e &er' crc%"! It % $t to ,ec%,e t+e 5!!er $"ter%"!#e(ore t+e !"# % ,e%-ne, T+e ,%$en%on o( 5!!er $"ter%"! *%!! +e!/ ,ec%,e t+e/"c%n- o( re%n(orce$ent "n, "ccor,%n-!' t+e ,e/t+ o( t+e !"# "n, ot+er trctr"!
,et"%! *%!! #e *or;e, otA!o) 5!!er $"ter%"! +o!, #e /ro/er!' o";e, %n *"ter o t+"t %t ,oe not "#or#"n' *"ter (ro$ t+e concrete +%!e %nt"!!%n- t+e 5!!er $"ter%"!) one *%!! +"&e to,ec%,e t+e concret%n- e?ence o( t+e !"# %e (ro$ *+ere t+e concrete *%!! #et"rte, "n, +o* *%!! %t /ro-re to co&er t+e *+o!e !"#>%!!er $"ter%"! !%;e M"n-!ore t%!eC!"' t%!e c"n #e %nt"!!e, %n t*o !"'er 2 noone o&er t+e ot+er entr"//%n- "n "%r c"&%t' #et*een t+e t*o t%!e A ;etc+
+o*%n- cro ect%on o( " 5!!er !"# *%t+ $"n-!ore t%!e % +o*n #e!o* T+% *%!!%$/ro&e t+e t+er$"! /ro/ert%e o( t+e !"#
A+.ATA/ES *F FLLER SLABTE0*L*/12
7/25/2019 slabs 4th
24/27
B' ",o/t%n- RCC 5!!er !"# contrct%on co$/"re, to " RCC o!%, con&ent%on"!!"# %n c"e *+ere $"n-!ore t%!e "re e, " " 5!!er $"ter%"!) 'o c"n "&e on"//ro%$"te!' 19K o( t+e tot"! concrete "n, %nc!,%n- t+e cot o( 5!!er $"ter%"!)'o c"n "&e "ron, :10K o( 'or concrete cot
Anot+er ",&"nt"-e %) %( t+e 5!!er $"ter%"! % Ft " *"te %e (or e te$/or"r'$"n-!ore t%!e t+"t "re re$o&e, (ro$ t+e roo( to contrct " /;;" roo() 'o c"n"&e /on ne"r!' 1K on 'or roo( concrete contrct%on cot
B%!,%n- " 2 ? $ !"# c"n "&e 'o "//ro R 000 (ro$ 'or concrete cot>%!!er !"# tec+no!o-' c"n "!o #e "//!%e, to $" +o%n- /roFect "n, to*n+%//roFect to -"%n +%-+ cot "&%n- "n, "!o "&%n- %n +%-+ ener-' con$%n-
$"ter%"!
Anot+er ",&"nt"-e c"n #e o( " #etter t+er$"! co$(ort %( " c"&%t' % ;e/t #et*eent+e 5!!er $"ter%"! or t+e 5!!er $"ter%"! %te!( +" " c"&%t' >or e"$/!e to* $"n-!oret%!eC!"' t%!e c"n #e ;e/t one o&er t+e ot+er to (or$ "n "%r c"&%t' t+ ;ee/%n- t+e%nter%or o( 'or +oe re$"%n coo!er %n $$er "n, *"r$er %n *%nter
>%!!er !"# c"n #e ;e/t e/oe, *%t+ /ro/er *or;$"n+%/ to cre"te "et+et%c"!!'/!e"%n- ce%!%n- *%t+ " &%e* o( 5!!er $"ter%"! (ro$ #e!o* "n, t+ t+e cot o(/!"ter%n- "n,or /"%nt%n- "!o c"n #e "&o%,e,
RCC #e%n- $",e o( ce$ent) tee!) "n, "n, "--re-"te) % " &er' +%-+ ener-'%nten%&e $"ter%"!So re,ct%on %n concrete ?"nt%t' co$/"re, to con&ent%on"! !"# contrct%on) ",,
t+% tec+no!o-' to t+e !%t o( t"%n"#!e "n, en&%ron$ent (r%en,!' tec+no!o-%e "n,cor/or"t%n- -reen #%!,%n- (e"tre
7/25/2019 slabs 4th
25/27
' *ST SA./SM"ter%"! "&%n- "$%n- " 100 $$ t+%c; !"# 24QJ86 $) "n, c"!c!"t%n-t+e $"ter%"! "n, cot "&%n- " /er $"r;et $"ter%"! r"te o( A+$e,"#",)GF"r"t) A-t) 2011 "n, co$/"r%n- t+e "&%n-for 1 m3 RCC Filler slab vs. Conventional Solid RCC Slab.161 #"- 19K "&%n- R 418 $J"&%n- %n ce$entcot009 $J!e "n, 19K "&%n- R 21 $J"&%n- %n "n, cot018 $J!e "--re-"te 19K "&%n- R 12 $J"&%n- %n "--re-"tecot10 ;- !e tee!$Jo( !"# c"te, R 00$J"&%n- %nre%n(orce$ent cotT+e t"#!e #e!o* +o* t+e con$o/t%on o( $"ter%"! "n, cot "&%n- (or 1m3 ?"nt%t' o( t+e !"#
able 1: Costsaving!cu.mo concreteslab
T+e 5-re %n t+e t"#!e ee$ !e " t+e !"# t";en (or c"!c!"t%on % " $"!!%e !"# E!"#or"t%n- t+% "&%n-) "$%n- " nor$"! MIG +oe "re" o( 100?$ -ron, "re" "n, o( t*o tor%e A$%n- t+e !"# "re" co$e to #e160 ?$ (or t+% +oe) t+e tot"! "&%n- %n concrete cot c"n #e R J0)000A!o %( t+e 5!!er $"ter%"! % not " &%r-%n $"ter%"! (or t+e !"# contrct%on) 'o
E E3B*+E+ EER/1 SA./S
7/25/2019 slabs 4th
26/27
E' E3B*+E+ EER/1 SA./ST+e t"#!e #e!o* +o* t+e e$#o,%e, ener-' c"!c!"t%on (or " 200 ?$ +oe !"# S!"#,%$en%on to #e "$e " "#o&e %n +' ost Sa$in%s'
7/25/2019 slabs 4th
27/27