Slide: 1 EUM/PPS/08/VWG/0124 - 22 October 2008 Programme Preparation 2 nd Post-EPS User Consultation Workshop Darmstadt, 3-4 February 2009 Lorenzo Sarlo ONLY SELECTED SLIDES FOR ASI
Transcript

Slide: 1 EUM/PPS/08/VWG/0124 - 22 October 2008

Programme Preparation

2nd Post-EPS User Consultation Workshop

Darmstadt, 3-4 February 2009

Lorenzo Sarlo

ONLY SELECTEDSLIDES FOR ASI

Slide: 2EUM/PPS/09/VWG/0013 3 February 2009

The Post-EPS Framework

08 10 15 20 25 30 35

EPS MetOp A, B, C (09:30 LTDN)

Post-EPS Sounding/Imaging (09:30 LTDN)

Post-EPS Additional Contribution (TBD)

NOAA-N, N’ (13:30 LTAN)

NPP (13:30 LTAN)

NPOESS C1, C3 (13:30 LTAN)

NPOESS C2, C4 (05:30 LTDN)

NPOESS follow-on programme

Jason 1, 2 Jason 2 follow-on / SWOT

Sentinel-3 (±10:30 LTDN)

Readiness /

Slide: 3EUM/PPS/09/VWG/0013 3 February 2009

The Post-EPS Framework

The Post-EPS Programme Preparation includes the Phases 0 and A

• The Phase 0 is currently running and will last until Q4 2009

• The Phase 0 will be closed with the planned MDR (Mission Definition Review)

• The Phase A includes a PCR (Preliminary Concept Review) and will close with a PRR (Preliminary Requirements Review) at system level

EUMETSAT conducts the overall Mission, System and Ground Segment Engineering

ESA conducts Industrial Studies at Pre-feasibility and feasibility level

ESA also ensures coordination at Space Segment Level for the GMES Sentinel 5Post-EPS Programme Preparation process based on the logic deployed for the successful

preparation of the MTG Programme.

MTG entered Phase B in January 2009

Slide: 4EUM/PPS/09/VWG/0013 3 February 2009

User Needs

Phase 0Studies

Phase AStudies

(2009-2011)

Phase ACloseout

1st Post-EPS UC Workshop, 2006

2nd Post-EPS UC Workshop, 2009

3rd Post-EPS UC Workshop

Application Expert Group (AEG)

Position Papers

Candidate Missions

Post-EPS MRD, PARD Space Segment

Configuration to be Selected by

CouncilDraft EURD

Payload Complement to be Selected by

Council

2005

2011

Key milestones of the User Consultation Process are these Workshops, providing the forum for users and experts to follow and steer the results of the process. PHASE

B

Post-EPSUser Consultation Process

PRR

MDR

Slide: 5EUM/PPS/09/VWG/0013 3 February 2009

User Consultation > 150 User Representatives involved

2 Workshops conducted since 2006

The 1st UC Workshop (DA, 2006) provided very relevant recommendations for the elaboration of mission requirements

This 2nd Workshop will help to discuss on candidate missions to support further consolidation of requirements and concepts

Further Workshops will be organised in the future to keep users informed on progress of Post-EPS during Phase A

The Post-EPS Mission Expert Team 7 meetings already done

Support to Mission Requirements definition and consolidation

Consulted for all relevant requirements descoping necessary to eliminate hard design drivers

Will be maintained during Phase A

Post-EPSUser Consultation Process

Slide: 6EUM/PPS/09/VWG/0013 3 February 2009

Post-EPS Status & RoadmapPlanningElements

Phase 0 Mission Analysis 2005 – 2009

Phase A Feasibility 2009 – 2011

Phase B Preliminary Definition 2011 – 2013

Phase C/D Detailed Definition, Production 2014 – 2019

Phase E Utilisation from 2018/2020

Slide: 7EUM/PPS/09/VWG/0013 3 February 2009

Post-EPS Status & Roadmap

Phase BPhase 0 Phase A

IR and MW SoundingVIS/IR Imaging

missions

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Phase C/D

Other missions

Prep. Programme

Development and Operation ProgrammeEUMETSATApproval Processes

ESA Programme

ESA Min. Conf.go ahead for phase B/C/D

Operations

2nd User Cons. Workshop

MDR

PlanningElements

Slide: 8EUM/PPS/09/VWG/0013 3 February 2009

ESA Phase 0 Studies

2007 2008 2009 2010 2011

ESA CMin-11go-ahead for Phase B/C/D

Ph.0 Studies Ph. A Studies

PAR MTR FR + MDR

2nd User ConsultationWorkshop

> EUMETSAT

Preparatory Programme

2012

PAR held in June June 2008

planned

extension

Industrial Studiesconducted

… Detailed Presentations planned at this workshop …

MTRs completed in January 2009

Slide: 9EUM/PPS/09/VWG/0013 3 February 2009

2nd User Consultation Workshop ObjectivesCooperation Framework

NPOESS

PostNPOESS

… otherOperators /Agencies …

JPS

Slide: 10EUM/PPS/09/VWG/0013 3 February 2009

Other potential areas for cooperation3MI and RO

The User Consultation Process is a Pillar of the EUMETSAT Programme Preparation process

The Post-EPS Mission Experts Team (PMET) effective work highly recognised and appreciated

Next Steps aim to prepare for important decisions of the EUMETSAT and ESA Councils for the Post-EPS

Programme to endorse MRD and agree on the cooperation schemes

… Dialogue with Users continues…