Town of Estes Park
Residential Renewable Energy
Reuben Bergsten
Estes Park Light and Power
10 October 2009
American Planning AssociationColorado Chapter
8/6/2019 Small Scale Renewable Distributed Generation
2/23
Intro
Reliable electricity is an expectation. Every yearour economy becomes more efficient and
productive. Electricity is the fundamental building
block for those efficiencies.
August 10, 1996 blackout in the Western US States: power was interrupted to approximately 7.5 million customers,
durations ranged from a few minutes to about nine hours.
costs to the regions economy ~ $2 b i l l ion .
August 14, 2003 blackout, Midwest/Northeast US & Ontario
50 million people Up to 4 days in the US
Cost estimates range between $4 b i l l ion and $10 b i l l ion
Is smal l sc a le w ind generat ion a feas ib leaddi t ion t o t he gr id ?
2
8/6/2019 Small Scale Renewable Distributed Generation
3/23
8/6/2019 Small Scale Renewable Distributed Generation
4/23
Technical Feasibility Siting
Estes Park results
Power Demand Just in time deliver
Economic Feasibility
Cultural Feasibility
4
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
5/23
Technical feasibility Siting (planning process of selecting a good wind generation site)
5
Residential Renewable Energy
http://www.engr.colostate.edu/ALP/videos/WindGeneration.wmv
Wind generation video from CSU & GEO
http://www.engr.colostate.edu/ALP/videos/WindGeneration.wmvhttp://www.engr.colostate.edu/ALP/videos/WindGeneration.wmvhttp://www.engr.colostate.edu/ALP/videos/WindGeneration.wmvhttp://www.engr.colostate.edu/ALP/videos/WindGeneration.wmv8/6/2019 Small Scale Renewable Distributed Generation
6/23
Technical feasibility Siting- Estes Park Anemometer Results
CSU Senior Researcher Michael Kostrzewa inconjunction with the Governors Energy Office(GEO) provided data collection & analysis.
Estes Park is a number 2 wind class at60 FEET. The worst is 1. Kostrzewa/GEO results for EstesPark.
Larimer County has a 40 foot height limit! Wind power classes 3 and higher are generally
considered suitable for wind power development.
6
Residential Renewable Energy
http://www.engr.colostate.edu/ALP/http://www.engr.colostate.edu/ALP/ALP_63_Estes_Park.htmhttp://www.engr.colostate.edu/ALP/ALP_63_Estes_Park.htmhttp://www.engr.colostate.edu/ALP/ALP_63_Estes_Park.htmhttp://www.engr.colostate.edu/ALP/ALP_63_Estes_Park.htmhttp://www.engr.colostate.edu/ALP/8/6/2019 Small Scale Renewable Distributed Generation
7/23
Technical feasibility Siting- Estes Park Anemometer Results
7
Turbine
RotorDiameter
meters
RotorPower
kW
HubHeightmeters
HubHeightWind
Speedmph
TimeAt
ZeroOutputpercent
TimeAt
RatedOutputpercent
AverageNet
PowerOutput
kW
AverageNet
EnergyOutputkWh/yr
AverageNet
CapacityFactor
%
Bergey Excel-R 6.7 7.5 12.2 10.14 40.52 3.09 1.1 9,500 14.4
Bergey Excel-S 6.7 10 12.2 10.14 32.06 1.5 1.2 10,200 11.6
Bergey XL.1 2.5 1 12.2 10.14 23.84 4.03 0.2 1,400 16.2
Southwest Skystream 3.7 3.7 1.8 12.2 10.14 38.4 0 0.3 2,500 16.1
Southwest Whisper 500 4.5 3 12.2 10.14 40.52 3.61 0.5 4,600 17.6
Source: Data collection & analysis provided by Michael Kostrzewa (CSU) in conjunctionwith the GEO.
Thats not good. PRPA will deliver renewable energyfrom Duke energys Silver Sage site having 40% net
capacity factor.
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
8/23
Technical Feasibility Siting
Estes Park results
Power Demand Just in time delivery (wind availability)
Economic Feasibility
Cultural Feasibility
8
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
9/23
Just In Time DeliveryElectricity is the worlds most unique Commodity
Electricity must be produced exactly when it
is needed.
Diurnal Electric Demand
kW
8/6/2019 Small Scale Renewable Distributed Generation
10/23
Just In Time DeliveryElectricity is the worlds most unique Commodity
Solar & wind energy generation is at Mother
Natures mercy !
Demand[kW]
WindGeneration[kW]
TIME [One Day]
6 AM 6 PMNoonThere is no guarantee electric wind
generation is coincident to customerdemand
8/6/2019 Small Scale Renewable Distributed Generation
11/23
Just In Time DeliveryElectricity is the worlds most unique Commodity
Renewable energy generation is at Mother Natures mercy
Demand[kW]
WindGeneration[kW]
TIME [One Day]
6 AM 6 PMNoonThere is no guarantee electric wind
generation is coincident to customerdemand
8/6/2019 Small Scale Renewable Distributed Generation
12/23
Just In Time DeliveryElectricity is the worlds most unique Commodity
Renewable energy generation is at Mother Natures mercy
Lets store it!
But WHERE?
8/6/2019 Small Scale Renewable Distributed Generation
13/23Batteries are Boring!
Energy storage is the enabling technology for small scalerenewable energy.
13
8/6/2019 Small Scale Renewable Distributed Generation
14/23
Boring but RICH ! Today, 99 percent of batteries for hybrids are made in Japan Aug 2009, the US gave out $2.4 billion in grants for advanced battery
manufacturing & research the largest battery investment in world history
14
ApplicantDOE Award (Dollars
in Millions)Project
LocationsTechnology
Cell, Battery, and Materials Manufacturing Facilities
Johnson Controls, Inc. $299.2Holland, MILebanon, OR
(Entek)
Production of nickel-cobalt-metal battery cells and packs, aswell as production of battery separators (bypartner Entek) for
hybrid and electric vehicles.
A123 Systems, Inc. $249.1Romulus, MIBrownstown, MI
Manufacturing of nano-iron phosphate cathode powder andelectrode coatings; fabrication of battery cells and modules;and assembly of complete battery pack systems for hybrid andelectric vehicles.
KD ABG MI, LLC (DowKokam) $161
Midland, MI Production of manganese oxide cathode / graphite lithium-ionbatteries for hybrid and electric vehicles.
Compact Power, Inc.(on behalf of LG Chem,Ltd.)
$151.4St. Clair, MIPontiac, MIHolland, MI
Production of lithium-ion polymer battery cells for the GM Voltusing a manganese-based cathode material and a proprietaryseparator.
EnerDel, Inc. $118.5Indianapolis, IN Production of lithium-ion cells and packs for hybrid and electricvehicles. Primary lithium chemistries include: manganese
spinel cathode and lithium titanate anode for high powerapplications, as well as manganese spinel cathode andamorphous carbon for high energy applications.
General MotorsCorporation $105.9
Brownstown, MI Production of high-volume battery packs for the GM Volt. Cellswill be from LG Chem, Ltd. and other cell providers to benamed.
8/6/2019 Small Scale Renewable Distributed Generation
15/23
Where to put those batteriesTesla, NOW
DOE
Displacing foreign oil
Chevy VOLT, 2011
8/6/2019 Small Scale Renewable Distributed Generation
16/23
Time Line for Storage
CO house bill 09-075Aug 2009 Tesla Model S
2011
Chevy Volt2011
$2.4B US Grants forAdvanced BatteriesAug 5, 2009
CAF 35.5 mpg2016
President Obamas Goal
1 million plug-in cars2015
EESTOR Miracle ultracapacitor, promised aworking Proto type 2010
EESTOR disruptive Technology
http://www.allcarselectric.com/blog/1034854_zenn-motors-requests-doe-grant-to-build-us-based-eestor-powered-electric-car-facilityhttp://www.allcarselectric.com/blog/1034854_zenn-motors-requests-doe-grant-to-build-us-based-eestor-powered-electric-car-facility8/6/2019 Small Scale Renewable Distributed Generation
17/23
Technical feasibility Siting
Estes Park results
Power Demand Just in time deliver (wind availability)
Economic feasibility
17
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
18/23
Economic feasibility Revenue expectations
Colorados Net Metering legislation requires electric
utilities to rollover excess energy generated eachmonth. Great customer SAVINGS, not revenue
At the end of one year, the excess renewable energy
generated is paid to the owner IN A MANNER DEEMEDAPPROPRIATE BY THE ELECTRIC ASSOCIATION Estes Park Light & Power pays customers an Avoided
cost ~ $0.02 per kWh. Most utilities deem zero to bethe appropriate amount.
18
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
19/23
Economic feasibility Revenue expectations
Net Metering A GREAT transitional incentive program to
meet political pressures Not sustainable!
19
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
20/23
Economic feasibility Net Metering
A GREAT transitional incentive program to meet political pressures
Not sustainable!
20
Residential Renewable Energy
$0.00746
$0.02984
$0.05559
Net metering allows small scale renewable owners to use grid's
transmission & distribution infrustructure, without paying for it.
Transmission
Generation
Distribution
Based on 2009 Estes Park Light & Power residential rates. Distribution from otherutilities will differ.
8/6/2019 Small Scale Renewable Distributed Generation
21/23
Technical feasibility Economic feasibility
Cultural Feasibility NIMBY issues
21
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
22/23
Cultural Feasibility NIMBY issues
22
Residential Renewable Energy
8/6/2019 Small Scale Renewable Distributed Generation
23/23
Plan for the FUTURE