Smart Grid at the DSO - Eandis1 oktober 2014
Distribution Grid OperatorDistribution
Grid Operator
Producers ElectricityProducers Electricity
Import Natural GasImport Natural Gas
EliaElia
FluxysFluxys
SuppliersSuppliers
CustomersCustomers
RegulatorCREG / VREG
RegulatorCREG / VREG
Eandis in the Energy market
1 october 2014 AIT Industry Day
Eandis Network: TS -> SS -> DSElia
225 Transformator stations
HS
300.000 LV feeders2.500.000
Customers
LS
AIT Industry Day1 october 2014
770 Switchingsubstations
28500 Distribution Substations
14000 Customer
Substations
Smart Grids : some slides?
AIT Industry Day1 october 2014
Smart Grid in Eandis:
AIT Industry Day1 october 2014
Active networkManagement
Network Operation
AssetManagement
• More measurements
• Data quality
• Network Calculations
• Real time operations
• Current Netstatus
• Optimising network investments and exploitation
Smart Grid
At conferences
Smart Grid
At the DSO
Eandis Smart Grids Program
AIT Industry Day1 october 2014
Smart Netelements
Smart Architecture MS
Distribution Management Systems
AssetManagement
Network Operation
Active Network
Mgmt
Eandis Smart Grids Program
AIT Industry Day1 october 2014
Smart Netelements AssetManagement
2012: Substation Automation PoC
Improve investment planning and assetmanagement
Minimize network losses Improve voltage regulation Extend capacity for decentralised
production Improve fault localisation and
restoration
Distribution substations Measurements to DMS Remote Fault current indication Remote Switching via DMS State estimation in DMS
Installation of 70 substations in fourdistribution networks
MS LS
TM
TB/TS
KSV
1 october 2014 AIT Industry Day
Final design: Telecontrolled substation
AIT Industry Day1 october 2014
Uni
vers
eel
conn
ecto
r
RMU (MV-cell)
Fault current
indicator
Motor isationRemote switching
SignalingSignalisation
LV-bords (Integrated TI)
Con
nect
orLS
m
etin
g (k
orts
luitm
ogel
ijkhe
id T
i)N L1 L2 L3
Ti Ti Ti
400V
N L1 L2 L3
230V
(Opt.)
Ti Ti Ti
Telecom
RTU
I/O
Modbus of equivalent
Meter
Secundair 400V
Meter
Secundair 230V
(Optioneel)
UPS (FCI, Telecontrol)U
nive
rsee
l co
nnec
tor
Connector PQ
230VConnector PQ
400V
Measurements
Con
nect
or L
S m
easu
rem
ent
Some ideas did not make it…
AIT Industry Day1 october 2014
Measurements on LV feeders
Replaced by an aggregatedmeasurement on the LV side of the transformer
Extensive Power quality measurements
Basic measurements were included(U, I, P, Q en cos Phi)
-> Some power quality measurements wereincluded at no extra cost (THD, Flicker)
Final implementation: Phoenix Contact
AIT Industry Day1 october 2014
2015: Distributiecabines uitrol @ 100/jaar2013: PoC 70 cabines in 4 lussen
Lessons learned: Connectors/testconnectors
AIT Industry Day1 october 2014
Driver: reduce investments/increase visibility
AIT Industry Day1 october 2014
1% - complex networks
4% - Semi complex networks
37 % - Straight networks
58 % - Simple Networks
Voltage Regulated Distribution Transformers
Regulateddistributiontransformers: Increase the voltage
variation on LV Compensate the
voltage fluctuationon MV
+/-10 % voltage variation to beused completelyon LV
Increase the capacity for Dec. Production
1 october 2014 AIT Industry Day
Example measurements
Distribution substation: 7%
Customer: 18%
1 october 2014 AIT Industry Day
• Cogenerationinjecting on MV
• Long LS feeders
• PV injecting on LV
Market analysis
On Load Tap Changer (OLTC) Motorized change of tap while on
load Technology of Machinenfabrik
Reinhausen (MR), also applied bydifferent vendors e.g. Siemens en CG
Booster Technologie Extra Coils on MV regulate the
voltage Patented solution presented by
Schneider
1 october 2014 AIT Industry Day
Market analysis
Magnetic voltage regulation Saturation of the core Presented by Magtech Expensive solution
Retain the existing transformer Extra Coils on LV regulated the
voltage Supplied by A-Eberlee Extra cabinet in substation,
increasing the size
1 october 2014 AIT Industry Day
Schneider - Minera Sgrid
Technische Specifications Booster Technology Vermogen: 400kVA Afmetingen: 1350x830x1550
– Standaard: 1250x850x1300 Tapstanden
– ON-Load: ± 2 x 2,5%– OFF-Load: ± 2 x 2,5%
1 october 2014 AIT Industry Day
Control Algorithms
AIT Industry Day1 october 2014
Phase 1: Local Algorithms Standard Algorithms Implemented in Control Box Stable LV output voltage Voltage drop (correction based on
current measurement)
Phase 2: Centralised Algorithm Development necessary Implemented in DMS Setpoint transformer based on
Voltage Measurements in the grid
Summary
AIT Industry Day1 october 2014