SMART PROGRAM AT A GLANCE PUBLISHED JUNE 2019 DISTRICT 1 Established 1915 County Public Schools BROWARD Data through April 30th, 2019 PROJECT PLANNING HIRE DESIGNER PROJECT DESIGN HIRE CONTRACTOR PROJECT COMPLETE PROJECT CONSTRUCTION 21 schools 7 schools 8 schools 0 schools Complete Complete What’s Happening in District 1 Primary Renovations Snapshot
Transcript
Page 1: SMARTPROGRAM AT A GLANCE · (f.k.a Hallandale Adult & Community Center) • Gulfstream Academy of Hallandale Beach K-8 (f.k.a Hallandale Elementary) • Gulfstream Early Learning

SMART PROGRAMAT A GLANCEPUBLISHED JUNE 2019

DISTRICT 1Established 1915

County Public SchoolsBROWARD

Data through April 30th, 2019

PROJECT PLANNING

HIREDESIGNER

PROJECTDESIGN

HIRE CONTRACTOR

PROJECTCOMPLETE

PROJECTCONSTRUCTION

21 schools 7 schools 8 schools 0 schoolsComplete Complete

What’s Happening in District 1Primary Renovations Snapshot

Page 2: SMARTPROGRAM AT A GLANCE · (f.k.a Hallandale Adult & Community Center) • Gulfstream Academy of Hallandale Beach K-8 (f.k.a Hallandale Elementary) • Gulfstream Early Learning

School Choice Enhancement Program (SCEP)

ATTUCKS MIDDLEFRONT OFFICE FURNITURE

BEACHSIDE MONTESSORI VILLAGESCIENCE EQUIPMENT

MIRAMAR ELEMENTARYOUTDOOR BENCHES

ORANGE BROOK ELEMENTARYMARQUEE

Miramar Elementary Contractors are installing roof drainage systems (emergency overflow) in all four buildings

SMART PROGRAM AT A GLANCE DISTRICT 1

Highlights• 8 schools have active constructionprojects valued at $27 million

• McNicol Middle is nearing completionwithin the next couple of months

• SCEP is fully complete at 13 schools andimplementation is underway at 15 schools

Page 3: SMARTPROGRAM AT A GLANCE · (f.k.a Hallandale Adult & Community Center) • Gulfstream Academy of Hallandale Beach K-8 (f.k.a Hallandale Elementary) • Gulfstream Early Learning

PASADENA LAKES ELEMENTARYLAPTOPS

HOLLYWOOD HILLS HIGHOFFICE FURNITURE

SHERIDAN HILLS ELEMENTARYCAFETERIA TABLES

WEST HOLLYWOOD ELEMENTARYMEDIA CENTER FURNITURE

Annabel C. Perry Pre-K - 8 A new fire alarm system and fire sprinklers are being installed

Page 4: SMARTPROGRAM AT A GLANCE · (f.k.a Hallandale Adult & Community Center) • Gulfstream Academy of Hallandale Beach K-8 (f.k.a Hallandale Elementary) • Gulfstream Early Learning

Primary Renovations can include:

• Roofing Improvements • Window Replacements

• HVAC Improvements • STEM Lab Improvements• Art Lab Improvements• Electrical Improvements• Fire Alarms

• Exterior Improvements• Fire Sprinklers

• Music Room Renovations

• Media Center Improvements

Items Purchased Include: o�ce furniture, marquees, student

laptops, two-way radios, P.E. equipment, and much more

Data through April 30th, 2019*Decrease in total number because of the merger of two schools

13 Schools Complete 15 Schools in Implementation9 Schools in Planning/Design

DISTRICT 1SMART PROGRAM AT A GLANCE

MIRAMAR ELEMENTARYLAPTOPS

McNicol Middle • Band classroom repainted and new floor, sink, & cabinets installed • Air handling units and pumps were

replaced in building 3• Removed concrete stage and installed

sound booths for music room• Fire sprinklers installed under stairwells

37 Schools* underway or complete

SCEP

$100,000

Page 5: SMARTPROGRAM AT A GLANCE · (f.k.a Hallandale Adult & Community Center) • Gulfstream Academy of Hallandale Beach K-8 (f.k.a Hallandale Elementary) • Gulfstream Early Learning

6 60 2123PROJECT

PLANNINGHIRE

DESIGNERPROJECTDESIGN

HIRE CONTRACTOR

PROJECT CONSTRUCTION

PROJECTCOMPLETE

1 2 3 4 5 6

SCHOOLS SCHOOLS

$0 $19.15 M $519.60 M $182.94 M $218.78 M $8.44 MSCHOOLS SCHOOLS SCHOOLS SCHOOLS

COMPLETE 6 60 43 2123

What’s Happening CountywidePrimary Renovations Snapshot

SMART by the Numbers | District 1

Safety

$26 Million invested

in single point of entry projects

Music & Art

7,294 Items Delivered

valued$2 million

Athletics

COMPLETE

3Tracks

4Weight Rooms

Renovation

8 Schools in construction

198 SCEP Items delivered and

installed

Technology

COMPLETE

11,670 Items Delivered

Data through April 30th, 2019

S M A R T

Page 6: SMARTPROGRAM AT A GLANCE · (f.k.a Hallandale Adult & Community Center) • Gulfstream Academy of Hallandale Beach K-8 (f.k.a Hallandale Elementary) • Gulfstream Early Learning

Established 1915

County Public SchoolsBROWARD

STAY INFORMEDwww.browardschools.com

VISIT BrowardSchools.com/SMARTFutures

EMAIL [email protected]

FOLLOW US ON TWITTER @RobertwRuncie

@BCPS_SMART@FrankGirardi15

• Annabel C. Perry Pre K-8 School• Apollo Middle School• Attucks Middle School• Beachside Montessori Village• Boulevard Heights Elementary School• Colbert Museum Magnet• Collins Elementary School• Dania Elementary School• Driftwood Elementary School• Driftwood Middle School• Gulfstream Academy of Hallandale Beach K-8

(f.k.a Hallandale Adult & Community Center)• Gulfstream Academy of Hallandale Beach K-8

(f.k.a Hallandale Elementary)• Gulfstream Early Learning Center of Excellence• Hallandale Magnet High School• Henry D. Perry Education Center• Hollywood Central Elementary School• Hollywood Hills Elementary School• Hollywood Hills High School• Hollywood Park Elementary School• Lake Forest Elementary School• Lanier-James Education Center• Mary M. Bethune Elementary School• McArthur High School• McNicol Middle School• Miramar Elementary School• Oakridge Elementary School• Olsen Middle School• Orange Brook Elementary School• Pasadena Lakes Elementary School• Pembroke Pines Elementary School• Sheridan Hills Elementary School• Sheridan Park Elementary School• Sheridan Technical College• South Broward High School• Stirling Elementary School• The Quest Center• Watkins Elementary School• West Hollywood Elementary School

*Bolded schools are in construction

38 FUNDED SCHOOLSIN DISTRICT 1