of 152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
1/152
N ISO 9001-2000 CERTIFIED COMP NY
OR
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
2/152
PROUDLY AN ISO 9001:2000
CERTI IED COMPANY
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
3/152
or The Kind Attention Of:
Ms. Wang Xiuchun
CMEC COMTRANS
春
中 际商务运输代理有限责任公司
北京市宣武区广安
门外大街178
号中
大厦1206
电话:010-63445388
传真:010-63268182
手机:13701200568
Wang Xiuchun
CMEC COMTRANS INTERNATIONAL CO., LTD
No.178 Guanganmenwai Street, Xuanwu District,
Beijing, China
Tel: 8610-63445388
ax: 8610-63268182
Mobile: 86-13701200568
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
4/152
COMPANIES PRO ILE
IRMS NAME :
M/s S.M.Asghar (Pvt) Limited
n ISO 9001:2000 Certified Company
COMPLETE ADDRESS : 908-910, 9
th
loor, Chapal
Plaza, Hasrat Mohani Road
Off I.I.Chundrigar Road
Karachi.
CORPORATE STATUS O IRM : PRIVATE LIMITED.
TELEPHONE NO : 00+ 92+21+32468091 -5
AX NO : 00+92+21+32468090.
IRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).
DATE O REGISTRATION WITH : 30-03-1980.
CUSTOMS
E- MAIL ADDRESS : [email protected]
E- MAIL ADDRESS : [email protected]
Web- Page : http://www.smasghar.com.pk
DATE O ISSUE O LICENCE : 30-03-1980.
NUMBER O STA EMPLOYED : 20.
YEAR O ESTABLISHMENT : 1980.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
5/152
SYED KHALID JAMAL CHIEF EXECUTIVE
SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION
SYED MOHAMMAD ALI KHALID GENNERAL MANAGER
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
6/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
7/152
PEOPLE BEHIND THE COMPANY
SYED KHALID JAMAL : CHIEF EXECUTIVE.
SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV
SYED MOHAMMAD ALI KHALID : GENERAL MANAGER
MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.
MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION
MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.
S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.
MOHD SALEEM : ASST PORT OPERATIONS.
MOHAMMAD TARIQ : ASST. PORT OPERATIONS
MOHD JAVED : ASST PORT OPERATIONS.
QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.
SALEEM NOOR : ASST. AIRPORT OPERATIONS
AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY
SAEED KHAN : HEAD OF COMPUTER DIVISION
DILSHAD A. SIDDIQUI. : MANAGER FINANCE
ASIF KHAN : ASST. MANAGER FINANCE
ATIA FASIAL : ASST. OFFICE CO-ORDINATOR
MOHAMMAD SAMI : INCHARGE GD PREPARATION (BY AIR)
ASAD ABBAS : ASST.BILLINGS & ACCOUNTS
MOHSIN KHAN : FIELD OFFICER.
SADDAM HUSSAIN : FIELD OFFICER.
SULEMAN : OFFICE PEON.USMAN GHANI : OFFICE PEON.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
8/152
SECTION 1 : INTRODUCTION
SECTION 2 : SCOPE OF WORK
SECTION 3 : DOCUMENTATION
REQUIREMENTS
SECTION 4 : PROJECT REFERENCES
SECTION 5 : PICUTRE GALLARY
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
9/152
问候巴基斯坦
我们感谢您对我们组织的信任和信心,通过发送电子邮件
我们
privilage在巴基斯坦几乎所有的 国公司工作重要级别的所有的
国家重大工程项目。
其 有。
1) 国石油
2) 国广西
3) 国水利水电建 集团
4) 中国港湾建 集团
5) 中国电线电缆
6) 中国云南公司
7) 中国新疆北新建 路与桥梁
8) 中国瑞福祥
我们很高兴通过所有强大的真主的恩典来告诉你,我们目前正在办理
项目估价或多或少US $ 12 亿美元。
你会
赞赏,在所有下面提到我们已经采取了
各种豁免及各种SRO 的利益因客户和项目上,以项目为基础的项目。
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
10/152
随着我们的背景经历,米 / 秒。 S.M.Asghar
私
营)有限公司已成功完成国家重要的所有主要和著名的项目,以及
具有国际重要性。
我们的专业团队与坐镇前的项目
/ 项目和开发的系统,并针对最复杂的
要求,我们的客户的方法一般灵活性的开始
..客户
我们将很高兴与你的信誉良好的组织工作
带着敬意
赛义德
Sajid 贾马尔
导演项目和商业部
Cell: +92-302-8269260
Cell: +92-314-2000073
We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more orless US $ 1.2 Billion Dollars.
You will appreciates that in all of the Projects mentioned belowwe have taken various Exemptions & benefits of various SRO’sfrom Customer to Customer & on Project to Project Basis.
With our background experience, M/s. S.M.Asghar (Pvt) Limited has successfully completed all the major & PrestigiousProjects of National Importance as well asInternational Importance.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
11/152
We on merit got the benefit of various ConcessionarySRO’s & Exemptions to our valued Customer to theirEntire satisfaction & without any problems and difficulty.
Our team of professionals sits with the Customer priorto the start of the Project/Projects & developed systemsand a general flexibility of approach tailored to ourClients most Complex of requirements.
We believe that our Professional approach to ourClient is unparalleled by any competitors.
Few of the recent Projects & Customer Referencesare given below, for whom we have claimed the various SRO’s& Exemptions to our valued Customer to their entiresatisfaction.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
12/152
MOL MAKORI GAS FIELD SRO: 678(I)/2004, DT: 07-08-2004
GHAMBAT SOUTH GAS PROCESSING FACILITY (GPF II)PROJECT OF PAKISTAN PETROLEUM LIMITED (PPL)
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Ravi SRO: 678(I)/2004, DT: 07-08-2004
SHELL GAS
SRO: 678(I)/2004, DT: 07-08-2004
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
13/152
SHV ENERGY PAKISTAN Various Equipments & Material Including Break Bulk LPG Mixture
SRO: 678(I)/2004, DT: 07-08-2004
Expansion of Plant: RAVI GAS SRO: 678(I)/2004, DT: 07-08-2004
WEATHERFORD DRILLING
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Engineering
(One of the Largest Private Sector Project for OGDCL US $ 135 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
14/152
TRANSASIA REFINERY LTD (Re-Location) (One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
INDUS REFINERY LTD (Re-Location) (Another Largest Private Sector Project US $ 650 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESALINATION & POWER PROJECT” at DHA Karachi (Total Cost of the Project US $ 160 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi EXPANSION PROJECT & NEW GANTRY CRANE
(Total Cost of the Project US $ 400 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
15/152
MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
SATPARA HYDRO POWER DAM PROJECT (The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
16/152
GOMAL ZAM HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I (The Project Cost US $ 45 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
17/152
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PROGAS LPG STORAGE & HANDLING TERMIANAL (Private Sector Project US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (The Second Expansion Phase Project US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PETROSIN ENGINEERING (Pvt) LTDQADIRPUR 600 MMSOFD EXPANSION PROJECT
(The Project Cost US $ 6 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
18/152
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR
BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD(The Project Cost US $ 14 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT
PROGRAM FOR ERRA(The Project Cost US $ 300 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAKISTAN LIMITEDFUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
(The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
19/152
ALSTOM PAKISTAN LIMITEDZHORLU WIND POWER ( Heavy Transformers)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.( The Project Cost US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
20/152
DESCON ENGINEERINGSETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERINGSETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
21/152
VARIOUS PORTS AT KARACHI
Qasim International Container Limited (QICT) Karachi Port Trust Head office (KPT)
Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
22/152
S.M.ASGHAR (PVT) LIMITED
908-910, 9
th
loor, Chapal Plaza, Hasrat Mohani
Road, Off I.I Chundrigar Road, KARACH I
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
23/152
We have a pleasure to give a brief introduction of our Company
M/s. S.M.Asghar (Pvt) Limited , a name famous for its credibility,
reliability & commitment in this part of world.
We are proudly an ISO 9001-2000 Certified Company.
We are among the few & pioneer company who got the ISOCertification in Custom Clearance in Pakistan.
With our background experience, M/s. S.M.Asghar (Pvt) Limited
has been able to developed systems and a general flexibility ofapproach tailored & personalized solutions to our Clients most ComplexRequirements that we believe is unparalleled by any competitors.
Most important our customers are able to deal with an InternationalNetwork who can arrange the movement and supervisionof cargo from Europe, and beyond, whilst they onlyinstruct one control office. This International Strengthand wealth of experience combined with a genuinely personalapproach we feel makes us a formidable contender.
Our Credentials our Enthusiasm and our Track Record speak for themselves.
For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited have developed & specializes and simultaneously Transformitself into a PROJECT CLEARANCE SPECIALIST.
If one can give a brief look at the Pakistan’s Most Advanced
& the Important Industrial Estate PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor forM/s. S.M.Asghar (Pvt) Limited to perform the Complete CustomClearance & the Logistics Support in the form of Local Transportation to thesePrestigious Projects.
Privilege To Handle The Prestigious Projects At
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
24/152
Port Bin Qasim ew Are Listed below
PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM(The Contractor for PARCO Project Cost US $ 300 Million Dollars)
ICI PTA T-11(The Largest Private Sector Project US $ 480 Million Dollars)
Engro Vopak Terminal Ltd (VCM Tank Farm)
Engro Vopak Terminal Ltd (MEG Tank Farm)
Engro Vopak Terminal Ltd (LPG Tank Farm)
Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm) (Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)
PROGAS LPG STORAGE & HANDLING TERMINAL(Private Sector Project US $ 50 Million Dollars)
INDUS REFINERY LIMITED(Another Largest Private Sector Project US $ 750 Million Dollars)
TRANASIA REFINERY LIMITED(Another Largest Private Sector Project US $ 800 Million Dollars)
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (FOTCO)(The Second Expansion Phase Project US $ 30 Million Dollars)
CHINA HARBOR ENGINEERING(The Contractor for EVTL for the EVTL JETTY Private Sector Project US$ 4 Million Dollars)
ENGRO ASAHI POLYEMR & CHEMICALS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
25/152
(Another One of the Largest Private Sector Project US $ 80 Million Dollars)
FAUJI FERTILIZER BIN QASIM LTD(Handling of Break Bulk Phosphoric Acid)
LPG BREAK BULK SHIPMENT(Handling of 90% of Pakistan Break Bulk LPG Shipments at EVTL& SSGC Terminal )
VCM BREAK BULK SHIPMENT(Handling of 100% of Break Bulk VCM Shipments at EVTL)
ETHYLENE BREAK BULK SHIPMENT(Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)
Karachi International Container Terminal Phase II Expansion PROJECT Total Cost of the Project US $ 400 Million Dollars
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
26/152
Hydro Power Sector
Privilege to Handle the Major Hydropower Power & Dam Projects ofNational Importance, among these Projects of National Importance are:
MIRANI HYDRO POWER DAM PROJECT(The Project Cost US $ 80 Million Dollars)
SATPARA HYDRO POWER DAM PROJECT(The Project Cost US $ 30 Million Dollars)
MANGLA RAISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
GOMAL ZAM HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars )
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
ALAI KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
27/152
DHA DESALINATION PLANT 3 MIGD
& 94 MW POWER PLANT KARACHI
Project Name DHA DESALINATION & POWER PLANT
PAKISTAN IRST EVER SEA DESALINATION
& POWER PLANT
Location: DHA, PHASE VIII. KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 million
CLIENTDHA COGEN LIMITED (DCL)
Completion: UNDER CONSTRUCTION
This is the first ever desalination plant in history of Pakistan. It has acapacity to Desal, 3 MGD (Million Gallons Per Day) of Water, beside toProduce & Generate Electricity of a Capacity 95 MW
TOTAL VALUE O L/C ESTABLISHED:
Siemens AG Germany $ 41,400,000 $ 33,120,000
Siemens AG Germany € 6,550,000 € 5,240,000
Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241
Lincas Electro Vertibas € 295,500 € 236,390
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
28/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
29/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
30/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
31/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
32/152
JAMSHORO JOINT VENTURE LIMITED
SINGLE LARGEST LPG EXTRACTION PLANT
Project Name JAMSHORO JOINT VENTURE LIMITED
Location: JAMSHORO, SINDH
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT ASSOCIATED GROUP
Completion: 2005
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I(The Project Cost US $ 80 Million Dollars)
M/s. S.M.Asghar (Pvt) Limited was awarded the President of Pakistan Award by the President General Pervez Musharraf for successfully andtimely performance in Clearance and Logistics of JJVL Phase I Project
JJVL is Pakistan’s single largest producer of LiquefiedPetroleum Gas. Situated in Dei Shah Bukhari, DistrictHyderabad, JJVL’s Extraction Plant has a daily output of about500 metric tons of LPG and 150 metric tons of NGL/Naphtha.JJVL accounts for about one-third of the total local LPG production ofthe country.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
33/152
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
34/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
35/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
36/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
37/152
PARCO White Oil Pipeline ProjectBy China Petroleum & Consortium
M/s S.M.Asghar (Pvt Limited also have a privilege of Handling02 chartered flights carrying main booster pumps weighingover 100 Tons by Air for
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
38/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
39/152
ICI T11 PTA Plant
Project Name ICI PTA T11 PLANT
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 480 million
CLIENT TRANSCAR PROJECTS UK/ OOSTER WHEELER UK
Completion: 1998
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
40/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
41/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
42/152
We also have a privilege of handling one of the Heaviest and Length WisePiece in History of Pakistan which Weights 265 M/tons and Length
Approx.76 Meters.
REQUIRED FOR CUSTOM CLEARANCE
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
43/152
SCOPE OF WORK
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
44/152
BENE IT O VAVARIOUS
CONCESSIONARY
SRO’s & EXEMPTIONS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
45/152
PREPARATION BE ORE ARRIVAL
O VESSEL
Upon receipt of the written instruction from the Importer /Representatives of the Importer , we will be in close contact with theshipping Company in order to ascertain the expected arrival date( ETA ) of the Ocean going Vessel at the Un-loading Port of theCountry.
CON IRMATION O THE ARRIVAL
O VESSEL:-
We shall inform the arrival and the berthing date of the vessel tothe Importer / Representatives of the Importer in order to keep a closeLoop for the berthing of the vessel.
CUSTOM CLEARANCE:
We shall collect in full advance all the necessarydocuments for the onward Custom Clearancefrom the Importer / Representatives of theImporter when intimated and will prepare GDand all the required documents and formalities tobe submitted to the related Custom Authority
and Will Complete the preparation of the GD (Goods Declaration) as perInvoice, Packing List & Bill Of Lading depending on weather the Vessel hasarrived and also subject to the Lodging Of Manifestation of IGM (ImportGeneral Manifest) by the Shipping Company / Shipping Agent.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
46/152
OBTAINING THE DELIVERY ORDER:
We shall complete all the formalities required by the relative Shipping Agent / Main Carrier Agent/ relevant Port Authority and will obtain the Delivery Order from the ShippingCompany/ OR their Agent against the presentation/ submission of Original Bill of Lading.
The delivery Order's are generally issued after filing of IGM in order to ascertain the goodshave not been Transshipped.
NECESSARY ASSISTANCE:
We shall provide all necessary Assistance andConsultancy Services Concerning Custom Clearance tothe Importer / Representatives of the Importer.
AIR CARGOES:
We shall also perform the Works Related to the Air Cargo As per request ofImporter / Representatives of the Importer… DELIVERY AT / TO THE PLANT SITE
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
47/152
We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low
Bed OR as per the requirement & Nature of Cargo to the Warehouse or theopen storage area as per the instruction of Importer / Representatives of theImporter.
CUSTOM DUTIES TAXES
SRO’s AND NECESSARY PERMITS
All the Plant, Machinery, Equipment and Parts/Spares which are imported intoPakistan shall be subject to Custom Duties and Taxes Prevailing at the time ofImport.
The Duties and Taxes concerns with the Custom Authorities as per
Pakistan Custom Tariff includes:-
Custom Duty/Duties From 5% Minimum To 20% Maximum
Sales Tax/Taxes 17 %
Income Tax/Taxes 5.5%
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
48/152
The Taxes Concerns with the Port Authorities:-
Port Wharfage
Port Demurrage
Weighment Charges (If any) (for Products like Pipes of Iron/Steel/Coil-Bar)
There Are Two Major Ports in Karachi Namely as below:
Karachi Port
Port Bin Qasim
Karachi Port is Further Divided into 02 Parts, namely;
1) EAST WHARF:
a) Pakistan Container Terminal (PICT) Private Terminal
b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.
c) Ghass Bunder, For Launches, Steamer and Boats
2) WEST WHARF:
a) Karachi International Container Terminal Ltd (KICT)
b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24 And 25
c) Berth Number 25 is for Heavy Lift Cargo that has On Shore HeavyCrane for capacity 50 M/Tons.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
49/152
For Containerized Cargo the various Yards/Ports are charging differentHandling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking
Charges/Yard Storage Charges.
Please note that for all the above mentioned charges the relevantPort /Yard will issue Receipts for the relevant charges.
Excise Taxes @ 1.0-1.05% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing at
the time of Import shall be Paid by the I m p o r t e r immediately before
the Clearance of the Consignments from the Port.
Further the completion of GD’s (Bill of Entry) and other Custom formalities aresubject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.
Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /
Bill of Lading OR any other relevant documents submitted by the Importer ,
will may render in delay to clear the consignment.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
50/152
SUBMITTAL O SHIPPING GUARANTEE
BOND IN ABSENCE O ORIGINAL BILL O LADING
If there is a delay in the arrival of the Original Bill of Lading, can cause a
delay in getting the Goods/ Cargo release of the from the Port
premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading
would be therefore required by the shipping company in order to issue the
Delivery Order. It shall be discussed and settle before arrival of the vessel.
We will provide all necessary assistance and advice for the Shipping
Guarantee to the Importer / Representatives of the Importer.
During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer or
Arrange a joint survey as soon as possible. Marine/Transit insurance
Shall be arranged by Importer / Representatives of the Importer ,
from Place of Origin up to the Plant Site
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
51/152
METHOD STATEMENT Newly Implemented Web-BasedOne Customs WeBoc) SYSTEM
At the present there are 02 procedures for Custom Clearance:-
Under this newly implemented procedure if the Vessel is berthed
at any of the below Ports i.e.
Karachi Port Trust (KPT)Karachi International Container Terminal (KICTL)Pakistan International Container Terminal (PICTL)Qasim International Container Terminal (QICTL Port Qasim)Air Freight Unit (AFU)FCL/LCL/Loose/Break Bulk
Goods Declaration (GD) is prepared on Line Under the New WeBOC System
(Via Electronic Mail Data Transfer System).
The G.D (Goods Declaration) is prepared in accordance with the declarationof the Importer and the documents provided by the Importer i.e.Commercial Invoice, Bill of Landing and the Packing List. Thereafter the G.Dis submitted to the Custom for Assessment on Line.
WEB BASED ONE CUSTOM WeBOC
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
52/152
* The amount of Custom Duties & Taxes and the Sindh Infra StructureFee (CESS) has to be paid in advance as per the Importer declaration.
* If the assessment by the WeBOC is done as per the declaration ofImporter, than the G.D is processed and the Importer can take thedelivery of the goods, after the payment of all the necessary Port Dues &Excise Tax.
In case the goods have been processed under WeBOC SYSTEM does notaccept the Importer Declaration, than the Importer may asked for additionalDuties & Taxes or If the Importer wants to Contest with the views of theCustoms than they can go for appeal & meet the Senior Custom Officialsalong with the relevant Documents & Proof to justify their claims.
The Custom Authorities may differ in three basic ways:
1) Disagreement in the PCT OR HS Code Classification.
2) Not Extending the Benefit of the Claimed Benefit/SRO.
3) Disagreement with the Valuation.
The GD is Prepared and filed Online (Via Electronic Filling),as per declaration of the Importer.
If Customs satisfy with all the 03 criteria’s mentioned above i.e.
PCTSRO
Valuation
The GD is than completed by the Concerned Group. The Importer has tothan pay the Applicable Duties & Taxes after that the GD is forwarded tothe Port side for Examination after which the Importer can take theDelivery of the goods after the payment necessary Port Dues.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
53/152
* If Customs do not satisfy with all the 03 Criteria’s mentioned above i.e.
PCTSROValuation
Than the GD is forwarded to the Port Side for Physical Examination tocheck the goods are in conformity to the declaration of the Importer &under the light of Examination Report GD will be completed by theconcerned Group in the Custom House.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
54/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
55/152
The following documents are required generally by the customs for processingthe B/E for the Cargo arriving at Sea Port.
I Original Invoice showing complete description of the goods with value ofthe each individual item
II Detail Packing List showing complete Description, Quantity GrossWt, Net Wt, Ullage Certificate.
III Original Bill of Lading duly endorsed at the backside in our Favor.
IV Certificate of Origin
V All Govt. Sanctions, Authorization from Government Agencies if any
VII Original Letter of Credit
VIII Sales Tax Registration Certificate
IX Import Registration
X National Tax No Certificate Copy
XI WeBOC Registration (User ID & Pass Word)
Any other document that may be requested by the Custom to verify thedeclaration of Importer
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
56/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
57/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
58/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
59/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
60/152
CLIENTS PROJECTS
* M/S CHINA GUANGXI CORPORATION
PAT EEDER CANAL PROJECT
* M/S CHINA DONG ANG CORPORATION
SEWERAGE TREATMENT PROJECT
* M/S CHINA PETROLEUM
KORANGI SEWERAGE TREATMENT
* M/S CHINA YUNNAN CORPORATION
KPT JINNAH BRIDGE PHASE II
* M/S CHINA NATIONAL ELECTRIC WIRE & CABLES
QUEENS ROAD POWER STATION
* M/S CHINA HARBOR ENGINEERING
JETTY OR ENGRO PAKTANK
* M/S IJM / IGI JOINT VENTURE.
LBOD SANGHAR PROJECTS
* M/S LI E LINE (Pvt) LTD.
DHURNAL LPG GAS EXPANSION PROJECT
* M/S ENGRO PAKTANK TERMINAL.
LPG TERMINAL AT BIN QASIM
CLIENTS PROJECTS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
61/152
* M/S ENGRO PAKTANK TERMINAL
VCM TERMINAL HANDLING PROJECT
* M/S HYUNDAI CORP KHI O ICE.
K.E.S.C HIGH TENSION CABLE PROJ.
* M/S HYDERABAD DEVELOPMENT AUTHORITY.
MACHINERY UNDER SPANISH GRANT
* M/S CHINA YUNNAN CORPORATION.
MALDIVE SPARLIAMENT BUILDING
* M/S CHINA NATIONAL CHEM ENGG CORP.
SUB CONTRACTOR OR DONG ANG
S2 PROJECT
* ENGRO ASAHI TRADING (PVT) LTD
EXPORT O PVC WORLD WIDE
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
62/152
CLIENTS PROJECTS
* M/S DESCON ENGINEERING WORKED OR NUMBER O PROJECTS
1) EPTL OR LPG TERMINAL
2) EPTL OR VCM PROJECT
3) EVTL OR MEG PROJECT
4) OR PARCO MID COUNTRY RE INERY
5) LASMO OIL BHIT GAS IELD PROJECT
US $ 6.5 Million Dollars
* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD
HUB & PIPRI PROJECT UNDED BY ADB
£ 15.8 Million Sterling
* M/S HYUNDAI HIDCO HAKAS JV
EXPORT O HEAVY DREDGING MACHINERY
US $ 2.5 Million Dollars
* M/S AL - NOOR SUGAR MILLS LTD
MD BOARD IBRE BUILDING BOARD PLANT
(LASSANI)
CLIENTS PROJECTS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
63/152
* PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.
US $ 4.5 Million Dollars
* M/S ENGRO PAKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
US $ 5.5 Million Dollars
* M/S SHV ENERGY PAKISTAN
GAS EXPANSION PROJECT
US & 1.5 Million Dollars
* M/S TEKSER INSAAT SANAYI VE TICCARRET
CHASMA RIGHT BANK CANNAL PROJECT C-
65 US $ 260 Million Dollars
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
64/152
BREAK BULK
LIQUID CHEMICALS &
PETROCHEMICALS HANDLING
PROJECTS IN HAND
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
65/152
* SHV ENERGY LIMITED
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* JAMSHORO JOINT VENTURE LIMITED
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* AFTAB TRADERS LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* CRESS LPG LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* RELIANCE CONSULTANCY
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* ENGRO POLYMER & CHEMICAL LIMITED
VINYL CHLORIDE (VCM)
IN BULK OF VARIOUS PARCELS
EDC IN BULK OF VARIOUS PARCELS
CAUSTIC SODA IN BULK ETHELYNE
IN BULK OF VARIOUS PARCELS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
66/152
UNDER GOING
PROJECTS
IN HAND
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
67/152
* M/S ENGRO OODS LIMITED
1) LAUNCHING & SETTING UP A COMPLETE STATE O AN ART
O O'MORE ICE CREAM PLANT
2) BRAND NEW STATE O AN ART ENGRO RICE &
PAR BOILING PLANT
3) EXPANSION O EXISTING DAIRY MILK PLANT. (OLPER'S
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
68/152
* M/s. OUNDATION ENERGY LIMITED-1
SETTING UP A STATE O AN ART WIND POWER PROJECT O A
CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE
* M/s. OUNDATION ENERGY LIMITED-II
SETTING UP A STATE O AN ART WIND POWER PROJECT O A
CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE
* M/S. PAK ARAB RE INERY LIMITED
SETTING UP A COMPLETE BRAND NEW ASPHALT BUILT UNIT
(ABU UNIT)
* ENGRO POLYMER TRADING LIMITED
EXPORT O PVC RESIN (SABZ BRAND) WORLD WIDE
APPROXIMATE EXPORT IN M/TONS 2500 PER MONTH
* M/s. CIVIL AVIATION AUTHORITY
SETTING UP A BRAND NEW BENAZIR BHUTTO
INTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06
RE UEL HYDRANT SYSTEM.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
69/152
KARKEY PAKISTAN
POWER SHIP & OIL SUPPLY TANKER
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
70/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
71/152
VARIOUS OTHER PROJECTS
O NATIONAL IMPORTANCE INCLUDING
HYDRO, SEWERAGE WATER
TREATMENT, DAMS CHEMICAL
INDUSTRY OIL & GAS SECTOR
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
72/152
* M/S CHINA SINOHYDRO CORPORATION
1) GOMAL ZAM DAM HYDRO POWER
2) DUBAR KHAWAR DAM HYDRO POWER
3) KHAN KHAWAR DAM
4) KWSB K-III
* M/S. INDUS RE INERY LIMITED.
HI-TECH 100,000 BPSD OIL RE INERY
ON RELOCATION BASIS
* M/S. JAMSHORO JOINT VENTURE
LPG EXTRACTION PLANT
* M/S. PETROSIN RAVI ENGINEERING
OIL & GAS PROJECTS LTD.
* M/S. SHELL GAS LPG PAKISTAN LTD
LPG PROJECTS / LPG GAS
* M/S. BI-WATER INTERNATIONAL
KARACHI WATER & SEWERAGE
BOARD HUB & PIPRI PUMPING
STATION PROJECT
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
73/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
74/152
* AREVA T&D PAKISTAN (PVT) LTD.
132 KV GRID STATION AT
CREEK CITY, DHA
* KHALID RAU & CO., (PVT) LTD.
IN RASTRUCTURE PROJECTS
LAHORE RING ROAD
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
75/152
HYDROPOWER PROJECTS
From our background experience, strength & experiences from
industrial development projects, S.M.Asghar (Pvt) Limited
has rapidly established itself as a key player in infrastructure
projects.
We successfully did the Custom Clearance & In-land
Transportation jobs of large-scale projects like dams, barrages,
highways and housing complexes.
We hold the distinction of being the first ever local company to do
the 07 Major Hydropower Projects Simultaneously of National
Importance in Pakistan
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
76/152
HYDROPOWER
PROJECTTaunsa Barrage Rehabilitation
And Modernization
Location: Taunsa Pakistan
Year Of Project March 2006-2007
Cost Of Project US $ 140 Million Dollars
Completion : May 2008
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
77/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
78/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
79/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
80/152
HYDROPOWER
PROJECT.SATPARA DAM
HYDROPOWER PROJECT
LOCATION PAKISTAN
NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.
COST OFPROJECT
US $ 140 Million Dollars
Completion : March 2007
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
81/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
82/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
83/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
84/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
85/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
86/152
Project Name
Duber Khwar
Location:
The project located on river Duber Khwar, right
bank tributary of Indus river near Patan in NW P
at a distance 265 Km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 109 million
Completion: 4 YEARS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
87/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
88/152
Location:Allai Khwar
Hydropower Plant
The Project is located on Allai
Khwar River, Left Tributary of
River Indus near Besham in
NW P, 245 km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 110 million
Completion: 4 YEARS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
89/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
90/152
Project Name
MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)
West of Turbat Town in Makran Div of
Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 120 million
Completion: 4 YEARS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
91/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
92/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
93/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
94/152
Integrated Bulk Liquid Chemical
Terminal Storage & Handling acilities
Terminal Information
Item Description
Port Port Muhammad Bin Qasim
Port Entrance Phitti Creek Fairway Buoy 24o33.1’,N, 67o02.9’,E
Tide Table PHB - 2, Pakistan Tide Tables
Local Time GMT + 5 Hrs
Berth Type Jetty
Commissioning 25th November 1997
Depth Alongside 11.0 m
Max LOA 225 m
Max Beam 33 m
Max Deadweight 75,000 tons
Current Operations Unloading and Storage (Chemicals and LPG)
Truck Loading and Pipeline Transfer
Products Handled /
Stored
Paraxylene (PX), Acetic Acid (AA), Vinyl Chloride
Monomer
(VCM), Acylonitrile (ACN), Phosphoric Acid, Mono
Ethylene Glycol (MEG), Liquefied Petroleum Gas
(LPG) and Ethylene
ServicesHeating, Chilling, Weighing and Nitrogen Blanketing,
Water
Storage Capacity 82,400 cubic meters
Number of Tanks 21
Total Area 102 Acres
Access Sea / Road / Pipeline
Investment Over USD 100 million
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
95/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
96/152
EVTL Bulk liquid Chemical and Storage Terminal the first phase comprised
construction of 41,000 cubic meter of storage facility the cost of first phase of the
Project was US $ 60 million the tank farm is situated on reclaimed land in the PQA.
PARAXYLENE
ACETIC ACID
PHOSPHORIC ACID (HANDLING ONLY)
VINYL CHLORIDE MONOMER
A
CRYLONITRILE
L
IQUE IED
P
ETROLEUM
G
AS
MONO ETHYLENE GLYCOL
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
97/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
98/152
Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint
Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi
Corporation (Japan), each with an 80% and 20% shareholding, respectively
EAPCL is the only PVC manufacturer in Pakistan with a Capacity
Of 100,000tons per annum (TPA) and its operations are located at Port Qasim
Project NameENGRO ASAHI POLYMER
& CHEMICALS LIMITED
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 100,000 (TPA) PVC MANU ACTURING PLANT
CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD
Completion: 1999-2000
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
99/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
100/152
PARCO Mid Country Refinery (100, 000 BPD)
Project Name PAK ARAB RE INERY COMPANY
Location: MULTAN, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT DESCON ENGINEERING
Completion: 1998
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
101/152
INDUS RE INERY LIMITED
PAKISTAN SECOND LARGEST RE INERY
Project Name IRL is a 100,000 bpd or 4.95 million metric tons per
annum complex fuels refinery. It will be the sixth
petroleum refinery in Pakistan and the country’s
largest refinery.
Location: PORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 700 million
CLIENT INDUS RE INERY LIMITED
Completion: UNDER CONSTRUCTION
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
102/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
103/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
104/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
105/152
PETRO CANADA RE INERY TO PAKISTAN PORT QASIM
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
106/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
107/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
108/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
109/152
Gambat South Gas Processing Facility(GPF-||) Project
Location: Distt. Sanghar, Sindh-Pakistan
Capacity: 50 MMSCFD Gas Processing
LPG 11 MTPD, Condensate 1050 BPD
Scope: EPCC of Complete Facility
Major Equipment
Wellhead Air Cooler
Inlet Separation
Feed Gas Compressor
Amine Purification Unit (MDEA Type)
HCDP Control Unit (Propane based Refrigeration
Compressor Package)
ProjectGambat South Gas Processing Facility
PROJECT NATURE
50 MMSCFD Gas Processing
LPG 11 MTPD, Condensate 1050 BPD
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
110/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
111/152
TRANSASIA RE INERY LIMITED
PAKISTAN SECOND LARGEST RE INERY
Project Name TRL is a 100,000 bpd or 4.00 million metric tons per
annum complex fuels refinery. It will be the state of an
Art petroleum refinery in Pakistan and will be one of
the country’s largest refinery.
Location: PORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 700 million
CLIENT TRANSASIA RE INERY LIMITED
Completion: UNDER CONSTRUCTION
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
112/152
TRANASIA REFINERY LIMITED
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
113/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
114/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
115/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
116/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
117/152
WIND POWER
PROJECTS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
118/152
AUJI ERTILIZER ENERGY COMPNAY
LIMITED ( CEL) 49.5 MW WIND ENERGY
PROJECT AT JHAMPIR, KARACHI
Project Name CEL WIND ENERGY PROJECT O CAPACITY 49.5 MW
Location: JHAMPIR, NEAR THATTA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 110 million
CLIENT DESCON ENGINEERING LIMITED
Completion: ALREADY COMPLETED
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
119/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
120/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
121/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
122/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
123/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
124/152
Project Name ASPHALT BUILT UNIT PROJECT (ABU)
OR PARCO
Location: PARCO MID COUNTRY RE INERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 30 Million
Completion: DECEMBER 2012
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
125/152
Project Name 49.5 MW OUNDATION WIND ENERGY-1 PROJECT
Location: JHAMPIR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 Million
Completion: SEPTEMBER 2014
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
126/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
127/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
128/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
129/152
Project Name 49.5 MW OUNDATION WIND ENERGY-II (Pvt) Ltd.
PROJECT
Location: JHAMPIR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 Million
Completion: SEPTEMBER 2014
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
130/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
131/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
132/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
133/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
134/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
135/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
136/152
Project Name NEW KHANKI BARRAGE HYDROPOWER PROJECT
Location: RIVER CHENAB, DISTT GUJRANWALA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 70 Million
Completion: SEPTEMBER 2016
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
137/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
138/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
139/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
140/152
Project NameASPHALT BUILT UNIT PROJECT (ABU)
OR PARCO
Location: PARCO MID COUNTRY RE INERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 30 Million
Completion:DECEMBER 2012
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
141/152
Project Name METRO HABIB CASH & CARRY PAKISTAN (PVT) LTD
Location: HEAD O ICE THOKAR NIAZ BAIG, MULTAN RD, LHR.
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 3.4
Completion: STILL UNDERGOING
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
142/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
143/152
KARACHI INTERNATIONAL CONTAINER
TERMINAL (KICTL) KARACHI
Project Name KARACHI INTERNATIONAL CONTAINER
TERMINAL (KICTL)
PHASE III EXPANSION PROJECT
Location: WEST WHAR ROAD, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 400 million
CLIENT KICTL PAKISTAN
Completion: UNDER CONSTRUCTION
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
144/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
145/152
BAHRIA TOWN (PVT) LIMITED
RAWALPINDI
Project Name BAHRIA TOWN (Pvt) LIMITED
AWAMI VILLAS PROJECT.
TOTAL # O VILLAS 8000
Location: RAWALPINDI, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 120 million
CLIENT BAHRIA TOWN (Pvt) LIMITED
Completion: UNDER CONSTRUCTION/ PROGRESS
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
146/152
HEALTH, SA ETY AND ENVIRONMENT
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
147/152
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
148/152
S.M.Asghar (Pvt) Limited believes that ACCIDENTS
DON
’
T JUST
happen, they’re caused, and it is the duty of the Companyto remove and minimize all possible causes of Accidents.
We at S.M.Asghar (Pvt) Limited takes preliminary guide to therecognition of potential hazards to the following.
M O S T - S A E - P L A C E S
M MACHINERY : Sources of Mechanical Power
O OPENINGS : Pits, Sumps, Ducts & Drains
S STACKS : Stores Materials, Raw & Process.
T TOOLS : All type of Tools.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
149/152
S A E - P L A C E S
S STRUCTURE : loors, Walls, Ceilings, Road
A ATMOSPHERE : Dust, gases, fumes & Spray.
IRE : ire Points & ire Exits.
E ELECTRICITY : Wires, Cables, Switches.
P PRESSURE VESSEL : Boilers & Compressors
L LADDERS : Steps, trestles & Scaffolds
A ATTIRE : Protective Clothing, Helmets
C CRANES : Hoist, Derricks & Ropes / Hooks
E EXPLOSIVES : lammable Liquids, LPG, Radioactive.
S or SIGNALS :
Warning Light, Telephone Buzzers.
As a Company Policy we take care of our Employee to the best Standards because
Employees are Our Assets.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
150/152
We provide following safety Equipments to our Port staff such as :
Safety Belts : They are provided to the Staff who
Works On the Ship /Vessel (VCM/LPG)
Emergency Lights : In case of Night Delivery at the Port
Premise/ Highways
Safety Helmets : At time of delivery at the Port Area
During Loading/ Unloading
Heavy Machineries/ Hazardous Cargo
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
151/152
Safety Boots : At the Ship Derricks & the Port
Premises
Safety Glasses : They are provided to the Staff who
Work on the Ship /Vessel.
8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans
152/152
HEAVY & SUPER HEAVY LIFTTRANSPORTATION EXPERIENCE
WE CALLED THIS ASABNORMAL LOADS