+ All Categories
Home > Documents > Smet Group Project timbered trenches Rixensart RER · Smet-F&C nv Kastelsedijk 64 B-2480 Dessel...

Smet Group Project timbered trenches Rixensart RER · Smet-F&C nv Kastelsedijk 64 B-2480 Dessel...

Date post: 18-Oct-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
1
Smet-F&C nv Kastelsedijk 64 B-2480 Dessel Smet Group Phone: 0032 14 38 96 96 E-mail: [email protected] Website: www.smetgroup.be m³ excavated: 33.520m³ Dimensions of the wall: - 1,2m thick - 100m long - 10 à 15m deep - on both sides of the existing railway Project timbered trenches Rixensart RER Construction of retaining wall in difficult work conditions.
Transcript
Page 1: Smet Group Project timbered trenches Rixensart RER · Smet-F&C nv Kastelsedijk 64 B-2480 Dessel Smet Group Phone: 0032 14 38 96 96 E-mail: infosf@smetgroup.be Website: m excavated:

Smet-F&C nv

Kastelsedijk 64 B-2480 Dessel

Smet Group

Phone: 0032 14 38 96 96 E-mail: [email protected] Website: www.smetgroup.be

m³ excavated: 33.520m³ Dimensions of the wall:

- 1,2m thick - 100m long - 10 à 15m deep - on both sides of the existing railway

Project timbered trenches Rixensart

RER

Construction of retaining wall in difficult work conditions.

Recommended