35
SMITH PLAYGROUND: PHASE 2 Improvements to November 6, 2019 Boston Parks and Recreation
Transcript
Page 1: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

SMITH PLAYGROUND: PHASE 2Improvements to

November 6, 2019Boston Parks and Recreation

Page 2: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

AGENDA

PROJECT TEAM INTRODUCTION1

EXISTING CONDITIONS/RECENT IMPROVEMENTS2

PRESENTATION3

LISTENING & DISCUSSION4

CLOSING REMARKS & NEXT STEPS5

1

Page 3: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

PROJECT TEAMCathy Baker-EclipseProject [email protected] or 617-961-3058

Stantec Planning & Landscape ArchitectureKevin Beuttell, Project Manager

Conor NewmanOffice of Neighborhood [email protected]

Page 4: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

PROJECT SCHEDULE & FUNDING

NOV. 2019Community Meeting 1

JAN. 2020Community Meeting 2

FEB. 2020Community Meeting 3

WINTER & SPRING 2020Design Development + Construction Documents

SUMMER 2020Bidding

FALL 2020 – FALL 2021ConstructionEstimated cost of Construction:$4,500,000

FALL 2021Anticipated Park Opening

Page 5: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

PARKDESIGN

Safety Guidelines+Regulatory Guidelines

City of BostonPriorities

Parks + RecreationGoals

CommunityInput

PARKDESIGN

Page 6: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

CITY OF BOSTON PRIORITIES

• Expanding walkable access to parks

• Addressing equity

• Climate resilience

• Health

• Housing and community building

Page 7: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

PARK & RECREATION GOALS

• Preserve And Protect Existing Trees

• Expand Usable Park Area

• Improve Universal Access

• Enhance Park Visibility

• Improve Access to Parks

• Design Flexible, Multi-functional Park Spaces

Page 8: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

COMMUNITY MEETING PROCESS

• Meeting #1Project Introduction + Overview

• Meeting #2 (Winter 2019)Design Alternatives

• Meeting #3 (Winter 2020)Preview Final Proposed Design

Page 9: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

CAMBRIDGE

• William E. Smith Playground

• Established in 1890’s• 14-acre park• Currently includes

athletic courts, hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways.

Project Overview: Locus

SMITH FIELD

WATERTOWN

ALLSTON

BRIGHTON

BROOKLINE

Page 10: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

PARK c.2017

HockeyBasketball

Playground

Little League

Multi-purpose Fields

Softball

Page 11: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

MASTER PLAN

Page 12: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

MASTER PLAN

Page 13: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Master Plan

LOOKING EAST

Page 14: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Master Plan

LOOKING SOUTHWEST

Page 15: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

PHASE 1 OPENING

Page 16: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

PHASE 1

Page 17: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

• Weak organic subsoils• Drainage challenges

Project Overview

PHASE 1 TAKEAWAYS

Page 18: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

PHASE 2

Page 19: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

BALL FIELDS

Page 20: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

BALL FIELD AMENITIES

Page 21: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

BALL FIELD AMENITIES

Page 22: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

DOG PARK

Page 23: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

DOG PARK

Small Dogs3,640 sf

Large Dogs13,600 sf

Page 24: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

DOG PARK

Page 25: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

PLAYELEMENTS

Page 26: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

MASTER PLAN

Page 27: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Park that is FUN and filled with energy, excitement, discovery and contemplation

Master Plan

PLAY & INCLUSIVEDESIGN

Page 28: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.
Page 29: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

PLAY ELEMENTS

Page 30: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.
Page 31: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

PLAY ELEMENTS

Page 32: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Design

PLAY ELEMENTS

Page 33: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

LISTENING & DISCUSSION

Help us build great parks. Let us know what matters to you.

Page 34: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

Project Overview

PHASE 2

Page 35: SMITH PLAYGROUND: PHASE 2 · 06/11/2019  · hockey/bike polo rink, athletic fields, pump track, tot lot, amphitheater, sculpture and pathways. Project Overview: Locus. SMITH FIELD.

THANK YOU!

For questions, maintenance requests or concerns regarding any of our

parks contact 311

November 6, 2019Boston Parks and Recreation