Snam.it Gas Logistics - the new information system supporting the commercial planning and balancing...

Date post: 27-Dec-2015
Category:
Upload: shonda-bryant
View: 215 times
Download: 2 times
Share this document with a friend
Popular Tags:
59
snam.it Gas Logistics - the new information system supporting the commercial planning and balancing processes Workshop Antonio Anchora, Milly Aimi MILAN, 16 July 2014
Transcript

snam.it

Gas Logistics - the new information system supporting the commercial planning and balancing processes

Workshop

Antonio Anchora, Milly Aimi

MILAN, 16 July 2014

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Functions anticipated for the single release

• Interim

• Interactions with users & B2B communications

• Next Steps

• Contacts2

Introduction

• In order to overcome the constraints and technological obsolescence of the application

currently being used (CAMINUS/AltraWEB), as well as direct the management and the

support for the development of new commercial processes resulting from national and

European regulations, Snam Rete Gas has started a specific project to create a new

information system dedicated to the commercial area

• The initiative was launched in November 2012 with the establishment of a transversal work

group dedicated to directing the various requirements to all the internal and/or external

processes involved

3

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Functions anticipated for the single release

• Interactions with users & B2B communications

• Interim

• Next Steps

• Contacts4

Scope

5

• New application for the management of the Gas Logistics area to cover the planning process of the transportation, allocation and gas statement.

Planning and Programming of the transportation service

As an example:

• Annual Planning• Half Year Planning• Monthly Planning• Weekly Planning• Planning at 30 days• Planning Authority• Daily Planning (Nomination)• Intraday Planning (Re-

Nomination)• Management of products of

trading capacity• Balancing session

Calculation of the quantities of gas to be allocated to the

users of the transportation

As an example:

• Provisional Allocation and Statement

• Final Allocation and Statement

• Adjustment session• Default service• Temporary Supplier

Contracting of the transportation capacity on National and Regional network. Verification and management access services

Dispatching and physical management of the transportation network; measurement of the volumes and the quality of the gas

Invoicing of the transportation capacity, the commodity, considerations for disequilibrium, other considerations

Capacity Contracts Planning Dispatching &

MeasurementBalancing Invoicing

Related processes

NOT Related processes

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Functions anticipated for the single release

• Interim

• Interactions with users & B2B communications

• Next Steps

• Contacts6

The application solution (1/3)

• The decision-making process relative to the application solution to be created has gone through:

• a software selection of the solutions available on the market

• a verification of the functional coverage offered relative to the distinctive features of the Italian

market

• a verification of the constraints imposed by the various packages

• a comparison with the implementation choices made by other European Transporters, who

have turned to custom applications to meet their needs

• The new application solution identified anticipates the realisation of a custom application based

on the latest technologies.

7

The application solution (2/3)

8

Portale Capacità

Bacheca Capacità

PSV

Bacheca PSV

Portale Mercato

Portale OBS

M- gas

Portale Fatture

Portale GPIT

Portale A/D PdR

The application solution (3/3)

9

«SNAM Applications in use»

«WEB Applications in use»

Under construction

NLG

The application solution: conceptual model

10

Planning

Daily and Intraday Planning

Allocation & Statement of Provisional Transportation

Allocation & Statement of Final Transportation

Adjustment Sessions

Protocols X12 /

Edig@s …

USER INTERFACE

Integration other systems

PSV /Portal M

M-Gas Portal OBS SampeiCapacity

PortalPortal GPIT

Portal SRG

Shipper / Foreign Transportation Companies

SRG Shipper National &Foreign

TransportationCompanies

Balancing Trader

Storage and Regasification

Companies

GME Op. Extra

Business

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Functions anticipated for the single release

• Interim

• Interactions with users & B2B communications

• Next Steps

• Contacts11

Features of the new platform (1/2)

• High reliability in the continuity of the service guaranteed by adopting the latest generation technologies

• Reduction in the processing times and guarantee of their stability

• Easier to adopt new functional and/or regulatory changes through application modularity and configuration / parameterisation tools

• Preparation to support various communication protocols (Edig@s)

• Optimisation and expansion of the integration capacities and degree of accessibility of the system both in the internal SRG context and externally with third parties

• Exceeding the technological limits imposed by the current system (increase in performance, greater compliance and flexibility of adjustment relative to the regulations, the standards of ICT security....)

12

Features of the new platform (2/2)

• Improvement in the operating methods for all the Users of the Transportation Service (Users of the Balancing, Storage Companies, Regasification Companies, Foreign and National Transportation Companies, Balancing Traders...)

• Complete management of the versioning and tracking of the data

• Availability of the business data on the new system going back 5 years, which can be viewed in a single environment of reference

• Introduction of the Multi-Language option (Italian and English)

• Availability of integrated Help Online & Manuals features

13

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Functions anticipated for the single release

• Interim

• Interactions with users & B2B communications

• Next Steps

• Contacts14

Release strategy

15

• 4 subsequent releases according to a "by process" organization

Daily Nomination/Re-Nomination(Release 1)

Post Launch Support

Allocation and Provisional Statement(Release 2)

PlanningAllocation and Final Statement

(Release 3)

Adjustment session/Intraday Allocation

(Release 4)

Agenda

16

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Functions anticipated for the single release

• Interim

• Interactions with users & B2B communications

• Next Steps

• Contacts

Functionality: Access

• Explorer 11 certified application

• Guarantee compatibily with the main Browser (Firefox , Chrome)

• Access mode as is: one point access with unique authentication by Single Sign On (SSO) of Snam

17

Illustrative

• Home Page Nuova Logistica

18

Illustrative

Functionality (1/4)

Functionality (2/4)

19

• Filters: every upper part of the screens has filters that can be used by the dedicated function

Functionality (3/4)

20

• The user can select the language (Italian or English).

• After the selection every screen will be translated

Illus

trat

ive

Functionality (4/4)

21

• Every internal User can refer to on line Manual in Italian or English

• Also the Users of the Transportation Service (Users of the Balancing, Storage Companies…) can refer to dedicated On Line Manual (in Italian or English)

Agenda

22

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Functions anticipated for the single release

• Interactions with users & B2B communications

• Next Steps

• Contacts

Functions for the single Release

• With reference to the strategy for subsequent Releases according to a "by process" organization,

following are the particulars of the functions/features anticipated for each release

23

Release 1 Release 2 Release 3 Release 4

• Allocation & Provisional Statement

• Allocation & Final Statement

• Short, medium and long term planning

• Adjustment Session• Edig@s• kWh• Intraday Allocation• Matching

• Daily Planning• Intraday Planning

Release 1: Nominations

24

Principal Features in Release 1

• User Profiling (access to features and rights to

relevant data)

• Identification Base

• Management Nomination Cycles

• Supporting reports

Release 1 Release 2 Release 3 Release 4

Principal innovations introduced compared to AS IS

Master data harmonization

Intraday Renomination

Detail Nominations Shipper Pair

o Required EIC code Communications relative to the Nomination through

Protocol X12/GISB:o Nomination on RN for the Intraday Cycle pertaining to the

Balancing Session G+1 (by 5:00 p.m. on the Gas G day)o Intraday renomination on all the points of the RNo Capacity check on the import/export points at the same

time as the receipt of the NominationEnter Nominations through file upload More information to support the Nomination processes

Release 1 : Nominations – Receiving nomination

25

• The function ‘Receive Nominations' makes it possible for every authorized outside user to enter and change the nomination data relative to the meters on National Network RN and on Regional Network (NOR, NOC, etc.) for their own area of responsibility, in compliance with the deadlines set in the system for the receipt of the nominations.

Illustrative

Illustrative

Release 1 : Nominations – Input nomination

26

27

• Every authorized outside user, through this feature, can display the nominations for which they are responsible in the Collection Areas and on the National Network, including the nominations at the import points, national production, interconnections with regasification and storage plants and at the export points.

Illustrative

Illustrative

Release 1 : Nominations - Displaying nomination

• The function 'Display Nomination', supporting the nomination process, displays with daily details and schedule the nominations, entered in the NLG system by the users of the transportation service.

Release 1: Nominations – Details: nominations status

28

Nominations Status

Description

ACQ Acquired Nomination (from GUI and/or File, x12) ACT Acquired and cut nomination for initial control in relation to the available capacity (related

to cycle 1 and 2 of the day G-1)TCU Cut nomination for reduction of the exploitable capacity (in relation to intraday

nomination)TIN Incomplete nomination (from x12)TIT Incomplete and cut nomination (da x12)TCF Cut nomination for counterflowTVC Cut nomination after the cut for capacity change (related to cycle 1 and 2 of the day G-1)TGL Cut nomination, under capacity control MAT Matched nominationCNF Confirmed nominationANN Delated nomination

Day: 01/10/2012 Nomination Cycle C1 Unit of measure GJ

RN 296.185,0 296.185,0 0,0NOC 1.121.862,0 1.001.865,0 119997,0NOR 205.028,5 205.028,5 0,0SOC 202.594,9 202.594,9 0,0SOC 268.511,5 268.509,5 2,0MER 110.060,6 110.060,6 0,0

NOMINATION AT THE INTERCONNECTION POINT RN-RR

Area of CollectionNomination at

Entry pointNomination at exit

pointUser Name Difference

Release 1: Nominations – Report

29

• Aggregation and comparison reports:

IllustrativeUSER NOMINATION

31/10/2012 Cycle C1

User NameUnit of measure GJ

RN 34640200 465,0NOC 30000301 65,8NOR 30333001 221,4SOC 34657100 864,5SOC 34845701 9,4MER 50059001 42,4CEN 33122501 115,7

Area of Collection Meter Nominated

Illustrative

Release 2: Provisional Allocation & Statement

30

Release 1 Release 2 Release 3 Release 4

Principal Features in Release 2

• Provisional Allocation

• Provisional Statement

• Supporting reports

Principal innovations introduced compared to AS IS

Adjustment of the Reporting of the SCADA files of

Provisional Allocation

Adjustment of the SNP Reporting (Nomination

Statistics Collected)

Use of easier formats for reporting and integration of

the information supplied

Denominazione Utente Giorno Gas Versione

Area Log

Crea ed Esporta File Scada

Release 2: Provisional Allocation & Statement - File SCADA

31

• Below is the Provisional SCADA Report File template to display the data of the Provisional Allocation for

every Meter for the Gas Day, User of the Transportation, Publication Version of the Provisional Statement:

Release 2: Provisional Allocation & Statement - SNP Report File Template (1/3)

32

• Below is the SNP Report template to display Provisional Nominations and Allocations by User of the

Balancing and by single Area of Collection:

- The Nomination - Collection values are expressed in GJ

Component Total Single Pool Total MP Single Pool Total MNP Not Shared Shared Not Measured Daily Measured DailyCollected 47194,5 31406,3 13606,9 45013,2 0,0 2181,3 2181,3 20000 27194,5 2000 45194,5Nominated 42528,2 15056,0 24155,2 39211,2 0,0 3317,0 3317,0 30000 12528,2 3000 39528,2Meters 737 468 221 689 0 48 48 323 414 102 635

Component Total Single Pool Total MP Single Pool Total MNP Not Shared Shared Not Measured Daily Measured Daily

Collected 47194,5 31406,3 13606,9 45013,2 0,0 2181,3 2181,3 20000 27194,5 2000 45194,5Nominated 42528,2 15056,0 24155,2 39211,2 0,0 3317,0 3317,0 30000 12528,2 3000 39528,2Meters 737 468 221 689 0 48 48 323 414 102 635

Log Area

Nomination Statistics Collected for the user "Company Name of the User of the Balancing" information relative to the day 22/ 09/ 2013 - Version 1

Export Meters report (.xls)Export data displayed

Measurement Received Measurement Not Received

Export Meters report (.txt)

BackExport Meters report with Details (.xls) Export Meters report with Details (.txt)

Area of National CollectionMeasurement Received Measurement Not Received

CEN Area of Collection

Illustrative

Release 2: Provisional Allocation & Statement - SNP Report File (2/3)

33

• Below is the SNP Report template to display Provisional Nominations and Allocations by User of the

Balancing with details of the Meters for Area of Collection selected:

- The Nomination - Collection values are expressed in GJ- The Limit value is expressed n GJ

which contains 3000 Search Clean

Type Limit Rank Level

NOC 34606600 39211,2 204,6 Yes 2 MG Received Rank 35,5 1

NOC 30009401 39211,2 232 No MG Not Received

NOC 34203000 39211,2 232 Yes 33 NMG Not Received

Log Area

Export Report (.txt)

Export Report (.xls) Export Meters report with Details (.xls)

Back

Shared

Export Meters report with Details (.txt)

Nomination Statistics Collected for the user "Company Name of the User of the Balancing"information relative to the day 22/ 09/ 2013 - Version 1

Search the meter

Adjust AllocationMeasurement Type

Measurement Status

Area of Collection

Meter Nominated Collected No. Users

Illustrative

Release 2: Provisional Allocation & Statement - SNP Report File (3/3)

34

• Below is the SNP Report template to display the Nomination, Collection and Measurement/Estimate by

Physical Meter and Pool of the Collection Area selected:

- The value of Energy is expressed in GJ; Volume in Sm3; PCS in MJ/Sm3- The Nomination - Collection values are expressed in GJ- The Limit value is expressed n GJ

Energy Volume PCS Type Limit Rank LevelNOC 30347901 30347901 39211,2 45013,2 204,6 5276 38,779 No MG Not ReceivedNOC 30347902 30347902 39211,2 45013,2 204,6 5276 38,779 Yes 2 MG Not Received Percent 35,55

Log Area

Detail Meter for the user "Company Name of the User of the Balancing"information relative to the day 22/ 09/ 2013 - Version 1

Area of Collection

Export data displayed Close

Shared No. UsersAdjust Allocation

Aggregate Meter Nominated CollectedMeasurement/Estimate Measurement

StatusMeasurement

Type

- The value of Energy is expressed in GJ; Volume in Sm3; PCS in MJ/Sm3- The Nomination - Collection values are expressed in GJ- The Limit value is expressed n GJ

Energy Volume PCS Type Limit Rank LevelNOC 34606600 34606600 39211,2 45013,2 204,6 5276 38,779 Yes 2 MG Not Received Prorata ConsistentNOC 34606600 34606601 175,1 4530 38,649 MG Not ReceivedNOC 34606600 34606602 29,5 746 39,513 MG Received

Log Area

Export data displayed Close

Aggregate Nominated CollectedMeter

information relative to the day 22/ 09/ 2013 - Version 1Detail Meter for the user "Company Name of the User of the Balancing"

Adjust AllocationNo. UsersShared

Measurement/EstimateArea of Collection

Measurement Status

Measurement Type

Illustrative

Illustrative

Release 2: Provisional Allocation & Statement – Appropriate capacity Report

35

• The "Appropriate Capacity" report provides evidence of the capacity used in the provisional allocation

(appropriate capacity - adequate capacity - booked capacity) for the meter selected and for the period of

interest

Illustrative

Release 2: Provisional Allocation & Balancing - Allocation by Collection Area (1/2)

36

• Below is the template of the Collection Area Allocation report to display the provisional allocation of the

meter selected and of the relative period of interest:

Unit of measure: Nomination GJ; Allocation GJ; Volume Sm3; PCS MJ/Sm3

Day Collection

AreaMeter Quantity Nominated Quantity Allocated Difference PCS Volume Version

Last Modification

01/07/2012 RN 34640200 14,1 111,7 97,6 37,716 2.964 1 02/07/201202/07/2012 RN 34640200 14,1 111,7 97,6 37,676 2.967 1 03/07/201203/07/2012 RN 34640200 14,1 111,7 97,6 37,679 2.967 1 04/07/201204/07/2012 RN 34640200 14,1 111,7 97,6 37,688 2.966 1 05/07/201205/07/2012 RN 34640200 14,1 111,7 97,6 37,690 2.966 2 08/07/201206/07/2012 RN 34640200 14,1 111,7 97,6 37,689 2.966 1 07/07/201207/07/2012 RN 34640200 14,1 111,7 97,6 37,690 2.966 1 08/07/201208/07/2012 RN 34640200 14,1 111,7 97,6 37,691 2.966 3 11/07/201209/07/2012 RN 34640200 14,1 111,7 97,6 37,721 2.963 1 10/07/201210/07/2012 RN 34640200 14,1 111,7 97,6 37,705 2.965 1 11/07/201211/07/2012 RN 34640200 14,1 111,7 97,6 37,681 2.966 1 12/07/201212/07/2012 RN 34640200 14,1 111,7 97,6 37,683 2.966 1 13/07/201213/07/2012 RN 34640200 14,1 111,7 97,6 37,771 2.959 1 14/07/201214/07/2012 RN 34640200 14,1 111,7 97,6 38,032 2.939 1 15/07/201215/07/2012 RN 34640200 14,1 111,7 97,6 37,698 2.965 1 16/07/201216/07/2012 RN 34640200 14,1 111,7 97,6 37,716 2.964 2 18/07/201217/07/2012 RN 34640200 14,1 111,7 97,6 37,708 2.964 1 18/07/201218/07/2012 RN 34640200 14,1 111,7 97,6 37,685 2.966 1 19/07/201219/07/2012 RN 34640200 14,1 111,7 97,6 37,681 2.966 1 20/07/201220/07/2012 RN 34640200 14,1 111,7 97,6 37,671 2.967 1 21/07/201221/07/2012 RN 34640200 14,1 111,7 97,6 37,702 2.965 1 22/07/2012

Company name of the User of the BalancingAllocation by Area of Collection

July 2012

Release 2: Provisional Allocation & Balancing - Template Allocation by Collection Area (1/2)

37

• Below is the template of the Collection Area Allocation report to display the provisional allocation for all

the points of all the collection areas of the relative period of interest:

Unità di misura: Nomina GJ; Allocazione GJ; Volume Sm3; PCS MJ/Sm3

Giorno Area Prelievo

Misuratore Quantità Nominata Quantità Allocata Differenza PCS Volume Versione Ultima Modifica

01/07/2012 RN 34640200 14,1 111,8 97,7 37,717 2964 1 02/08/201302/07/2012 RN 34640200 14,1 111,8 97,7 37,677 2967 1 03/08/201303/07/2012 RN 34640200 14,1 111,8 97,7 37,679 2967 1 04/08/201304/07/2012 RN 34640200 14,1 111,8 97,7 37,688 2966 1 05/08/201305/07/2012 RN 34640200 14,1 111,8 97,7 37,690 2966 2 06/08/201306/07/2012 RN 34640200 14,1 111,8 97,7 37,690 2966 1 07/08/201301/07/2012 RN 35718200 212612,4 217626,8 5014,4 38,296 5682807 1 02/08/201302/07/2012 RN 35718200 172972,8 171349,5 -1623,3 38,351 4467927 1 03/08/201303/07/2012 RN 35718200 172972,8 168540,9 -4431,9 38,269 4404139 1 04/08/201304/07/2012 RN 35718200 172972,8 174162,9 1190,1 38,364 4539717 1 05/08/201305/07/2012 RN 35718200 172972,8 172330,6 -642,2 38,293 4500349 2 06/08/201306/07/2012 RN 35718200 172972,8 165397,6 -7575,2 38,050 4346844 1 07/08/201301/07/2012 RN 35718301 374572,1 381560,0 6987,9 38,403 9935792 1 02/08/201302/07/2012 RN 35718301 755478,6 768793,4 13314,8 38,397 20022287 1 03/08/201303/07/2012 RN 35718301 749650,9 745709,5 -3941,4 38,400 19419523 1 04/08/201304/07/2012 RN 35718301 699668,3 683314,7 -16353,6 38,406 17791803 1 05/08/201305/07/2012 RN 35718301 950464,7 988751,7 38287,0 38,440 25721616 2 06/08/201306/07/2012 RN 35718301 1112236,1 1105580,8 -6655,3 38,446 28757047 1 07/08/201301/08/2013 NOC 30009401 41,4 939,0 897,6 38,311 24510 1 02/08/201302/08/2013 NOC 30009401 41,5 695,2 653,7 38,291 18156 1 03/08/201303/08/2013 NOC 30009401 43,6 303,7 260,1 38,248 7940 1 04/08/201304/08/2013 NOC 30009401 49,3 80,9 31,6 38,276 2114 1 05/08/201305/08/2013 NOC 30009401 16,6 300,2 283,6 38,233 7852 2 06/08/201306/08/2013 NOC 30009401 11,4 817,2 805,8 38,286 21345 1 07/08/2013

Ragione sociale dell'utente del bilanciamento

Mese di Luglio 2012

Allocazione per Area di Prelievo

related to cycle 1 and 2 of the day G-1related to cycle 1 and 2 of the day G-1

Illustrative

Release 2: Provisional Allocation & Statement– Template Report Provisional Statement

38

• Below is the template of the Provisional Statement report to display the provisional statement for the

relative period of interest:

Illustrative

Release 3: Final Allocation & Balancing, Transportation Planning

39

Release 1 Release 2 Release 3 Release 4

Principal innovations introduced compared to AS IS

One input template for planning data

Management in "rolling" mode of the missing Nomination information with the Planning data and relative supporting report preparation

Use of easier formats for reporting and integration of the information supplied

Principal Features in Release 3

• Final Allocation

• Final Statement

• Short, medium and long term planning

• Supporting reports

Release 3: Final Allocation & Balancing, Template Final Statement Report

40

 Ritaglio schermo acquisito: 07/07/2014 09:32 

• Below is the template of the Final Statement report to display the Final Statement for the relative

period of interest:

 Ritaglio schermo acquisito: 07/07/2014 11:07 

Illustrative

Release 3 -Planning– Overview Planning Template

41

 Ritaglio schermo acquisito: 07/07/2014 09:32 

 Ritaglio schermo acquisito: 07/07/2014 09:32 

• The template for the input of planning data has the following structure:

o Head Informations (dislpayed in authomatic by LG)

Name of the users: Company name of the User

Period of interest: time interval for the planning

Unit of Measure: Unit of Measure used for planning data

o Planning informations

Meter: code meter displayed

Month/Day: quantity of gas to be transported displayed

% Market Shares: displayed as % of the quantity of gas

Total: displayed as total quantity of gas to be transported through a Meter for a Day/Month

 Ritaglio schermo acquisito: 07/07/2014 11:07 

User Name:

STATEMENT THERMAL YEAR 2014/2015

Unit of Measure GJ

User Name:

STATEMENT THERMAL YEAR 2014/2015

Unit of Measure GJ

… SEPTEMBERCivil

Taking (%)

Indusrtial Taking

(%)

Thermoelectric Taking

(%)

TOTAL

SEPTEMBERCivil

Taking (%)

Indusrtial Taking

(%)

Thermoelectric Taking

(%)

TOTAL

METER APRILCivil Taking

(%)Indusrtial

Taking (%)Thermoelectric

Taking (%)

METER OCTOBERCivil Taking

(%)Indusrtial

Taking (%)Thermoelectric

Taking (%)…

Release 3: Planning– Template Annual and Half-Yearly Planning

42

 Ritaglio schermo acquisito: 07/07/2014 09:32 

 Ritaglio schermo acquisito: 07/07/2014 09:32 

• Below is the template for the input of Annual and half-Yearly Planning

 Ritaglio schermo acquisito: 07/07/2014 11:07 

Head Informations

Head Informations

Planning Informations

Planning Informations

User Name:

STATEMENT June

Unit of Measure GJ 2014

08/06/2014Civil

Taking (%)

Indusrtial Taking

(%)

Thermoelectric Taking

(%)

… … 30/06/2014Civil Taking

(%)

Indusrtial Taking

(%)

Thermoelectric Taking

(%)

TOTALMETER 01/06/2014Civil Taking

(%)Indusrtial

Taking (%)Thermoelectric

Taking (%)

User Name:

STATEMENT June 2014

Unit of Measure GJ

30/06/2014Civil

Taking (%)

Indusrtial Taking

(%)

Thermoelectric Taking

(%)

TOTALMETER 01/06/2014Civil Taking

(%)Indusrtial

Taking (%)Thermoelectric

Taking (%)…

Release 3: Planning – Template Monthly and Weekly Planning

43

 Ritaglio schermo acquisito: 07/07/2014 09:32 

 Ritaglio schermo acquisito: 07/07/2014 09:32 

 Ritaglio schermo acquisito: 07/07/2014 11:07 

Head Informations

Planning Informations

Planning Informations

Head Informations

• Below is the template for the input of Monthly and Weekly Planning

Release 3: Planning– Template 30-days planning

44

 Ritaglio schermo acquisito: 07/07/2014 09:32 

 Ritaglio schermo acquisito: 07/07/2014 09:32 

• Below is the template for the input of 30-days planning

 Ritaglio schermo acquisito: 07/07/2014 11:07 

User Name:

STATEMENT Beginning date 24/05/2014

Unit of Measure GJ

23/06/2014Civil

Taking (%)

Indusrtial Taking

(%)

Thermoelectric Taking

(%)

TOTALMETER 24/05/2014Civil Taking

(%)Indusrtial

Taking (%)Thermoelectric

Taking (%)…

Head Informations

Planning Informations

Release 4: Sess. of Adjustment, Intraday Allocation, ...

45

Release 1 Release 2 Release 3 Release 4

Principal innovations introduced compared to AS IS

kWh Introduction protocol Edig@s to manage the

Nomination and Allocation messages

Principal Features in Release 4

• Adjustment session

• Intraday Allocation

• Display Matching data

• Additional supporting reports

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Interim

• Access method

• B2B Communications

• Next Steps

• Contacts46

Interim: Release 1

• For the planning of the activities for subsequent releases in accordance with an organization by process, below is an outline of the operations in relation to the application systems (old and new) given their coexistence during the transitional phase relative to the Nomination Management activities

47

• It will be used for the following activities:

Display of supporting identification information

Input, change, display Nomination information, both in web mode, for the authorized shippers, and X12

Display Reports Display nomination information with 5 year

history

• It will continue to manage:

Display and availability data of Provisional and Final Statement

Adjustment Session Input, change, display of Planning

information

Caminus SystemNLG System

48

• In addition to the functions already highlighted for Release 1, the NLG system will be used for the following additional activities:

Display and availability data of Provisional Statement

Display Allocation and Provisional Statement information with 5 year history

• It will continue to manage:

Display and availability data of Final Statement

Adjustment Session Input, change, display of Planning

information

Caminus SystemNLG System

Interim: Release 2

• For the planning of the activities for subsequent releases in accordance with an organization by process, below is an outline of the operations in relation to the application systems (old and new) given their coexistence during the transitional phase relative to the Allocation and Statement activities

49

• In addition to the functions already highlighted for Release 1 & 2, the NLG system will be used for the following additional activities:

Display and availability data of Final Statement

Input, change, display of Planning information

Display Allocation and Final Statement information with 5 year history

Caminus System

• It will continue to manage:

Adjustment Session

NLG System

• For the planning of the activities for subsequent releases in accordance with an organization by process, below is an outline of the operations in relation to the application systems (old and new) given their coexistence during the transitional phase relative to the Allocation and Final Statement activities

Interim: Release 3

50

NLG System

• In addition to the functions already highlighted for Release 1, 2 & 3, the NLG system will be used for the following additional activities:

Adjustment Session kWh Management of the Nomination and

Allocation messages through protocol Edig@s

Intraday Allocation

Display Matching data

Caminus System

• n.a. due to complete decommissioning

Interim: Release 4

• With regard to Release 4, focused on functional and regulatory enhancement, operations will be conducted entirely on the new system

Interim: Attention Points

• In the new platform will exist more data details, for example there will be 7 decimal numbers for the

data expressed in Energy (GJ), until the transition is completed we point out the coexistence of a

different method of managing the number of decimal numbers between the nomination and

allocation data.

• Simultaneous use of both systems (Caminus and NLG), maintaining the operations as is

• Where possible, setting up the data base with depth of five years according to the logic of NLG

51

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Interim

• B2B Communications

• Next Steps

• Contacts

52

Interaction Method with the Users

• Communication with the Users can take place in various ways

o Web interface Planning (GUI, File Upload) Allocations (GUI, File Download) Statements (GUI, File Download)

o B2B Integration - Protocol X12 Nominations

o B2B Integration - Protocol Edig@s Nominations Allocations

53

• Starting in March special information communications have been published of the Snam Rete Gas site for the Users relative to the development of the new system, containing information and instructions on the approach to adopt regarding the innovations introduced by the new platform.

• News of the solution: Increased Security Level

o the Snam Rete Gas Logistics System will use exclusively the HTTPS (HyperText Transfer Protocol over Secure Socket Layer) protocol in both directions, with authentication of the system (Basic Authentication).

o The coding of the message is not anticipated in the communications, only the transmission channel through Secure HTTP (HTTPS).

• Connectivity Test on HTTPS protocol completed in June (further details to follow)

54

Interaction Method with the Users: B2B Communications

Connectivity Test X12 - Results

• Number of Shippers who attended the connectivity test: 56

• Results at 30th June 2014 (end of the test)

Positive: 46 (82%)

Negative: 2 (3,5%)

Not attended: 8 (14,5%)

55

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Interim

• Access method & interaction with users

• B2B Communications

• Next Steps

• Contacts56

Next Steps

• Integration Test Release R1: July 2014 / August 2014 (ongoing)

• R1 System Tests: 2 weeks before the go live system, there will be a week for system test

57

Agenda

• Introduction

• Scope

• The application solution

• New Platform Features

• Release Strategy

• Functionality

• Interim

• Access method & interaction with users

• B2B Communications

• Next Steps

• Contacts58

Contacts

• Should you need clarifications, please contact the following:

[email protected]

Thank you for your attention

Contacts