SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works September 24, 2019 Road & Street Maintenance Supervisors’ Conference
Transcript
Page 1: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

SNOW & ICE RESPONSE

Tyler BemisPierce County Planning & Public Works

September 24, 2019 Road & Street Maintenance Supervisors’ Conference

Page 2: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

About Us

9/24/2019 2

Resources

Staff• 164 Road Ops• 25 SWM Ops• 26 Equipment Services

Equipment• 34 Heavy Trucks• 5 Motor Graders• 5 1Ton “Hit Trucks”

Page 3: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

➢ Truck Setup / Route Running➢ Plow/Sander Control Training➢ Snow Fighting Plan➢ Snow and Ice Fighting Equipment Maintenance➢ 1 Ton Plow Training for MW’s➢ Loads and Load Securement➢ Policies and Procedures➢ Intro to NIMS / ICS Training➢ iPad Training / 123 Survey➢ Communication / Media Outreach➢ Rivers 101➢ Chainsaw Training ➢ Chipper Safety Training➢ Anti-ice Day

Annual Emergency Preparedness Training

9/24/2019 3

https://youtu.be/bQhNcOS-_UA

Page 4: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

ECMF Salt Shed

9/24/2019 4

Page 5: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

9/24/2019 5

Emergency Response Plans – 4 PhasesPhase 1 – Prep & Readiness

• Driven by forecast

• Communication & Outreach

• Brief EICG

• Resource Staging

• Shift Changes

• Preventative Applications

Phase 2 – Transition to Response/ICS• Driven by conditions

• Communication & Outreach

• Brief EICG, recommend conf call as warranted

• Respond to isolated impacts

• Resources Assigned to Response Zones

Phase 3 – Response, Open Operations Center (ROC)• Impacts are occurring and are widespread

• Communication & Outreach

• Regular EICG Sit-reps

• Inclement Weather conf calls as warranted

• Social Media updates

• Normal M&O Ops are deferred

• 24hr Coverage

Phase 4 – Recovery, Return to Normal Ops• Driven by forecast and conditions

• May conduct Rapid Damage Assessment

• Communication & Outreach

• EICG Sit-reps as warranted

• Social Media updates as warranted

• Clean, repair, inventory resources

• Transition to normal shifts

• Resume normal M&O Operations

Page 6: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

9/24/2019 Presentation Title 6

Page 7: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

Emergency Plans

9/24/2019 7

28 Emergency Response Zones

Five Map SetsMap Set A

• 1,700 LM of Primary Roads

• Major arterials, life-line routes

• Principle Map Set when in Phase 3

Map Set B (subset of Map Set A)

• 650 LM of highest volume roadways

• Utilized when conditions overwhelm available

resources

Map Set C (subset of Map Set A)

• Multi-lane Arterials

• Utilized when available resources support multi-

truck plowing operations

Map Set D • 1,600 LM of residential, local access roadways

• Parsed out by developments within sub-zones

Map Set E (subset of Map Set A)

• Utilized for preventative liquid applications

• 760 LM of high risk areas

• Hills, curves, controlled intersections, shaded

areas, elevated structures

Page 8: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

February 1st 2019 - Initiate Phase 1

9/24/2019 8

Page 9: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

February 3rd 2019 - Phase 2

9/24/2019 9

Page 10: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

February 4th 2019 - Transition to Phase 3

9/24/2019 10

Page 11: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

February 5-8th 2019 - Continue Phase 3

9/24/2019 11

Page 12: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

Tactical Decision Point

9/24/2019 12

Facts:

• Forecast suggest emergency response needs likely to continue for several days or more,

• Most staff on 12hr shifts since Feb 3rd.

• Salt supply at 58% of 3,100 ton target

• Relative lull in weather impacts mid-week

• Beginning to receive salt & salt brine requests from contract agencies

Problem 1 – Crew Fatigue

Decisions:

• Short term- Staff afforded 8hr shifts and leave requests honored (until next round of severe weather)

• Long term- Developed plans to adjust shifts to 3 – 8hr shifts to provide 24hr coverage with modest LOS reduction.

• Sandwiches – provided each crewmember a 6” sub at beginning of shift

Problem 2 – Materials Re-supply

Decisions:

• Short term- Re-located sand supplies to utilize salt/sand blend until salt storages are adequate and/or emergency

response needs abate

• Interim term- Fuel resupply orders placed

• Long term- 2,000 ton order placed with primary salt vendor, guaranteed resupply of 60T per day until fulfilled

• Contingency 1,500 ton orders (PO) placed with WSDOT supplier as “insurance.” Confirmed with vendor (LTI) that

supplies at POS were adequate at that time.

Page 13: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

February 9-12th 2019 - Continue Phase 3

9/24/2019 13

Page 14: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

Tactical Decision Point

9/24/2019 14

Facts:

Compact snow/ice continues to impact many roads county-wide

Heavy accums of snow/slush impact most all residential roads

Most staff on duty since Feb 3rd.

WSDOT commandeered salt (from LTI), local trucking resources, fuel and

plow blades

Problem 1 – Crew Fatigue

Decisions:

• Short term- Reached out to other PPW divisions for support

• Sewer Utility staff with CDLs assigned to lower risk areas

• Long term- 3 – 8hr shift plans readied.

Problem 2 – Materials Re-supply

Decisions:

• Short term- Continue to pursue salt resupply alternatives

• Long term- 2,000 ton order placed with primary salt vendor, guaranteed resupply of 60T

per day until fulfilled

• Contingency 1,500 ton LTI order intiated. WSDOT directed LTI to decline PO. Negotiated

500 ton FOB.

Problem 3 – Increasing complaints about unplowed snow accums on secondary/residential roads

Decisions:

• Short term- Stand up Operations Task Force to focus on residential roads, AGO dash board, Snow Plow Hot Line w/web page

• Engage private sector for additional resources to support new task force

• Move 1T & 5yd plows into secondary roads as primaries are returned to bare/wet in each response zone

Page 15: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

9/24/2019 15

Page 16: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

9/24/2019 16

Page 17: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

Tactical Decision Point

9/24/2019 17

Facts:

Gig Harbor, Key Penn, Anderson Island impacted by up to 12” new accums

• Heavy tree damage affecting roadways, power outages

Heavy rain affecting central, south and east county

• Melt accelerated, local flooding

Heavy accums of snow/slush persists on all residential roads

Most staff on duty since Feb 3rd.

Salt re-supply progressing better than expected

Problem 1 – Crew Fatigue

Decisions:

• Short term- Reached out to other PPW divisions for support

• Sewer Utility with CDLs, SWM DM leading Residential Task Force, Traffic Ops

assigned to local flooding response, PIS supporting Snow Plow Hotline,

• Long term- 3 – 8hr shifts plans readied.

Problem 3 – Extensive tree damage in Gig Harbor, Key Penn, Anderson Island areas

Decisions:

• Short term- Shift CMF resources to GH, KP, AI as conditions warrant

• Secure rental chippers

• Engage private sector for additional resources to support residential task force

• Move 1T & 5yd plows into secondary roads as primaries are returned to bare/wet in each response zone

Page 18: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

Summary

9/24/2019 18

Duration:

Feb 3-15th in Phase 3

Resources:

Labor – 16.7K hours; $815K

Equipment Hours – 27K; $1.3M

Materials –

Salt – 2,700 ton; $440K

Sand – 1,700 ton; $26K

Brine – 33K gal; $11K

Total Costs: $2.7M

Page 19: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

Lessons Learned

9/24/2019 19

Staffing & Training

• Pro-active cross training

• CDL holders, plow/salt basics

• Chain saw & Utility Line safety

• Mobile device usage

Plans

• Minimize dependence on WSDOT contract

resources

• Improve response zone maps

• Cohesive segmentation

• Develop Hot Line implementation plans

• Exercise NIMS tactics PPW-wide

• Develop plans/contracts to provide employees

meals when warranted

• Develop basic snow removal plans (re-

location of problematic roadside snow

accums)

Tactics

• Engage PPW team members early

• Exercise NIMS expansion

• Ops Task Force

• Private sector oversight

• Improve real-time employee communication

Equipment, Materials & Tools

• Improve materials quantification capability

• Develop canned Ops Dash Boards

• Transition to single-product chloride

• Max capacity of salt sheds pre-winter

• Consider sand supply/logistics

Page 20: SNOW & ICE RESPONSE · SNOW & ICE RESPONSE Tyler Bemis Pierce County Planning & Public Works ... • Resume normal M&O Operations. 9/24/2019 Presentation Title 6. Emergency Plans

QUESTIONS?

Tyler Bemis(253)798-4948 or [email protected]

9/24/2019 20