Soar Catchment Management Plan 1 Soar Catchment Management Plan Version 2 March 2018
Transcript
Page 1: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

1

Soar Catchment

Management Plan

Version 2

March 2018

Page 2: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

2

Soar Catchment Management Plan

Written on behalf of the

River Soar Catchment Partnership

Page 3: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

3

Contents 1.0 Purpose of this document .......................................................................................................................... 4

2.0 The Catchment Based Approach ................................................................................................................ 4

3.0 River Soar Catchment ................................................................................................................................. 4

4.0 The Soar Catchment Partnership ............................................................................................................... 6

4.1 Soar Catchment Vision ........................................................................................................................... 7

4.2 Soar Catchment Partnership Objectives ................................................................................................. 8

4.3 Compelling Outcomes ............................................................................................................................ 9

5.0 Data and evidence .................................................................................................................................... 11

5.1 Methods for data analysis .................................................................................................................... 11

5.2 Soar Catchment Partnership Priorities ................................................................................................. 13

6.0 Establishing future areas of work ............................................................................................................. 20

7.0 Summary of Projects ................................................................................................................................ 20

8.0 Details of Projects ..................................................................................................................................... 24

9.0 Monitoring and Evaluation ....................................................................................................................... 47

10.0 Acknowledgements ................................................................................................................................ 48

Appendix – Extract of data table used as part of data and evidence analysis ............................................... 49

Page 4: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

4

1.0 Purpose of this document This document provides the baseline to take forward the work of the Soar Catchment Partnership. It

describes the Soar catchment and the issues that need to be tackled describes the data and evidence

approach that has been used to support the areas and project identified for future development.

The summary tables (page 22-23) show the multiple benefits for each project against the Soar Catchment

Partnership goals. Section 8.0 contains the specifications for each project including the current status of the

project; the lead organisation and next steps required to make it happen.

2.0 The Catchment Based Approach In 2012 Defra launched the Catchment Based Approach (CABA). The Catchment Based Approach

encourages organisations to manage land and water in a balanced way, by identifying the

pressures on the water environment, by working together to agree common objective and by

implementing solutions. A key principle is encouraging organisation to work in partnership and to

deliver a range of benefits through a single initiative.

3.0 River Soar Catchment The catchment of the River Soar covers an area of approximately 1,380 km2, covering much of the county

of Leicestershire. It rises between Hinckley and Lutterworth flowing north towards Leicester, the principle

urban area within its catchment. It is joined by the Grand Union Canal before Leicester. Other significant

towns include Wigston, Melton Mowbray and Loughborough. Downstream of Leicester it is joined by the

River Wreake from Melton Mowbray .The River continues through Barrow upon Soar, past Loughborough

and Kegworth before joining the River Trent near Ratcliffe-on-Soar in Nottinghamshire.

The catchment contains a variety of landscapes, including the Leicestershire Vales, the Nottinghamshire

and Leicestershire Wolds and Charnwood’s upland heathlands. The lower Soar valley forms part of the

Trent wash lands. The predominant geology is Keuper Marl interspersed with beds of Triassic Sandstone.

The dominant land use across the catchment is rural, mostly arable production with a small portion in

pasture. Diffuse nutrient pollution (phosphate) from agricultural runoff is considered to be a major

contributing factor to the overall WFD status of the catchment.

A significant amount of urban drainage reaches the Soar and a number of its smaller tributaries where it

flows through Leicester. Key issues causing water quality problems come from overflows from sewage

works, surface water runoff from quarry workings and the road network. The invasive species Floating

Pennywort is present in the low catchment but has been subject to a rigorous control programme so is

now in decline. There are also significant numbers of communities in some areas at risk of flooding within

the catchment.

Before CABA there were already many projects ongoing across the Soar that delivered benefits for the

water environment. However, few of them looked at the catchment as a whole. The Soar Catchment

Partnership has brought many well established organisations together to discuss their work and future

aspirations at the catchment scale. The work reinforces the strength of some of the existing projects, and

allows the partners to look more widely at opportunities to work with partners to bring about benefits that

may not be achievable by working alone.

Page 5: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

5

Figure 1 Map of River Soar Catchment Area

River Soar Catchment Area © Crown copyright and database rights 2017 Ordnance Survey 100024198

Page 6: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

6

4.0 The Soar Catchment Partnership The Soar Catchment Partnership (SCP) has been developed in response to the Defra Catchment Based

Approach policy using funding by Defra and the environment Agency (EA). A range of organisations have

been meeting to look at the options across the Soar since the start of 2014.

The Soar catchment partnership has a wide and active membership. The Catchment Based Approach has

brought a catchment scale focus to the members recognising the wider benefits that can be achieved

by a coordinated partnership. The organisations that attend the meetings are listed below.

Blaby District Council

British Canoeing

Canal and River Trust

Charnwood Borough Council

Country Landowners Association

Environment Agency

Game and Wildlife Conservation Trust

Harborough District Council

Leicester City Council

Leicestershire and Rutland Wildlife Trust

Leicestershire County Council

Inland Waterways Society

Loughborough Soar Angling Society

Melton & Oakham Waterways Society

National Farmers Union

Natural England

Oadby & Wigston Borough Council

Rushcliffe Borough Council

Severn Trent Water

Trent Rivers Trust (catchment host)

Waterside Care

Key pressures in the Soar Catchment

Diffuse pollution from roads and urban areas

Heavily modified river channels and loss of instream habitats

Rural point source and diffuse pollution

Separation of the river from its floodplain

Barriers to fish migration

Loss of riparian wetland habitats

Litter in the River Soar and its tributaries

Raised levels of phosphates

Risk of properties and roads flooding

Land use leading to flashy watercourses

Building and development too close to the watercourse

Lack of access to the river and conflicts of recreation users in sensitive areas

Lack of community awareness and engagement with water and rivers

Page 7: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

7

4.1 Soar Catchment Vision The Soar catchment partnership has an agreed vision for the long term on the River Soar.

Vision for the Soar Catchment Partnership

"A Soar catchment that has a sustainable and diverse water environment that benefits people, the natural environment and the economy of the local area.

A catchment in good ecological condition with improved resilience to climate change, flooding and pollution events”.

Page 8: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

8

4.2 Soar Catchment Partnership Objectives These objectives have been developed by the partnership over a number of workshops when the

partnership started out. Partners were asked to identify their key issues and they have been grouped

by subject area.

Long term objective Long term aspiration Enhance Biodiversity and Natural Processes

There is a rich and varied collection of habitats and species across the catchment within the river and the floodplain. Areas of high conservation value are in good condition and are connected by wildlife corridors. Fish can move freely throughout the catchment, with adequate areas for refuge and ample habitat for all life stages.

Support Sustainable Flood Risk Management

Rain water is stored and managed to reduce the risk of flooding. Rain water is held where it falls through the use of urban and rural sustainable drainage solutions wherever possible. Properties and livelihoods are not impacted by flood risk and are resilient to future climate change. Floodplains are managed to store flood water as well as providing other local benefits.

Work with Disadvantaged Communities

Partnership work, projects and access routes are linked to areas of economic deprivation. Partnership work and projects are benefiting deprived communities.

Promote Rural Livelihoods

Rural and agricultural communities are aware of and are engaged in delivering benefits for the water environment. Land is managed to enhance its value for water and biodiversity in ways that do not harm the farm business.

Strengthen Community Involvement and Recreation

There is a high level of public understanding of the importance of rivers and floodplains to provide places for people and wildlife. Communities are involved with a local river project. There is a range of recreation and accessible sites along the river and throughout the catchment.

Improve Water quality

Water quality from point and diffuse sources is improved. There is a raised awareness of pollution risk from residential, commercial, rural and urban sources.

Table 1 Objectives of the Soar Catchment Partnership

Page 9: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

9

4.3 Compelling Outcomes

The outcomes list below was generated at a partner event on 6th May 2015. Partners were

encouraged to prepare a set of outcomes from their own organisation before the meeting.

These outcomes were then presented and discussed at the meeting to establish where

there is ‘common ground’ between two or more partners. The outcomes were combined

and re-worded to better reflect a range of partners’ original outcomes.

The final list of outcomes was generated via discussion throughout the day and should

represent the priority outcomes from the organisations that were there on the day.

Work Area Outcome Additional notes 1) An enhanced

environment. Priority given to;

1.1 WFD improvements have been made

Emphasis given to improve fish passage, channel morphology, and floodplain connectivity where possible.

1.2 At least ten schemes have been delivered that achieve multiple benefits by 2020.

Include small scale as well as larger scale interventions.

1.3 Statutory and non-statutory protect sites are improved and enhanced.

2) Improved engagement and understanding from local communities, individuals, businesses.

2.1 Public understanding of the importance of rivers and floodplains for multiple benefits across the Soar has improved by 2020 compared to in 2015.

Difficult to measure

2.2 A land management engagement programme applicable to rural & urban areas delivered by 2017.

Working with farming as well as urban communities.

2.3 The wider benefits of SuDS are well known through dissemination of interpretation materials/publicity to both developers & the public by 2018.

Materials exist for developers to explain the SUDS that owners are taking on, the benefits are monitored an explained.

2.4 A number of well interpreted SUDS features exist across the catchment.

These include -An urban retrofit -A new development -Simple domestic SUDS features

2.5 A communication plan incorporating key messages, opportunities & resources for all interests is ready for implement-action by 2016;

To include a directory of expertise for the CP and Use of media to share knowledge within the CP. Incorporate community

Page 10: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

10

engagement, knowledge sharing and effective representation from community groups.

3) More people visiting, understanding & using the environment.

3.1 The Soar CP is supporting partners to provide access, interpretation and events across the Soar to attract and engage the public.

4) Work and projects planned and delivered.

4.1 The most beneficial places for land management interventions that deliver multiple benefits have been identified and mapped by 2016.

Map and text clearly show the benefits are achievable at each site, including public access, community involvement, FRM, WQ, Biodiversity. Also includes current status/level of progress of each site. Sites identified as having potential only.

4.2 A Catchment Management Plan in place by March 2017

4.3 Partners and service providers are providing long term sustainable support for projects and the partnership by 2020.

4.4 The Soar Catchment Partnership is maintained and has a secure financial base by 2017.

Table 2 Compelling Outcomes for the Soar Catchment Partnership

Page 11: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

11

5.0 Data and evidence A central theme for the Soar Catchment Partnership is for its work and priorities to be backed up by

evidence. A substantial amount of resource has been dedicated to exploring the data and evidence

base across the Soar to inform work and our future priorities.

The River Soar Catchment Partnership has reviewed a whole range of data and evidence for the

catchment to produce a set of strategic maps, to guide the partner organisations towards working

collaboratively on projects, which can benefit to people and the natural environment. For instance, if

a green infrastructure scheme is planned in Leicester to reduce the risk of surface water flooding,

with careful planning, the same scheme could also help clean up water pollution, provide much-

needed wildlife habitat, and afford recreation and health benefits to local people. This work has

resulted in a series of interactive maps, which set out the joint priorities of the partner organisations

across the whole catchment, and then provide more detail to help plan specific locations for

collaborative action. An extract from the data used is presented in Appendix XY.

The interactive maps is available online by clicking this link.

5.1 Methods for data analysis Given the large size of the catchment, priority maps were produced by summarising a whole range

of data against smaller units or sub-catchments. These ‘sub-catchment’ units are formed from

combining a number of waterbodies that share similar land use pressures and are shown in table 3

and in Figure 2 below.

Sub catchment No. of water bodies

Area (km2) Key land use in sub-catchment

Eye Catchment 10 203 Rural, upstream of Melton

Leicester Central 2 72 Heavily urbanised Leicester City Centre

Leicester East tribs 5 101 Eastern edge of Leicester including some rural areas

Leicester West Rural 2 140 Western edge of catchment outside of Leicester.

Lower Soar 5 189 Lowlands of the Soar before it reaches the Trent, downstream of Leicester

River Sence 5 206 Rural catchment to the south east of Leicester

River Wreake 5 213 Rural land downstream of Melton

Soar tribs West 6 129 North western corner of the River Soar

Upper Soar 6 206 Upper end of Soar upstream of Leicester and River Sence confluence

Table 3 Sub-catchments in the Soar Catchment

Page 12: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

12

Figure 2 Sub-catchments with the Soar Catchment Area

Page 13: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

13

5.2 Soar Catchment Partnership Priorities

As part of using the data and evidence base, it has been necessary to identity which sub-catchments are a priority for four of the different objectives where

suitable data were available (biodiversity, flood risk, water quality and disadvantaged communities). A series of scores for each sub-catchment have been

derived, based on available data and evidence, to highlight the areas which present the greatest priority for action and where multiple benefits can be

realised by collaborative action.

The 'wagon wheel' symbols shown on the map in Figure 3 represent the scores for each of the four objectives

These show which issues have been identified as being the most important to tackle in each sub-catchment. For example, if flooding and water quality and

community disadvantage all score highly, then this would be a good location to zoom in on the detailed maps to try and identify areas suitable for projects

that can provide a benefit for all these objectives.

Page 14: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

14

Figure 3 Map of Soar CP priorities for each water body, wagon wheels showing the relative priority for each theme. One wagon wheel per water body.

© Crown copyright and database rights 2017 Ordnance Survey 100024198

Page 15: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

15

The maps on the following pages are taken directly from the online mapping platform. They illustrate how the data has been summarised then presented in

mapped format categorised into the following themes; Biodiversity, Flood Risk, Water Quality and Disadvantaged Communities (Index of multiple

deprivation)

Page 16: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

16

Figure 4 Soar Catchment map (taken from online mapping), highlighting biodiversity and fishery issues

Page 17: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

17

Figure 5 Soar Catchment map (taken from online mapping), highlighting flood risk

Page 18: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

18

Figure 6 Soar Catchment highlighting (taken from online mapping), water quality issues and pollution incidents

Page 19: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

19

Figure 7 Soar Catchment highlighting disadvantaged Communities (showing Index of Multiple Deprivation taken from online mapping)

Page 20: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

20

6.0 Establishing future areas of work

A series of ‘Delivery Projects' have been developed by the Soar Catchment Partnership since it started

meeting in 2014. This working document identifies many of these projects and provides a draft

specification for work. As the partnership as discussed the projects, those with the most backing have

been developed further, while others with less backing have been dropped.

General principles used to identify and prioritise ‘Delivery projects’ for the Soar Catchment

The general methodology used to identify these projects are listed below:

At an event at Beedles Lake Golf Course in February 2014 a long list of projects were identified

by the partners. These were mapped and their status recorded (Potential, Planned, Ongoing,

Completed).

This list has been discussed, revised and refined during a number of meetings and partner

discussion. Other projects have been added to the list as new stakeholders have become

involved in the partnership and new project ideas have been developed. The list was reviewed

at another meeting In Woodhouse in December 2017.

This approach ensures that the limited resources of the CaBA partnership are used to develop

projects which attract the most support from the group and reflect the partnership priorities.

The rivers in the catchment are highly modified with significant industrial and urban pollution.

Catchment scale water quality and overall habitat are likely to be very difficult to bring back

in a way that will give high quality ecology due to multiple upstream sources of pollution and

pressure.

The projects is on rivers, groundwater and reservoirs where there will be multiple benefits.

The data behind the online mapping platform has been used with summary and water body

documents to focus in on the main opportunities which will bring multiple benefits.

Actions are assessed for how closely they meet the range of Soar CP objectives of 1)

Biodiversity and Natural Processes, 2) Flood Risk Management, 3) Rural livelihoods and

Farming, 4) Disadvantaged Communities, 5) Community Involvement and Recreation, and 6)

Water Quality.

The summary table below could be used to change or refine the suggested projects, in

consultation with the Catchment Partnership, to better deliver the catchment strategy.

Each project has a 'lead partner’ to drive it forward.

7.0 Summary of Projects The table below lists the projects identified within the Soar Catchment Partnership. Section 8 contains

the specifications for each project ‘Project Sheets’) including the current status of the project; the lead

organisation and next steps required to make it happen.

Projects are allocated a ‘Status’, indicating the level of priority for delivery and or development

assigned by the partnership. These priorities are correct as of March 2018.

Page 21: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

21

This level of status for the High and medium priority status projects was ratified at the Catchment

Partnership event in December 2017.

Project Status High priority – identified as being a key project, delivering multiple benefits and receiving widespread support

Medium priority – identified as being key projects and delivering multiple benefits.

Planned – identified as important projects with support delivering at least one major benefit. Currently inactive – projects that deliver SCP objectives but are not currently in a position to deliver.

Funded or Ongoing – projects delivering Soar CP objectives, funded from other sources

Page 22: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

22

Ref No. Project name Lead Partner Status Original Project No. Project sheet CMP?

SCPN / 001 Chronicles of Charnia NF High priority SCPN / 044 Yes

SCPN / 002 Sileby Brook TRT High priority SCPN / 043 Yes

SCPN / 003 Soar & Wreake Valley Living Landscapes L&RWT High priority SCPN / 025 Yes

SCPN / 004 Soar NFM EA High priority SCPN / 004 Yes

SCPN / 005 River Biam & Aylestone Meadows LCityC High priority

Yes

SCPN / 006 Kingston Brook RDC High priority SCPN / 017 Yes

SCPN / 007 River Eye SSSI Restoration NE High priority SCPN / 016 Yes

SCPN / 008 Thurnby Lodge LCityC High priority SCPN / 012 Yes

SCPN / 009 Braunstone Lakes LCityC Medium priority SCPN / 020 Yes

SCPN / 010 Kittys Brook, Glen Parva BDC Medium priority

Yes

SCPN / 011 Rushcliffe BOM Soar Valley Focus Area Rushcliffe BC Medium priority SCPN / 015 Yes

SCPN / 012 Ratcliffe Weir Fish Pass EA Medium priority SCPN / 022 Yes

SCPN / 013 Sycamore Way, Littlethorpe BDC Planned

Yes

SCPN / 014 Willow Brook Catchment Citizen Science TRT Planned SCPN / 024 Yes

SCPN / 015 Watermead Regeneation Corridor Charnwood BC Planned

Yes

SCPN / 016 Watermead Reed Bed LROS Planned SCPN / 008 Yes

SCPN / 017 Waterside Care WC Planned

Yes

SCPN / 018 Rothley Lodge Fry Refuge L&RWT Planned

Yes

SCPN / 019 Shared Waters LCityC Planned SCPN / 002 Yes

SCPN / 020 Phillip Drive, Glen Parva Blaby DC Planned

Yes

SCPN / 021 Oak Crescent Blaby DC Planned

Yes

SCPN / 022 Leicester Brooks Urban Diffuse Pollution and Control LCityC Planned

Yes

SCPN/ 023 Green Lifeboat LCityC Planned SCPN/018 No

SCPN/ 024 Ellis Meadows Community Engagement Project LCityC Planned SCPN/019 No

SCPN / 025 Diffuse pollution in the Willow Brook / Reaching Communities LCityC Planned

No

SCPN / 026 Diffuse pollution on the Wissendine Brook Sustainable LT Planned No

SCPN/ 027 Syston Hub MOWS Planned SCPN/003 No

Page 23: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

23

SCPN/ 028 Planting on County Farms / Upstream tree planting LCC Currently inactive SCPN/006 No

SCPN/ 029 River Soar and Grand Union Partnership projects LCityC / LCC Currently inactive SCPN/013 No

SCPN/ 030 Braunstone Lakes LCityC Currently inactive SCPN/020 Yes

SCPN/ 031 Wash Brook Catchment Project Oadby &Wigston BC Currently inactive SCPN/023 No

SCPN/ 032 Charnwood SSSI project NE Currently inactive SCPN/027 No

SCPN/ 033 Fish passage at Zouch Weir EA Currently inactive SCPN/030 No

SCPN/ 034-42

Fish Passage at Multiple weirs on the River Soar EA Currently inactive SCPN/031-038 No

SCPN/43 Groby Pool SSSI remediation NE Currently inactive

No

SCPN/44 Lockington Marshes SSSI remediation NE Currently inactive

No

SCPN/ 045 Wildlife Friendly Farming Project GCT Funded or Ongoing SCPN/029 No

SCPN/ 046 Phosphate removal at 13l waste water treatment works ST Funded or Ongoing SCPN/039 No

SCPN/ 047 Severn Trent Water Sewer Management Plan ST Funded or Ongoing SCPN/040 No

SCPN / 048 River Eye SSSI Catchment Project NE Funded or Ongoing SCPN /026 Yes

SCPN/ 049 Flood Risk Green Infrastructure project Leicester EA/LCC Funded or Ongoing SCPN/010 No

SCPN/ 050 Cropston / Swithland Catchment Farm Engagement ST Funded or Ongoing SCPN/028 No

Page 24: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

24

8.0 Details of Projects (Project Sheets).

Project Name: Charnwood Forest Landscape Partnership

(The Chronicles of Charnwood)

Project Overview Project Number SCPN / 001

Project Status: High Priority

Funding status Received Round 1 approval from HLF

Lead Organisation: National Forest Company

Project Manager: Sam Lattaway

Waterbody Number:

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Ease

of

Del

iver

y

✓✓ ✓✓ ✓✓ ✓ ✓✓✓ ✓✓ £3.6m

Project description: A Landscape Partnership application in the north western corner of the Soar catchment encompassing Charnwood Forest and unusual geology formations. Project working with a range of partners to conserve and promote this distinctive landscape and its heritage.

Maps / Photos: Any additional information

Next steps: An 18-month development phase leading up to Round 2 submission in Autumn 2019.

Page 25: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

25

Project Name: Sileby Brook Project

Project Overview Project Number SCPN / 002

Project Status: High Priority

Funding status Needs funding

Lead Organisation: TRT

Project Manager: Ian Underwood

Waterbody Number:

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Ease

of

Del

iver

y

✓✓ ✓✓✓ ✓✓ ✓✓✓ ✓✓

Project description: Work with Sileby Parish Council and others to enhance the corridor of the brook course within the village. Develop opportunities to improve flood management using storage areas along the brook, and with upstream landowners where appropriate. Enhance the habitat value of the brook by removing concrete lining where this is feasible.

Maps / Photos: Any additional information

Next steps: Work up details of scheme with PC, EA and Leicestershire County Council

Page 26: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

26

Project Name: Soar and Wreake Valley Living Landscape

Project Overview Project Number SCPN / 003

Contact Email: [email protected]

Project status: High Priority

Additional funding required?

Yes

Lead Organisation: Leicestershire and Rutland Wildlife Trust

Project Manager: Claire Install

Waterbody Number:

Waterbody Name: Soar and Wreake catchment

Location (NGR)

Last Reviewed: January 2017

Info. Publically available? **

Yes

Objectives and Costs (***please add ticks, based on scoring criteria in pink box)

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

( if

kno

wn

✓✓✓ ✓✓ ✓ ✓✓ ✓✓

Project Summary : A landscape-scale project based in the Soar and Wreake Valleys, part of the Wildlife

Trust’s ‘Living Landscape’ strategy.

Project description: The Ssoar and Wreake Valley identified as a landscapes with a large number of ecologically important sites, and would benefit from habitat improvement to make its wildlife resilient to future changes and pressures. Priority is to restore wildlife and wild places to the floodplains of the Soar and Wreak, to enable the floodplain to function more naturally to benefit nature and people. Continue to survey, acquire more land managed as Nature Reserves, carry out habitat enhancement works, and provide advice to landowners, centred around Cossington Meadows. Maps / Photos: Available on request

Next steps: Ongoing land owner advice and surveys to assess the habitat quality / direct future management.

Habitat connectivity mapping is an aspiration to direct future work.

Page 27: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

27

Project Name: Soar NFM

Project Overview Project Number SCPN/004

Project Status: High Priority

Funding status Trent FRCC application submitted Defra funding allocated

Lead Organisation: EA

Project Manager: Alex McDonald

Waterbody Number: Various

Waterbody Name: Various

Location (NGR) Upper Soar

Last Reviewed: Dec 2017

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Ease

of

Del

iver

y

✓ ✓✓✓ ✓✓ ✓ ✓✓ 200 2

Project description: Work with farmers and landowners to develop capital projects to deliver natural flood management features. Integrate with advice on good farming practise, enhanced biodiversity. Project targeted to upstream catchments where there is a flood risk downstream.

Feasibility study underway (February 2017) focussing on three areas, the Willow Brook, Wash Brook and River Sence, the Upper Soar and the Upper Eye

Maps / Photos:

Next steps: TRT and partners working with the EA to develop a business case to secure funding to deliver a

range of NFM schemes.

Page 28: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

28

Project Name: River Biam & Aylestone Meadows

Project Overview Project Number SCPN/005

Project Status: High Priority

Funding status

Lead Organisation: Leicester City Council

Project Manager:

Waterbody Number:

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Project description: What is the project doing to actually do? (150 words max if possible).

1. Siltation trap - to capture siltation/runoff from rural areas and off Lutterworth Brook - consider siltation trap

further back into catchment too

2. Naturalise brook to re-instate natural meander and reduce pressure of flooding onto Braunstone Ln East/Middle

St (possibly link in with IFRMS)

3. Create good habitat for otter and water vole previously recorded

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

Page 29: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

29

Project Name: Kingston Brook

Project Overview Project Number SCPN / 006

Contact Email: [email protected]

Project status: High Priority

Additional funding required? Yes

Lead Organisation: To be confirmed

Project Manager: To be confirmed (Paul Phillips for now)

Waterbody Number:

Waterbody Name: Kingston Brook

Location (NGR) Kingston Brook

Last Reviewed:

Info. Publically available? **

Yes

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

( if

kno

wn

✓✓ ✓ ✓ ✓ ✓✓✓

Project Summary : Project to improve water quality in the catchment area of the Kingston Brook

Project description: Project to improve water quality in the catchment area of the Kingston Brook, with the aim of achieving good ecological status. Other aims are to enhance biodiversity, landscape, access as well as reduce and store surface water run-off. Potential actions include channel modification, off line ponds, farm advice, silt traps and livestock control. Additional work required with Seven Trent Water to address sewage / water treatment capacity issues.

Maps / Photos: See https://en.wikipedia.org/wiki/Kingston_Brook

Next steps: Trent Valley Internal Drainage Board are currently mapping the brook, following this work detailed

actions and costings will be developed.

Page 30: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

30

Project Name: River Eye SSSI Restoration

Project Overview Project Number SCPN / 007

Project Status: High Priority

Funding status Additional funding required

Lead Organisation: TRT

Project Manager: Alan Graham

Waterbody Number: GB104028047550

Waterbody Name: Eye / Wreake from Langham Brook to Soar

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

✓✓✓ ✓ ✓✓

Project description: Modify the bank profile, install large woody material, create in channel features, promote sensitive riparian land management to enhance the natural features of the river promote its value for biodiversity.

Maps / Photos:

Next steps: Secure funding for remaining areas of restoration scheme. Support landowners to identify acres

where there is mutual benefit.

Page 31: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

31

Project Name: Thurnby Lodge, (Daykin Road), Willow Brook, Leicester

Project Overview Project Number SCPN /008

Project Status: High Priority

Funding status

Lead Organisation: Leicester City Council

Project Manager:

Waterbody Number:

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Project description: What is the project doing to actually do? (150 words max if possible).

1. Siltation traps - two smaller-scale traps to capture siltation upstream of weir - will link in with NRM further upstream and reduce need for major sediment clear-outs every few years within the park

2. Naturalise brook to re-instate meanders downstream of weir and into wet marshland area to temporarily inundate the area

3. Re- instate and restore wet- marshland habitat through re-profiling and digging out to create open-water and marshy areas

4. Gully guards and siltatation trap - near to Thurncourt Rd

4. Create good habitat for otter, water vole and kingfisher

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

Page 32: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

32

Project Name: Braunstone Lakes Enhancement Project 2

Project Overview Project Number SCPN / 009

Project Status: Medium Priority

Funding status

Lead Organisation: Leicester City Council

Project Manager:

Waterbody Number:

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Project description: What is the project doing to actually do? (150 words max if possible).

Raise awareness - campaign and active "zero tolerance" of point- source pollution from Ind

estate upstream

Raise awareness - campaign for mis-connections and reduce phosphates into Braunstone Brook

which flows into Lakes

Gully guards and siltation trap - near to Cort Cresent and Hinckley Rd

Dredge out Lake 2 (less polluted) followed by Lake 1 to remove toxins and aid fish and invertebrate recovery

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

Page 33: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

33

Project Name: Kitty’s Brook, Glen Parva

Project Overview Project Number SCPN / 010

Project Status: Medium Priority

Funding status

Lead Organisation: Blaby DC

Project Manager: David Gould

Waterbody Number:

Waterbody Name: Tributary of River Soar

Location (NGR)

Last Reviewed:

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

2 2 0 0 1 0

Project description: What is the project doing to actually do? (150 words max if possible).

This project involves a 200m length of this tributary of the River Soar. The main issues are collapsing banks,

and poor management of trees and vegetation, with some flytipped garden waste. The watercourse

receives surface water from several public sewers, originating in the Saffron catchment. There is some

involvement from Riparian owners. Historically Blaby District Council has checked and cleared debris from

the grid located on the watercourse before it is culverted beneath parish council land and housing.

Maps / Photos: Any additional information

Attached

Next steps: Key points for what needs doing next

Works to stabilise the banks of the watercourse

Management of the trees and vegetation bordering the watercourse

Application of NFM techniques to control and maintain flow.

Page 34: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

34

Project Name: Rushcliffe BOM - Soar Valley Focal Area

Project Overview Project Number SCPN / 011

Contact Email: [email protected]

Project status: Medium Priority

Additional funding required? Yes

Lead Organisation: Rushcliffe Nature Conservation Strategy Implementation Group

Project Manager: Paul Phillips

Waterbody Number:

Waterbody Name: River Soar

Location (NGR) River Soar

Last Reviewed:

Info. Publically available? **

Yes

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

( if

kno

wn

✓✓✓ ✓ ✓ ✓ ✓✓

Project Summary : Focal area identified within The Rushcliffe Biodiversity Opportunity Mapping

Project

Project description: Area identified within The Rushcliffe Biodiversity Opportunity Mapping Project with lots of potential for wetland/grassland developments along the whole of the river corridor, but with particular focus on the lowlands around Sutton Bonnington. Detailed actions are not yet identified.

Maps / Photos: see http://www.nottsbag.org.uk/pdfs/RushcliffeBOMReport2015_V3.pdf

Next steps: Development of an action plan and costings. Sourcing funding

Page 35: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

35

Project Name: Ratcliffe weir fish passage project

Project Overview Project Number SCPN/012

Project Status: Medium Priority

Funding status Funding required

Lead Organisation: EA

Project Manager: Karen Twine

Waterbody Number: GB104028047212

Waterbody Name: River Soar from Long Whatton Brook to Trent

Location (NGR) SK4924928806

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Ease

of

Del

iver

y

✓✓✓ ✓✓

Project description: What is the project going to actually do? (150 words max if possible).

Enabling fish passage between the Rivers Trent and Soar would help to address WFD objectives and Eel Regulations, allowing fish to move freely and access different habitat types, potentially improving spawning and recruitment success. This will also have socio-economic benefits as an improved fishery will interest more anglers.

Options for fish passage include technical fish pass or easement

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

Page 36: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

36

Project Name: Sycamore Way, Littlethorpe

Project Overview Project Number SCPN / 013

Project Status: Planned

Funding status

Lead Organisation: Blaby DC

Project Manager: David Gould

Waterbody Number:

Waterbody Name: Tributary of Cosby Brook

Location (NGR)

Last Reviewed:

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

1 2 0 0 0 1

Project description: What is the project doing to actually do? (150 words max if possible).

This project involves a unnamed tributary of Cosby Brook, which flows between several gardens in

Littlethorpe. The watercourse has a poor flow due to change of direction and backfall, together with

overgrown vegetation. It receives surface water from a number of sewers, including highway drainage.

There has been historical flooding and issuing of sandbags to protect several houses from highway derived

flooding.

Maps / Photos: Any additional information

Map attached

Next steps: Key points for what needs doing next

Clearance of overgrown vegetation from the watercourse towards confluence with Cosby Brook

Application of NFM techniques to maintain and control flow

Limited resident involvement so far

Page 37: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

37

Project Name: Willow Brook Catchment Citizen Science Project

Project Overview Project Number SCP / 024

Project Status: Planned

Funding status Funding required

Lead Organisation: TRT

Project Manager: Ruth Needham

Waterbody Number:

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Ease

of

Del

iver

y

✓✓✓ ✓✓

Project description: Working with communities to monitor water quality at set sampling points across the Willow Brook catchment. Data collected to track base line conditions and evaluate effectiveness of schemes upstream. Currently using the FreshWaterWater equipment and app to tool to engage with communities on water quality discussion.

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

Page 38: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

38

Project Name: Watermead Regeneration Corridor

Project Overview Project Number SCPN / 015

Project Status: Planned

Funding status

Lead Organisation: Charnwood Borough Council

Project Manager: Richard Brown

Waterbody Number:

Waterbody Name:

Location (NGR) Watermead Wanlip, Birstall, Thurmaston, west Syston

Last Reviewed:

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

1 1 1 2 2 1

Project description: What is the project doing to actually do? (150 words max if possible).

Watermead Regeneration Framework is a series of short (2018), medium (2021) and long term actions (2031)

Whilst Charnwood Borough Council is the Project Lead, many of the actions relate to Watermead Country

Park and will be delivered in partnership with Leicestershire County Council.

Project to be delivered by 2018 include:

Raising awareness of events in the Watermead area through marketing

Improved signage and entrances

Car parking strategy

New visitor centre (within the Country Park)

Encouraging educational use

Habitat interventions

Redeveloping Old School in Thurmaston Village Centre

New north south bridge to link County and City parts of Watermead Country Park

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

Establishing working groups for individual projects, engaging with key partners especially County and City

Councils.

Page 39: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

39

Project Name: Watermead Reedbed

Project Overview Project Number SCPN/016

Project Status: Planned

Funding status Needs funding

Project Owner: Leicester and Rutland Ornithology Group

Project Manager: Peter Williams

Waterbody Number: GB104028047030

Waterbody Name: Soar from Sence to Rothley Brook

Location (NGR): Watermead Country Park, Leicester

Last Reviewed: January 2017

Contact Email: [email protected]

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

✓✓✓ ✓✓ ✓✓ ✓✓ 25

Project Summary: Creation of reedbed at Watermead Country Park

Project description: Excavation and construction of an off-line reed bed reserve with the aim of improving the

wetland habitat of the area. The works will also have additional benefits in creating additional flood storage

capacity, water cleansing, fisheries improvement, landscape benefits and support Water Framework Directive objectives. The scheme has been designed to provide a priority wetland habitat as identified in the Biodiversity

Action Plan for Leicestershire & Rutland. Such habitats are scarce in Leicestershire and this scheme will benefit birds, (particularly Water Rail, Bittern, Little Egret, Reed Warbler, Sedge Warbler, Cetti's Warbler), Mammals

(Otter and Water Shrew), Fish - Roach, Bream, Chub, Dace, Perch and Pike, by providing a spawning area and backwater linked to the main river.

Maps / Photos

Plan of proposed reedbed

Location of proposed reedbed

Next steps

Drainage flood consent has been obtained from the Environment Agency. Planning permission is not required.

Secure funding.

Page 40: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

40

Project Name: WatersideCare

Project Overview Project Number SCPN / 017

Project Status: Planned / Ongoing

Funding status Requires funding from 1 April 2018

Lead Organisation: Keep Britain Tidy

Project Manager: Les Warren

Waterbody Number: All within catchment

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

1 1 1 1 2 1 £100,000 pa

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Project description: What is the project doing to actually do? (150 words max if possible).

WatersideCare is a project that supports volunteer groups to help clean up waterways across the Midlands.

Volunteers are provided with insurance, equipment, risk assessments, first aid training and access to

specialist knowledge on how to improve the health of waterways. Groups are encouraged to pick up litter

and heavy items from the waterways, check on water quality, assess outfalls, report and check up on

pollution and misconnections, remove invasive non native species and work with catchment partnerships

to promote community engagement. Volunteers also work on waterways to improve habitat management

and to increase the value that local residents see in the waterway

WatersideCare is a project managed by Keep Britain Tidy and funded by the Environment Agency, Severn

Trent and the Canal & River Trust. It employs two Project Officers to work with the 59 volunteer groups

currently across the Midlands, including six WatersideCare groups in the Soar Catchment

Maps / Photos: Any additional information

WatersideCare works with volunteer groups on the Willow Brook, Evington Brook, River Soar and Burleigh

Brook, involving around 100 volunteers in a regular clean up or water quality check, reporting the

information to the Project Officers who in turn provide a Project Report each month

Page 41: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

41

The Project, which has been going for seven years, is assessed annually through an evaluation with all

volunteers, and through the reports to the Steering Group. A very extensive set of Key Performance

Indicators are used to assess the performance of the project against agreed targets

An annual celebration event is held each year to thank the many volunteers and to showcase the inspiration

and success of volunteering. Social media is used extensively to promote the project, events and the success

of the volunteers

Keep Britain Tidy brings a very successful brand and track record to the Project, helping volunteers to be part

of a national #LitterHeroes campaign to get rid of litter and clean up local areas. The Charity also uses the

very successful Great British Spring Clean to encourage more volunteers to clean up grot spots

Next steps: Key points for what needs doing next

The WatersideCare Project is in need of funding to continue the work in the Midlands, including the Soar

Catchment

Page 42: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

42

Rothley Lodge and Cossington Fry Refuge

Project Overview Project Number SCPN / 018

Project Status: Planned

Funding status

Lead Organisation: Leicestershire and Rutland Wildlife Trust

Project Manager:

Waterbody Number:

Waterbody Name:

Location (NGR)

Last Reviewed:

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Project description: What is the project doing to actually do? (150 words max if possible).

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

Page 43: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

43

Project Name: Shared Waters

Project Overview Project Number SCPN / 019

Project Status: Planned

Funding status

Project Owner: Leicester City Council

Project Manager: Victoria Hudson

Waterbody Number: GB104028046980, GB104028046960

Waterbody Name: Willow Brook and Evington Brook

Location (NGR) SK 62102 85870

Last Reviewed: January 2017

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Ease

of

Del

iver

y

✓✓ ✓ ✓✓✓ ✓✓✓ ✓✓ 1

Project description: Range of work and projects to involve the local community in the Willow Brook. Includes litter picking, Invasive species removal, raising awareness.

Maps / Photos

Next steps

Extend work along other watercourses in Leicester

Page 44: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

44

Project Name: Phillip Drive, Glen Parva

Project Overview Project Number SCPN /020

Project Status: Planned

Funding status

Lead Organisation: Blaby DC

Project Manager:

Waterbody Number:

Waterbody Name: Ditch flowing into Grand Union Canal

Location (NGR)

Last Reviewed:

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

2 2 0 0 2 1

Project description: What is the project doing to actually do? (150 words max if possible).

This project focuses on a ditch that flows between residential gardens and the playing fields of South

Wigston Academy. It receives surface water from a public sewer that also drains several roads. The

discharge point for the sewer is close to the bed level . There are a number of overgrown trees on the

eastern bank of the watercourse, and this causes some root intrusion into the bed. The banks to the

gardens are eroded in places. The Academy has an educational wildlife area alongside the watercourse, but

the 2 do not appear to be connected at present. The flow is extremely slow at the confluence with the

Canal. There is some resident involvement, but the fence to the housing development inhibits access.

Maps / Photos: Any additional information

Attached

Next steps: Key points for what needs doing next

Management of trees and other vegetation alongside the ditch

Additional support for banks

Improved discharge point for sewer

Application of NFM techniques to maintain and control flow

Investigate potential for the watercourse and the educational wildlife area to be associated

Nuture community involvement, and improve access esp. through fenceline

Page 45: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

45

Project Name: Oak Crescent, Braunstone Town

Project Overview Project Number SCPN / 021

Project Status: Planned

Soar CP Action:

Funding status

Lead Organisation: Blaby DC

Project Manager:

Waterbody Number:

Waterbody Name: Lubbesthorpe Brook

Location (NGR)

Last Reviewed:

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

2 1 0 2 2 1

Project description: What is the project doing to actually do? (150 words max if possible).

This project involves a 50m stretch of Lubbesthorpe Brook, as it flows between Braunstone Town and

Thorpe Astley. There is an overgrown footpath on the southern side and residents ford the watercourse

with some antisocial behaviour and flytipping. The watercourse is bounded by significant potential habitat.

Several local residents prepared to be involved.

Maps / Photos: Any additional information

Google map attached with approximate 50m boundary indicated

Next steps: Key points for what needs doing next

Clearance of overgrown footpath

Fencing off of watercourse

Removal of flytipped material and cleansing of watercourse

Management of trees and other vegetation to enhance biodiversity

Page 46: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

46

Project Name: Leicester brooks Urban Diffuse Pollution and Control

Project Overview Project Number SCPN / 022

Project Status: Planned

Soar CP Action:

Funding status Amount required still to be confirmed

Lead Organisation: Leicester City Council

Project Manager: Louise Davis

Waterbody Number:

Waterbody Name: River soar & Connection water courses

Location (NGR)

Last Reviewed: Ongoing

Criteria for scoring objectives (0 – not an objective, 1-Minor objective, 2-Main objective)

Objectives and Costs

Bio

div

ersi

ty &

Nat

ura

l

Pro

cess

es

Flo

od

Ris

k

Man

agem

ent

Ru

ral

Live

liho

od

s

Dis

adva

nta

ged

Co

mm

un

itie

s

Co

mm

un

ity

Invo

lvem

en

t &

Rec

reat

ion

Wat

er Q

ual

ity

Co

st (

£K

(

Yes Yes Yes

Project description: What is the project doing to actually do? (150 words max if possible).

The project is aiming to identify the key locations along the river soar and connecting water courses within

the city boundary where silt and litter build up are a major issue. The issues may be related to poor water

flow, raised water level (during wet weather periods), sitting within identified flood risk areas, poor water

quality, impacting negatively on nature conservation.

The long term plan will be to identify new and innovative schemes of work to reduce the silt, litter build up,

and improve water flow, quality and navigation by leisure and working boats. The project will be considering

best methods and approach in terms of initial installation, clearance, improvement, ongoing maintenance

and lifespan of designs.

Maps / Photos: Any additional information

Next steps: Key points for what needs doing next

LCC Riverside project Manager and Conservation & Planning Team Leader to submit a draft outline proposal

of options for members’ approval before progressing with further project development.

Page 47: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

47

9.0 Monitoring and Evaluation

As part of promoting delivery, it is important to monitor the effects and impacts of the work and projects.

The Soar Catchment Management Group meets quarterly to review the development of the partnership and

of the management plan.

It is the role of each project leader to monitor and evaluate the benefits of their work and projects. Project

evaluation enables improvement in methods and techniques used for future work.

A monitoring and evaluation tool with associated support for the Catchment Partners to use it is currently in

development.

Page 48: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

48

10.0 Acknowledgements

The development of this Catchment Plan has been supported by WaterLIFE (LIFE13 ENV/UK/000497)

The Soar Catchment Partnership would like to acknowledge the support of the following organisations in

supporting the development of this plan.

The Trent Rivers Trust

Environment Agency

Defra

PJHydro

The Rivers Trust

Members of the Soar Catchment Partnership

Page 49: Soar Catchment Management Plan River Soar Catchment ... · Soar Catchment Management Plan River Soar Catchment Partnership 1 Soar Catchment Management Plan ... Barriers to fish migration

Soar Catchment Management Plan River Soar Catchment Partnership

49

Appendix – Extract of data table used as part of data and evidence analysis


Recommended