Social and Environmental Monitoring Report
This report has been submitted to ADB by the Gujarat Energy Transmission Corporation Limited (GETCO), Vadodra and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.
This social and environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Project Number: 44431-013 May 2017 Period: November 2014 – April 2015
IND: Gujarat Solar Power Transmission Project
Submitted by
Gujarat Energy Transmission Corporation Limited (GETCO), Vadodra
Social and Environmental Monitoring Report
Project Number: 4431-013
Date: 05.10.2015
Reporting Period: Bi Annual Report (1st November 2014 to 30th April 2015)
IND: Gujarat Solar Power Transmission Project
Prepared by
Gujarat Energy Transmission Corporation Limited (GETCO)
The Monitoring document is a document of the borrower. The views expressed herein do not necessarily
represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.
Asian Development Bank
TABLE OF CONTENTS
1. Abbreviations, Weights And Measures 3
2. Introduction 4
a. Project Description 5
3. Compliance Status With Statutory Environmental and Social Requirements 7
4. Compliance Status With The Environmental and Social Loan Covenants 8
5. Environmental Management and Monitoring 12
6. Component of Environmental Monitoring Plan 20
7. Involuntary Resettlement 20
8. Complaints And Grievances 23
9. Follow-Up Actions And Conclusions 23
10. Annexures 24
Abbreviations, Weights and measures
ADB – Asian Development Bank
CEA – Central Environmental Authority
DC or D/C – Double Circuit
DPR – Detailed Project Report
EA – Executing Agency
EHV – Extra High Voltage
EIA – Environmental Impact Assessment
EMP – Environmental Management Plan
EMoP – Environmental Monitoring Plan
FFA – Framework Financing Agreement
GETCO – Gujarat Energy Transmission Corporation Ltd.
GOG – Government of Gujarat
GoI – Government of India
GPCL – Gujarat Power Corporation Limited
GPCB – Gujarat Pollution Control Board
GRM – Grievance Redress Mechanism
ha – Hectare
HVDS – High-Voltage Distribution System
IA – Implementing Agency
IEE – Initial Environmental Examination
MOEF – Ministry of Environment and Forests
MP – Madhya Pradesh
MOP – Ministry of Power
MSL – Mean Sea Level
NIT – Notice of Inviting Tender
PTCC – Power Telecom Co-ordination Committee
PGCIL – Power Grid Corporation of India Limited
PLF – Plant Load Factor
PMU – Project Management Unit
RE – Rural Electrification
RP – Resettlement Plan
ROW – Right of Way
INTRODUCTION
The Government of Gujarat (GoG) and Gujarat Power Corporation Ltd (GPCL) are developing
all necessary infrastructure for a 500 MW solar park at Charanka Village, Patan District, Gujarat,
with the intention to encourage private developers to build solar generating capacity on a number
of individual plots of land. The onsite and offsite power transmission system associated with the
solar park is funded by ADB (thereafter referred to as the Gujarat Solar Power Transmission
Project or the Project).
The Project aims to support the development of long-term sustainable energy sources in a cost-
effective manner in India. The Project’s outcome is the successful development and operation of
a transmission link to evacuate power from the Solar Park at Charanka to the Gujarat
transmission grid. The proposed Project has been envisaged in consultation with GOI and other
beneficiary constituents for the reliable evacuation of the 500 MW generated at the solar park
from a 66/220/400 kV substation at Charanka, via two dedicated 220 kV and 400kV lines to the
existing 220 kV substation at Jangral and the 400 kV Sankhari substation. The two transmission
lines will be double circuit and have been routed differently in order to maintain adequate system
reliability.
In addition, as per Government of Gujarat Solar Power Policy, 2009 dated 06.01.2009, GETCO
has to construct the transmission system for evacuation of solar power from the switchyards of
each solar power generation plants. The Solar Park of 500 MW has been proposed with a mix of
Photovoltaic (PV) with a range of 5 MW to 25 MW and Concentrated Solar Power (CSP) with a
range of 25 MW to 50 MW. The power generated from PVs and CSPs will be evacuated at 66
kV level to the electrical pooling substation in the Solar Park through underground cables in
order to avoid shadow of transmission towers and conductors on Solar panels.
GETCO, State Transmission Utility (STU) and deemed licensee to operate in the State of
Gujarat, will be the executing agency (EA) and the implementing agency (IA) for the Solar
Power Transmission Project. GETCO will also be responsible for supervising project
implementation and monitoring of transmission project operational performance.
Gujarat Electricity Regulatory Commission (GERC) issued tariff order on 29 January 2010
(Order No. 2 of 2010) for procurement of power by distribution licensees and others from solar
energy projects in the State of Gujarat. The approved tariff is applicable to solar power projects
commissioned during the Control Period of two years ending on 28 January 2012. It was a
critical situation for GETCO to complete evacuation system of Charanka Solar Park before end
of the control period so that solar power producers can avail tariff approved by GERC. To
comply time bound target, GETCO executed portion of 14.52 Km of 220 KV transmission line
from Charanka to Jangral by its own fund and created a temporary evacuation system for
charanks solar park. Subsequently, ADB funded 220 KV transmission line is reduced to 96.13
Km. As the whole transmission line was funded ADB, hence ADB has insisted to perform a due
diligence of 14.52 Km portion of 220 KV transmission line, which was submitted on 28.07.2015
for ADB approval.
Based on detail survey before execution of 220 KV & 400 KV transmission lines, the alignment
is changed considering most appropriate route. Considering the same, updates and finalization of
Initial Environmental Examination (IEE), Environment Management Plan (EMP) &
Resettlement Plan (RP) are required under loan agreement for the project due to change in
alignment.
Due diligence of 14.52 Km portion of 220 KV transmission line along with update Initial
Environmental Examination (IEE), Environment Management Plan (EMP) & Resettlement Plan
(RP) for the portion of new alignment was submitted on 28.07.2015 for ADB approval.
1. Project Description
The Gujarat Solar Power Transmission Project will assist the Government of India (GoI) and
Government of Gujarat (GoG) to develop least-cost project implementation through various
physical outputs by 2014 such as:
(i) 400/220/66 kV substations at Charanka and Sankhari and 2 Nos 220 KV feeder bays at
Jangral S/S,
(ii) Supply & erection of 400/220 kV 315 MVA transformers, 400 kV Bus reactors and 220/66
kV 100 MVA transformers for Substations,
(iii) About 99.62 kms of 400 kV double circuit transmission line from the solar park to
Sankhari,
(iv) About 96.13 kms of 220 kV double circuit transmission line from the solar park to Jangral,
(v) Supply of 66 kV underground cables of about 140 kms for Charanka Park.
The project is estimated to cost US$ 130 Million (without IDCs and contingencies) with the
ADB share at $80 million. The erection/commissioning of all these facilities are to be
implemented by Gujarat Energy Transmission Corporation Limited (GETCO). GETCO, along
with GoG, will be the Executing Agency (EA) for the transmission and power evacuation
component. GETCO will be responsible for supervising project implementation and monitoring
of project operational performance. GETCO will establish a Project Management Unit (PMU)
headed by a Project Director to be responsible for day-to-day implementation of the Project.
GETCO is responsible for undertaking the Project in accordance with the Initial Environmental
Examination (IEE) and implementing the Resettlement Plan (RP) in accordance with ADBs
Safeguard Policy Statement 2009. The Project Management Unit (PMU) is responsible for
coordinating and implementing all social and environmental activities. The PMU has a
designated officer for Right of Way (ROW) clearances including environmental, social and
safety issues.
This bi-annual Safeguards Monitoring Report (SMR) is prepared by GETCO as is required as per
loan covenants under Schedule 5. GETCO will disclose the relevant information from this report
promptly to affected persons and ADB will disclose the document on its website as per its
Communication Policy (2011).
2. Compliance status with statutory environmental and social requirements
The sub-projects under this program should comply with the requirements of the following Acts, Rules, Notifications, Standards and
Policies of GoI, National / State / Local level statutory requirements:
Project section Clearances and NOC’s required Status Remarks
400/220/66 kV substations at
Charanka and Sankhari and 2 Nos.
220 KV feeder bays at Jangral S/S,
Approval of Chief Electrical Inspector
(CEI)
Land for Charanka substation is owned by Gujarat Power Corporation Ltd and provided on 07-05-2011 for construction of 400/220/66 kV substations for evacuation of power generated from Charanka Solar project. Land for Sankhari substation is provided by Govt. of Gujarat on 04-11-2011 for construction of 400/220/66 kV substations to facilitate power evacuation from Charanka Solar project. Jangral Substation is existing substation, where land acquisition is not required. Only 2 Nos. 220 KV feeder bays need to be constructed.
As the land is provided by GoG, hence there is no land acquisition and resettlement. Approval from Chief Electrical Inspector (CEI) will be taken at the time of commissioning of substation.
Supply & erection of 400/220 kV 315 MVA transformers, 400 kV Bus reactors and 220/66 kV 100 MVA transformers for Substations,
For charging of Transformer, approval of Chief Electrical Inspector (CEI) is required.
Approval from Chief Electrical Inspector (CEI) will be taken at the time of commissioning/ Charging the Transformer.
-do-
About 99.62 kms of 400 kV double circuit transmission line from the solar park to Sankhari,
Most feasible route selection considering all environmental & Social parameters, availability of logistics support during construction, operation and maintenance of transmission lines and specific geographical condition to construct the lines, relevant topographic maps and walkover surveys, etc. The angle points taken are minimum and only as per requirement.
400 KV transmission line:
400 KV transmission line package is awarded to M/s Gammon India Ltd. Date of commencement of 400 KV transmissions Line is 09.10.2013. Forest approval is obtained and submitted to ADB on 04.09.2015. In monitoring period i.e. from 1st Nov 2014 to 30th April 2015, 41 Nos. of tower foundations, 53 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed.
Railway, Forest & Road clearances is required accordingly.
(Cumulative- 191 Nos. of tower foundations,168 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed).
220 KV transmission line:
Contract for 220 kV double circuit lines package has been awarded to M/s L&T Ltd. In monitoring period i.e. from 1st Nov 2014 to 30th April 2015, 18 Nos. of tower foundations, 32 Nos. of tower erection and 36.750 route Km. of tower stringing have been completed. (Cumulative- 302 Nos. of tower foundations and 302 Nos. of tower erection and 93.710 route Km. of tower stringing have been completed).
About 96.13 kms of 220 kV double circuit transmission line from the solar park to Jangral,
Supply of 66 kV underground cable of about 140 kms for Charanka Park
Contract placed_ Complied.
3. Compliance status with the environmental and social loan covenants
Sr.
No.
Environment, resettlement and social safeguards
loan covenant
Status of compliance and developments during
current reporting period. Remarks
Environment, Health and Safety.
The State and GETCO shall ensure that the preparation, design, construction, implementation, operation and
commissioning of the project and all project facilities comply with:
1a All applicable laws and regulations of the Borrower
relating to environment, health and safety
GETCO is taking care that all applicable measures
and requirements of Environmental Safeguards in the
IEE, EMP during execution of project.
GETCO is also updated Initial Environmental Examination (IEE), Environment Management Plan (EMP) & Resettlement Plan (RP) for the portion of new alignment and perform Due diligence of 14.52 Km portion of 220 KV transmission line and was submitted on 28.07.2015 for ADB approval.
Due diligence of 14.52 Km portion of 220 KV transmission line along with update of Initial Environmental Examination (IEE), Environment Management Plan (EMP) & Resettlement Plan (RP) was submitted on 28.07.2015 for ADB approval.
1b The Environmental Safeguards
1c
All measures and requirements set forth in the IEE, EMP
and any corrective or preventive actions set forth in a
safeguards monitoring report.
Land acquisition and involuntary resettlement.
The State and GETCO shall ensure that all land and all rights-of-way required for the project are made available to the
works contractor in accordance with the schedule agreed under the related works contract and all land acquisition and
resettlement activities are implemented in compliance with:
Remarks
2a All applicable laws and regulations of the Borrower
relating to land acquisition and involuntary resettlement
For Substations purpose, Only Government waste lands have been considered, which does not involve any acquisition of private/ agriculture land. Hence, there is no land acquisition or involuntary resettlement. For Transmission Line purpose, the route alignment passes through shrub lands, cultivated and abandoned fields. No land acquisition is required for placing transmission towers. After placing transmission towers, land is given back to land owners. Hence there is no Land acquisition or resettlement involved in the project. However, for tree clearance/crop compensation/way leave etc, a provision of Rs 5,00,000 per kms has been provided in bidding documents of Tower package and bids were invited under ICB. The same would be paid to the affected farmers towards loss in agricultural production as per assessment of local Revenue officer in line with provision laid down in Point No. 5 & 6 of Clause No. 68 of The Electricity Act, 2003. * GETCO / Contractor will ensure all measures and requirements of original and updated IEE, EMP & RP at the time of execution of project.
No Land acquisition or any
involuntary resettlement.
2b The Involuntary Resettlement Safeguards
2c
All measures and requirements set forth in the RP and
any corrective or preventive actions set forth in the
safeguards monitoring report.
No Land acquisition or any
involuntary resettlement.
Provision of compensation
(towards loss in agricultural
production) has been
provided to affected farmers
in all three stages i.e.
foundation, erection &
stringing of lines.
Timing of physical or economic displacement.
Without limiting the application of the Involuntary Resettlement Safeguards or RP, the State shall ensure that no
physical or economic displacement takes place in connection with the project until:
Remarks
3a Compensation and other entitlements have been provided to affected people in accordance with the RP,
No physical or economic displacement.
3b A comprehensive income and livelihood restoration program has been established in accordance with the RP
No income and livelihood restoration program, as there is no physical or economic displacement.
Gender. Remarks
4
The State and GETCO shall ensure that the Gender Action Plan is effectively implemented, to achieve its objectives of, among others, enabling participation of women in employment, skills training and energy-based alternative livelihood activities.
Primary School of Charanka Village is developed/ renovated under GETCO CSR Plan. Detail Report in this regard was already submitted in previous monitoring report.
Development/renovation
work is completed.
4a Implementation of Gender Action Plan through Technical Assistance_ PDPU/ UN Women/ SEWA
Gujarat Solar Vocational Training and Livelihoods Project executed by UN Women, SEWA and PDPU under Technical Assistance (TA) is completed. Copy of the report submitted by PDPU was already submitted in last monitoring report.
Contractors.
GETCO shall ensure effective implementation of the following activities, including as required, that all bidding
documents and contracts for works contain provisions that require contractors to:
Remarks
5a
Comply with measures relevant to the contractor set forth in the IEE, EMP, and the RP, and any corrective or preventive measures set forth in a Safeguards Monitoring Report
GETCO along with contract will act as per
compliance during execution of project, pathway,
approach road was reinstated after execution. Any
kind of crop or tree damage is compensated as per
revenue authority assessment.
Safeguard requirement related to 14.52 Km portion
of 220 KV transmission line is compiled by GETCO
and Due Diligence report for the same along with
update Initial Environmental Examination (IEE) &
Resettlement Plan (RP) was submitted on 28.07.2015
for ADB approval.
5b
Provide GETCO with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the project that were not considered in the IEE, the EMP, and the RP.
5c Adequately record the condition of roads, and other infrastructure prior to starting to transport materials and construction, and
5d
Reinstate pathways, other local infrastructure, and land to at least their pre-project condition upon completion of construction.
5e Make available a budget for all such environmental and
social measures
A provision of Rs 5,00,000 per kms has been
provided in bidding documents of Tower package
and bids were invited under ICB.
Reporting on Safeguards.
The State shall do or cause GETCO to do the following:
Remarks
6a
Submit semi-annual Safeguards Monitoring Reports to
ADB and disclose relevant information from such
reports to affected persons promptly upon submission
GETCO is submitting all safeguard related aspects
through semi-annual Safeguards Monitoring Reports
and same will submitted accordingly. 6b
If any unanticipated environmental and/or social risk and impacts arise during construction, implementation or operation of the project that were not considered in the IEE, the EMP and the RP, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan
6c
Report any actual or potential breach in compliance with
the measures and requirements set forth in the EMP or
the RP promptly after becoming aware of the breach.
Indigenous Peoples. Remarks
7
The State and GETCO shall ensure that the project does
not impact indigenous peoples within the meaning of the
Safeguard Policy Statement. If due to unforeseen
circumstances, the project impacts indigenous peoples,
the State and GETCO shall take all steps necessary or
desirable to ensure that the project complies with all
applicable laws and regulations and that of the Borrower
and the State and with the Safeguard Policy Statement.
No impact as on date.
Labor Laws and HIV/AIDS awareness.
GETCO shall ensure that civil works contracts under the Project follow all applicable labor laws of the Borrower and
the State and that these further include provisions to the effect that contractors:
Remarks
8a
Carry out HIV/AIDS awareness programs for labor and disseminate information at worksites on risks of sexually transmitted diseases and HIV/AIDS as part of health and safety measures for those employed during construction
Awareness programs of HIV/ AIDS for labor community as a health and safety measures was organized in past.
8b Follow and implement all statutory provisions on labor (including not employing children as labor, equal pay for
GETCO along with contractor will ensure implementation of all labour law provisions during
equal work), health, safety, welfare, sanitation, and working conditions. Such contracts shall also include clauses for termination in case of any breach of the stated provisions by the contractors.
execution of projects.
Safeguard requirement related labour law for 14.52 Km portion of 220 KV transmission line is compiled by GETCO and same was submitted in Due Diligence report along with update Initial Environmental Examination (IEE) & Resettlement Plan (RP) on 28.07.2015 for ADB approval.
Grievances redressing mechanism. Remarks
9
The State shall maintain a grievance redress committee or committees with representation from all stakeholders in the project facilities for the purpose of addressing any grievances from affected peoples concerning resettlement, environment and any other social issues in a timely manner
A Grievance Redress Committee (GRC) consisting of the Panchayat Head, Project Engineer (Line in Field), Nominated district revenue officer as nodal officer and the designated official in GETCO dealing with safeguards has been established.
No grievances received to
date.
Information disclosure. Remarks
10
The State shall, or shall cause GETCO, to establish a website for the Project within three months of the Effective Date to disclose information regarding the project including procurement activities relating to the project
Same will be reported in GETCO website:
www.getcogujarat.com
4. Environmental Management and Monitoring
Project is under construction stage; hence compliance related to Environment Management Plan will be complied by GETCO/Contractor is as under.
Sr.
No.
Project
Activity
Potential
Environmental
Impact
Institutional
Responsibili
ty
Mitigation Action as per
Environment Management Plan
Mitigation Activity during reporting
period Remark
Pre-construction
1 Temporary use of land.
Impact to the existing environment.
Loss of agricultural productivity
GETCO/ Contractor
Selection of lands adhering to local laws and regulations Construction facilities should be placed at least 500 m away from water bodies, natural flow paths, important ecological habitats and residential areas
Substation land is waste land provided by Government. So there will be no impact to the existing environment.
Route alignment of most feasible route in terms of least disturbance to people or environment is considered and in line with that transmission lines are passing
through remote area and away from local community.
2 Substation location and design
Noise generation Exposure to noise,
Nuisance to neighbouring properties
GETCO
Substation designed to ensure noise will not be a nuisance.
As substation land is waste land away from local community. Hence there is no exposure to noise to general public.
Nearest community is almost 3-4 Km from site so there will be no nuisance to neighbouring properties.
Disturbance to the adjacent lands and the people due to cut and fill operations
GETCO
Maintained adequate clearance, construction of retaining structures, minimise cut and fill operations adjoining to the dwellings
Substation land is waste land covered by proper boundary, so there will be no loss/ disturbance to the adjacent lands and people due to cut and fill operations.
3
Location of transmission towers and transmission line alignment and design
Exposure to safety related risks
GETCO
Setback of dwellings to overhead line route designed in accordance with permitted level of power frequency and the regulation of supervision at sites.
Route alignment of most feasible route in terms of least disturbance to people or environment is considered.
All Safeguard requirements related to 14.52 Km portion of 220 KV transmission line is compiled by GETCO. Due Diligence report in the matter was submitted on 28.07.2015 for ADB approval .
Impact on water bodies/ land/ residences
GETCO
Consideration of site location to avoid water bodies or agricultural land as much as possible. Careful site selection to avoid existing settlements
4
Equipment specifications and design parameters
Release of chemicals and harmful gases in receptors (air, water, land)
GETCO
PCBs not used in substation transformers or other project facilities or equipment.
Equipment specifications and designs are standard and there will be no release of chemicals and harmful gases in receptors.
5
Encroachment into precious ecological areas
Loss of precious ecological values/ damage to precious species
GETCO
Avoid encroachment by careful site and alignment selection and reconnaissance before final sitting of activities. Minimise the need by using existing towers and RoW wherever possible
No encroachment into precious ecological areas takes place.
6
Involuntary Resettlement or land acquisition
Loss of land & structure
GETCO
Compensation paid for temporary/ permanent loss of productive land. No Involuntary Resettlement or land
acquisition takes place.
7 Encroachment into farmland
Loss of agricultural productivity
Not applicable to GETCO
Use existing tower footings/towers wherever possible. Avoid sighting new towers on farmland wherever possible. Farmers compensated for any permanent loss of productive land trees that need to be trimmed removed along RoW.
No encroachment into farmland.
Farmers are compensated for loss of agricultural productivity in any stages. Details related to compensation paid towards loss in agricultural production to affected farmers in all stages in reporting period is submitted as Annexure A.
Compensation paid towards loss in agricultural production is as per Electricity Act, 2003
8
Interference with drainage patterns/Irrigation channels
Temporary flooding hazards/loss of agricultural production
GETCO
Appropriate sighting of towers to avoid channel interference Appropriate provision or excess soil dug up from the cable trenches.
No temporary flooding hazards to date.
9 Explosions/Fire Hazards to life GETCO
Design of substations to include modern fire control systems/firewalls. Provision of fire fighting equipment to be located close to transformers, power generation equipment.
Many safety initiatives are taken or explained under safety drill like placing Color Codes for Helments, no explosives are being used till date for execution, appointment of Safety Incharge to ensure all safety requirement, etc, resulting no hazards to life due to any fire to date.
Construction
10
Removal or disturbance to other public utilities
Public inconvenience
GETCO
Advance notice to the public about the time and the duration of the utility disruption Use of well trained and experienced machinery operators to reduce accidental damage to the public utilities Restore the utilities immediately to overcome public inconvenience
Advance notice to the public is served
as per procedure.
There is no removal or disturbance to
other public utilities till date.
11
Acquisition of cultivable lands
Loss of agricultural productivity
GETCO, Contractor
through contract
provisions
Avoid faming season wherever possible for the project activities. Ensure existing irrigation facilities are maintained in working condition Protect /preserve topsoil and reinstate after construction completed Repair /reinstate damaged bunds etc. After construction completed Compensation for temporary loss in agricultural production
Farmers are compensated for loss of agricultural production in any stages of work as per assessment of revenue authority.
Compensation paid towards loss in agricultural production as per Electricity Act, 2003
12 Temporary outage of the electricity
Loss of power supply to the local community when distribution lines crossing the new transmission line are switched off
Contractor
GETCO
Advance notice to the public about the time and the duration of the utility disruption
Restore the utilities immediately to overcome public inconvenience
No Loss of power supply to the local community to date.
13 Equipment layout and installation
Noise and vibrations GETCO,
Contractor through contract
provisions
Selection of construction techniques and machinery to minimise ground disturbance.
Construction activity in substation and line is generally far from local community. Construction techniques and machinery will ensure no noise and vibrations impact minimal.
GETCO will take proper care while erection of Switchgear and other equipments.
SF6 leakage during storage and erection of Switchgear
Record of all substation switchgear, cylinders located within secure casings
14 Substation construction
Loss of soil
GETCO, Contractor
through contract
provisions
Fill for the substation foundations obtained by creating or improving local drain system.
As substation land is waste, barren land provided by Government. Hence there is no possibility of loss of soil or water pollution.
Peripheral drainage system was constructed in substations as per substation design.
Water pollution
GETCO, Contractor
through contract
provisions
Minimize construction activities involving significant ground disturbance (i.e. substation land forming) during the monsoon season. Provide drains and retention ponds if required.
15 Construction schedules
Noise nuisance to neighbouring properties
GETCO, Contractor
through contract
provisions
Minimize construction activities undertaken during the night and local communities informed of the construction schedule.
Mostly construction activities are not carried out during night hours.
Work is carried out with prior intimation to concern.
16
Provision of facilities for construction workers
Contamination of receptors (land, water, air)
GETCO, Contractor
through contract
provisions
Construction workforce facilities to include proper sanitation, water supply and waste disposal facilities.
Basic facility for construction workers is provided by contractor like tent, drinking water, medical facility (first-aid system), and vessels for domestic work. Hence there is no contamination of receptors (land, water, air) to date. Construction work is executed during day time and sanitation facilities for workers are provided in substation.
17 Surplus earthwork/soil
Runoff to cause water pollution, solid waste disposal
GETCO, Contractor
through contract
provisions
Excess fill from tower foundation excavation to be reused on site or disposed of next to roads or around houses, in agreement with the local community or landowners.
Location of soil filling site in Solar Park in consultation with GPCL.
After erection of any tower or structure, solid wastes are taken from site and soil is placed in original or nearby state as per local community request.
18
Wood/ vegetation harvesting,
cut and fill operations
Loss of vegetation and deforestation
GETCO, Contractor
through contract
provisions
Construction workers prohibited from harvesting wood in the project area during their employment. As transmission lines are passing
through remote area and away from local community. Hence, there will be no loss of vegetation of local people.
In addition to above, labour workers are educated by contractor for not disturbing local vegetation, hence there is no adverse effect on fauna.
Effect on fauna GETCO
Prevent work force from disturbing the flora, fauna including hunting of animal and fishing in water bodies. Proper awareness programme regarding conservation of flora, fauna including ground vegetation to all drivers, operators and other workers.
19 Site clearance Vegetation
GETCO, Contractor
through contract
Marking of vegetation to be removed prior to clearance, and strict control on clearing activities to ensure
Substation land is Government waste land hence there is no impact to the existing environment.
provisions minimal clearance.
Soil erosion and surface runoff
GETCO, Contractor
through contract
provisions
Construction near seasonal rivers, erosion and flood-prone areas should be restricted to the dry season.
Provision and maintenance of drains and retention ponds.
Treat clearing and filling areas against flow acceleration and construction work should be carefully designed to minimize obstruction or destruction to natural drainage.
Peripheral drainage system was constructed in substations to avoid soil erosion and surface runoff.
20 Mechanised construction
Noise, vibration and operator safety, efficient operation
Noise, vibration, equipment wear and tear.
GETCO, Contractor
through contract
provisions
Construction equipment to be well maintained.
Proper maintenance and turning off plant not in use.
Execution take place far from nearest community so there will be no noise and vibration.
Operator safety and equipment wear and tear will be observed as per our safety standards.
21 Construction of roads for accessibility
Increase in airborne dust particles
Increased land requirement for temporary accessibility
GETCO, Contractor
through contract
provisions
Existing roads and tracks used for construction and maintenance access to the site wherever possible.
New access ways restricted to a single carriageway width.
As execution take place far from nearest community so airborne dust particles will not cause any trouble to local community.
Land used for temporary accessibility and any agricultural damage will be compensated as per procedure.
22 Transportation and storage of materials
Nuisance to the general public
GETCO
Transport loading and unloading of construction materials should not to cause nuisance to the people by way of noise, vibration and dust
Avoid storage of construction materials beside the road, around water bodies, residential or public
Transportation & storage of materials is kept in a way to minimize any hazard to local community & workers.
sensitive locations
Construction materials should be stored in covered areas to ensure protection from dust, emissions and such materials should be bundled in environment friendly and nuisance free manner
23 Trimming/cutting of trees within RoW.
Fire hazards
Loss of vegetation and deforestation
GETCO, Contractor
through contract
provisions
Trees allowed growing up to a height within the RoW by maintaining adequate clearance between the top of tree and the conductor as per the regulations. Trees that can survive pruning to comply should be pruned instead of cleared. Felled trees and other cleared or pruned vegetation to be disposed of as authorized by the statutory bodies.
Most appropriate route of minimum vegetation was selected and accordingly execution activity was planned.
Currently work related to tower foundation, tower erection and stringing is under progress, so there is no Trimming/cutting of trees within RoW.
At the time of commissioning of transmission lines, trimming/cutting of trees obstructing line will be planned.
24 Health and safety
Injury and sickness of workers and members of the public
GETCO (Contractor
through contract
provisions)
Contract provisions specifying minimum requirements for construction camps. Contractor to prepare and implement a health and safety plan and provide workers with required PPE.
Contractor to arrange for health and safety awareness programmes
GETCO will work as per GETCO’s Safety Manual.
Many safety initiatives are taken like
placing Color Codes for Helments,
Appointment of Safety Incharge, etc.
25 Nuisance to nearby properties
Losses to neighbouring land uses/ values
GETCO (Contractor
through contract
provisions)
Contract clauses specifying careful construction practices. As much as possible existing access ways will be used.
Productive land will be reinstated following completion of construction
Compensation will be paid for loss of production, if any.
As mentioned above, best feasible/ possible route was selected and accordingly execution activity was planned.
As construction activity is generally far from local community and route is in mostly waste/ barren & agriculture land. Hence there is no possibility of any kind of nuisance to local peoples.
Any loss/ damage of crop is compensated as per procedure.
Operation and Maintenance Phase
26 Electric shock Death or injury to the workers and public
GETCO
Security fences around substation Establishment of warning signs Careful design using appropriate technologies to minimise hazards
Would be complied during operational stage.
Would be complied during operational stage.
27 Noise generation
Nuisance to the
community
around the site
GETCO Provision of noise barriers near substation sites
28 Soil Erosion Removal of top soil
GETCO Planting of buffer zone species suitable for arid climate.
29
Maintenance of Transmission line
Exposure to electromagnetic interference
GETCO
Transmission line design to comply with the limits of electromagnetic interference from overhead power lines
30 Substation maintenance
Exposure to electromagnetic interference
GETCO Substation design to comply with the limits of electromagnetic interference within floor area
31 Oil spillage Contamination of land/nearby water bodies
GETCO
Substation transformers located within secure and impervious bundled areas with a storage capacity of at least 100% of the capacity of oil in transformers and associated reserve tanks.
32 Operation of Switchgear
Leakage of SF6 gas
GETCO Record of all substation switchgear located within secure casings
5. Component of Environmental Monitoring Plan:
Sr. No. Component of Environmental
Monitoring Plan
Institutional
responsibility Current Project Stage
1 Air quality
GETCO/
contractor
Construction of substation & transmission line activities does not envolve
major construction. It is moreover assembling work with minor civil
work.
Such kind of activities (assembling with minor civil work) are not going
to change/ affect any air, water, noise and soil quality of the area. It has a
temporary impact which will not affect local community or existing
environment.
2 Water quality
3 Noise and vibration
4 Soil quality
6. Involuntary Resettlement
Involuntary Resettlement as per project components implementation of the SRP(s) are explained as under:
SN Component of SRP Institutional
responsibility Status to date
Activities
done /
developments
1. 400/220/66 kV substations at Charanka and Sankhari and
2 Nos. 220 KV feeder bays at Jangral S/S:
- Make detailed resettlement planning for standing crops compensation on this GPCL-owned land for non-titled affected people
- Give notice to harvest seasonal crops or compensate for crops at market value
- Report on consultation, information disclosure of entitlements and grievance mechanism in local language, the chosen cut-off date, date of identity card distribution and payment of compensation before the start of the works.
220 kV Bays at Jangral Substation:
- The land is reported to be “within the existing premises of GETCO” and at current, no resettlement or compensation issues are expected.
- Report on any changes with regard to resettlement or compensation at this site.
GETCO/
contractor
Land for substation in Charanka and Sankhari is
Govt. Waste land, hence there will be no
resettlement.
Consultation with local people is carried out
regularly. In case of transmission line, consultation is
carried out before execution of work in all the stages.
Work is not executed without consultation.
Construction
activity is
under
progress.
SN Component of SRP Institutional
responsibility Status to date
Activities
done /
developments
400 kV Bays at Sankhrai Substation:
- About 5 acres of land required, belonging to the government. At current it is reportedly valued as “totally flat and barren with light shrubs and trees”. At current, no resettlement or compensation issues are expected.
- Report on any changes with regard to resettlement or compensation at this site.
2. Supply & erection of 400/220 kV 315 MVA
transformers, 400 kV Bus reactors and 220/66 kV 100
MVA transformers for Substations
GETCO/
contractor
Involuntary Resettlement is Nil in supply of
transformer.
3. About 96.13 kms of 220 kV double circuit transmission
line from the solar park to Jangral.
- Make detailed resettlement and compensation planning for access roads temporary loss of land, loss of trees and crops, etc.
- give notice to harvest seasonal crops or compensate for crops at market value
- report on consultation, information disclosure of entitlements and grievance mechanism in local language, the chosen cut-off date, date of identity card distribution and payment of compensation before the start of the works. GETCO/
contractor
No Land acquisition take place, only land is used for
execution of transmission tower work and as per
Indian Electricity Act, 2003 farmers are compensated
for loss of agricultural productivity in any stages of
work up to reporting period.
In monitoring period i.e. from 1st Nov 2014 to 30th
April 2015, 18 Nos. of tower foundations, 32 Nos. of
tower erection and 36.750 route Km. of tower
stringing have been completed.
(Cumulative- 302 Nos. of tower foundations and 302
Nos. of tower erection and 93.710 route Km. of
tower stringing have been completed).
GETCO executed portion of 14.52 Km of 220 KV
transmission line from Charanka to Jangral by its
own fund and created a temporary evacuation system
for charanks solar park. Subsequently, ADB funded
220 KV transmission line is reduced to 96.13 Km.
Due diligence report for mentioned 14.52 Km portion
of 220 KV transmission line was submitted on
28.07.2015 for ADB approval.
Consultation with local people was carried out
regularly. Future consultation will be communicated
Construction
activity is
under
progress.
SN Component of SRP Institutional
responsibility Status to date
Activities
done /
developments
in future Bi annual report.
4. About 99.62 kms of 400 kV double circuit transmission
line from the solar park to Sankhari.
- Make detailed resettlement and compensation planning for access roads temporary loss of land, loss of trees and crops, etc.
- give notice to harvest seasonal crops or compensate for crops at market value
- report on consultation, information disclosure of entitlements and grievance mechanism in local language, the chosen cut-off date, date of identity card distribution and payment of compensation before the start of the works.
GETCO/
contractor
400 KV transmission line package is awarded to M/s
Gammon India Ltd. Date of commencement of 400
KV transmission Line is 09.10.2013.
In monitoring period i.e. from 1st Nov 2014 to 30th April 2015, 41 Nos. of tower foundations, 53 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed. (Cumulative- 191 Nos. of tower foundations,168 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed)
Construction
activity is
under
progress.
5. Supply of 66 kV underground cable of about 140 kms for
Charanka Park.
GETCO/
contractor
Cable supply is in ADB Package and Involuntary
Resettlement is nil in cable supply.
Sr. No. Tower No.Name of the
Village
Name of
the
Districts
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/
No)
Owners
hip
(Agricul
ture) or
Govern
ment
Number
of
Affected
Persons
/Househ
olds/Fa
milies
Name/s of the Owner in case of
Agriculture Land
Founda
tion
Comple
ted
(Yes/No
)
Erection
Complet
ed
(Yes/No)
Stringin
g
Complet
ed
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
foundation
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringing
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of Crop
Compensation
(Rupees) paid
for Stringing
Other
Impacts
such as
approach
road,
additional
area
during
execution
of work
(yes/No)
If Yes,
area for
crop
damage
(hectare)
Names of Affected
Persons
Amount of
Crop
Compensati
on (Rupees)
paid for crop
damage
1 13A/0 Sidhada Patan Yes Agri 1 Dharsibhai Rugnathbhai Thakor Yes Yes Yes Yes Yes Yes 1500 25000
2 13B/0 Sidhada Patan Yes Agri 1 Dhrshibhai Rugnathbhai Thakor Yes Yes Yes Yes Yes Yes 1208 20000
3 13 B/0-1 Sidhada Patan Yes Agri 1 SAKINABEN M. THEBA Yes Yes Yes Yes Yes Yes 640 11000
4 13B/1 Sidhada Patan Yes Agri 1 Miyabhai Sahenkhan Ghori Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000
5 13B/1 to 13B/2 Shidhada Patan Yes Agri 1 Zakirkhan Rasulkhan Theba Yes Yes Yes Yes Yes Yes 452 7500
6 13B/2 Sidhada Patan Yes Agri 1 Babiben Karimkhan Theba Yes Yes Yes Yes Yes Yes 880 15000
7 13 B/2 Sidhada Patan Yes Agri 1 ALIMAMAD R.THEBA Yes Yes Yes Yes Yes Yes 600 17000
8 13 B/2- 3 Sidhada Patan Yes Agri 1 JUSHALBHAI V.RAUMA Yes Yes Yes Yes Yes Yes 880 15000
9 13 B/2-3 Sidhada Patan Yes Agri 1 RAMZANBHAI T.THEBA Yes Yes Yes Yes Yes Yes 740 20000
10 13 B/2-1 Sidhada Patan Yes Agri 1 ABDULKHAN R.THEBA Yes Yes Yes Yes Yes Yes 640 11000
11 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Zahirkhan R Terba Yes Yes Yes Yes Yes Yes 306 5000
12 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Alimamad R Terba Yes Yes Yes Yes Yes Yes 306 5000
13 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Ramjanbhai T Terba Yes Yes Yes Yes Yes Yes 306 5000
14 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Jushalbhai V Rauma Yes Yes Yes Yes Yes Yes 306 5000
15 13B/3 Sidhada Patan Yes Agri 1 Nagori Jambhai Punjabhai Yes Yes Yes Yes Yes Yes 909 909 1513 15000 15000 25000
16 13B/3 to 13B/4 Shidhada Patan Yes Agri 1 Harunbhai Karemkhan Theba Yes Yes Yes Yes Yes Yes 724 12000
17 13B/3 to 13B/4 Sidhada Patan Yes Agri 1 Theba Rematkhan M. Yes Yes Yes Yes Yes Yes 960 16000
18 13 B/4 VARAHI Patan Yes Agri 1 JIVABHAI B.RABARI Yes Yes Yes Yes Yes Yes 1040 18000
19 13 B/5 KORADA Patan Yes Agri 1 DANIBEN AYUBKHAN MALEK Yes Yes Yes Yes Yes Yes 2080 35000
20 13 B/6 VARAHI Patan Yes Agri 1 MASABHAI S.THAKOR Yes Yes Yes Yes Yes Yes 1360 23000
21 13 B/7 to 13 B/8 VARAHI Patan Yes Agri 1 MANUBHAI RASULKHAN Yes Yes Yes Yes Yes Yes 904 15000
22 13 B/5-6 VARAHI Patan Yes Agri 1 AYUBKHAN A.PATHAN Yes Yes Yes Yes Yes Yes 880 15000
23 13 B/6-7 VARAHI Patan Yes Agri 1 NARSHUNGBHAI R.THAKOR Yes Yes Yes Yes Yes Yes 360 10000
24 13 B/7 VARAHI Patan Yes Agri 1 RAMSIBHAI D.THAKOR Yes Yes Yes Yes Yes Yes 1360 23000
25 13 B/8 VARAHI Patan Yes Agri 1 LAKHAMANBHAI R.RABARI Yes Yes Yes Yes Yes Yes 1520 26000
26 13B/8 to 13B/9 DALDI Patan Yes Agri 1 Saktabhai M.Thakor Yes Yes Yes Yes Yes Yes 480 8000
27 13 B/9 DALDI Patan Yes Agri 1 JAKASHIBHAI R.THAKOR Yes Yes Yes Yes Yes Yes 2160 37000
28 13 B/10 to 13 B/9 Sidhada Patan Yes Agri 1 Satabhai M.Thakor Yes Yes Yes Yes Yes Yes 380 9000
29 13B/9 Daldi Patan Yes Agri 1 Jagshibhai Rajabhai Thakor Yes Yes Yes Yes Yes Yes 904 15000
30 13B/9 Daldi Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 904 Jagshibhai Rajabhai 15000
31 13B/11 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 152THAKOR
JEVATBHAI .D4150
32 13B/12 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 148THAKOR
BAJUBHAI
LAGDHIRBHAI
4000
3313B/12-13 DABHI
Patan Yes Agri 1 THAKOR GAMERBHAI.KANJIBHAI Yes Yes Yes Yes Yes Yes 148 4000
34 13B/13 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 180THAKOR
MOMJIBHAI
DUDABHAI
4000
3513B/14 DABHI
Patan Yes Agri 1THAKOR VERSHIBHAI
BHAGVANBHAIYes Yes Yes Yes Yes Yes 672 18000
36 13 B/14 to 13 B/15 Sidhada Patan Yes Agri 1 Rahim A.THEBA Yes Yes Yes Yes Yes Yes 580 13500
37 13B/15 Dabhi Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 904 Thakor Mansukhbha 15000
38 13B/16 Dabhi Patan Yes Agri 1 Thakor Mansukhbhai Laksmanbhai Yes Yes Yes Yes Yes Yes 904 15000
39 13B/17 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 195THAKOR
VARAJUBEN
AMTHUBHAI
4300
4013B/19 DABHI
Patan Yes Agri 1THAKOR MANSUKHBHAI
LAKHAMANBHAIYes Yes Yes Yes Yes Yes 904 904 15000 15000
41 14/1 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 160THAKOR
HARCHANBHAI
TALASHIBHAI
4300
42 14/2 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 180GADAAYA
MAGANBHAI
PRABHABHAI
4000
43 15/3 Jekda Patan Yes Agri 1 Amratbhai Ramsibhai Thakor Yes Yes Yes Yes Yes Yes 558 558 15000 15000
44 15/4 Korda Patan Yes Agri 1 Jitabhai Pachabhai Thakor Yes Yes Yes Yes Yes Yes 1100 30000
45 16/4 to 16/3 JARUSHA Patan Yes Agri 1 DINESHBHAI NARANBHAI CHAUDH Yes Yes Yes Yes Yes Yes 320 7500
46 16/7 Jarusha Patan Yes Agri 1 Patel Karmanbhai Khemabhai Yes Yes Yes Yes Yes Yes 906 906 15000 15000
General Details
Annexure A1_Details of Crop Copmensation (200 kV Charanka - Jangral Line) for Dt- 01.11.2014 to Dt-30.04.2015Status on Payment of Affected Area for crop Amount of Compensation (Rupees) Other ImpactsDetails on Affected Persons/Families/Households Status on Construction
Sr. No. Tower No.Name of the
Village
Name of
the
Districts
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/
No)
Owners
hip
(Agricul
ture) or
Govern
ment
Number
of
Affected
Persons
/Househ
olds/Fa
milies
Name/s of the Owner in case of
Agriculture Land
Founda
tion
Comple
ted
(Yes/No
)
Erection
Complet
ed
(Yes/No)
Stringin
g
Complet
ed
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
foundation
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringing
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of Crop
Compensation
(Rupees) paid
for Stringing
Other
Impacts
such as
approach
road,
additional
area
during
execution
of work
(yes/No)
If Yes,
area for
crop
damage
(hectare)
Names of Affected
Persons
Amount of
Crop
Compensati
on (Rupees)
paid for crop
damage
47 16/7 to 16/8 JARUSHA Patan Yes Agri 1 RAMESHBHAI DHARAMSHIBHAI KUMBYes Yes Yes Yes Yes Yes 320 7500
48 16/8 to 16/9 Jarusha Patan Yes Agri 1 Jemaben naranbhai patel Yes Yes Yes Yes Yes Yes 300 5000
49 16/8 to 16/7 JARUSHA Patan Yes Agri 1 SHANKARBHAI DHUDABHAI THAKO Yes Yes Yes Yes Yes Yes 320 7500
50 16/9 to 16/8 JARUSHA Patan Yes Agri 1 RAMESHBHAI PACHANBHAI PATEL Yes Yes Yes Yes Yes Yes 320 7500
51 16/10 Jarusha Patan Yes Agri 1 Khokhar(Sipai) Gajibhaibhai Ibrahimbh Yes Yes Yes Yes Yes Yes 749 20000
52 16/10 to 16/11 JARUSHA Patan Yes Agri 1 MAVAJIBHAI KARAMANBHAI PATEL Yes Yes Yes Yes Yes Yes 428 10000
53 16/11 Jarusha Patan Yes Agri 1 Khokhar(Sipai) Nurmahmad Husenbh Yes Yes Yes Yes Yes Yes 906 15000
54 16/11 to 16A/0 Jekda Patan Yes Agri 1 Raymalbhai Jevatbhai Patel Yes Yes Yes Yes Yes Yes 440 7500
55 16/11 to 16A/0 Korda Patan Yes Agri 1 Ragabhai S Chaudhary Yes Yes Yes Yes Yes Yes 1305 35000
56 16A/0 Jekda Patan Yes Agri 1 Prahladbhai M Sadhu Yes Yes Yes Yes Yes Yes 558 25000
57 16A/0-1 Gadha Patan Yes Agri 1 ParbhatbhaiSivubhai Vaghela Yes Yes Yes Yes Yes Yes 720 12000
58 16A/1-2 Jekda Patan Yes Agri 1 Karamanbhai Khetabhai Patel Yes Yes Yes Yes Yes Yes 800 15800
59 16A/2 to 16A/3 Gadha Patan Yes Agri 1 Navubha B.Vaghela Yes Yes Yes Yes Yes Yes 640 640 11700 11700
60 16A/2-3 Jekda Patan Yes Agri 1 Amaratbhai Ramshibhai Raval Yes Yes Yes Yes Yes Yes 120 2000
61 16A/2-3 Jekda Patan Yes Agri 1 Rayabhai Dharamshibhai Suthar Yes Yes Yes Yes Yes Yes 840 14000
62 16A/3 Jekda Patan Yes Agri 1 Rashikbhai N.Prajapati Yes Yes Yes Yes Yes Yes 816 816 2291 15000 15000 49400
63 16A/3-4 Jekda Patan Yes Agri 1 Suthar Kamabhai Sankarbhai Yes Yes Yes Yes Yes Yes 1200 20000
64 16A/4 Jekda Patan Yes Agri 1 Himatbhai Nanjibhai Prajapati Yes Yes Yes Yes Yes Yes 2176 40000
65 16A/4 to 16A/4 Zekda Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 2157 Himat Nanjibhai Praj 39600
66 16A/4-5 Jekda Patan Yes Agri 1 Kalabhai Mehabhai Patel Yes Yes Yes Yes Yes Yes 680 16000
67 16A/5 Jekda Patan Yes Agri 1 Bhikhabhai Mehabhai Chaoudhary Yes Yes Yes Yes Yes Yes 816 816 2745 15000 15000 50000
68 16A/5-6 Jekda Patan Yes Agri 1 Rasuben Vajabhai chaoudhary Yes Yes Yes Yes Yes Yes 560 10000
69 16A/6 Jekda Patan Yes Agri 1 HaribhaiPunabhai Patel Yes Yes Yes Yes Yes Yes 816 816 2340 15000 15000 54500
70 16A/6-7 Jekda Patan Yes Agri 1 Bharvad Bhikhabhai Bavabhai Yes Yes Yes Yes Yes Yes 342 5000
71 16A/7-8 Jekda Patan Yes Agri 1 Magabhai Parmabhai patel Yes Yes Yes Yes Yes Yes 212 5000
72 16A/7-8 Jekda Patan Yes Agri 1 Manubhai K.Bhil Yes Yes Yes Yes Yes Yes 444 7500
73 17/0 Zekda Patan Yes Agri 1 Haribhai M.Chaudhary Yes Yes Yes Yes Yes Yes 2080 2080 20000 20000
74 17/0 Jekda Patan Yes Agri 1 Haribhai Manabhai Choudhary Yes Yes Yes Yes Yes Yes 2580 60000
75 17/0 to 17/1 Jekda Patan Yes Agri 1 Nanjibhai Momjibhai Choudhary Yes Yes Yes Yes Yes Yes 500 11700
76 17/0 to 16A/8 Jekda Patan Yes Agri 1 Lilaben bhagvanbhai patel Yes Yes Yes Yes Yes Yes 600 13950
77 17/0 to 17/1 Zekda Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 500 Nathabhai Madevbh 11700
78 17/1 to 17/1 Zekda Patan Yes Agri 1 Bhemabhai M.Chaudhary Yes Yes Yes Yes Yes Yes 816 816 2795 15000 15000 65000
79 17/1 to 17/1 Zekda Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 272 Bhemabhai M.Chaud 5000
80 17/2 Jekda Patan Yes Agri 1 Puriben B.Chaudhary Yes Yes Yes Yes Yes Yes 816 816 3010 15000 15000 70000
81 17/3 Jekda Patan Yes Agri 1 Dehalbhai M Thakor Yes Yes Yes Yes Yes Yes 444 444 20000 20000
82 17/3 to 17/3 Jekada Patan Yes Agri 1 Dehalbhai Megharaj Thakor Yes Yes Yes Yes Yes Yes 2080 40000
83 17/3 to 17/4 Zazansar Patan Yes Agri 1 Verasibhai Malabhai Thakor Yes Yes Yes Yes Yes Yes 320 7500
84 17/4 Santhali Patan Yes Agri 1 Thakor Veljibhai Khetabhai Yes Yes Yes Yes Yes Yes 2576 60000
85 17/4 to 17/5 Santhali Patan Yes Agri 1 Sundabhai Mohanbhai Thakor Yes Yes Yes Yes Yes Yes 500 11700
86 17/5 Santhli Patan Yes Agri 1 Masabhai R Thakor Yes Yes Yes Yes Yes Yes 904 904 15000 15000
87 17/6 Santhali Patan Yes Agri 1 Jethabhai Sankarbhai Patel Yes Yes Yes Yes Yes Yes 965 22500
88 17/6 to 17/7 Santhali Patan Yes Agri 1 Meghabhai Parbatbhai Patel Yes Yes Yes Yes Yes Yes 380 8900
89 17/7 SANTHALI Patan Yes Agri 1 HARIBHAI LAKHABHAI PATEL Yes Yes Yes Yes Yes Yes 2070 48160
90 17/7 to 17/8 SANTHALI Patan Yes Agri 1 AMTHUBHAI MEGHABHAI PATEL Yes Yes Yes Yes Yes Yes 200 4650
91 17/7 to 17/8 SANTHALI Patan Yes Agri 1 KHETABHAI SAKTABHAI PATEL Yes Yes Yes Yes Yes Yes 720 10800
92 17/8 Santhli Patan Yes Agri 1 Mali Dalabhai Mansangbhai Yes Yes Yes Yes Yes Yes 906 906 1624 15000 15000 26900
93 17/8 to 17/9 RANGPURA Patan Yes Agri 1 VIRBHANBHAI LEBABHAI THAKOR Yes Yes Yes Yes Yes Yes 360 5400
94 17/8 to 17/9 RANGPURA Patan Yes Agri 1 VALABHAI TALASIBHAI THAKOR Yes Yes Yes Yes Yes Yes 360 8400
95 17/8 to 17/9 SANTHALI Patan Yes Agri 1 MAGHABHAI GANGARAMBHAI MALI Yes Yes Yes Yes Yes Yes 380 8900
96 17/8 to 17/9 SANTHALI Patan Yes Agri 1 BHAGVANBHAI MANJIBHAI MALI Yes Yes Yes Yes Yes Yes 460 6900
97 17/9 to 17/10 RANGPURA Patan Yes Agri 1 RAMABHAI TALSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 320 4800
98 17/9 to 17/10 RANGPURA Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 380 VALABHAI TALASIB 5700
99 17/10 RANGPURA Patan Yes Agri 1 NATHABHAI DHARAMSIBHAI THAKO Yes Yes Yes Yes Yes Yes 3288 20400
100 17/10 to 17/11 RANGPURA Patan Yes Agri 1 SUNDABHAI SAVSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 644 15000
101 17/10 to 17/11 RANGPURA Patan Yes Agri 1 NAGJIBHAI SAVSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 400 6000
102 17/11 to 17/12 RANGPURA Patan Yes Agri 1 VIRABHANBHAI MOHANBHAI THAK Yes Yes Yes Yes Yes Yes 1073 25000
103 17/11 to 17/12 RANGPURA Patan Yes Agri 1 KALYANBHAI DHARSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 640 15000
104 17/11 to 17/12 RANGPURA Patan Yes Agri 1 TALSIBHAI MAVABHAI THAKOR Yes Yes Yes Yes Yes Yes 1595 30000
105 17/12 RANGPURA Patan Yes Agri 1 LAXMANBHAI LALABHAI RABARI Yes Yes Yes Yes Yes Yes 1245 24000
106 17/12 to 17/13 Rangpura Patan Yes Agri 1 Velabhai Lakhabhai Rabari Yes Yes Yes Yes Yes Yes 200 4700
107 17/12 to 17/13 SANTHALI Patan Yes Agri 1 GIRISH ARJANBHAI RABARI Yes Yes Yes Yes Yes Yes 430 10000
Sr. No. Tower No.Name of the
Village
Name of
the
Districts
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/
No)
Owners
hip
(Agricul
ture) or
Govern
ment
Number
of
Affected
Persons
/Househ
olds/Fa
milies
Name/s of the Owner in case of
Agriculture Land
Founda
tion
Comple
ted
(Yes/No
)
Erection
Complet
ed
(Yes/No)
Stringin
g
Complet
ed
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
foundation
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringing
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of Crop
Compensation
(Rupees) paid
for Stringing
Other
Impacts
such as
approach
road,
additional
area
during
execution
of work
(yes/No)
If Yes,
area for
crop
damage
(hectare)
Names of Affected
Persons
Amount of
Crop
Compensati
on (Rupees)
paid for crop
damage
108 17/13 RANGPURA Patan Yes Agri 1 BHEMABHAI LALABHAI RABARI Yes Yes Yes Yes Yes Yes 1285 24600
109 17/13 to 17A/0 RANGPURA Patan Yes Agri 1 RAMABHAI SAVSHIBHAI THAKOR Yes Yes Yes Yes Yes Yes 480 11160
110 17 A/0 BHILOT Patan Yes Agri 1 UDESANG .K.VAGELA Yes Yes Yes Yes Yes Yes 744 744 552 20000 20000 15000
111 17 A/0 BHILOT Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 552 VDESANG .K.VAGE 15000
112 17/A/0 RANGPURA Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 480 GANDABHAI M.THA 8000
113 17A/0 BHILOT Patan Yes Agri 1 DOLUBHA HAMIRJI VAGHELA Yes Yes Yes Yes Yes Yes 744 744 20000 20000
114 17A/0 to 17B/0 BHILOT Patan Yes Agri 1 BALABHAI GANESHBHAI RABARI Yes Yes Yes Yes Yes Yes 320 7500
115 17B/0 RANGPURA Patan Yes Agri 1 VIRBHANBHAI DAYABHAI THAKOR Yes Yes Yes Yes Yes Yes 1764 1764 1720 15000 15000 40000
116 17B/0 to 17B/1 RANGPURA Patan Yes Agri 1 CHOTHIBEN ISHWERBHAI THAKOR Yes Yes Yes Yes Yes Yes 1050 24460
117 17B/1 to 17B/2 RANGPURA Patan Yes Agri 1 DHIRSIBHAI VISABHAI THAKOR Yes Yes Yes Yes Yes Yes 680 12510
118 17B/1 to 17B/2 RANGPURA Patan Yes Agri 1 RUGHANATHABHAI MOHANBHAI THAYes Yes Yes Yes Yes Yes 360 5400
119 17B/2 BHILOT Patan Yes Agri 1 PURIBA M.JADEJA Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000
120 17B/2 BHILOT Patan Yes Agri 1 MUMABHA I.VAGHELA Yes Yes Yes Yes Yes Yes 600 10000
121 17B/3 to 17B/4 Bhilot Patan Yes Agri 1 Ajamalbhai Ramubhai Nadda Yes Yes Yes Yes Yes Yes 1349 31500
122 17B/3 to 18/0 BHILOT Patan Yes Agri 1 PRAVINKUMAR JAYSHANKAR JOSHI Yes Yes Yes Yes Yes Yes 320 7500
123 17B/3 to 18/0 BHILOT Patan Yes Agri 1 VASHARAMBHAI SANKARBHAI PAT Yes Yes Yes Yes Yes Yes 645 15000
124 18/0 BHILOT Patan Yes Agri 1 HIRABHAI HARJIBHAI KANBI Yes Yes Yes Yes Yes Yes 645 645 645 15000 15000 15000
125 18/0 BHILOT Patan Yes Agri 1 VAJABHAI HARJIBHAI PATEL Yes Yes Yes Yes Yes Yes 645 15000
126 18/0 to 19/0 Bhilot Patan Yes Agri 1 Gagdas R Rabari Yes Yes Yes Yes Yes Yes 153 153 2500 2500
127 18/0 to 19/0 Bhilot Patan Yes Agri 1 Devjibhai B Thakor Yes Yes Yes Yes Yes Yes 153 153 2500 2500
128 18/0 to 19/0 BHILOT Patan Yes Agri 1 JIVABHAI DEVJIBHAI RAVAL Yes Yes Yes Yes Yes Yes 444 12000
12918/0 to 19/0 BHILOT
Patan Yes Agri 1VASRAMBHAI SANKARBHAI
PATELYes Yes Yes Yes Yes Yes 404 6700
130 18/0 to 19/0 BHILOT Patan Yes Agri 1 RAEAVSANKAR P RAVAL Yes Yes Yes Yes Yes Yes 300 5000
131 19/0 BHILOT Patan Yes Agri 1 GAURISHANKARKEVALRAM RAVAL Yes Yes Yes Yes Yes Yes 645 15000
132 19/0 to 18/0 BHILOT Patan Yes Agri 1 JETHABHAI R.KANANI Yes Yes Yes Yes Yes Yes 1200 17400
13319/0 to 19/1 BHILOT
Patan Yes Agri 1 SUNDABHAI RAMJIBHAI THAKOR Yes Yes Yes Yes Yes Yes 840 14000
13419/1 BHILOT
Patan Yes Agri 1RAMSANGBHAI RAMJIBHAI
THAKORYes Yes Yes Yes Yes Yes 905 1705 15000 28200
135 19/3 BHILOT Patan Yes Agri 1 RUPSINH HAMIRJI VAGHELA Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000
136 19/3 to 19/4 BHILOT Patan Yes Agri 1 MAGANBHAI M.THAKOR Yes Yes Yes Yes Yes Yes 180 3000
137 19/3 to 19/4 BHILOT Patan Yes Agri 1 LALJIBHAI P.VAGHELA Yes Yes Yes Yes Yes Yes 904 15000
138 19/3 to 19/4 BHILOT Patan Yes Agri 1 GAJUBHA BHURUBH VAGHELA Yes Yes Yes Yes Yes Yes 880 12800
13919/3 to 19/4 BHILOT
Patan Yes Agri 1 BHURABHA NARANJI VAGHELA Yes Yes Yes Yes Yes Yes 880 12800
14019/4 BHILOT
Patan Yes Agri 1RAGUBHAI RANSHODBHAI
KUMBHARYes Yes Yes Yes Yes Yes 1425 23600
141 19/4 to 19/5 BHILOT Patan Yes Agri 1 ARJANBHAI V.THAKOR Yes Yes Yes Yes Yes Yes 452 7500
142 19/5 to 19/4 BHILOT Patan Yes Agri 1 RAGUBHAI R.KUMBHAR Yes Yes Yes Yes Yes Yes 1040 17300
143 19/5 BHILOT Patan Yes Agri 1 Thakor Amthuji Kunvarbhai Yes Yes Yes Yes Yes Yes 905 905 15000 15000
144 19/5 Bhilot Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 240 Thakor Amthuji Kunv 4000
145 19/5 to 19/6 BHILOT Patan Yes Agri 1 VAGHABHAI M.THAKOR Yes Yes Yes Yes Yes Yes 300 5000
14619/5 to 19/6 BHILOT
Patan Yes Agri 1 BALABHAI KONARABHAI THKOR Yes Yes Yes Yes Yes Yes 950 13800
147 19/6 BHILOT Patan Yes Agri 1 SHANKARBHAI R.CHAUDHARI Yes Yes Yes Yes Yes Yes 905 905 15000 15000
148 19/6 BHILOT Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 301 RADHABEN S. PAT 5000
149 19/6 to 20/0 BHILOT Patan Yes Agri 1 RADHABEN S. PATEL Yes Yes Yes Yes Yes Yes 425 10200
15019/6 to 20/0 BHILOT
Patan Yes Agri 1GANESHBHAI KHODABHAI
PRJAPATIYes Yes Yes Yes Yes Yes 208 3500
151 20/0 BHILOT Patan Yes Agri 1 VIBHABHAI R.RABARI Yes Yes Yes Yes Yes Yes 600 10000
152 20/0 BHILOT Patan Yes Agri 1 RAJABHAI DALABHAI CHOUDHARI Yes Yes Yes Yes Yes Yes 860 860 40000 40000
153 20/2 Bhilot Patan Yes Agri 1 Lataben Ramjibhai Joshi Yes Yes Yes Yes Yes Yes 906 906 15000 15000
15420/3 to 20/4 BHILOT
Patan Yes Agri 1RAJENDRASINH PATUBHA
VAGHELAYes Yes Yes Yes Yes Yes 1032 15000
155 20/6 Memdavad Patan Yes Agri 1 Ganchi Daud Jamubhai Yes Yes Yes Yes Yes Yes 906 15000
156 20/8 Memdavad Patan Yes Agri 1 Kanbi Rragnathbhai Nanjibhai Yes Yes Yes Yes Yes Yes 560 15000
157 20/9 Memdavad Patan Yes Agri 1 Thakkar Kanubhai Vakuthram Yes Yes Yes Yes Yes Yes 906 15000
158 20/11 MEMDAVAD Patan Yes Agri 1 OKHABHAI MOHANBHAI HARIJAN Yes Yes Yes Yes Yes Yes 1320 28200
159 20A/0 BHILOT Patan Yes Agri 1 JETHABHAI KALABHAI KANBI Yes Yes Yes Yes Yes Yes 1720 860 40000 20000
160 21/0 Memdavad Patan Yes Agri 1 Dayabhai Govindbhai Thakor Yes Yes Yes Yes Yes Yes 1376 1376 30000 30000
161 22/0 Memdavad Patan Yes Agri 1 Shivabhai Samabhai Rabari Yes Yes Yes Yes Yes Yes 744 1728 20000 26000
Sr. No. Tower No.Name of the
Village
Name of
the
Districts
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/
No)
Owners
hip
(Agricul
ture) or
Govern
ment
Number
of
Affected
Persons
/Househ
olds/Fa
milies
Name/s of the Owner in case of
Agriculture Land
Founda
tion
Comple
ted
(Yes/No
)
Erection
Complet
ed
(Yes/No)
Stringin
g
Complet
ed
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
foundation
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringing
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of Crop
Compensation
(Rupees) paid
for Stringing
Other
Impacts
such as
approach
road,
additional
area
during
execution
of work
(yes/No)
If Yes,
area for
crop
damage
(hectare)
Names of Affected
Persons
Amount of
Crop
Compensati
on (Rupees)
paid for crop
damage
162 22/1 Memdavad Patan Yes Agri 1 Laxmanbhai Hardasbhai Rabari Yes Yes Yes Yes Yes Yes 906 906 15000 15000
163 22/1 to 22/2 RADHANPUR Patan Yes Agri 1 DUNGARBHAI AMBABHAI HARIJAN Yes Yes Yes Yes Yes Yes 400 7320
164 22/1 to 22/2 MEMDAVAD Patan Yes Agri 1 KALABHAI MELABHAI DESAI Yes Yes Yes Yes Yes Yes 320 4800
165 22/2 to 22/3 MEMDAVAD Patan Yes Agri 1 AJUBHAI PRAGBHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 550 8300
166 22/2 to 22/3 MEMDAVAD Patan Yes Agri 1 CHOTHIBEN RANCHHODBHAI THAK Yes Yes Yes Yes Yes Yes 600 14880
16722/3 BHILOT
Patan Yes Agri 1 NATUBHAI SANKARBHAI PATEL Yes Yes Yes Yes Yes Yes906 906
906 15000 15000 15000
168 22/3 to 22/4 MEMDAVAD Patan Yes Agri 1 RATANBHAI SHANKARBHAI PATEL Yes Yes Yes Yes Yes Yes 600 14000
169 22/5 MEMDAVAD Patan Yes Agri 1 DEVJIBHAI VASABHAI KANABI Yes Yes Yes Yes Yes Yes 1240 18600
170 22/5 to 22/6 MEMDAVAD Patan Yes Agri 1 AMRATBHAI GANESHBHAI SUTHAR Yes Yes Yes Yes Yes Yes 580 8700
171 22/5 to 22/6 MEMDAVAD Patan Yes Agri 1 ACHARATLAL MOHANLAL PATEL Yes Yes Yes Yes Yes Yes 350 8200
172 22/6 MEMDAVAD Patan Yes Agri 1 BHAGVANBHAI GOVINDBHAI PATEL Yes Yes Yes Yes Yes Yes 1540 23100
173 22/6 to 22/7 SHERGANJ Patan Yes Agri 1 RATNABHAI DEVUBHAI THAKOR Yes Yes Yes Yes Yes Yes 450 6800
174 22/6 to 22/7 SHERGANJ Patan Yes Agri 1 POPATBHAI MFABHAI THAKOR Yes Yes Yes Yes Yes Yes 900 13500
175 22/6 to 22/7 SHERGANJ Patan Yes Agri 1 SADABHAI DAYABHAI THAKOR Yes Yes Yes Yes Yes Yes 960 14400
176 22/7 to 22/8 SHERGANJ Patan Yes Agri 1 RAMABHAI MAVJIBHAI THAKOR Yes Yes Yes Yes Yes Yes 666 10000
177 22/8 SHERGANJ Patan Yes Agri 1 GANDABHAI JASAVANTBHAI PATEL Yes Yes Yes Yes Yes Yes 924 21600
178 22/8 to 22/9 SHERGANJ Patan Yes Agri 1 DILIPBHAI GANDABHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 600 14000
179 22-Sep SHERGANJ Patan Yes Agri 1 PARAGJIBHAI LALJIBHAI CHOUDHA Yes Yes Yes Yes Yes Yes 1045 24300
180 22/10 Sherganj Patan Yes Agri 1 Mafabhai Shankarbhai Chaudhry Yes Yes Yes Yes Yes Yes 900 2700 1800 15000 45000 30000
181 22/10 Sherganj Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 1500Mafabhai
Shankarbhai
Chaudhry
25000
182 22/10 Sherganj Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 1200Mafabhai
Shankarbhai
Chaudhry
15000
183 22/10 to 22/11 SHERGANJ Patan Yes Agri 1 RANSODBHAI DANABHAI PATEL Yes Yes Yes Yes Yes Yes 620 9300
184 22/10 to 22/11 SHERGANJ Patan Yes Agri 1 AJMALBHAI HARJIBHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 320 4200
185 22/11 Sherganj Patan Yes Agri 1 NURMOHAMED GANIBHAI VHORA Yes Yes Yes Yes Yes Yes 1836 27600
186 22/11 to 23/0 SHERGANJ Patan Yes Agri 1 JESINGHBHAI JEVATBHAI PATEL Yes Yes Yes Yes Yes Yes 445 10400
187 23/0 Sherganj Patan Yes Agri 1 Jasvantbhai H Patel Yes Yes Yes Yes Yes Yes 1116 1116 30000 30000
188 23/0 to 24/0 Sherganj Patan Yes Agri 1 Hitesh Kantilal Koradiya Yes Yes Yes Yes Yes Yes 556 13000
189 24/0 to 25/0 Sherganj Patan Yes Agri 1 Induben G Nayi Yes Yes Yes Yes Yes Yes 150 150 3750 3750
190 24/0 to 25/0 SHERGANJ Patan Yes Agri 1 SAILESHBHAI RAGUBHAI NAYI Yes Yes Yes Yes Yes Yes 2576 60000
191 24/0 to 25/0 SHERGANJ Patan Yes Agri 1 BHAVABHAI REVABHAI NAI Yes Yes Yes Yes Yes Yes 1072 25000
192 24/0 to 25/0 SHERGANJ Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 212 DINESHBHAI VAGHA 5000
193 25/0 Sherganj Patan Yes Agri 1 Nai Jagdishbhai Vaghabhai Yes Yes Yes Yes Yes Yes 1288 1933 30000 45000
194 25/0 Sherganj Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 276 Nai Jagdishbhai Vag 7500
195 25/0 to 25/1 SHERGANJ Patan Yes Agri 1 NARESHBHAI GANDABHAI NAYI Yes Yes Yes Yes Yes Yes 360 8400
196 25/0 to 25/1 SHERGANJ Patan Yes Agri 1 INDUBEN GANDABHAI NAYI Yes Yes Yes Yes Yes Yes 420 9800
197 25/0 to 25/1 SHERGANJ Patan Yes Agri 1 BABUBHAI VAGHABHAI NAI Yes Yes Yes Yes Yes Yes 360 8400
198 25/1 Kolhapur Patan Yes Agri 1 Sendha bhai Karmshibhai Rabari Yes Yes Yes Yes Yes Yes 1932 45000
199 25/1 Kolhapur Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 644 Sendha bhai Karmshi 15000
200 25/1 to 25/2 Anandpura Patan Yes Agri 1 Madarshing Vghjibhai Gohil Yes Yes Yes Yes Yes Yes 320 7500
201 25/1 to 25/2 Kolapur Patan Yes Agri 1 Adeshi V.Gohil Yes Yes Yes Yes Yes Yes 600 10000
202 25/1 to 25/2 KOLAPUR Patan Yes Agri 1 ABHESING PRATAPSING GOHIL Yes Yes Yes Yes Yes Yes 320 7500
203 25/1 to 25/2 SHERGANJ Patan Yes Agri 1 CHAUDHARI KAMABHAI KARSHANB Yes Yes Yes Yes Yes Yes 440 10230
204 25/2 Kolapur Patan Yes Agri 1 Varjangbhai.M.Thakor Yes Yes Yes Yes Yes Yes 1416 26000
205 25/3 Kolhapur Patan Yes Agri 1 Satabhai Sangrambhai Rabari Yes Yes Yes Yes Yes Yes 2597 55000
206 25/3 Kolhapur Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 544 Satabhai Sangrambh 10000
207 25/3 to 25/4 Kolapur Patan Yes Agri 1 Panchanbhai V.Thakor Yes Yes Yes Yes Yes Yes 560 8400
208 25/3 to 25/4 Kolapur Patan Yes Agri 1 Manabhai R.Thakor Yes Yes Yes Yes Yes Yes 420 6300
209 25/3 to 25/4 Kolapur Patan Yes Agri 1 Kamuben D.Thakor Yes Yes Yes Yes Yes Yes 315 7350
210 25/4 Kolapur Patan Yes Agri 1 Kamuben C.Thakor Yes Yes Yes Yes Yes Yes 1420 21300
211 25/4 to 25/5 Porana Patan Yes Agri 1 Vasantbhai R.ThakoR Yes Yes Yes Yes Yes Yes 320 5125
212 25/4 to 25/5 Kolapur Patan Yes Agri 1 Galalbhai S.Thakor Yes Yes Yes Yes Yes Yes 1120 18300
213 25/4 to 25/5 Kolapur Patan Yes Agri 1 Chhotabhai V.Thakor Yes Yes Yes Yes Yes Yes 960 14400
214 25/5 Alahbad Patan Yes Agri 1 Laxmanbhai A Chaudhry Yes Yes Yes Yes Yes Yes 896 896 15000 15000
215 25/5 Porana Patan Yes Agri 1 Manabhai D. Thakor Yes Yes Yes Yes Yes Yes 1194 1194 20000 20000
216 25/5 Alahbad Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 1595 Laxmanbhai A Chaud 30000
217 25/5 Kolapur Patan Yes Agri 1 MevabhaiS.Thakor Yes Yes Yes Yes Yes Yes 524 8400
218 25/5 Porana Patan Yes Agri 1 Manbhai D.Thakor Yes Yes Yes Yes Yes Yes 1328 24400
Sr. No. Tower No.Name of the
Village
Name of
the
Districts
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/
No)
Owners
hip
(Agricul
ture) or
Govern
ment
Number
of
Affected
Persons
/Househ
olds/Fa
milies
Name/s of the Owner in case of
Agriculture Land
Founda
tion
Comple
ted
(Yes/No
)
Erection
Complet
ed
(Yes/No)
Stringin
g
Complet
ed
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
foundation
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringing
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of Crop
Compensation
(Rupees) paid
for Stringing
Other
Impacts
such as
approach
road,
additional
area
during
execution
of work
(yes/No)
If Yes,
area for
crop
damage
(hectare)
Names of Affected
Persons
Amount of
Crop
Compensati
on (Rupees)
paid for crop
damage
219 25/5 to 25/6 Porana Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 188 Vasant R. Thakor 5000
220 25/6 Porana Patan Yes Agri 1 Sundaji Viraji Thakor Yes Yes Yes Yes Yes Yes 1696 1696 3392 17500 17500 35000
221 25/6 to 25/7 Porana Patan Yes Agri 1 Nagjibhai A.Bharvad Yes Yes Yes Yes Yes Yes 304 5000
222 25/6 to 25/7 Porana Patan Yes Agri 1 Pethabhai R.Patel Yes Yes Yes Yes Yes Yes 328 6000
223 25/6 to 25/7 Porana Patan Yes Agri 1 Shindhabhai A.Bharvad Yes Yes Yes Yes Yes Yes 304 5000
224 25/6 to 25/7 Porana Patan Yes Agri 1 Nanjibhai B.Kanbi Yes Yes Yes Yes Yes Yes 400 7320
225 25/6 to 25/7 Porana Patan Yes Agri 1 Hengabhai A.Bharvad Yes Yes Yes Yes Yes Yes 660 12080
226 25/7 Porana Patan Yes Agri 1 Mavjibhai Virabhai Chaudhary Yes Yes Yes Yes Yes Yes 558 558 750 15000 15000 20000
227 25/8 Alahabad Patan Yes Agri 1 Vairshibhai V.Thakor Yes Yes Yes Yes Yes Yes 1664 25000
228 25/8 to 25/9 Porana Patan Yes Agri 1 Vasarambhai B.Thakor Yes Yes Yes Yes Yes Yes 300 5500
229 25/8 to 25/9 Porana Patan Yes Agri 1 Bhagabhai B.Bharvad Yes Yes Yes Yes Yes Yes 900 17425
230 25/9 Alahbad Patan Yes Agri 1 Ramabhai Karsanbhai Bharvad Yes Yes Yes Yes Yes Yes 1768 30000
231 25/9 to 25/10 Alahabad Patan Yes Agri 1 Somabhai D.Suthar Yes Yes Yes Yes Yes Yes 300 4900
232 25/9 to 25/10 Alahabad Patan Yes Agri 1 Kanjibhai D.Suthar Yes Yes Yes Yes Yes Yes 300 4500
233 25/10 ALAHABAD Patan Yes Agri 1 AJIBEN MOHANBHAI SOLANKI Yes Yes Yes Yes Yes Yes 666 666 666 10000 10000 10000
234 25/10 to 25/11 Alahabad Patan Yes Agri 1 Gandabhai N.Patel Yes Yes Yes Yes Yes Yes 480 9900
235 25/11 Alahbad Patan Yes Agri 1 Revaben vihabhai Chaudhry Yes Yes Yes Yes Yes Yes 744 20000
236 25/11 to 25/12 Alahabad Patan Yes Agri 1 Dharamshibhai Amthabhai Prajapathi Yes Yes Yes Yes Yes Yes 550 10065
237 25/11 to 25/12 Alahabad Patan Yes Agri 1 Valabhai A.Parjapati Yes Yes Yes Yes Yes Yes 600 11000
238 25/11 to 25/12 ALAHABAD Patan Yes Agri 1 REVABEN VISHABHAI CHOUDHARI Yes Yes Yes Yes Yes Yes 773 45000
239 25/12 Alahbad Patan Yes Agri 1 Pababhai kamabhai Patel Yes Yes Yes Yes Yes Yes 900 900 1800 15000 15000 30000
240 25/12 Alahabad Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 188Dharamshibhai
Amthabhai
Prajapati
5000
241 25/12 Alahabad Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 188Shankuben
VAJABHAI
Prajapathi
5000
242 25/12 to 25/13 Alahabad Patan Yes Agri 1 Jivanbhai K.Patel Yes Yes Yes Yes Yes Yes 1008 19500
243 25/12 to 25/13 Arjanshan Patan Yes Agri 1 Pababhai K.Patel Yes Yes Yes Yes Yes Yes 200 4075
244 25/13 Alahbad Patan Yes Agri 1 Jivanbhai K Patel Yes Yes Yes Yes Yes Yes 558 558 1116 15000 15000 30000
245 25/14 Alahbad Patan Yes Agri 1 Bhavabhai A Patel Yes Yes Yes Yes Yes Yes 906 975 15000 32200
246 25/14 to 25/15 Alahabad Patan Yes Agri 1 Shankarbhai A.Patel Yes Yes Yes Yes Yes Yes 525 17550
247 25/14 to 25/15 Alahabad Patan Yes Agri 1 Jitabhai M.Patel Yes Yes Yes Yes Yes Yes 1040 15600
248 25/14 to 25/15 ALAHABAD Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 260 BHAVABHAI AMTHA 7000
249 25/15 to 25/16 Alahabad Patan Yes Agri 1 Narmadaben H.Joshi Yes Yes Yes Yes Yes Yes 1050 19280
250 25/15 to 25/16 ALAHABAD Patan Yes Agri 1 TEJABHAI HARJIBHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 204 3400
251 25/16 Alahbad Patan Yes Agri 1 Nathabhai Valabhai Patel Yes Yes Yes Yes Yes Yes 558 15000
252 25/16 to 25/17 Alahabad Patan Yes Agri 1 Nathabhai Valabhai Chaoudhary Yes Yes Yes Yes Yes Yes 2356 42050
253 25/17 Arajansar Patan Yes Agri 1 Jagubhai Lalabhai Prajapati Yes Yes Yes Yes Yes Yes 1190 15000
254 25/17 to 25/18 Arjansar Patan Yes Agri 1 Rameshbhai Parshotambhai Panchal Yes Yes Yes Yes Yes Yes 400 8150
255 25/17 to 25/18 Arjansar Patan Yes Agri 1 Pababhai Mavabhai Patel Yes Yes Yes Yes Yes Yes 344 5700
256 25/18 to 25/19 Arjanshan Patan Yes Agri 1 Somabhai D..Patel Yes Yes Yes Yes Yes Yes 600 8880
257 25/18 to 25/19 Arjanshan Patan Yes Agri 1 Jayntibhai A.Chaudhary Yes Yes Yes Yes Yes Yes 335 5000
258 25/18 to 25/19 Arjanshan Patan Yes Agri 1 Ajubhai M.Patel Yes Yes Yes Yes Yes Yes 388 10500
259 25/19 Arjanshan Patan Yes Agri 1 Bhavabhai A.Patel Yes Yes Yes Yes Yes Yes 1176 24000
260 25/19 to 25/20 Arjanshan Patan Yes Agri 1 Hirabhai L.Patel Yes Yes Yes Yes Yes Yes 160 2400
261 25/19 to 25/20 Arjanshan Patan Yes Agri 1 Ravabhai C.Patel Yes Yes Yes Yes Yes Yes 850 14400
262 25/19 to 25/20 Arjanshan Patan Yes Agri 1 Ganesh.C.Patel Yes Yes Yes Yes Yes Yes 640 9600
263 25/20 to 26/0 Arjanshan Patan Yes Agri 1 Naranbhai A.Chaudhary Yes Yes Yes Yes Yes Yes 480 7200
264 25/20 to 26/0 Arjanshan Patan Yes Agri 1 Vihabhai J.Patel Yes Yes Yes Yes Yes Yes 1281 23500
265 25/20 to 26/0 ARJANSAR Patan Yes Agri 1 NARANBHAI VALABHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 730 17000
266 26/0 Arajansar Patan Yes Agri 1 Kamabhai dungarbhai Patel Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000
267 26/0 to 26/1 Arjanshan Patan Yes Agri 1 Santilal P.Solanki Yes Yes Yes Yes Yes Yes 244 5000
268 26/0 to 26/1 Arajansar Patan Yes Agri 1 Naranbhai A Chaudhry Yes Yes Yes Yes Yes Yes 360 6000
269 26/0 to 26/1 Arajansar Patan Yes Agri 1 Shantilal P Solanki Yes Yes Yes Yes Yes Yes 420 7000
270 26/1 Arajansar Patan Yes Agri 1 Sevadas Bajrangdas Sadhu Yes Yes Yes Yes Yes Yes 560 15000
271 26/1 to 26/2 Arajansar Patan Yes Agri 1 Devsibhai G Thakor Yes Yes Yes Yes Yes Yes 420 7000
272 26/1 to 26/2 Arajansar Patan Yes Agri 1 Narsinh T Thakor Yes Yes Yes Yes Yes Yes 720 10400
273 26/1 to 26/2 Arajansar Patan Yes Agri 1 Mafaji D Thakor Yes Yes Yes Yes Yes Yes 300 5000
274 26/2 Arjanshan Patan Yes Agri 1 Harkhabhai P.Chaudhary Yes Yes Yes Yes Yes Yes 820 15000
275 26/2 Arajansar Patan Yes Agri 1 Harkhabhai Panabhai Patel Yes Yes Yes Yes Yes Yes 560 15000
276 26/2 to 26/3 Arajansar Patan Yes Agri 1 Arjanbhai M Rabari Yes Yes Yes Yes Yes Yes 180 3000
Sr. No. Tower No.Name of the
Village
Name of
the
Districts
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/
No)
Owners
hip
(Agricul
ture) or
Govern
ment
Number
of
Affected
Persons
/Househ
olds/Fa
milies
Name/s of the Owner in case of
Agriculture Land
Founda
tion
Comple
ted
(Yes/No
)
Erection
Complet
ed
(Yes/No)
Stringin
g
Complet
ed
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
foundation
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringing
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of Crop
Compensation
(Rupees) paid
for Stringing
Other
Impacts
such as
approach
road,
additional
area
during
execution
of work
(yes/No)
If Yes,
area for
crop
damage
(hectare)
Names of Affected
Persons
Amount of
Crop
Compensati
on (Rupees)
paid for crop
damage
277 26/2 to 26/3 Arajansar Patan Yes Agri 1 Karsanbhai B Patel Yes Yes Yes Yes Yes Yes 360 9700
278 26/2 to 26/3 Arajansar Patan Yes Agri 1 Rupabhai V Rabari Yes Yes Yes Yes Yes Yes 360 6000
279 26/3 Arajansar Patan Yes Agri 1 Manaji Hemrajji Thakor Yes Yes Yes Yes Yes Yes 560 15000
280 26/3 to 26/4 Arajansar Patan Yes Agri 1 Prabhubhai D Nayi Yes Yes Yes Yes Yes Yes 428 11500
281 26/3 to 26/4 Arajansar Patan Yes Agri 1 DaJabhai O Patel Yes Yes Yes Yes Yes Yes 280 7600
282 26/3 to 26/4 Arajansar Patan Yes Agri 1 Jemabhai Valabhai Kanbi Yes Yes Yes Yes Yes Yes 1395 29000
283 26/4 to 26/5 Arajansar Patan Yes Agri 1 Lebubhai L Thakor Yes Yes Yes Yes Yes Yes 320 8600
284 26/4 to 26/5 Arajansar Patan Yes Agri 1 Dalachhabhai M Nayi Yes Yes Yes Yes Yes Yes 500 13500
285 26/4 to 26/5 Arajansar Patan Yes Agri 1 Jagmalbhai K Kanbi Yes Yes Yes Yes Yes Yes 180 3000
286 26/4 to 26/5 Arajansar Patan Yes Agri 1 Sakuben K patel Yes Yes Yes Yes Yes Yes 180 3000
287 26/5 Arajansar Patan Yes Agri 1 Somabhai Virabhai Thakor Yes Yes Yes Yes Yes Yes 1120 30000
288 26/5 to 26/5 Arjanshan Patan Yes Agri 1 Somabhai V.Thakor Yes Yes Yes Yes Yes Yes 335 5000
289 26/6 Arajansar Patan Yes Agri 1 Revaben Ramsibhai Chaudhary Yes Yes Yes Yes Yes Yes 268 4500
290 28/6 to 28/7 savpura B.K Yes Agri 1 Vinaji Chaturji Sabusana Yes Yes Yes Yes Yes Yes 430 10000
291 28/7 28/8 Bhalgam B.K Yes Agri 1 Manshangji Ravaji Sabosana Yes Yes Yes Yes Yes Yes 360 8000
292 26/7 to 26/8 Arajansar Patan Yes Agri 1 Balvantji C Thakor Yes Yes Yes Yes Yes Yes 296 8000
293 26/8 to 26/9 Arajansar Patan Yes Agri 1 Viraben Kamabhai Patel Yes Yes Yes Yes Yes Yes 372 10000
294 26/9 Tatiyana B.K Yes Agri 1 Thkkar Vasantbhai Amratbhai Yes Yes Yes Yes Yes Yes 1120 30000
295 26/10 to 26/11 Tatiyana B.K Yes Agri 1 Bhudarji sivaji dhandhaniya Yes Yes Yes Yes Yes Yes 320 8600
296 29/0 savpura B.K Yes Agri 1 Savshiji Jetaji Thakor Yes Yes Yes Yes Yes Yes 1290 30000
297 29/1 to 29/2 savpura B.K Yes Agri 1 Narkhanji Sartanji Thakor Yes Yes Yes Yes Yes Yes 320 7500
298 30/0 to 31/0 Bhalgam B.K Yes Agri 1 Keshaji Raychandji Sabosana Yes Yes Yes Yes Yes Yes 900 15000
299 32/1 Anandpura B.K Yes Agri 1 Lotiya Joitaji Mafaji Yes Yes Yes Yes Yes Yes 1704 31300
300 32/2 Anandpura B.K Yes Agri 1 Becharbhai Sankarbhai Solanki Yes Yes Yes Yes Yes Yes 1664 27600
301 32/4 Anandpura B.K Yes Agri 1 Solanki Chanduji Chaturji Yes Yes Yes Yes Yes Yes 1109 22700
302 32/4 to 32/5 Anandpura B.K Yes Agri 1 Dayabhai Gemarbhai Bhatakiya Yes Yes Yes Yes Yes Yes 400 9300
303 32/5 Anandpura B.K Yes Agri 1 Tejaji Nanjiji Bhatakiya Yes Yes Yes Yes Yes Yes 1188 19700
304 32/5 to 33/0 Anandpura B.K Yes Agri 1 Dharamshibhai Punabhai Mehriya Yes Yes Yes Yes Yes Yes 512 8500
305 32/5 to 33/0 Anandpura B.K Yes Agri 1 Gordhanbhai Punabhai Prajapati Yes Yes Yes Yes Yes Yes 500 10200
306 32/5 to 33/0 Anandpura B.K Yes Agri 1 Hirabhai Ramjibhai Mehriya Yes Yes Yes Yes Yes Yes 2320 38500
307 38A/0 Kashra Patan Yes Agri 1 Babu[uri Devpuri Goswami Yes Yes Yes Yes Yes Yes 1638 15000
308 38A/0-1 Kashra Patan Yes Agri 1 Revaben Virambhai Chauodhary Yes Yes Yes Yes Yes Yes 650 18000
309 38A/0-1 Kashra Patan Yes Agri 1 Virampuri Devpuri Goswami Yes Yes Yes Yes Yes Yes 1472 34300
310 38A/1 Kashra Patan Yes Agri 1 Chauodhary Kuberbhai Ramabhai Yes Yes Yes Yes Yes Yes 1925 32250
311 38A/1-2 Kashra Patan Yes Agri 1 Chaoudhary Parmabhai Ratnabhai Yes Yes Yes Yes Yes Yes 680 13800
312 38A/2-3 Kashra Patan Yes Agri 1 Bhagvanbhai Ratnabhai Chaoudhari Yes Yes Yes Yes Yes Yes 510 12000
313 39/0 Devpura Patan Yes Agri 1 Bijolbhai Arjanbhai Rabari Yes Yes Yes Yes Yes Yes 2915 65000
314 40/2 Sariyad Patan Yes Agri 1 Jivrambhai Ujambhai Joshi Yes Yes Yes Yes Yes Yes 904 15000
315 40/4 Sariyad Patan Yes Agri 1 Srirambhai Amrutbhai Joshi Yes Yes Yes Yes Yes Yes 904 15000
316 40/5 Sariyad Patan Yes Agri 1 Hardevbhai BHAMJIBHAI Joshi Yes Yes Yes Yes Yes Yes 904 15000
317 40/7 Sariyad Patan Yes Agri 1 Bharatbhai Gopalbhai Joshi Yes Yes Yes Yes Yes Yes 1472 34000
318 40/8 Sariyad Patan Yes Agri 1 Manchheben Baldevbhai Joshi Yes Yes Yes Yes Yes Yes 904 15000
319 40/9 Sariyad Patan Yes Agri 1 Ambaram Vaghabhai Joshi Yes Yes Yes Yes Yes Yes 904 15000
320 40/10 Sariyad Patan Yes Agri 1 Ramshigbhai Devshibhai Chaoudhay Yes Yes Yes Yes Yes Yes 904 15000
321 40/11 Sariyad Patan Yes Agri 1 Laxmanbhai Dhulabhai Panchal Yes Yes Yes Yes Yes Yes 600 10000
322 41/0 Sariyad Patan Yes Agri 1 Dungarbhai Ramabhai Chaoudhary Yes Yes Yes Yes Yes Yes 605 10000
323 41/2 Sariyad Patan Yes Agri 1 Vasudev Bhanjibhai Joshi Yes Yes Yes Yes Yes Yes 450 7500
324 41/2 Sariyad Patan Yes Agri 1 Prabhuram Jemabhai Joshi Yes Yes Yes Yes Yes Yes 450 7500
325 41A/0 Sariyad Patan Yes Agri 1 Laxmiram Shivarambhai Joshi Yes Yes Yes Yes Yes Yes 904 15000
326 41A/1 Sariyad Patan Yes Agri 1 Revabhai Vashibhai Desai Yes Yes Yes Yes Yes Yes 904 15000
327 41A/2 Sariyad Patan Yes Agri 1 Raniben Laxmanbhai Chaoudhay Yes Yes Yes Yes Yes Yes 904 15000
328 41A/3 Sariyad Patan Yes Agri 1 Parmabhai Devanbhai Chaoudhary Yes Yes Yes Yes Yes Yes 904 15000
329 42/0 Sariyad Patan Yes Agri 1 Ranchhodbhai Bhemabhai Choudhari Yes Yes Yes Yes Yes Yes 904 15000
330 42/2 Sariyad Patan Yes Agri 1 Punabhai Gemabhai Nai Yes Yes Yes Yes Yes Yes 904 15000
331 42/3 Sariyad Patan Yes Agri 1 Laxmanbhai Ganeshbhai Chaoudhary Yes Yes Yes Yes Yes Yes 480 8000
332 42/5 Lodhi Patan Yes Agri 1 Rabari Jorabhai Vastabhai Yes Yes Yes Yes Yes Yes 904 15000
333 43/1 Lodhi Patan Yes Agri 1 Harijan Paniben Haribhai Yes Yes Yes Yes Yes Yes 1060 11925
334 44/1 Vadiya Patan Yes Agri 1 Savshiji Gemaji Thakor Yes Yes Yes Yes Yes Yes 300 5000
335 44/3 Vadiya Patan Yes Agri 1 Manjaji Abhaji Thakor Yes Yes Yes Yes Yes Yes 600 10000
336 44/4 Vadiya Patan Yes Agri 1 Okhaji Kaluji Thakor Yes Yes Yes Yes Yes Yes 480 8000
337 45/0 Kalodhi Patan Yes Agri 1 Thakor Varsungji Rayji Yes Yes Yes Yes Yes Yes 904 15000
Sr. No. Tower No.Name of the
Village
Name of
the
Districts
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/
No)
Owners
hip
(Agricul
ture) or
Govern
ment
Number
of
Affected
Persons
/Househ
olds/Fa
milies
Name/s of the Owner in case of
Agriculture Land
Founda
tion
Comple
ted
(Yes/No
)
Erection
Complet
ed
(Yes/No)
Stringin
g
Complet
ed
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
foundation
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringing
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of Crop
Compensation
(Rupees) paid
for Stringing
Other
Impacts
such as
approach
road,
additional
area
during
execution
of work
(yes/No)
If Yes,
area for
crop
damage
(hectare)
Names of Affected
Persons
Amount of
Crop
Compensati
on (Rupees)
paid for crop
damage
338 45/3 Sadasan Patan Yes Agri 1 Narshangji Karshnji Thakor Yes Yes Yes Yes Yes Yes 904 15000
339 45B/2 Melusan Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 320 Rabari Govabhai Vas 5500
340 46/0 Melusan Patan Yes Agri 1 Rabari Vershibhai Vasrambhai Yes Yes Yes Yes Yes Yes 180 5000
34146/4 DHANASARA
Patan Yes Agri 1JAYANTHIBHAI RAMESHBHAI
JOSHIYes Yes Yes Yes Yes Yes 905 1305 15000 22000
342 47/0 Dharushan Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 875Hardevbhai
Lakhirambhai Joshi20000
343 47/0 - 47/1 Dharushan Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 430Mansukbhai
Laxmiram Joshi10000
344 47/2 Dharusan Patan Yes Agri 1 Joshi Hardevbhai Ramjibhai Yes Yes Yes Yes Yes Yes 1112 30000
345 47/3 Kanosan Patan Yes Agri 1 Thakor Ranchhodji Virbhanji Yes Yes Yes Yes Yes Yes 1208 20000
346 49/0 to 49/1 Kanosan Patan Yes Agri 1 Shankerbhai Radhabhai Bhangi Yes Yes Yes Yes Yes Yes 904 15000
347 49/1 Kanosan Patan Yes Agri 1 Thakor Dalsangji Nagarji Yes Yes Yes Yes Yes Yes 904 15000
348 49/2 Kanosan Patan Yes Agri 1 Ramanlal Chunilal Panchal Yes Yes Yes Yes Yes Yes 904 15000
349 49/3 Ganeshpura Patan Yes Agri 1 Ishverbhai Khodabhai Rabari Yes Yes Yes Yes Yes Yes 904 15000
350 49/4 Ganeshpura Patan Yes Agri 1 Babubhai Shartanbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000
351 49/5 Ganeshpura Patan Yes Agri 1 Udesinh Dalaji Rajput Yes Yes Yes Yes Yes Yes 904 15000
352 49/6 Ganeshpura Patan Yes Agri 1 Bharatbhai Sartanbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000
353 49/7 Ganeshpura Patan Yes Agri 1 Ramjibhai Ramchandbhai Raval Yes Yes Yes Yes Yes Yes 904 15000
354 49/8 Ganeshpura Patan Yes Agri 1 Taljabhai Shartanbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000
355 50/1 Abluva Patan Yes Agri 1 Kanjibhai Nathabhai Rabari Yes Yes Yes Yes Yes Yes 904 15000
356 50A/2 Abluva Patan Yes Agri 1 Chaturji Kalaji Thakor Yes Yes Yes Yes Yes Yes 904 15000
357 51/1 Abluva Patan Yes Agri 1 Amrutbhai Nathabhai RABARI Yes Yes Yes Yes Yes Yes 904 15000
358 51/4 Abluva Patan Yes Agri 1 Amrutbhai Maganbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000
359 51B/2 Delvada Patan Yes Agri 1 BharatKumar Kantilal Brahmbhatt Yes Yes Yes Yes Yes Yes 904 15000
360 51B/3 Delvada Patan Yes Agri 1 Rasmikant Natawarlal Bramhbhatt Yes Yes Yes Yes Yes Yes 904 15000
S.
No.
Towe
r No.
Name of
the Village
Name of
the
Districts
survey
No
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/ No
Ownershi
p (Agri)
or
Governm
ent
Number of
Affected
Persons/H
ouseholds
/Families
Name/s of the Owner
in case of Agri Land
Found
ation
Compl
eted
(Yes/N
o)
Erectio
n
Comple
ted
(Yes/No
)
Stringi
ng
Compl
eted
(Yes/N
o)
Payment
of
Compensa
tion done
for crop
damage
during
foundation
(Yes/No)
Payment
of
Compensa
tion done
for crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringin
g
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of
Crop
Compensati
on
(Rupees)
paid for
Stringing
Amount for
Other Impacts
such as
approach
road,
additional
area during
execution of
work
Other Impacts
such as
approach
road,
additional
area during
execution of
work (yes/No)
If Yes,
area for
crop
damage
(hectare)
Number
of
affected
Person
s
Names of
Affected Person
1 2/0. PATANKA PATAN 405 Yes Agri 5 VIRAMBHAI B.THAKOR YES YES YES YES NO NO 1371 - - 20000 - - 2000 yes 160 5VIRAMBHAI
B.THAKOR
2 2/1. PATANKA PATAN 394 Yes Agri 8 DHARSHIBHAI S.THAKOR YES YES YES YES YES NO 1371 1371 - 20000 20000 - 3000 yes 240 8DHARSHIBHAI
S.THAKOR
3 2/2. PATANKA PATAN 397 Yes Agri 6 BECHARBHAI S.THAKOR YES YES YES YES NO NO 1371 - -20000
- - - no - -BECHARBHAI
S.THAKOR
4 16/2 Korda PATAN 652 Yes Gov. land 1 Sendabhai Thakor YES YES NO YES YES NO 686 686 - 10000 10000 - 2000 yes 240 1 Sendabhai Thakor
5 17/0 Jarusha PATAN 225 Yes Agri 1 Vrajlal Nagjibhai Suthar YES YES NO YES YES NO 1375 1375 - 20000 20000 - 3000+4000 yes 240+240 1Vrajlal Nagjibhai
Suthar
6 Jarusha PATAN 203/1 Yes Agri 1Chaganbhai Danabhai
PrajapatiYES NO NO 675 - - 10000 - - 2000 yes 240 1
Chaganbhai
Danabhai Prajapati
7 Jarusha PATAN 205 Yes Agri 9 Memabhai Jivabhai Patel YES NO NO 675 - - 10000 - - 4000 yes 300 1Memabhai Jivabhai
Patel
8 17/5 Jarusha PATAN 243 Yes Agri 4 Patel jagmal H YES YES NO YES YES NO - 1375 - - 20000 - 4000 yes 300 4 Patel jagmal H
9 17/11 Jekda PATAN 13 Yes Agri 1Chaudhari Vajabhai
MahadevbhaiYES YES NO YES YES NO 1375 1371 - 20000 20000 - 10000+5000 yes 800+400 1
Chaudhari Vajabhai
Mahadevbhai
10 Jekda PATAN 23 Yes Agri 8 Luhar Laxmanbhai B YES YES NO - 1371 - - 20000 - 3000 yes 240 8 Luhar Laxmanbhai B
11 Jekda PATAN 22 Yes Agri 1Shankar Bhai Vrsang Bhai
BharwadYES YES NO - 150 - - 3000 - - no - -
Shankar Bhai Vrsang
Bhai Bharwad
12 18/2 Jekda PATAN 289 Yes Agri 1 Bharvad Varsangbhai R YES YES NO YES YES NO - 1371 - - 20000 - - no - -Bharvad
Varsangbhai R
13 19/0 Bhilot PATAN 55 Yes Agri 1Joshi Pravinkumar
Jayshankar BhaiYES YES NO YES YES NO 1375 1376 - 20000 20000 - 3000+3000 yes 300+150 1
Joshi Pravinkumar
Jayshankar Bhai
14 Bhilot PATAN 49 Yes Agri 7Suthar Jayrambhai
KeshavlalYES YES NO 1371 1371 - 20000 20000 - 3000+3000 yes 150+150 7
Suthar Jayrambhai
Keshavlal
15 Bhilot PATAN Yes Agri 1 Bhogilal Revashankar Joshi YES YES NO 240 280 - 3000 5000 - - no - -Bhogilal
Revashankar Joshi
16 Bhilot PATAN Yes Agri 1Gelubha Mobatsang
VagelaYES NO NO 240 - - 3000 - - - no - -
Gelubha Mobatsang
Vagela
17 21/0 Bhilot PATAN 250/1/1 Yes Agri 5Merambhai Talsibhai
ThakorYES YES NO YES YES NO 1371 1371 - 20000 20000 - 3000+3000 yes 300+240 5
Merambhai
Talsibhai Thakor
18 23/4 Mehmdavad PATANgov.
landYes Gov. land 1
okhabhai mohanbhai
harijanYES YES NO YES YES NO - 1371 - - 20000 - - no - -
okhabhai
mohanbhai harijan
19 26/8 Alahbad PATAN 151/5 Yes Agri 6Bharvad Lakhmanbhai
KarshanbhaiYES YES NO YES YES NO 1371 - 20000 20000 - 5000+3000 yes 343 6
Bharvad
Lakhmanbhai
Karshanbhai
20 26/9 Alahbad PATAN 182 Yes Agri 2 Thakor Devanbhai Ajubhai YES YES NO YES NO NO 1371 - - 19975 - - - no - -Thakor Devanbhai
Ajubhai
21 Alahbad PATAN 67/3 Yes Agri 4 Vejaben Kamabhai Patel YES YES NO 1371 1371 - 20000 20000 - 4000+3000 yes 200+200 4Vejaben Kamabhai
Patel
22 Alahbad PATAN 67/2 Yes Agri 4Patel Laghjirbhai
BhagabhaiYES YES NO - 760 - - 8000 - - no - -
Patel Laghjirbhai
Bhagabhai
23 27/0 Arjansar PATAN79 /5
Yes Gov. land 1 Thakor Dajabhai Gagaram YES YES NO YES YES NO - 1371 - - 20000 - 3000 yes 240 1Thakor Dajabhai
Gagaram
24 33/1 ANADPURABANASKA
NTHA94 Yes
VARSUNGJI MANAJI
THAKORYES YES NO YES YES NO - - - 20000 - - no - -
VARSUNGJI MANAJI
THAKOR
26/11 YES
Annexure A2_Detail of Crop Compensation (400 kV Charanka - Sankhari Line) for Dt-01.11.2014 to Dt-30.04.2015
NO
YES YES
YES
YES
NO
NO
Details on Each Tower 400 KV Charanka - Veloda Line
General Details Details on Affected Status on Construction Status on Payment of
NO
17/3
17/13
Affected Area for crop
20/0
Amount of Compensation (Rupees) Other Impacts
YES
YES
YES
S.
No.
Towe
r No.
Name of
the Village
Name of
the
Districts
survey
No
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/ No
Ownershi
p (Agri)
or
Governm
ent
Number of
Affected
Persons/H
ouseholds
/Families
Name/s of the Owner
in case of Agri Land
Found
ation
Compl
eted
(Yes/N
o)
Erectio
n
Comple
ted
(Yes/No
)
Stringi
ng
Compl
eted
(Yes/N
o)
Payment
of
Compensa
tion done
for crop
damage
during
foundation
(Yes/No)
Payment
of
Compensa
tion done
for crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringin
g
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of
Crop
Compensati
on
(Rupees)
paid for
Stringing
Amount for
Other Impacts
such as
approach
road,
additional
area during
execution of
work
Other Impacts
such as
approach
road,
additional
area during
execution of
work (yes/No)
If Yes,
area for
crop
damage
(hectare)
Number
of
affected
Person
s
Names of
Affected Person
25 33/2 ANADPURABANASKA
NTHA66 Yes
Kalaniya Chehrabhai
PunjabhaiYES YES NO YES YES NO - - - 20000 - 3000 yes - -
Kalaniya
Chehrabhai
Punjabhai
26 34/0 odhaBANASKA
NTHA64 Yes Gov. land 1
Sonetha Maganbhai
AmathbhaiYES YES YES YES YES YES 1371 1371 20000 20000 20000
3000+13048+60
86yes 900+420 1
Sonetha Maganbhai
Amathbhai
27 34/1 odhaBANASKA
NTHA45 Yes Agri 9
Rajabhai Mafabhai
BhangeeYES YES YES YES YES YES 1370 1371 20000 20000 20000 6956 yes 480 9
Rajabhai Mafabhai
Bhangee
28 34/2 OdhaBANASKA
NTHA37P1 Yes Agri 1 Ghia Saifudeen Husainbhai YES YES YES YES YES YES - - 1371 - - 20000 7826+20869 yes 540+1440 1
Ghia Saifudeen
Husainbhai
29 OdhaBANASKA
NTHA92 Yes Agri 1 Yusufali Ibrahim Ghiya YES YES YES - - 1030 - - 15000 6956 yes 480 1
Yusufali Ibrahim
Ghiya
30 odhaBANASKA
NTHA56 Yes Agri 7
Shankuben Raymalbhai
PataniYES YES YES 240 900 5000 5000 13048 5000 yes 341 7
Shankuben
Raymalbhai Patani
31 34/4 OdhaBANASKA
NTHA89P1 Yes Agri 3
Farudeen Husainbhai
GhiyaYES YES YES YES YES YES - - 1371 - - 20000 10434+12173 yes 840+720 3
Farudeen
Husainbhai Ghiya
32 34/5 OdhaBANASKA
NTHA75 Yes Gov. land 1 Ludharia Bhemabhai V YES YES YES YES YES YES - 1371 - 20000 20000 18550 yes 1280 1
Ludharia
Bhemabhai V
33 TotanaBANASKA
NTHA134 Yes Agri 5
PATNI RAMABHAI
MOHANBHAIYES YES YES - 1371 - 20000 20000 3250+17500 yes 1400 5
PATNI RAMABHAI
MOHANBHAI
34 TotanaBANASKA
NTHA134 Yes Agri 1
Vaghari Naranbhai
MohanbhaiYES YES YES - 1080 - 5500 15650 - no - -
Vaghari Naranbhai
Mohanbhai
34/3
34 /7
YES
YES YES
YES YES
YES
S.
No.
Towe
r No.
Name of
the Village
Name of
the
Districts
survey
No
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/ No
Ownershi
p (Agri)
or
Governm
ent
Number of
Affected
Persons/H
ouseholds
/Families
Name/s of the Owner
in case of Agri Land
Found
ation
Compl
eted
(Yes/N
o)
Erectio
n
Comple
ted
(Yes/No
)
Stringi
ng
Compl
eted
(Yes/N
o)
Payment
of
Compensa
tion done
for crop
damage
during
foundation
(Yes/No)
Payment
of
Compensa
tion done
for crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringin
g
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of
Crop
Compensati
on
(Rupees)
paid for
Stringing
Amount for
Other Impacts
such as
approach
road,
additional
area during
execution of
work
Other Impacts
such as
approach
road,
additional
area during
execution of
work (yes/No)
If Yes,
area for
crop
damage
(hectare)
Number
of
affected
Person
s
Names of
Affected Person
35 34/12 TotanaBANASKA
NTHA207 Yes
THAKOR VERASIJI
MOHANJIYES YES YES YES YES NO - - - 20000 - 8000 yes - -
THAKOR VERASIJI
MOHANJI
36 34/13 TotanaBANASKA
NTHA202 Yes
TOTANIYA BAJUJI
RAMASIJIYES YES YES YES YES NO - - - 20000 - - no - -
TOTANIYA BAJUJI
RAMASIJI
37 35/3 TotanaBANASKA
NTHAYes
Hajabhai Dayabhai
BharwadYES YES YES YES NO NO - - 20000 - - - no - -
Hajabhai Dayabhai
Bharwad
38 35/4 TotanaBANASKA
NTHA296/3/3 Yes Agri 3
Gandabhai Kasabhai
BharavadYES YES YES YES YES NO 1370 - 20000 20000 - - no - -
Gandabhai Kasabhai
Bharavad
39 35/5 TotanaBANASKA
NTHA296/3/2 Yes Agri 4
Jamabhai Bhurabhai
BharvadYES YES YES YES YES NO 1370 - 20000 20000 - - no - -
Jamabhai Bhurabhai
Bharvad
40 35/6 TotanaBANASKA
NTHA296\4 Yes
Bharvad Babubhai Ganesh
BhaiYES YES YES YES YES NO - - - 20000 - 5000 yes - -
Bharvad Babubhai
Ganesh Bhai
41 35/7 TotanaBANASKA
NTHA433/b/1 Yes Agri 12 Thakor Chelaji Wadhaji YES YES YES YES NO NO 1371 - - 20000 - - - no - -
Thakor Chelaji
Wadhaji
42 35/9 Mota JampurBANASKA
NTHA433/1 Yes Gov. land 1
Charanbha Kanubha
VaghelaYES YES YES YES NO NO 1371 - - 20000 - - - no - -
Charanbha Kanubha
Vaghela
43 35/10 Mota JampurBANASKA
NTHA433/1 Yes Gov. land 1
Charanbha Kanubha
VaghelaYES YES YES YES NO NO 1371 - - 20000 - - - no - -
Charanbha Kanubha
Vaghela
44 35/11 Mota JampurBANASKA
NTHA433/1 Yes Gov. land 1 Pratapjee Thakhaji Solanki YES YES YES YES NO NO 1371 - - 20000 - - - no - -
Pratapjee Thakhaji
Solanki
45 36/0 Mota JampurBANASKA
NTHA433 Yes Gov. land 1 Madhaji Ladhaji Thakor YES YES YES YES YES NO 1471 - 20000 20000 - 4000 yes - -
Madhaji Ladhaji
Thakor
46 37/0 Mota JampurBANASKA
NTHA433/2 Yes Gov. land 1 Vaghila Jambha Chapuji YES YES YES YES NO NO 1371 - - 20000 - - - no - -
Vaghila Jambha
Chapuji
47 37/1 Mota JampurBANASKA
NTHA433/b/1 Yes Gov. land 1 Pratapjee Thakhaji Solanki YES YES YES YES NO NO 1371 - - 20000 - - - no - -
Pratapjee Thakhaji
Solanki
48 37/2 Vithlod PATAN 8 Yes Thakor Ramsanji Babaji YES YES YES YES YES NO - - - 20000 - - no - -Thakor Ramsanji
Babaji
49 37/3 Vithlod PATAN
7
GOV.
LAND
Yes Vershiji Kamaji Thakor YES YES YES YES YES NO - - - 20000 - 7000 yesVershiji Kamaji
Thakor
50 37/4 Vithlod PATAN
6
GOV.
LAND
Yes Thakor Lembuji Devsiji YES YES YES YES YES NO - - - 20000 - 6000 yesThakor Lembuji
Devsiji
51 37/5 Vithlod PATAN 4P1 Yes Thakor Makanji Sursangji YES YES YES YES YES NO - - - 20000 - 5000 yesThakor Makanji
Sursangji
52 37/6 Vithlod PATAN 43P2 Yes Thakor Lilaji Devsiji YES YES YES YES YES NO - - - 20000 - 4000 yes Thakor Lilaji Devsiji
53 37/7 devpura PATAN 89 Yes sarupji rasunji thakor YES YES YES YES YES NO - - - 20000 - 4600 yessarupji rasunji
thakor
54 37/8 devpura PATAN 75 Yes sarupji rasunji thakor YES YES YES YES YES NO - - - 20000 - 6700 yessarupji rasunji
thakor
55 38/0. DEVPURA PATAN 72/2 P1 YesSAMUBEN B.VAGHARI
YES YES YES YES YES NO - - - 20000 - 11000 yesSAMUBEN
B.VAGHARI
56 38/1 devpura PATAN 64 Yes Agri 7 Liluben Jorabhai Desai YES YES NO 1371 - 20000 20000 - 2500 yes 245 7Liluben Jorabhai
Desai
57 38/1 devpura PATAN 25/1 Yes Thakor Bhupatsinh Bajuju YES YES NO - - - 5000 - - no - -Thakor Bhupatsinh
Bajuju
58 39/0 devpura PATAN 18/2/1 Yes Agri 1 Mavajibhai Hirabhai Rava YES YES YES YES YES NO 1371 - 20000 20000 - 6000+6000 yes 300 1Mavajibhai Hirabhai
Rava
59 devpura PATAN 193 Yes thakor vershiji talaji YES YES NO - - - 10000 - 2000 yes thakor vershiji talaji
60 devpura PATAN 192 Yes Agri 1 Lilaji Motiji Thakor YES YES NO 697 - 10000 10000 - 5000 yes Lilaji Motiji Thakor
61 39/2 devpura PATAN 95 Yes Agri 1Raychandbhai Amthabhai
VagharYES YES NO YES YES NO 1371 - 20000 20000 - - no - -
Raychandbhai
Amthabhai Vaghar
62 Vithlod PATAN 98\1 Yes Agri 1 Cheharabhai J Chaudhri YES YES NO - 1371 - - 20000 - 3000 yes 240 1Cheharabhai J
Chaudhri
39/1
YES
NO
YES
NO
YES
YES
YES39/6 YES
YES
S.
No.
Towe
r No.
Name of
the Village
Name of
the
Districts
survey
No
Complet
ion of
final
surveys
and
pegging
of tower
(Yes/ No
Ownershi
p (Agri)
or
Governm
ent
Number of
Affected
Persons/H
ouseholds
/Families
Name/s of the Owner
in case of Agri Land
Found
ation
Compl
eted
(Yes/N
o)
Erectio
n
Comple
ted
(Yes/No
)
Stringi
ng
Compl
eted
(Yes/N
o)
Payment
of
Compensa
tion done
for crop
damage
during
foundation
(Yes/No)
Payment
of
Compensa
tion done
for crop
damage
during
Erection
(Yes/No)
Payment of
Compensati
on done for
crop
damage
during
Stringing
(Yes/No)
Area
affected
during
foundatio
n (square
meters)
Area
Affected
During
Erection
(square
meters)
Area
Affected
during
stringin
g
(square
meters)
Amount of
Crop
Compensati
on (Rupees)
paid for
foundation
Amount of
Crop
Compensati
on (Rupees)
paid for
Erection
Amount of
Crop
Compensati
on
(Rupees)
paid for
Stringing
Amount for
Other Impacts
such as
approach
road,
additional
area during
execution of
work
Other Impacts
such as
approach
road,
additional
area during
execution of
work (yes/No)
If Yes,
area for
crop
damage
(hectare)
Number
of
affected
Person
s
Names of
Affected Person
63 Vithlod PATAN 98\2 Yes Agri 1Paragbhai Ranchhodbhai
ChaudhariYES YES NO - - - 5000 - - no - -
Paragbhai
Ranchhodbhai
Chaudhari
64 39/7 Dhanera PATAN 96/2 Yes Agri 1 Rajabhai Varshibhai Desai YES YES NO YES YES NO 1371 1371 - 20000 20000 - - no - -Rajabhai Varshibhai
Desai
65 Sariyad PATAN 273P1 Yes Agri 6 Thakor Chandanji Rudaji YES YES NO - 1371 - - 20000 - 10217 yes 705 6Thakor Chandanji
Rudaji
66 Sariyad PATAN Yes Agri 9 Badsangji Rudaji Thakor YES YES NO - 422 - - 4000 - - no - -Badsangji Rudaji
Thakor
67 40/0 Sariyad PATAN 253 Yes Agri 2 Talaji Laxmanji Thakor YES YES YES YES YES NO 1370 1371 - 20000 20000 - 4000+3000 yes 400 2Talaji Laxmanji
Thakor
68 40/1 Sariyad PATAN 246\1 Yes Agri 4 Lakhiram D Joshi YES YES YES YES YES NO 1400 1371 - 20000 20000 - - no - - Lakhiram D Joshi
69 40/2 Sariyad PATAN 241 Yes Agri 3 Shamjibhai A Joshi YES YES YES YES YES NO 1380 1371 - 20000 20000 - 3000+4000 yes 300+300 3 Shamjibhai A Joshi
70 40/5 Sariyad PATAN 188\1 Yes Agri 7Prajapati Jashiben
MafabhaiYES YES YES YES YES NO 1370 1371 - 20000 20000 - 3000+2250 yes 300+246 7
Prajapati Jashiben
Mafabhai
71 40/6 Sariyad PATAN 185\1 Yes Agri 1Pajapati Gandabhai
HaribhaiYES YES YES YES YES NO 1370 1371 - 20000 20000 - 3000+3000 yes 300+360 1
Pajapati Gandabhai
Haribhai
72 Sariyad PATAN 45/1 Yes Agri 1 Pratapji Raychandji Thakor YES YES NO 862 852 - 10000 10000 -8176+5765+
8000+7000yes
705+493+1
60
483
1Pratapji Raychandji
Thakor
73 Sariyad PATAN 430/4 Yes Agri 4 Taljabhai Daljibhai Rabari YES YES NO 738 682 - 10000 10000 - 3000+4000 yes 320+548 4Taljabhai Daljibhai
Rabari
74 41/2 Sariyad PATAN 512 Yes Agri 1Ranchhodbhai Ramabhai
ChaudhryYES YES NO YES YES NO - 1371 - - 20000 - 6500 yes 465 1
Ranchhodbhai
Ramabhai Chaudhry
75 41/4 PATANKA PATAN 543/2 Yes Agri 1 ISHWERBHAI C.CHAMAR YES YES NO YES YES NO - 1371 - - 20000 - - no - -ISHWERBHAI
C.CHAMAR
76 42/0 Sariyad PATAN 581 Yes Agri 2Narotambhai Virambhai
NayeeYES YES YES YES YES NO - 1371 - - 20000 - 5000 yes 342 2
Narotambhai
Virambhai Nayee
77 Sariyad PATAN 587 Yes Agri 1 Nai Velabhai Balvantbhai YES YES NO - 300 - - 4000 - - no - -Nai Velabhai
Balvantbhai
78 Sariyad PATAN 581 Yes Agri 2Valabhai sagrambhai
chudhariYES YES NO - 1371 - - 20000 - 4000 yes 240 2
Valabhai
sagrambhai
chudhari
79 42/4 Sariyad PATAN 732 Yes Agri 8 Lila bhai Karsanbhai Rabari YES YES YES YES YES NO - 1371 - - 20000 - 5000 yes 360 8Lila bhai Karsanbhai
Rabari
80 42/5 Lodhi PATAN 89/41 Yes Agri 3Nagjibhai Vashrambhai
RabariYES YES YES YES YES NO 1340 1371 - 20000 20000 - 3000+4000 yes 150+175 3
Nagjibhai
Vashrambhai Rabari
81 42/6 Lodhi PATAN 89/43 Yes Agri 9Revabhai Hamirbhai
RabariYES YES YES YES YES NO - 1371 - - 20000 - 2500 yes 240 9
Revabhai Hamirbhai
Rabari
82 43/0 Lodhi PATAN 89/49 Yes Agri 1 Rabari Sankabhai Lilabhai YES YES YES YES YES NO 1453 1453 - 20000 20000 - 4000+3000 yes 240+180 1Rabari Sankabhai
Lilabhai
83 43/1 Lodhi PATAN 89/50/1 Yes Agri 1 Jorabhai Vastabhai Rabari YES YES YES YES YES NO - 1371 - - 20000 - 3000 yes 180 1Jorabhai Vastabhai
Rabari
84 43/2 Veloda PATAN 56 Yes Agri 2Bhikhabhai Danabhai
RabariYES YES YES YES YES NO 1371 1371 - 20000 20000 - 3000 yes 210 2
Bhikhabhai
Danabhai Rabari
85 43/3 Veloda PATAN 58/5 Yes Agri 1Rabari Jamabhai Rama
BhaiYES YES YES YES YES NO 1371 1371 - 20000 20000 - 15900 yes 660 1
Rabari Jamabhai
Rama Bhai
86 43/4 Veloda PATAN 62 Yes Agri 10Jamabhai Naranbhai
RabariYES YES YES YES YES NO 1371 1371 - 20000 20000 - 4000 yes 300 10
Jamabhai
Naranbhai Rabari
NO
NO
YES
41/0
YES
YES YES YES
YES YES
YES
39/8 YES
39/6 YES
42/1