Social and Environmental Monitoring Report This report has been submitted to ADB by the Gujarat Energy Transmission Corporation Limited (GETCO), Vadodra and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This social and environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Project Number: 44431-013 May 2017 Period: November 2014 – April 2015 IND: Gujarat Solar Power Transmission Project Submitted by Gujarat Energy Transmission Corporation Limited (GETCO), Vadodra
Transcript
Page 1: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Social and Environmental Monitoring Report

This report has been submitted to ADB by the Gujarat Energy Transmission Corporation Limited (GETCO), Vadodra and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.

This social and environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Number: 44431-013 May 2017 Period: November 2014 – April 2015

IND: Gujarat Solar Power Transmission Project

Submitted by

Gujarat Energy Transmission Corporation Limited (GETCO), Vadodra

Page 2: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November
Page 3: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Social and Environmental Monitoring Report

Project Number: 4431-013

Date: 05.10.2015

Reporting Period: Bi Annual Report (1st November 2014 to 30th April 2015)

IND: Gujarat Solar Power Transmission Project

Prepared by

Gujarat Energy Transmission Corporation Limited (GETCO)

The Monitoring document is a document of the borrower. The views expressed herein do not necessarily

represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

Asian Development Bank

Page 4: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

TABLE OF CONTENTS

1. Abbreviations, Weights And Measures 3

2. Introduction 4

a. Project Description 5

3. Compliance Status With Statutory Environmental and Social Requirements 7

4. Compliance Status With The Environmental and Social Loan Covenants 8

5. Environmental Management and Monitoring 12

6. Component of Environmental Monitoring Plan 20

7. Involuntary Resettlement 20

8. Complaints And Grievances 23

9. Follow-Up Actions And Conclusions 23

10. Annexures 24

Page 5: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Abbreviations, Weights and measures

ADB – Asian Development Bank

CEA – Central Environmental Authority

DC or D/C – Double Circuit

DPR – Detailed Project Report

EA – Executing Agency

EHV – Extra High Voltage

EIA – Environmental Impact Assessment

EMP – Environmental Management Plan

EMoP – Environmental Monitoring Plan

FFA – Framework Financing Agreement

GETCO – Gujarat Energy Transmission Corporation Ltd.

GOG – Government of Gujarat

GoI – Government of India

GPCL – Gujarat Power Corporation Limited

GPCB – Gujarat Pollution Control Board

GRM – Grievance Redress Mechanism

ha – Hectare

HVDS – High-Voltage Distribution System

IA – Implementing Agency

IEE – Initial Environmental Examination

MOEF – Ministry of Environment and Forests

MP – Madhya Pradesh

MOP – Ministry of Power

MSL – Mean Sea Level

NIT – Notice of Inviting Tender

PTCC – Power Telecom Co-ordination Committee

PGCIL – Power Grid Corporation of India Limited

PLF – Plant Load Factor

PMU – Project Management Unit

RE – Rural Electrification

RP – Resettlement Plan

ROW – Right of Way

Page 6: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

INTRODUCTION

The Government of Gujarat (GoG) and Gujarat Power Corporation Ltd (GPCL) are developing

all necessary infrastructure for a 500 MW solar park at Charanka Village, Patan District, Gujarat,

with the intention to encourage private developers to build solar generating capacity on a number

of individual plots of land. The onsite and offsite power transmission system associated with the

solar park is funded by ADB (thereafter referred to as the Gujarat Solar Power Transmission

Project or the Project).

The Project aims to support the development of long-term sustainable energy sources in a cost-

effective manner in India. The Project’s outcome is the successful development and operation of

a transmission link to evacuate power from the Solar Park at Charanka to the Gujarat

transmission grid. The proposed Project has been envisaged in consultation with GOI and other

beneficiary constituents for the reliable evacuation of the 500 MW generated at the solar park

from a 66/220/400 kV substation at Charanka, via two dedicated 220 kV and 400kV lines to the

existing 220 kV substation at Jangral and the 400 kV Sankhari substation. The two transmission

lines will be double circuit and have been routed differently in order to maintain adequate system

reliability.

In addition, as per Government of Gujarat Solar Power Policy, 2009 dated 06.01.2009, GETCO

has to construct the transmission system for evacuation of solar power from the switchyards of

each solar power generation plants. The Solar Park of 500 MW has been proposed with a mix of

Photovoltaic (PV) with a range of 5 MW to 25 MW and Concentrated Solar Power (CSP) with a

range of 25 MW to 50 MW. The power generated from PVs and CSPs will be evacuated at 66

kV level to the electrical pooling substation in the Solar Park through underground cables in

order to avoid shadow of transmission towers and conductors on Solar panels.

GETCO, State Transmission Utility (STU) and deemed licensee to operate in the State of

Gujarat, will be the executing agency (EA) and the implementing agency (IA) for the Solar

Power Transmission Project. GETCO will also be responsible for supervising project

implementation and monitoring of transmission project operational performance.

Gujarat Electricity Regulatory Commission (GERC) issued tariff order on 29 January 2010

(Order No. 2 of 2010) for procurement of power by distribution licensees and others from solar

energy projects in the State of Gujarat. The approved tariff is applicable to solar power projects

Page 7: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

commissioned during the Control Period of two years ending on 28 January 2012. It was a

critical situation for GETCO to complete evacuation system of Charanka Solar Park before end

of the control period so that solar power producers can avail tariff approved by GERC. To

comply time bound target, GETCO executed portion of 14.52 Km of 220 KV transmission line

from Charanka to Jangral by its own fund and created a temporary evacuation system for

charanks solar park. Subsequently, ADB funded 220 KV transmission line is reduced to 96.13

Km. As the whole transmission line was funded ADB, hence ADB has insisted to perform a due

diligence of 14.52 Km portion of 220 KV transmission line, which was submitted on 28.07.2015

for ADB approval.

Based on detail survey before execution of 220 KV & 400 KV transmission lines, the alignment

is changed considering most appropriate route. Considering the same, updates and finalization of

Initial Environmental Examination (IEE), Environment Management Plan (EMP) &

Resettlement Plan (RP) are required under loan agreement for the project due to change in

alignment.

Due diligence of 14.52 Km portion of 220 KV transmission line along with update Initial

Environmental Examination (IEE), Environment Management Plan (EMP) & Resettlement Plan

(RP) for the portion of new alignment was submitted on 28.07.2015 for ADB approval.

1. Project Description

The Gujarat Solar Power Transmission Project will assist the Government of India (GoI) and

Government of Gujarat (GoG) to develop least-cost project implementation through various

physical outputs by 2014 such as:

(i) 400/220/66 kV substations at Charanka and Sankhari and 2 Nos 220 KV feeder bays at

Jangral S/S,

(ii) Supply & erection of 400/220 kV 315 MVA transformers, 400 kV Bus reactors and 220/66

kV 100 MVA transformers for Substations,

(iii) About 99.62 kms of 400 kV double circuit transmission line from the solar park to

Sankhari,

(iv) About 96.13 kms of 220 kV double circuit transmission line from the solar park to Jangral,

(v) Supply of 66 kV underground cables of about 140 kms for Charanka Park.

Page 8: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

The project is estimated to cost US$ 130 Million (without IDCs and contingencies) with the

ADB share at $80 million. The erection/commissioning of all these facilities are to be

implemented by Gujarat Energy Transmission Corporation Limited (GETCO). GETCO, along

with GoG, will be the Executing Agency (EA) for the transmission and power evacuation

component. GETCO will be responsible for supervising project implementation and monitoring

of project operational performance. GETCO will establish a Project Management Unit (PMU)

headed by a Project Director to be responsible for day-to-day implementation of the Project.

GETCO is responsible for undertaking the Project in accordance with the Initial Environmental

Examination (IEE) and implementing the Resettlement Plan (RP) in accordance with ADBs

Safeguard Policy Statement 2009. The Project Management Unit (PMU) is responsible for

coordinating and implementing all social and environmental activities. The PMU has a

designated officer for Right of Way (ROW) clearances including environmental, social and

safety issues.

This bi-annual Safeguards Monitoring Report (SMR) is prepared by GETCO as is required as per

loan covenants under Schedule 5. GETCO will disclose the relevant information from this report

promptly to affected persons and ADB will disclose the document on its website as per its

Communication Policy (2011).

Page 9: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

2. Compliance status with statutory environmental and social requirements

The sub-projects under this program should comply with the requirements of the following Acts, Rules, Notifications, Standards and

Policies of GoI, National / State / Local level statutory requirements:

Project section Clearances and NOC’s required Status Remarks

400/220/66 kV substations at

Charanka and Sankhari and 2 Nos.

220 KV feeder bays at Jangral S/S,

Approval of Chief Electrical Inspector

(CEI)

Land for Charanka substation is owned by Gujarat Power Corporation Ltd and provided on 07-05-2011 for construction of 400/220/66 kV substations for evacuation of power generated from Charanka Solar project. Land for Sankhari substation is provided by Govt. of Gujarat on 04-11-2011 for construction of 400/220/66 kV substations to facilitate power evacuation from Charanka Solar project. Jangral Substation is existing substation, where land acquisition is not required. Only 2 Nos. 220 KV feeder bays need to be constructed.

As the land is provided by GoG, hence there is no land acquisition and resettlement. Approval from Chief Electrical Inspector (CEI) will be taken at the time of commissioning of substation.

Supply & erection of 400/220 kV 315 MVA transformers, 400 kV Bus reactors and 220/66 kV 100 MVA transformers for Substations,

For charging of Transformer, approval of Chief Electrical Inspector (CEI) is required.

Approval from Chief Electrical Inspector (CEI) will be taken at the time of commissioning/ Charging the Transformer.

-do-

About 99.62 kms of 400 kV double circuit transmission line from the solar park to Sankhari,

Most feasible route selection considering all environmental & Social parameters, availability of logistics support during construction, operation and maintenance of transmission lines and specific geographical condition to construct the lines, relevant topographic maps and walkover surveys, etc. The angle points taken are minimum and only as per requirement.

400 KV transmission line:

400 KV transmission line package is awarded to M/s Gammon India Ltd. Date of commencement of 400 KV transmissions Line is 09.10.2013. Forest approval is obtained and submitted to ADB on 04.09.2015. In monitoring period i.e. from 1st Nov 2014 to 30th April 2015, 41 Nos. of tower foundations, 53 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed.

Page 10: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Railway, Forest & Road clearances is required accordingly.

(Cumulative- 191 Nos. of tower foundations,168 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed).

220 KV transmission line:

Contract for 220 kV double circuit lines package has been awarded to M/s L&T Ltd. In monitoring period i.e. from 1st Nov 2014 to 30th April 2015, 18 Nos. of tower foundations, 32 Nos. of tower erection and 36.750 route Km. of tower stringing have been completed. (Cumulative- 302 Nos. of tower foundations and 302 Nos. of tower erection and 93.710 route Km. of tower stringing have been completed).

About 96.13 kms of 220 kV double circuit transmission line from the solar park to Jangral,

Supply of 66 kV underground cable of about 140 kms for Charanka Park

Contract placed_ Complied.

3. Compliance status with the environmental and social loan covenants

Sr.

No.

Environment, resettlement and social safeguards

loan covenant

Status of compliance and developments during

current reporting period. Remarks

Environment, Health and Safety.

The State and GETCO shall ensure that the preparation, design, construction, implementation, operation and

commissioning of the project and all project facilities comply with:

1a All applicable laws and regulations of the Borrower

relating to environment, health and safety

GETCO is taking care that all applicable measures

and requirements of Environmental Safeguards in the

IEE, EMP during execution of project.

GETCO is also updated Initial Environmental Examination (IEE), Environment Management Plan (EMP) & Resettlement Plan (RP) for the portion of new alignment and perform Due diligence of 14.52 Km portion of 220 KV transmission line and was submitted on 28.07.2015 for ADB approval.

Due diligence of 14.52 Km portion of 220 KV transmission line along with update of Initial Environmental Examination (IEE), Environment Management Plan (EMP) & Resettlement Plan (RP) was submitted on 28.07.2015 for ADB approval.

1b The Environmental Safeguards

1c

All measures and requirements set forth in the IEE, EMP

and any corrective or preventive actions set forth in a

safeguards monitoring report.

Page 11: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Land acquisition and involuntary resettlement.

The State and GETCO shall ensure that all land and all rights-of-way required for the project are made available to the

works contractor in accordance with the schedule agreed under the related works contract and all land acquisition and

resettlement activities are implemented in compliance with:

Remarks

2a All applicable laws and regulations of the Borrower

relating to land acquisition and involuntary resettlement

For Substations purpose, Only Government waste lands have been considered, which does not involve any acquisition of private/ agriculture land. Hence, there is no land acquisition or involuntary resettlement. For Transmission Line purpose, the route alignment passes through shrub lands, cultivated and abandoned fields. No land acquisition is required for placing transmission towers. After placing transmission towers, land is given back to land owners. Hence there is no Land acquisition or resettlement involved in the project. However, for tree clearance/crop compensation/way leave etc, a provision of Rs 5,00,000 per kms has been provided in bidding documents of Tower package and bids were invited under ICB. The same would be paid to the affected farmers towards loss in agricultural production as per assessment of local Revenue officer in line with provision laid down in Point No. 5 & 6 of Clause No. 68 of The Electricity Act, 2003. * GETCO / Contractor will ensure all measures and requirements of original and updated IEE, EMP & RP at the time of execution of project.

No Land acquisition or any

involuntary resettlement.

2b The Involuntary Resettlement Safeguards

2c

All measures and requirements set forth in the RP and

any corrective or preventive actions set forth in the

safeguards monitoring report.

No Land acquisition or any

involuntary resettlement.

Provision of compensation

(towards loss in agricultural

production) has been

provided to affected farmers

in all three stages i.e.

foundation, erection &

stringing of lines.

Timing of physical or economic displacement.

Without limiting the application of the Involuntary Resettlement Safeguards or RP, the State shall ensure that no

physical or economic displacement takes place in connection with the project until:

Remarks

3a Compensation and other entitlements have been provided to affected people in accordance with the RP,

No physical or economic displacement.

3b A comprehensive income and livelihood restoration program has been established in accordance with the RP

No income and livelihood restoration program, as there is no physical or economic displacement.

Page 12: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Gender. Remarks

4

The State and GETCO shall ensure that the Gender Action Plan is effectively implemented, to achieve its objectives of, among others, enabling participation of women in employment, skills training and energy-based alternative livelihood activities.

Primary School of Charanka Village is developed/ renovated under GETCO CSR Plan. Detail Report in this regard was already submitted in previous monitoring report.

Development/renovation

work is completed.

4a Implementation of Gender Action Plan through Technical Assistance_ PDPU/ UN Women/ SEWA

Gujarat Solar Vocational Training and Livelihoods Project executed by UN Women, SEWA and PDPU under Technical Assistance (TA) is completed. Copy of the report submitted by PDPU was already submitted in last monitoring report.

Contractors.

GETCO shall ensure effective implementation of the following activities, including as required, that all bidding

documents and contracts for works contain provisions that require contractors to:

Remarks

5a

Comply with measures relevant to the contractor set forth in the IEE, EMP, and the RP, and any corrective or preventive measures set forth in a Safeguards Monitoring Report

GETCO along with contract will act as per

compliance during execution of project, pathway,

approach road was reinstated after execution. Any

kind of crop or tree damage is compensated as per

revenue authority assessment.

Safeguard requirement related to 14.52 Km portion

of 220 KV transmission line is compiled by GETCO

and Due Diligence report for the same along with

update Initial Environmental Examination (IEE) &

Resettlement Plan (RP) was submitted on 28.07.2015

for ADB approval.

5b

Provide GETCO with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the project that were not considered in the IEE, the EMP, and the RP.

5c Adequately record the condition of roads, and other infrastructure prior to starting to transport materials and construction, and

5d

Reinstate pathways, other local infrastructure, and land to at least their pre-project condition upon completion of construction.

5e Make available a budget for all such environmental and

social measures

A provision of Rs 5,00,000 per kms has been

provided in bidding documents of Tower package

and bids were invited under ICB.

Page 13: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Reporting on Safeguards.

The State shall do or cause GETCO to do the following:

Remarks

6a

Submit semi-annual Safeguards Monitoring Reports to

ADB and disclose relevant information from such

reports to affected persons promptly upon submission

GETCO is submitting all safeguard related aspects

through semi-annual Safeguards Monitoring Reports

and same will submitted accordingly. 6b

If any unanticipated environmental and/or social risk and impacts arise during construction, implementation or operation of the project that were not considered in the IEE, the EMP and the RP, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan

6c

Report any actual or potential breach in compliance with

the measures and requirements set forth in the EMP or

the RP promptly after becoming aware of the breach.

Indigenous Peoples. Remarks

7

The State and GETCO shall ensure that the project does

not impact indigenous peoples within the meaning of the

Safeguard Policy Statement. If due to unforeseen

circumstances, the project impacts indigenous peoples,

the State and GETCO shall take all steps necessary or

desirable to ensure that the project complies with all

applicable laws and regulations and that of the Borrower

and the State and with the Safeguard Policy Statement.

No impact as on date.

Labor Laws and HIV/AIDS awareness.

GETCO shall ensure that civil works contracts under the Project follow all applicable labor laws of the Borrower and

the State and that these further include provisions to the effect that contractors:

Remarks

8a

Carry out HIV/AIDS awareness programs for labor and disseminate information at worksites on risks of sexually transmitted diseases and HIV/AIDS as part of health and safety measures for those employed during construction

Awareness programs of HIV/ AIDS for labor community as a health and safety measures was organized in past.

8b Follow and implement all statutory provisions on labor (including not employing children as labor, equal pay for

GETCO along with contractor will ensure implementation of all labour law provisions during

Page 14: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

equal work), health, safety, welfare, sanitation, and working conditions. Such contracts shall also include clauses for termination in case of any breach of the stated provisions by the contractors.

execution of projects.

Safeguard requirement related labour law for 14.52 Km portion of 220 KV transmission line is compiled by GETCO and same was submitted in Due Diligence report along with update Initial Environmental Examination (IEE) & Resettlement Plan (RP) on 28.07.2015 for ADB approval.

Grievances redressing mechanism. Remarks

9

The State shall maintain a grievance redress committee or committees with representation from all stakeholders in the project facilities for the purpose of addressing any grievances from affected peoples concerning resettlement, environment and any other social issues in a timely manner

A Grievance Redress Committee (GRC) consisting of the Panchayat Head, Project Engineer (Line in Field), Nominated district revenue officer as nodal officer and the designated official in GETCO dealing with safeguards has been established.

No grievances received to

date.

Information disclosure. Remarks

10

The State shall, or shall cause GETCO, to establish a website for the Project within three months of the Effective Date to disclose information regarding the project including procurement activities relating to the project

Same will be reported in GETCO website:

www.getcogujarat.com

4. Environmental Management and Monitoring

Project is under construction stage; hence compliance related to Environment Management Plan will be complied by GETCO/Contractor is as under.

Sr.

No.

Project

Activity

Potential

Environmental

Impact

Institutional

Responsibili

ty

Mitigation Action as per

Environment Management Plan

Mitigation Activity during reporting

period Remark

Pre-construction

1 Temporary use of land.

Impact to the existing environment.

Loss of agricultural productivity

GETCO/ Contractor

Selection of lands adhering to local laws and regulations Construction facilities should be placed at least 500 m away from water bodies, natural flow paths, important ecological habitats and residential areas

Substation land is waste land provided by Government. So there will be no impact to the existing environment.

Route alignment of most feasible route in terms of least disturbance to people or environment is considered and in line with that transmission lines are passing

Page 15: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

through remote area and away from local community.

2 Substation location and design

Noise generation Exposure to noise,

Nuisance to neighbouring properties

GETCO

Substation designed to ensure noise will not be a nuisance.

As substation land is waste land away from local community. Hence there is no exposure to noise to general public.

Nearest community is almost 3-4 Km from site so there will be no nuisance to neighbouring properties.

Disturbance to the adjacent lands and the people due to cut and fill operations

GETCO

Maintained adequate clearance, construction of retaining structures, minimise cut and fill operations adjoining to the dwellings

Substation land is waste land covered by proper boundary, so there will be no loss/ disturbance to the adjacent lands and people due to cut and fill operations.

3

Location of transmission towers and transmission line alignment and design

Exposure to safety related risks

GETCO

Setback of dwellings to overhead line route designed in accordance with permitted level of power frequency and the regulation of supervision at sites.

Route alignment of most feasible route in terms of least disturbance to people or environment is considered.

All Safeguard requirements related to 14.52 Km portion of 220 KV transmission line is compiled by GETCO. Due Diligence report in the matter was submitted on 28.07.2015 for ADB approval .

Impact on water bodies/ land/ residences

GETCO

Consideration of site location to avoid water bodies or agricultural land as much as possible. Careful site selection to avoid existing settlements

4

Equipment specifications and design parameters

Release of chemicals and harmful gases in receptors (air, water, land)

GETCO

PCBs not used in substation transformers or other project facilities or equipment.

Equipment specifications and designs are standard and there will be no release of chemicals and harmful gases in receptors.

5

Encroachment into precious ecological areas

Loss of precious ecological values/ damage to precious species

GETCO

Avoid encroachment by careful site and alignment selection and reconnaissance before final sitting of activities. Minimise the need by using existing towers and RoW wherever possible

No encroachment into precious ecological areas takes place.

Page 16: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

6

Involuntary Resettlement or land acquisition

Loss of land & structure

GETCO

Compensation paid for temporary/ permanent loss of productive land. No Involuntary Resettlement or land

acquisition takes place.

7 Encroachment into farmland

Loss of agricultural productivity

Not applicable to GETCO

Use existing tower footings/towers wherever possible. Avoid sighting new towers on farmland wherever possible. Farmers compensated for any permanent loss of productive land trees that need to be trimmed removed along RoW.

No encroachment into farmland.

Farmers are compensated for loss of agricultural productivity in any stages. Details related to compensation paid towards loss in agricultural production to affected farmers in all stages in reporting period is submitted as Annexure A.

Compensation paid towards loss in agricultural production is as per Electricity Act, 2003

8

Interference with drainage patterns/Irrigation channels

Temporary flooding hazards/loss of agricultural production

GETCO

Appropriate sighting of towers to avoid channel interference Appropriate provision or excess soil dug up from the cable trenches.

No temporary flooding hazards to date.

9 Explosions/Fire Hazards to life GETCO

Design of substations to include modern fire control systems/firewalls. Provision of fire fighting equipment to be located close to transformers, power generation equipment.

Many safety initiatives are taken or explained under safety drill like placing Color Codes for Helments, no explosives are being used till date for execution, appointment of Safety Incharge to ensure all safety requirement, etc, resulting no hazards to life due to any fire to date.

Construction

10

Removal or disturbance to other public utilities

Public inconvenience

GETCO

Advance notice to the public about the time and the duration of the utility disruption Use of well trained and experienced machinery operators to reduce accidental damage to the public utilities Restore the utilities immediately to overcome public inconvenience

Advance notice to the public is served

as per procedure.

There is no removal or disturbance to

other public utilities till date.

Page 17: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

11

Acquisition of cultivable lands

Loss of agricultural productivity

GETCO, Contractor

through contract

provisions

Avoid faming season wherever possible for the project activities. Ensure existing irrigation facilities are maintained in working condition Protect /preserve topsoil and reinstate after construction completed Repair /reinstate damaged bunds etc. After construction completed Compensation for temporary loss in agricultural production

Farmers are compensated for loss of agricultural production in any stages of work as per assessment of revenue authority.

Compensation paid towards loss in agricultural production as per Electricity Act, 2003

12 Temporary outage of the electricity

Loss of power supply to the local community when distribution lines crossing the new transmission line are switched off

Contractor

GETCO

Advance notice to the public about the time and the duration of the utility disruption

Restore the utilities immediately to overcome public inconvenience

No Loss of power supply to the local community to date.

13 Equipment layout and installation

Noise and vibrations GETCO,

Contractor through contract

provisions

Selection of construction techniques and machinery to minimise ground disturbance.

Construction activity in substation and line is generally far from local community. Construction techniques and machinery will ensure no noise and vibrations impact minimal.

GETCO will take proper care while erection of Switchgear and other equipments.

SF6 leakage during storage and erection of Switchgear

Record of all substation switchgear, cylinders located within secure casings

14 Substation construction

Loss of soil

GETCO, Contractor

through contract

provisions

Fill for the substation foundations obtained by creating or improving local drain system.

As substation land is waste, barren land provided by Government. Hence there is no possibility of loss of soil or water pollution.

Peripheral drainage system was constructed in substations as per substation design.

Water pollution

GETCO, Contractor

through contract

provisions

Minimize construction activities involving significant ground disturbance (i.e. substation land forming) during the monsoon season. Provide drains and retention ponds if required.

Page 18: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

15 Construction schedules

Noise nuisance to neighbouring properties

GETCO, Contractor

through contract

provisions

Minimize construction activities undertaken during the night and local communities informed of the construction schedule.

Mostly construction activities are not carried out during night hours.

Work is carried out with prior intimation to concern.

16

Provision of facilities for construction workers

Contamination of receptors (land, water, air)

GETCO, Contractor

through contract

provisions

Construction workforce facilities to include proper sanitation, water supply and waste disposal facilities.

Basic facility for construction workers is provided by contractor like tent, drinking water, medical facility (first-aid system), and vessels for domestic work. Hence there is no contamination of receptors (land, water, air) to date. Construction work is executed during day time and sanitation facilities for workers are provided in substation.

17 Surplus earthwork/soil

Runoff to cause water pollution, solid waste disposal

GETCO, Contractor

through contract

provisions

Excess fill from tower foundation excavation to be reused on site or disposed of next to roads or around houses, in agreement with the local community or landowners.

Location of soil filling site in Solar Park in consultation with GPCL.

After erection of any tower or structure, solid wastes are taken from site and soil is placed in original or nearby state as per local community request.

18

Wood/ vegetation harvesting,

cut and fill operations

Loss of vegetation and deforestation

GETCO, Contractor

through contract

provisions

Construction workers prohibited from harvesting wood in the project area during their employment. As transmission lines are passing

through remote area and away from local community. Hence, there will be no loss of vegetation of local people.

In addition to above, labour workers are educated by contractor for not disturbing local vegetation, hence there is no adverse effect on fauna.

Effect on fauna GETCO

Prevent work force from disturbing the flora, fauna including hunting of animal and fishing in water bodies. Proper awareness programme regarding conservation of flora, fauna including ground vegetation to all drivers, operators and other workers.

19 Site clearance Vegetation

GETCO, Contractor

through contract

Marking of vegetation to be removed prior to clearance, and strict control on clearing activities to ensure

Substation land is Government waste land hence there is no impact to the existing environment.

Page 19: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

provisions minimal clearance.

Soil erosion and surface runoff

GETCO, Contractor

through contract

provisions

Construction near seasonal rivers, erosion and flood-prone areas should be restricted to the dry season.

Provision and maintenance of drains and retention ponds.

Treat clearing and filling areas against flow acceleration and construction work should be carefully designed to minimize obstruction or destruction to natural drainage.

Peripheral drainage system was constructed in substations to avoid soil erosion and surface runoff.

20 Mechanised construction

Noise, vibration and operator safety, efficient operation

Noise, vibration, equipment wear and tear.

GETCO, Contractor

through contract

provisions

Construction equipment to be well maintained.

Proper maintenance and turning off plant not in use.

Execution take place far from nearest community so there will be no noise and vibration.

Operator safety and equipment wear and tear will be observed as per our safety standards.

21 Construction of roads for accessibility

Increase in airborne dust particles

Increased land requirement for temporary accessibility

GETCO, Contractor

through contract

provisions

Existing roads and tracks used for construction and maintenance access to the site wherever possible.

New access ways restricted to a single carriageway width.

As execution take place far from nearest community so airborne dust particles will not cause any trouble to local community.

Land used for temporary accessibility and any agricultural damage will be compensated as per procedure.

22 Transportation and storage of materials

Nuisance to the general public

GETCO

Transport loading and unloading of construction materials should not to cause nuisance to the people by way of noise, vibration and dust

Avoid storage of construction materials beside the road, around water bodies, residential or public

Transportation & storage of materials is kept in a way to minimize any hazard to local community & workers.

Page 20: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

sensitive locations

Construction materials should be stored in covered areas to ensure protection from dust, emissions and such materials should be bundled in environment friendly and nuisance free manner

23 Trimming/cutting of trees within RoW.

Fire hazards

Loss of vegetation and deforestation

GETCO, Contractor

through contract

provisions

Trees allowed growing up to a height within the RoW by maintaining adequate clearance between the top of tree and the conductor as per the regulations. Trees that can survive pruning to comply should be pruned instead of cleared. Felled trees and other cleared or pruned vegetation to be disposed of as authorized by the statutory bodies.

Most appropriate route of minimum vegetation was selected and accordingly execution activity was planned.

Currently work related to tower foundation, tower erection and stringing is under progress, so there is no Trimming/cutting of trees within RoW.

At the time of commissioning of transmission lines, trimming/cutting of trees obstructing line will be planned.

24 Health and safety

Injury and sickness of workers and members of the public

GETCO (Contractor

through contract

provisions)

Contract provisions specifying minimum requirements for construction camps. Contractor to prepare and implement a health and safety plan and provide workers with required PPE.

Contractor to arrange for health and safety awareness programmes

GETCO will work as per GETCO’s Safety Manual.

Many safety initiatives are taken like

placing Color Codes for Helments,

Appointment of Safety Incharge, etc.

25 Nuisance to nearby properties

Losses to neighbouring land uses/ values

GETCO (Contractor

through contract

provisions)

Contract clauses specifying careful construction practices. As much as possible existing access ways will be used.

Productive land will be reinstated following completion of construction

Compensation will be paid for loss of production, if any.

As mentioned above, best feasible/ possible route was selected and accordingly execution activity was planned.

As construction activity is generally far from local community and route is in mostly waste/ barren & agriculture land. Hence there is no possibility of any kind of nuisance to local peoples.

Page 21: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Any loss/ damage of crop is compensated as per procedure.

Operation and Maintenance Phase

26 Electric shock Death or injury to the workers and public

GETCO

Security fences around substation Establishment of warning signs Careful design using appropriate technologies to minimise hazards

Would be complied during operational stage.

Would be complied during operational stage.

27 Noise generation

Nuisance to the

community

around the site

GETCO Provision of noise barriers near substation sites

28 Soil Erosion Removal of top soil

GETCO Planting of buffer zone species suitable for arid climate.

29

Maintenance of Transmission line

Exposure to electromagnetic interference

GETCO

Transmission line design to comply with the limits of electromagnetic interference from overhead power lines

30 Substation maintenance

Exposure to electromagnetic interference

GETCO Substation design to comply with the limits of electromagnetic interference within floor area

31 Oil spillage Contamination of land/nearby water bodies

GETCO

Substation transformers located within secure and impervious bundled areas with a storage capacity of at least 100% of the capacity of oil in transformers and associated reserve tanks.

32 Operation of Switchgear

Leakage of SF6 gas

GETCO Record of all substation switchgear located within secure casings

Page 22: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

5. Component of Environmental Monitoring Plan:

Sr. No. Component of Environmental

Monitoring Plan

Institutional

responsibility Current Project Stage

1 Air quality

GETCO/

contractor

Construction of substation & transmission line activities does not envolve

major construction. It is moreover assembling work with minor civil

work.

Such kind of activities (assembling with minor civil work) are not going

to change/ affect any air, water, noise and soil quality of the area. It has a

temporary impact which will not affect local community or existing

environment.

2 Water quality

3 Noise and vibration

4 Soil quality

6. Involuntary Resettlement

Involuntary Resettlement as per project components implementation of the SRP(s) are explained as under:

SN Component of SRP Institutional

responsibility Status to date

Activities

done /

developments

1. 400/220/66 kV substations at Charanka and Sankhari and

2 Nos. 220 KV feeder bays at Jangral S/S:

- Make detailed resettlement planning for standing crops compensation on this GPCL-owned land for non-titled affected people

- Give notice to harvest seasonal crops or compensate for crops at market value

- Report on consultation, information disclosure of entitlements and grievance mechanism in local language, the chosen cut-off date, date of identity card distribution and payment of compensation before the start of the works.

220 kV Bays at Jangral Substation:

- The land is reported to be “within the existing premises of GETCO” and at current, no resettlement or compensation issues are expected.

- Report on any changes with regard to resettlement or compensation at this site.

GETCO/

contractor

Land for substation in Charanka and Sankhari is

Govt. Waste land, hence there will be no

resettlement.

Consultation with local people is carried out

regularly. In case of transmission line, consultation is

carried out before execution of work in all the stages.

Work is not executed without consultation.

Construction

activity is

under

progress.

Page 23: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

SN Component of SRP Institutional

responsibility Status to date

Activities

done /

developments

400 kV Bays at Sankhrai Substation:

- About 5 acres of land required, belonging to the government. At current it is reportedly valued as “totally flat and barren with light shrubs and trees”. At current, no resettlement or compensation issues are expected.

- Report on any changes with regard to resettlement or compensation at this site.

2. Supply & erection of 400/220 kV 315 MVA

transformers, 400 kV Bus reactors and 220/66 kV 100

MVA transformers for Substations

GETCO/

contractor

Involuntary Resettlement is Nil in supply of

transformer.

3. About 96.13 kms of 220 kV double circuit transmission

line from the solar park to Jangral.

- Make detailed resettlement and compensation planning for access roads temporary loss of land, loss of trees and crops, etc.

- give notice to harvest seasonal crops or compensate for crops at market value

- report on consultation, information disclosure of entitlements and grievance mechanism in local language, the chosen cut-off date, date of identity card distribution and payment of compensation before the start of the works. GETCO/

contractor

No Land acquisition take place, only land is used for

execution of transmission tower work and as per

Indian Electricity Act, 2003 farmers are compensated

for loss of agricultural productivity in any stages of

work up to reporting period.

In monitoring period i.e. from 1st Nov 2014 to 30th

April 2015, 18 Nos. of tower foundations, 32 Nos. of

tower erection and 36.750 route Km. of tower

stringing have been completed.

(Cumulative- 302 Nos. of tower foundations and 302

Nos. of tower erection and 93.710 route Km. of

tower stringing have been completed).

GETCO executed portion of 14.52 Km of 220 KV

transmission line from Charanka to Jangral by its

own fund and created a temporary evacuation system

for charanks solar park. Subsequently, ADB funded

220 KV transmission line is reduced to 96.13 Km.

Due diligence report for mentioned 14.52 Km portion

of 220 KV transmission line was submitted on

28.07.2015 for ADB approval.

Consultation with local people was carried out

regularly. Future consultation will be communicated

Construction

activity is

under

progress.

Page 24: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

SN Component of SRP Institutional

responsibility Status to date

Activities

done /

developments

in future Bi annual report.

4. About 99.62 kms of 400 kV double circuit transmission

line from the solar park to Sankhari.

- Make detailed resettlement and compensation planning for access roads temporary loss of land, loss of trees and crops, etc.

- give notice to harvest seasonal crops or compensate for crops at market value

- report on consultation, information disclosure of entitlements and grievance mechanism in local language, the chosen cut-off date, date of identity card distribution and payment of compensation before the start of the works.

GETCO/

contractor

400 KV transmission line package is awarded to M/s

Gammon India Ltd. Date of commencement of 400

KV transmission Line is 09.10.2013.

In monitoring period i.e. from 1st Nov 2014 to 30th April 2015, 41 Nos. of tower foundations, 53 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed. (Cumulative- 191 Nos. of tower foundations,168 Nos. of tower erection and 15.485 route Km. of tower stringing have been completed)

Construction

activity is

under

progress.

5. Supply of 66 kV underground cable of about 140 kms for

Charanka Park.

GETCO/

contractor

Cable supply is in ADB Package and Involuntary

Resettlement is nil in cable supply.

Page 25: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November
Page 26: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Sr. No. Tower No.Name of the

Village

Name of

the

Districts

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/

No)

Owners

hip

(Agricul

ture) or

Govern

ment

Number

of

Affected

Persons

/Househ

olds/Fa

milies

Name/s of the Owner in case of

Agriculture Land

Founda

tion

Comple

ted

(Yes/No

)

Erection

Complet

ed

(Yes/No)

Stringin

g

Complet

ed

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

foundation

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringing

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of Crop

Compensation

(Rupees) paid

for Stringing

Other

Impacts

such as

approach

road,

additional

area

during

execution

of work

(yes/No)

If Yes,

area for

crop

damage

(hectare)

Names of Affected

Persons

Amount of

Crop

Compensati

on (Rupees)

paid for crop

damage

1 13A/0 Sidhada Patan Yes Agri 1 Dharsibhai Rugnathbhai Thakor Yes Yes Yes Yes Yes Yes 1500 25000

2 13B/0 Sidhada Patan Yes Agri 1 Dhrshibhai Rugnathbhai Thakor Yes Yes Yes Yes Yes Yes 1208 20000

3 13 B/0-1 Sidhada Patan Yes Agri 1 SAKINABEN M. THEBA Yes Yes Yes Yes Yes Yes 640 11000

4 13B/1 Sidhada Patan Yes Agri 1 Miyabhai Sahenkhan Ghori Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000

5 13B/1 to 13B/2 Shidhada Patan Yes Agri 1 Zakirkhan Rasulkhan Theba Yes Yes Yes Yes Yes Yes 452 7500

6 13B/2 Sidhada Patan Yes Agri 1 Babiben Karimkhan Theba Yes Yes Yes Yes Yes Yes 880 15000

7 13 B/2 Sidhada Patan Yes Agri 1 ALIMAMAD R.THEBA Yes Yes Yes Yes Yes Yes 600 17000

8 13 B/2- 3 Sidhada Patan Yes Agri 1 JUSHALBHAI V.RAUMA Yes Yes Yes Yes Yes Yes 880 15000

9 13 B/2-3 Sidhada Patan Yes Agri 1 RAMZANBHAI T.THEBA Yes Yes Yes Yes Yes Yes 740 20000

10 13 B/2-1 Sidhada Patan Yes Agri 1 ABDULKHAN R.THEBA Yes Yes Yes Yes Yes Yes 640 11000

11 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Zahirkhan R Terba Yes Yes Yes Yes Yes Yes 306 5000

12 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Alimamad R Terba Yes Yes Yes Yes Yes Yes 306 5000

13 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Ramjanbhai T Terba Yes Yes Yes Yes Yes Yes 306 5000

14 13B/2 to 13B/3 Sidhada Patan Yes Agri 1 Jushalbhai V Rauma Yes Yes Yes Yes Yes Yes 306 5000

15 13B/3 Sidhada Patan Yes Agri 1 Nagori Jambhai Punjabhai Yes Yes Yes Yes Yes Yes 909 909 1513 15000 15000 25000

16 13B/3 to 13B/4 Shidhada Patan Yes Agri 1 Harunbhai Karemkhan Theba Yes Yes Yes Yes Yes Yes 724 12000

17 13B/3 to 13B/4 Sidhada Patan Yes Agri 1 Theba Rematkhan M. Yes Yes Yes Yes Yes Yes 960 16000

18 13 B/4 VARAHI Patan Yes Agri 1 JIVABHAI B.RABARI Yes Yes Yes Yes Yes Yes 1040 18000

19 13 B/5 KORADA Patan Yes Agri 1 DANIBEN AYUBKHAN MALEK Yes Yes Yes Yes Yes Yes 2080 35000

20 13 B/6 VARAHI Patan Yes Agri 1 MASABHAI S.THAKOR Yes Yes Yes Yes Yes Yes 1360 23000

21 13 B/7 to 13 B/8 VARAHI Patan Yes Agri 1 MANUBHAI RASULKHAN Yes Yes Yes Yes Yes Yes 904 15000

22 13 B/5-6 VARAHI Patan Yes Agri 1 AYUBKHAN A.PATHAN Yes Yes Yes Yes Yes Yes 880 15000

23 13 B/6-7 VARAHI Patan Yes Agri 1 NARSHUNGBHAI R.THAKOR Yes Yes Yes Yes Yes Yes 360 10000

24 13 B/7 VARAHI Patan Yes Agri 1 RAMSIBHAI D.THAKOR Yes Yes Yes Yes Yes Yes 1360 23000

25 13 B/8 VARAHI Patan Yes Agri 1 LAKHAMANBHAI R.RABARI Yes Yes Yes Yes Yes Yes 1520 26000

26 13B/8 to 13B/9 DALDI Patan Yes Agri 1 Saktabhai M.Thakor Yes Yes Yes Yes Yes Yes 480 8000

27 13 B/9 DALDI Patan Yes Agri 1 JAKASHIBHAI R.THAKOR Yes Yes Yes Yes Yes Yes 2160 37000

28 13 B/10 to 13 B/9 Sidhada Patan Yes Agri 1 Satabhai M.Thakor Yes Yes Yes Yes Yes Yes 380 9000

29 13B/9 Daldi Patan Yes Agri 1 Jagshibhai Rajabhai Thakor Yes Yes Yes Yes Yes Yes 904 15000

30 13B/9 Daldi Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 904 Jagshibhai Rajabhai 15000

31 13B/11 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 152THAKOR

JEVATBHAI .D4150

32 13B/12 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 148THAKOR

BAJUBHAI

LAGDHIRBHAI

4000

3313B/12-13 DABHI

Patan Yes Agri 1 THAKOR GAMERBHAI.KANJIBHAI Yes Yes Yes Yes Yes Yes 148 4000

34 13B/13 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 180THAKOR

MOMJIBHAI

DUDABHAI

4000

3513B/14 DABHI

Patan Yes Agri 1THAKOR VERSHIBHAI

BHAGVANBHAIYes Yes Yes Yes Yes Yes 672 18000

36 13 B/14 to 13 B/15 Sidhada Patan Yes Agri 1 Rahim A.THEBA Yes Yes Yes Yes Yes Yes 580 13500

37 13B/15 Dabhi Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 904 Thakor Mansukhbha 15000

38 13B/16 Dabhi Patan Yes Agri 1 Thakor Mansukhbhai Laksmanbhai Yes Yes Yes Yes Yes Yes 904 15000

39 13B/17 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 195THAKOR

VARAJUBEN

AMTHUBHAI

4300

4013B/19 DABHI

Patan Yes Agri 1THAKOR MANSUKHBHAI

LAKHAMANBHAIYes Yes Yes Yes Yes Yes 904 904 15000 15000

41 14/1 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 160THAKOR

HARCHANBHAI

TALASHIBHAI

4300

42 14/2 DABHI Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 180GADAAYA

MAGANBHAI

PRABHABHAI

4000

43 15/3 Jekda Patan Yes Agri 1 Amratbhai Ramsibhai Thakor Yes Yes Yes Yes Yes Yes 558 558 15000 15000

44 15/4 Korda Patan Yes Agri 1 Jitabhai Pachabhai Thakor Yes Yes Yes Yes Yes Yes 1100 30000

45 16/4 to 16/3 JARUSHA Patan Yes Agri 1 DINESHBHAI NARANBHAI CHAUDH Yes Yes Yes Yes Yes Yes 320 7500

46 16/7 Jarusha Patan Yes Agri 1 Patel Karmanbhai Khemabhai Yes Yes Yes Yes Yes Yes 906 906 15000 15000

General Details

Annexure A1_Details of Crop Copmensation (200 kV Charanka - Jangral Line) for Dt- 01.11.2014 to Dt-30.04.2015Status on Payment of Affected Area for crop Amount of Compensation (Rupees) Other ImpactsDetails on Affected Persons/Families/Households Status on Construction

Page 27: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Sr. No. Tower No.Name of the

Village

Name of

the

Districts

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/

No)

Owners

hip

(Agricul

ture) or

Govern

ment

Number

of

Affected

Persons

/Househ

olds/Fa

milies

Name/s of the Owner in case of

Agriculture Land

Founda

tion

Comple

ted

(Yes/No

)

Erection

Complet

ed

(Yes/No)

Stringin

g

Complet

ed

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

foundation

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringing

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of Crop

Compensation

(Rupees) paid

for Stringing

Other

Impacts

such as

approach

road,

additional

area

during

execution

of work

(yes/No)

If Yes,

area for

crop

damage

(hectare)

Names of Affected

Persons

Amount of

Crop

Compensati

on (Rupees)

paid for crop

damage

47 16/7 to 16/8 JARUSHA Patan Yes Agri 1 RAMESHBHAI DHARAMSHIBHAI KUMBYes Yes Yes Yes Yes Yes 320 7500

48 16/8 to 16/9 Jarusha Patan Yes Agri 1 Jemaben naranbhai patel Yes Yes Yes Yes Yes Yes 300 5000

49 16/8 to 16/7 JARUSHA Patan Yes Agri 1 SHANKARBHAI DHUDABHAI THAKO Yes Yes Yes Yes Yes Yes 320 7500

50 16/9 to 16/8 JARUSHA Patan Yes Agri 1 RAMESHBHAI PACHANBHAI PATEL Yes Yes Yes Yes Yes Yes 320 7500

51 16/10 Jarusha Patan Yes Agri 1 Khokhar(Sipai) Gajibhaibhai Ibrahimbh Yes Yes Yes Yes Yes Yes 749 20000

52 16/10 to 16/11 JARUSHA Patan Yes Agri 1 MAVAJIBHAI KARAMANBHAI PATEL Yes Yes Yes Yes Yes Yes 428 10000

53 16/11 Jarusha Patan Yes Agri 1 Khokhar(Sipai) Nurmahmad Husenbh Yes Yes Yes Yes Yes Yes 906 15000

54 16/11 to 16A/0 Jekda Patan Yes Agri 1 Raymalbhai Jevatbhai Patel Yes Yes Yes Yes Yes Yes 440 7500

55 16/11 to 16A/0 Korda Patan Yes Agri 1 Ragabhai S Chaudhary Yes Yes Yes Yes Yes Yes 1305 35000

56 16A/0 Jekda Patan Yes Agri 1 Prahladbhai M Sadhu Yes Yes Yes Yes Yes Yes 558 25000

57 16A/0-1 Gadha Patan Yes Agri 1 ParbhatbhaiSivubhai Vaghela Yes Yes Yes Yes Yes Yes 720 12000

58 16A/1-2 Jekda Patan Yes Agri 1 Karamanbhai Khetabhai Patel Yes Yes Yes Yes Yes Yes 800 15800

59 16A/2 to 16A/3 Gadha Patan Yes Agri 1 Navubha B.Vaghela Yes Yes Yes Yes Yes Yes 640 640 11700 11700

60 16A/2-3 Jekda Patan Yes Agri 1 Amaratbhai Ramshibhai Raval Yes Yes Yes Yes Yes Yes 120 2000

61 16A/2-3 Jekda Patan Yes Agri 1 Rayabhai Dharamshibhai Suthar Yes Yes Yes Yes Yes Yes 840 14000

62 16A/3 Jekda Patan Yes Agri 1 Rashikbhai N.Prajapati Yes Yes Yes Yes Yes Yes 816 816 2291 15000 15000 49400

63 16A/3-4 Jekda Patan Yes Agri 1 Suthar Kamabhai Sankarbhai Yes Yes Yes Yes Yes Yes 1200 20000

64 16A/4 Jekda Patan Yes Agri 1 Himatbhai Nanjibhai Prajapati Yes Yes Yes Yes Yes Yes 2176 40000

65 16A/4 to 16A/4 Zekda Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 2157 Himat Nanjibhai Praj 39600

66 16A/4-5 Jekda Patan Yes Agri 1 Kalabhai Mehabhai Patel Yes Yes Yes Yes Yes Yes 680 16000

67 16A/5 Jekda Patan Yes Agri 1 Bhikhabhai Mehabhai Chaoudhary Yes Yes Yes Yes Yes Yes 816 816 2745 15000 15000 50000

68 16A/5-6 Jekda Patan Yes Agri 1 Rasuben Vajabhai chaoudhary Yes Yes Yes Yes Yes Yes 560 10000

69 16A/6 Jekda Patan Yes Agri 1 HaribhaiPunabhai Patel Yes Yes Yes Yes Yes Yes 816 816 2340 15000 15000 54500

70 16A/6-7 Jekda Patan Yes Agri 1 Bharvad Bhikhabhai Bavabhai Yes Yes Yes Yes Yes Yes 342 5000

71 16A/7-8 Jekda Patan Yes Agri 1 Magabhai Parmabhai patel Yes Yes Yes Yes Yes Yes 212 5000

72 16A/7-8 Jekda Patan Yes Agri 1 Manubhai K.Bhil Yes Yes Yes Yes Yes Yes 444 7500

73 17/0 Zekda Patan Yes Agri 1 Haribhai M.Chaudhary Yes Yes Yes Yes Yes Yes 2080 2080 20000 20000

74 17/0 Jekda Patan Yes Agri 1 Haribhai Manabhai Choudhary Yes Yes Yes Yes Yes Yes 2580 60000

75 17/0 to 17/1 Jekda Patan Yes Agri 1 Nanjibhai Momjibhai Choudhary Yes Yes Yes Yes Yes Yes 500 11700

76 17/0 to 16A/8 Jekda Patan Yes Agri 1 Lilaben bhagvanbhai patel Yes Yes Yes Yes Yes Yes 600 13950

77 17/0 to 17/1 Zekda Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 500 Nathabhai Madevbh 11700

78 17/1 to 17/1 Zekda Patan Yes Agri 1 Bhemabhai M.Chaudhary Yes Yes Yes Yes Yes Yes 816 816 2795 15000 15000 65000

79 17/1 to 17/1 Zekda Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 272 Bhemabhai M.Chaud 5000

80 17/2 Jekda Patan Yes Agri 1 Puriben B.Chaudhary Yes Yes Yes Yes Yes Yes 816 816 3010 15000 15000 70000

81 17/3 Jekda Patan Yes Agri 1 Dehalbhai M Thakor Yes Yes Yes Yes Yes Yes 444 444 20000 20000

82 17/3 to 17/3 Jekada Patan Yes Agri 1 Dehalbhai Megharaj Thakor Yes Yes Yes Yes Yes Yes 2080 40000

83 17/3 to 17/4 Zazansar Patan Yes Agri 1 Verasibhai Malabhai Thakor Yes Yes Yes Yes Yes Yes 320 7500

84 17/4 Santhali Patan Yes Agri 1 Thakor Veljibhai Khetabhai Yes Yes Yes Yes Yes Yes 2576 60000

85 17/4 to 17/5 Santhali Patan Yes Agri 1 Sundabhai Mohanbhai Thakor Yes Yes Yes Yes Yes Yes 500 11700

86 17/5 Santhli Patan Yes Agri 1 Masabhai R Thakor Yes Yes Yes Yes Yes Yes 904 904 15000 15000

87 17/6 Santhali Patan Yes Agri 1 Jethabhai Sankarbhai Patel Yes Yes Yes Yes Yes Yes 965 22500

88 17/6 to 17/7 Santhali Patan Yes Agri 1 Meghabhai Parbatbhai Patel Yes Yes Yes Yes Yes Yes 380 8900

89 17/7 SANTHALI Patan Yes Agri 1 HARIBHAI LAKHABHAI PATEL Yes Yes Yes Yes Yes Yes 2070 48160

90 17/7 to 17/8 SANTHALI Patan Yes Agri 1 AMTHUBHAI MEGHABHAI PATEL Yes Yes Yes Yes Yes Yes 200 4650

91 17/7 to 17/8 SANTHALI Patan Yes Agri 1 KHETABHAI SAKTABHAI PATEL Yes Yes Yes Yes Yes Yes 720 10800

92 17/8 Santhli Patan Yes Agri 1 Mali Dalabhai Mansangbhai Yes Yes Yes Yes Yes Yes 906 906 1624 15000 15000 26900

93 17/8 to 17/9 RANGPURA Patan Yes Agri 1 VIRBHANBHAI LEBABHAI THAKOR Yes Yes Yes Yes Yes Yes 360 5400

94 17/8 to 17/9 RANGPURA Patan Yes Agri 1 VALABHAI TALASIBHAI THAKOR Yes Yes Yes Yes Yes Yes 360 8400

95 17/8 to 17/9 SANTHALI Patan Yes Agri 1 MAGHABHAI GANGARAMBHAI MALI Yes Yes Yes Yes Yes Yes 380 8900

96 17/8 to 17/9 SANTHALI Patan Yes Agri 1 BHAGVANBHAI MANJIBHAI MALI Yes Yes Yes Yes Yes Yes 460 6900

97 17/9 to 17/10 RANGPURA Patan Yes Agri 1 RAMABHAI TALSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 320 4800

98 17/9 to 17/10 RANGPURA Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 380 VALABHAI TALASIB 5700

99 17/10 RANGPURA Patan Yes Agri 1 NATHABHAI DHARAMSIBHAI THAKO Yes Yes Yes Yes Yes Yes 3288 20400

100 17/10 to 17/11 RANGPURA Patan Yes Agri 1 SUNDABHAI SAVSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 644 15000

101 17/10 to 17/11 RANGPURA Patan Yes Agri 1 NAGJIBHAI SAVSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 400 6000

102 17/11 to 17/12 RANGPURA Patan Yes Agri 1 VIRABHANBHAI MOHANBHAI THAK Yes Yes Yes Yes Yes Yes 1073 25000

103 17/11 to 17/12 RANGPURA Patan Yes Agri 1 KALYANBHAI DHARSIBHAI THAKOR Yes Yes Yes Yes Yes Yes 640 15000

104 17/11 to 17/12 RANGPURA Patan Yes Agri 1 TALSIBHAI MAVABHAI THAKOR Yes Yes Yes Yes Yes Yes 1595 30000

105 17/12 RANGPURA Patan Yes Agri 1 LAXMANBHAI LALABHAI RABARI Yes Yes Yes Yes Yes Yes 1245 24000

106 17/12 to 17/13 Rangpura Patan Yes Agri 1 Velabhai Lakhabhai Rabari Yes Yes Yes Yes Yes Yes 200 4700

107 17/12 to 17/13 SANTHALI Patan Yes Agri 1 GIRISH ARJANBHAI RABARI Yes Yes Yes Yes Yes Yes 430 10000

Page 28: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Sr. No. Tower No.Name of the

Village

Name of

the

Districts

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/

No)

Owners

hip

(Agricul

ture) or

Govern

ment

Number

of

Affected

Persons

/Househ

olds/Fa

milies

Name/s of the Owner in case of

Agriculture Land

Founda

tion

Comple

ted

(Yes/No

)

Erection

Complet

ed

(Yes/No)

Stringin

g

Complet

ed

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

foundation

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringing

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of Crop

Compensation

(Rupees) paid

for Stringing

Other

Impacts

such as

approach

road,

additional

area

during

execution

of work

(yes/No)

If Yes,

area for

crop

damage

(hectare)

Names of Affected

Persons

Amount of

Crop

Compensati

on (Rupees)

paid for crop

damage

108 17/13 RANGPURA Patan Yes Agri 1 BHEMABHAI LALABHAI RABARI Yes Yes Yes Yes Yes Yes 1285 24600

109 17/13 to 17A/0 RANGPURA Patan Yes Agri 1 RAMABHAI SAVSHIBHAI THAKOR Yes Yes Yes Yes Yes Yes 480 11160

110 17 A/0 BHILOT Patan Yes Agri 1 UDESANG .K.VAGELA Yes Yes Yes Yes Yes Yes 744 744 552 20000 20000 15000

111 17 A/0 BHILOT Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 552 VDESANG .K.VAGE 15000

112 17/A/0 RANGPURA Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 480 GANDABHAI M.THA 8000

113 17A/0 BHILOT Patan Yes Agri 1 DOLUBHA HAMIRJI VAGHELA Yes Yes Yes Yes Yes Yes 744 744 20000 20000

114 17A/0 to 17B/0 BHILOT Patan Yes Agri 1 BALABHAI GANESHBHAI RABARI Yes Yes Yes Yes Yes Yes 320 7500

115 17B/0 RANGPURA Patan Yes Agri 1 VIRBHANBHAI DAYABHAI THAKOR Yes Yes Yes Yes Yes Yes 1764 1764 1720 15000 15000 40000

116 17B/0 to 17B/1 RANGPURA Patan Yes Agri 1 CHOTHIBEN ISHWERBHAI THAKOR Yes Yes Yes Yes Yes Yes 1050 24460

117 17B/1 to 17B/2 RANGPURA Patan Yes Agri 1 DHIRSIBHAI VISABHAI THAKOR Yes Yes Yes Yes Yes Yes 680 12510

118 17B/1 to 17B/2 RANGPURA Patan Yes Agri 1 RUGHANATHABHAI MOHANBHAI THAYes Yes Yes Yes Yes Yes 360 5400

119 17B/2 BHILOT Patan Yes Agri 1 PURIBA M.JADEJA Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000

120 17B/2 BHILOT Patan Yes Agri 1 MUMABHA I.VAGHELA Yes Yes Yes Yes Yes Yes 600 10000

121 17B/3 to 17B/4 Bhilot Patan Yes Agri 1 Ajamalbhai Ramubhai Nadda Yes Yes Yes Yes Yes Yes 1349 31500

122 17B/3 to 18/0 BHILOT Patan Yes Agri 1 PRAVINKUMAR JAYSHANKAR JOSHI Yes Yes Yes Yes Yes Yes 320 7500

123 17B/3 to 18/0 BHILOT Patan Yes Agri 1 VASHARAMBHAI SANKARBHAI PAT Yes Yes Yes Yes Yes Yes 645 15000

124 18/0 BHILOT Patan Yes Agri 1 HIRABHAI HARJIBHAI KANBI Yes Yes Yes Yes Yes Yes 645 645 645 15000 15000 15000

125 18/0 BHILOT Patan Yes Agri 1 VAJABHAI HARJIBHAI PATEL Yes Yes Yes Yes Yes Yes 645 15000

126 18/0 to 19/0 Bhilot Patan Yes Agri 1 Gagdas R Rabari Yes Yes Yes Yes Yes Yes 153 153 2500 2500

127 18/0 to 19/0 Bhilot Patan Yes Agri 1 Devjibhai B Thakor Yes Yes Yes Yes Yes Yes 153 153 2500 2500

128 18/0 to 19/0 BHILOT Patan Yes Agri 1 JIVABHAI DEVJIBHAI RAVAL Yes Yes Yes Yes Yes Yes 444 12000

12918/0 to 19/0 BHILOT

Patan Yes Agri 1VASRAMBHAI SANKARBHAI

PATELYes Yes Yes Yes Yes Yes 404 6700

130 18/0 to 19/0 BHILOT Patan Yes Agri 1 RAEAVSANKAR P RAVAL Yes Yes Yes Yes Yes Yes 300 5000

131 19/0 BHILOT Patan Yes Agri 1 GAURISHANKARKEVALRAM RAVAL Yes Yes Yes Yes Yes Yes 645 15000

132 19/0 to 18/0 BHILOT Patan Yes Agri 1 JETHABHAI R.KANANI Yes Yes Yes Yes Yes Yes 1200 17400

13319/0 to 19/1 BHILOT

Patan Yes Agri 1 SUNDABHAI RAMJIBHAI THAKOR Yes Yes Yes Yes Yes Yes 840 14000

13419/1 BHILOT

Patan Yes Agri 1RAMSANGBHAI RAMJIBHAI

THAKORYes Yes Yes Yes Yes Yes 905 1705 15000 28200

135 19/3 BHILOT Patan Yes Agri 1 RUPSINH HAMIRJI VAGHELA Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000

136 19/3 to 19/4 BHILOT Patan Yes Agri 1 MAGANBHAI M.THAKOR Yes Yes Yes Yes Yes Yes 180 3000

137 19/3 to 19/4 BHILOT Patan Yes Agri 1 LALJIBHAI P.VAGHELA Yes Yes Yes Yes Yes Yes 904 15000

138 19/3 to 19/4 BHILOT Patan Yes Agri 1 GAJUBHA BHURUBH VAGHELA Yes Yes Yes Yes Yes Yes 880 12800

13919/3 to 19/4 BHILOT

Patan Yes Agri 1 BHURABHA NARANJI VAGHELA Yes Yes Yes Yes Yes Yes 880 12800

14019/4 BHILOT

Patan Yes Agri 1RAGUBHAI RANSHODBHAI

KUMBHARYes Yes Yes Yes Yes Yes 1425 23600

141 19/4 to 19/5 BHILOT Patan Yes Agri 1 ARJANBHAI V.THAKOR Yes Yes Yes Yes Yes Yes 452 7500

142 19/5 to 19/4 BHILOT Patan Yes Agri 1 RAGUBHAI R.KUMBHAR Yes Yes Yes Yes Yes Yes 1040 17300

143 19/5 BHILOT Patan Yes Agri 1 Thakor Amthuji Kunvarbhai Yes Yes Yes Yes Yes Yes 905 905 15000 15000

144 19/5 Bhilot Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 240 Thakor Amthuji Kunv 4000

145 19/5 to 19/6 BHILOT Patan Yes Agri 1 VAGHABHAI M.THAKOR Yes Yes Yes Yes Yes Yes 300 5000

14619/5 to 19/6 BHILOT

Patan Yes Agri 1 BALABHAI KONARABHAI THKOR Yes Yes Yes Yes Yes Yes 950 13800

147 19/6 BHILOT Patan Yes Agri 1 SHANKARBHAI R.CHAUDHARI Yes Yes Yes Yes Yes Yes 905 905 15000 15000

148 19/6 BHILOT Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 301 RADHABEN S. PAT 5000

149 19/6 to 20/0 BHILOT Patan Yes Agri 1 RADHABEN S. PATEL Yes Yes Yes Yes Yes Yes 425 10200

15019/6 to 20/0 BHILOT

Patan Yes Agri 1GANESHBHAI KHODABHAI

PRJAPATIYes Yes Yes Yes Yes Yes 208 3500

151 20/0 BHILOT Patan Yes Agri 1 VIBHABHAI R.RABARI Yes Yes Yes Yes Yes Yes 600 10000

152 20/0 BHILOT Patan Yes Agri 1 RAJABHAI DALABHAI CHOUDHARI Yes Yes Yes Yes Yes Yes 860 860 40000 40000

153 20/2 Bhilot Patan Yes Agri 1 Lataben Ramjibhai Joshi Yes Yes Yes Yes Yes Yes 906 906 15000 15000

15420/3 to 20/4 BHILOT

Patan Yes Agri 1RAJENDRASINH PATUBHA

VAGHELAYes Yes Yes Yes Yes Yes 1032 15000

155 20/6 Memdavad Patan Yes Agri 1 Ganchi Daud Jamubhai Yes Yes Yes Yes Yes Yes 906 15000

156 20/8 Memdavad Patan Yes Agri 1 Kanbi Rragnathbhai Nanjibhai Yes Yes Yes Yes Yes Yes 560 15000

157 20/9 Memdavad Patan Yes Agri 1 Thakkar Kanubhai Vakuthram Yes Yes Yes Yes Yes Yes 906 15000

158 20/11 MEMDAVAD Patan Yes Agri 1 OKHABHAI MOHANBHAI HARIJAN Yes Yes Yes Yes Yes Yes 1320 28200

159 20A/0 BHILOT Patan Yes Agri 1 JETHABHAI KALABHAI KANBI Yes Yes Yes Yes Yes Yes 1720 860 40000 20000

160 21/0 Memdavad Patan Yes Agri 1 Dayabhai Govindbhai Thakor Yes Yes Yes Yes Yes Yes 1376 1376 30000 30000

161 22/0 Memdavad Patan Yes Agri 1 Shivabhai Samabhai Rabari Yes Yes Yes Yes Yes Yes 744 1728 20000 26000

Page 29: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Sr. No. Tower No.Name of the

Village

Name of

the

Districts

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/

No)

Owners

hip

(Agricul

ture) or

Govern

ment

Number

of

Affected

Persons

/Househ

olds/Fa

milies

Name/s of the Owner in case of

Agriculture Land

Founda

tion

Comple

ted

(Yes/No

)

Erection

Complet

ed

(Yes/No)

Stringin

g

Complet

ed

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

foundation

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringing

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of Crop

Compensation

(Rupees) paid

for Stringing

Other

Impacts

such as

approach

road,

additional

area

during

execution

of work

(yes/No)

If Yes,

area for

crop

damage

(hectare)

Names of Affected

Persons

Amount of

Crop

Compensati

on (Rupees)

paid for crop

damage

162 22/1 Memdavad Patan Yes Agri 1 Laxmanbhai Hardasbhai Rabari Yes Yes Yes Yes Yes Yes 906 906 15000 15000

163 22/1 to 22/2 RADHANPUR Patan Yes Agri 1 DUNGARBHAI AMBABHAI HARIJAN Yes Yes Yes Yes Yes Yes 400 7320

164 22/1 to 22/2 MEMDAVAD Patan Yes Agri 1 KALABHAI MELABHAI DESAI Yes Yes Yes Yes Yes Yes 320 4800

165 22/2 to 22/3 MEMDAVAD Patan Yes Agri 1 AJUBHAI PRAGBHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 550 8300

166 22/2 to 22/3 MEMDAVAD Patan Yes Agri 1 CHOTHIBEN RANCHHODBHAI THAK Yes Yes Yes Yes Yes Yes 600 14880

16722/3 BHILOT

Patan Yes Agri 1 NATUBHAI SANKARBHAI PATEL Yes Yes Yes Yes Yes Yes906 906

906 15000 15000 15000

168 22/3 to 22/4 MEMDAVAD Patan Yes Agri 1 RATANBHAI SHANKARBHAI PATEL Yes Yes Yes Yes Yes Yes 600 14000

169 22/5 MEMDAVAD Patan Yes Agri 1 DEVJIBHAI VASABHAI KANABI Yes Yes Yes Yes Yes Yes 1240 18600

170 22/5 to 22/6 MEMDAVAD Patan Yes Agri 1 AMRATBHAI GANESHBHAI SUTHAR Yes Yes Yes Yes Yes Yes 580 8700

171 22/5 to 22/6 MEMDAVAD Patan Yes Agri 1 ACHARATLAL MOHANLAL PATEL Yes Yes Yes Yes Yes Yes 350 8200

172 22/6 MEMDAVAD Patan Yes Agri 1 BHAGVANBHAI GOVINDBHAI PATEL Yes Yes Yes Yes Yes Yes 1540 23100

173 22/6 to 22/7 SHERGANJ Patan Yes Agri 1 RATNABHAI DEVUBHAI THAKOR Yes Yes Yes Yes Yes Yes 450 6800

174 22/6 to 22/7 SHERGANJ Patan Yes Agri 1 POPATBHAI MFABHAI THAKOR Yes Yes Yes Yes Yes Yes 900 13500

175 22/6 to 22/7 SHERGANJ Patan Yes Agri 1 SADABHAI DAYABHAI THAKOR Yes Yes Yes Yes Yes Yes 960 14400

176 22/7 to 22/8 SHERGANJ Patan Yes Agri 1 RAMABHAI MAVJIBHAI THAKOR Yes Yes Yes Yes Yes Yes 666 10000

177 22/8 SHERGANJ Patan Yes Agri 1 GANDABHAI JASAVANTBHAI PATEL Yes Yes Yes Yes Yes Yes 924 21600

178 22/8 to 22/9 SHERGANJ Patan Yes Agri 1 DILIPBHAI GANDABHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 600 14000

179 22-Sep SHERGANJ Patan Yes Agri 1 PARAGJIBHAI LALJIBHAI CHOUDHA Yes Yes Yes Yes Yes Yes 1045 24300

180 22/10 Sherganj Patan Yes Agri 1 Mafabhai Shankarbhai Chaudhry Yes Yes Yes Yes Yes Yes 900 2700 1800 15000 45000 30000

181 22/10 Sherganj Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 1500Mafabhai

Shankarbhai

Chaudhry

25000

182 22/10 Sherganj Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 1200Mafabhai

Shankarbhai

Chaudhry

15000

183 22/10 to 22/11 SHERGANJ Patan Yes Agri 1 RANSODBHAI DANABHAI PATEL Yes Yes Yes Yes Yes Yes 620 9300

184 22/10 to 22/11 SHERGANJ Patan Yes Agri 1 AJMALBHAI HARJIBHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 320 4200

185 22/11 Sherganj Patan Yes Agri 1 NURMOHAMED GANIBHAI VHORA Yes Yes Yes Yes Yes Yes 1836 27600

186 22/11 to 23/0 SHERGANJ Patan Yes Agri 1 JESINGHBHAI JEVATBHAI PATEL Yes Yes Yes Yes Yes Yes 445 10400

187 23/0 Sherganj Patan Yes Agri 1 Jasvantbhai H Patel Yes Yes Yes Yes Yes Yes 1116 1116 30000 30000

188 23/0 to 24/0 Sherganj Patan Yes Agri 1 Hitesh Kantilal Koradiya Yes Yes Yes Yes Yes Yes 556 13000

189 24/0 to 25/0 Sherganj Patan Yes Agri 1 Induben G Nayi Yes Yes Yes Yes Yes Yes 150 150 3750 3750

190 24/0 to 25/0 SHERGANJ Patan Yes Agri 1 SAILESHBHAI RAGUBHAI NAYI Yes Yes Yes Yes Yes Yes 2576 60000

191 24/0 to 25/0 SHERGANJ Patan Yes Agri 1 BHAVABHAI REVABHAI NAI Yes Yes Yes Yes Yes Yes 1072 25000

192 24/0 to 25/0 SHERGANJ Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 212 DINESHBHAI VAGHA 5000

193 25/0 Sherganj Patan Yes Agri 1 Nai Jagdishbhai Vaghabhai Yes Yes Yes Yes Yes Yes 1288 1933 30000 45000

194 25/0 Sherganj Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 276 Nai Jagdishbhai Vag 7500

195 25/0 to 25/1 SHERGANJ Patan Yes Agri 1 NARESHBHAI GANDABHAI NAYI Yes Yes Yes Yes Yes Yes 360 8400

196 25/0 to 25/1 SHERGANJ Patan Yes Agri 1 INDUBEN GANDABHAI NAYI Yes Yes Yes Yes Yes Yes 420 9800

197 25/0 to 25/1 SHERGANJ Patan Yes Agri 1 BABUBHAI VAGHABHAI NAI Yes Yes Yes Yes Yes Yes 360 8400

198 25/1 Kolhapur Patan Yes Agri 1 Sendha bhai Karmshibhai Rabari Yes Yes Yes Yes Yes Yes 1932 45000

199 25/1 Kolhapur Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 644 Sendha bhai Karmshi 15000

200 25/1 to 25/2 Anandpura Patan Yes Agri 1 Madarshing Vghjibhai Gohil Yes Yes Yes Yes Yes Yes 320 7500

201 25/1 to 25/2 Kolapur Patan Yes Agri 1 Adeshi V.Gohil Yes Yes Yes Yes Yes Yes 600 10000

202 25/1 to 25/2 KOLAPUR Patan Yes Agri 1 ABHESING PRATAPSING GOHIL Yes Yes Yes Yes Yes Yes 320 7500

203 25/1 to 25/2 SHERGANJ Patan Yes Agri 1 CHAUDHARI KAMABHAI KARSHANB Yes Yes Yes Yes Yes Yes 440 10230

204 25/2 Kolapur Patan Yes Agri 1 Varjangbhai.M.Thakor Yes Yes Yes Yes Yes Yes 1416 26000

205 25/3 Kolhapur Patan Yes Agri 1 Satabhai Sangrambhai Rabari Yes Yes Yes Yes Yes Yes 2597 55000

206 25/3 Kolhapur Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 544 Satabhai Sangrambh 10000

207 25/3 to 25/4 Kolapur Patan Yes Agri 1 Panchanbhai V.Thakor Yes Yes Yes Yes Yes Yes 560 8400

208 25/3 to 25/4 Kolapur Patan Yes Agri 1 Manabhai R.Thakor Yes Yes Yes Yes Yes Yes 420 6300

209 25/3 to 25/4 Kolapur Patan Yes Agri 1 Kamuben D.Thakor Yes Yes Yes Yes Yes Yes 315 7350

210 25/4 Kolapur Patan Yes Agri 1 Kamuben C.Thakor Yes Yes Yes Yes Yes Yes 1420 21300

211 25/4 to 25/5 Porana Patan Yes Agri 1 Vasantbhai R.ThakoR Yes Yes Yes Yes Yes Yes 320 5125

212 25/4 to 25/5 Kolapur Patan Yes Agri 1 Galalbhai S.Thakor Yes Yes Yes Yes Yes Yes 1120 18300

213 25/4 to 25/5 Kolapur Patan Yes Agri 1 Chhotabhai V.Thakor Yes Yes Yes Yes Yes Yes 960 14400

214 25/5 Alahbad Patan Yes Agri 1 Laxmanbhai A Chaudhry Yes Yes Yes Yes Yes Yes 896 896 15000 15000

215 25/5 Porana Patan Yes Agri 1 Manabhai D. Thakor Yes Yes Yes Yes Yes Yes 1194 1194 20000 20000

216 25/5 Alahbad Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 1595 Laxmanbhai A Chaud 30000

217 25/5 Kolapur Patan Yes Agri 1 MevabhaiS.Thakor Yes Yes Yes Yes Yes Yes 524 8400

218 25/5 Porana Patan Yes Agri 1 Manbhai D.Thakor Yes Yes Yes Yes Yes Yes 1328 24400

Page 30: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Sr. No. Tower No.Name of the

Village

Name of

the

Districts

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/

No)

Owners

hip

(Agricul

ture) or

Govern

ment

Number

of

Affected

Persons

/Househ

olds/Fa

milies

Name/s of the Owner in case of

Agriculture Land

Founda

tion

Comple

ted

(Yes/No

)

Erection

Complet

ed

(Yes/No)

Stringin

g

Complet

ed

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

foundation

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringing

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of Crop

Compensation

(Rupees) paid

for Stringing

Other

Impacts

such as

approach

road,

additional

area

during

execution

of work

(yes/No)

If Yes,

area for

crop

damage

(hectare)

Names of Affected

Persons

Amount of

Crop

Compensati

on (Rupees)

paid for crop

damage

219 25/5 to 25/6 Porana Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 188 Vasant R. Thakor 5000

220 25/6 Porana Patan Yes Agri 1 Sundaji Viraji Thakor Yes Yes Yes Yes Yes Yes 1696 1696 3392 17500 17500 35000

221 25/6 to 25/7 Porana Patan Yes Agri 1 Nagjibhai A.Bharvad Yes Yes Yes Yes Yes Yes 304 5000

222 25/6 to 25/7 Porana Patan Yes Agri 1 Pethabhai R.Patel Yes Yes Yes Yes Yes Yes 328 6000

223 25/6 to 25/7 Porana Patan Yes Agri 1 Shindhabhai A.Bharvad Yes Yes Yes Yes Yes Yes 304 5000

224 25/6 to 25/7 Porana Patan Yes Agri 1 Nanjibhai B.Kanbi Yes Yes Yes Yes Yes Yes 400 7320

225 25/6 to 25/7 Porana Patan Yes Agri 1 Hengabhai A.Bharvad Yes Yes Yes Yes Yes Yes 660 12080

226 25/7 Porana Patan Yes Agri 1 Mavjibhai Virabhai Chaudhary Yes Yes Yes Yes Yes Yes 558 558 750 15000 15000 20000

227 25/8 Alahabad Patan Yes Agri 1 Vairshibhai V.Thakor Yes Yes Yes Yes Yes Yes 1664 25000

228 25/8 to 25/9 Porana Patan Yes Agri 1 Vasarambhai B.Thakor Yes Yes Yes Yes Yes Yes 300 5500

229 25/8 to 25/9 Porana Patan Yes Agri 1 Bhagabhai B.Bharvad Yes Yes Yes Yes Yes Yes 900 17425

230 25/9 Alahbad Patan Yes Agri 1 Ramabhai Karsanbhai Bharvad Yes Yes Yes Yes Yes Yes 1768 30000

231 25/9 to 25/10 Alahabad Patan Yes Agri 1 Somabhai D.Suthar Yes Yes Yes Yes Yes Yes 300 4900

232 25/9 to 25/10 Alahabad Patan Yes Agri 1 Kanjibhai D.Suthar Yes Yes Yes Yes Yes Yes 300 4500

233 25/10 ALAHABAD Patan Yes Agri 1 AJIBEN MOHANBHAI SOLANKI Yes Yes Yes Yes Yes Yes 666 666 666 10000 10000 10000

234 25/10 to 25/11 Alahabad Patan Yes Agri 1 Gandabhai N.Patel Yes Yes Yes Yes Yes Yes 480 9900

235 25/11 Alahbad Patan Yes Agri 1 Revaben vihabhai Chaudhry Yes Yes Yes Yes Yes Yes 744 20000

236 25/11 to 25/12 Alahabad Patan Yes Agri 1 Dharamshibhai Amthabhai Prajapathi Yes Yes Yes Yes Yes Yes 550 10065

237 25/11 to 25/12 Alahabad Patan Yes Agri 1 Valabhai A.Parjapati Yes Yes Yes Yes Yes Yes 600 11000

238 25/11 to 25/12 ALAHABAD Patan Yes Agri 1 REVABEN VISHABHAI CHOUDHARI Yes Yes Yes Yes Yes Yes 773 45000

239 25/12 Alahbad Patan Yes Agri 1 Pababhai kamabhai Patel Yes Yes Yes Yes Yes Yes 900 900 1800 15000 15000 30000

240 25/12 Alahabad Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 188Dharamshibhai

Amthabhai

Prajapati

5000

241 25/12 Alahabad Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 188Shankuben

VAJABHAI

Prajapathi

5000

242 25/12 to 25/13 Alahabad Patan Yes Agri 1 Jivanbhai K.Patel Yes Yes Yes Yes Yes Yes 1008 19500

243 25/12 to 25/13 Arjanshan Patan Yes Agri 1 Pababhai K.Patel Yes Yes Yes Yes Yes Yes 200 4075

244 25/13 Alahbad Patan Yes Agri 1 Jivanbhai K Patel Yes Yes Yes Yes Yes Yes 558 558 1116 15000 15000 30000

245 25/14 Alahbad Patan Yes Agri 1 Bhavabhai A Patel Yes Yes Yes Yes Yes Yes 906 975 15000 32200

246 25/14 to 25/15 Alahabad Patan Yes Agri 1 Shankarbhai A.Patel Yes Yes Yes Yes Yes Yes 525 17550

247 25/14 to 25/15 Alahabad Patan Yes Agri 1 Jitabhai M.Patel Yes Yes Yes Yes Yes Yes 1040 15600

248 25/14 to 25/15 ALAHABAD Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 260 BHAVABHAI AMTHA 7000

249 25/15 to 25/16 Alahabad Patan Yes Agri 1 Narmadaben H.Joshi Yes Yes Yes Yes Yes Yes 1050 19280

250 25/15 to 25/16 ALAHABAD Patan Yes Agri 1 TEJABHAI HARJIBHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 204 3400

251 25/16 Alahbad Patan Yes Agri 1 Nathabhai Valabhai Patel Yes Yes Yes Yes Yes Yes 558 15000

252 25/16 to 25/17 Alahabad Patan Yes Agri 1 Nathabhai Valabhai Chaoudhary Yes Yes Yes Yes Yes Yes 2356 42050

253 25/17 Arajansar Patan Yes Agri 1 Jagubhai Lalabhai Prajapati Yes Yes Yes Yes Yes Yes 1190 15000

254 25/17 to 25/18 Arjansar Patan Yes Agri 1 Rameshbhai Parshotambhai Panchal Yes Yes Yes Yes Yes Yes 400 8150

255 25/17 to 25/18 Arjansar Patan Yes Agri 1 Pababhai Mavabhai Patel Yes Yes Yes Yes Yes Yes 344 5700

256 25/18 to 25/19 Arjanshan Patan Yes Agri 1 Somabhai D..Patel Yes Yes Yes Yes Yes Yes 600 8880

257 25/18 to 25/19 Arjanshan Patan Yes Agri 1 Jayntibhai A.Chaudhary Yes Yes Yes Yes Yes Yes 335 5000

258 25/18 to 25/19 Arjanshan Patan Yes Agri 1 Ajubhai M.Patel Yes Yes Yes Yes Yes Yes 388 10500

259 25/19 Arjanshan Patan Yes Agri 1 Bhavabhai A.Patel Yes Yes Yes Yes Yes Yes 1176 24000

260 25/19 to 25/20 Arjanshan Patan Yes Agri 1 Hirabhai L.Patel Yes Yes Yes Yes Yes Yes 160 2400

261 25/19 to 25/20 Arjanshan Patan Yes Agri 1 Ravabhai C.Patel Yes Yes Yes Yes Yes Yes 850 14400

262 25/19 to 25/20 Arjanshan Patan Yes Agri 1 Ganesh.C.Patel Yes Yes Yes Yes Yes Yes 640 9600

263 25/20 to 26/0 Arjanshan Patan Yes Agri 1 Naranbhai A.Chaudhary Yes Yes Yes Yes Yes Yes 480 7200

264 25/20 to 26/0 Arjanshan Patan Yes Agri 1 Vihabhai J.Patel Yes Yes Yes Yes Yes Yes 1281 23500

265 25/20 to 26/0 ARJANSAR Patan Yes Agri 1 NARANBHAI VALABHAI CHAUDHARI Yes Yes Yes Yes Yes Yes 730 17000

266 26/0 Arajansar Patan Yes Agri 1 Kamabhai dungarbhai Patel Yes Yes Yes Yes Yes Yes 744 744 744 20000 20000 20000

267 26/0 to 26/1 Arjanshan Patan Yes Agri 1 Santilal P.Solanki Yes Yes Yes Yes Yes Yes 244 5000

268 26/0 to 26/1 Arajansar Patan Yes Agri 1 Naranbhai A Chaudhry Yes Yes Yes Yes Yes Yes 360 6000

269 26/0 to 26/1 Arajansar Patan Yes Agri 1 Shantilal P Solanki Yes Yes Yes Yes Yes Yes 420 7000

270 26/1 Arajansar Patan Yes Agri 1 Sevadas Bajrangdas Sadhu Yes Yes Yes Yes Yes Yes 560 15000

271 26/1 to 26/2 Arajansar Patan Yes Agri 1 Devsibhai G Thakor Yes Yes Yes Yes Yes Yes 420 7000

272 26/1 to 26/2 Arajansar Patan Yes Agri 1 Narsinh T Thakor Yes Yes Yes Yes Yes Yes 720 10400

273 26/1 to 26/2 Arajansar Patan Yes Agri 1 Mafaji D Thakor Yes Yes Yes Yes Yes Yes 300 5000

274 26/2 Arjanshan Patan Yes Agri 1 Harkhabhai P.Chaudhary Yes Yes Yes Yes Yes Yes 820 15000

275 26/2 Arajansar Patan Yes Agri 1 Harkhabhai Panabhai Patel Yes Yes Yes Yes Yes Yes 560 15000

276 26/2 to 26/3 Arajansar Patan Yes Agri 1 Arjanbhai M Rabari Yes Yes Yes Yes Yes Yes 180 3000

Page 31: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Sr. No. Tower No.Name of the

Village

Name of

the

Districts

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/

No)

Owners

hip

(Agricul

ture) or

Govern

ment

Number

of

Affected

Persons

/Househ

olds/Fa

milies

Name/s of the Owner in case of

Agriculture Land

Founda

tion

Comple

ted

(Yes/No

)

Erection

Complet

ed

(Yes/No)

Stringin

g

Complet

ed

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

foundation

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringing

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of Crop

Compensation

(Rupees) paid

for Stringing

Other

Impacts

such as

approach

road,

additional

area

during

execution

of work

(yes/No)

If Yes,

area for

crop

damage

(hectare)

Names of Affected

Persons

Amount of

Crop

Compensati

on (Rupees)

paid for crop

damage

277 26/2 to 26/3 Arajansar Patan Yes Agri 1 Karsanbhai B Patel Yes Yes Yes Yes Yes Yes 360 9700

278 26/2 to 26/3 Arajansar Patan Yes Agri 1 Rupabhai V Rabari Yes Yes Yes Yes Yes Yes 360 6000

279 26/3 Arajansar Patan Yes Agri 1 Manaji Hemrajji Thakor Yes Yes Yes Yes Yes Yes 560 15000

280 26/3 to 26/4 Arajansar Patan Yes Agri 1 Prabhubhai D Nayi Yes Yes Yes Yes Yes Yes 428 11500

281 26/3 to 26/4 Arajansar Patan Yes Agri 1 DaJabhai O Patel Yes Yes Yes Yes Yes Yes 280 7600

282 26/3 to 26/4 Arajansar Patan Yes Agri 1 Jemabhai Valabhai Kanbi Yes Yes Yes Yes Yes Yes 1395 29000

283 26/4 to 26/5 Arajansar Patan Yes Agri 1 Lebubhai L Thakor Yes Yes Yes Yes Yes Yes 320 8600

284 26/4 to 26/5 Arajansar Patan Yes Agri 1 Dalachhabhai M Nayi Yes Yes Yes Yes Yes Yes 500 13500

285 26/4 to 26/5 Arajansar Patan Yes Agri 1 Jagmalbhai K Kanbi Yes Yes Yes Yes Yes Yes 180 3000

286 26/4 to 26/5 Arajansar Patan Yes Agri 1 Sakuben K patel Yes Yes Yes Yes Yes Yes 180 3000

287 26/5 Arajansar Patan Yes Agri 1 Somabhai Virabhai Thakor Yes Yes Yes Yes Yes Yes 1120 30000

288 26/5 to 26/5 Arjanshan Patan Yes Agri 1 Somabhai V.Thakor Yes Yes Yes Yes Yes Yes 335 5000

289 26/6 Arajansar Patan Yes Agri 1 Revaben Ramsibhai Chaudhary Yes Yes Yes Yes Yes Yes 268 4500

290 28/6 to 28/7 savpura B.K Yes Agri 1 Vinaji Chaturji Sabusana Yes Yes Yes Yes Yes Yes 430 10000

291 28/7 28/8 Bhalgam B.K Yes Agri 1 Manshangji Ravaji Sabosana Yes Yes Yes Yes Yes Yes 360 8000

292 26/7 to 26/8 Arajansar Patan Yes Agri 1 Balvantji C Thakor Yes Yes Yes Yes Yes Yes 296 8000

293 26/8 to 26/9 Arajansar Patan Yes Agri 1 Viraben Kamabhai Patel Yes Yes Yes Yes Yes Yes 372 10000

294 26/9 Tatiyana B.K Yes Agri 1 Thkkar Vasantbhai Amratbhai Yes Yes Yes Yes Yes Yes 1120 30000

295 26/10 to 26/11 Tatiyana B.K Yes Agri 1 Bhudarji sivaji dhandhaniya Yes Yes Yes Yes Yes Yes 320 8600

296 29/0 savpura B.K Yes Agri 1 Savshiji Jetaji Thakor Yes Yes Yes Yes Yes Yes 1290 30000

297 29/1 to 29/2 savpura B.K Yes Agri 1 Narkhanji Sartanji Thakor Yes Yes Yes Yes Yes Yes 320 7500

298 30/0 to 31/0 Bhalgam B.K Yes Agri 1 Keshaji Raychandji Sabosana Yes Yes Yes Yes Yes Yes 900 15000

299 32/1 Anandpura B.K Yes Agri 1 Lotiya Joitaji Mafaji Yes Yes Yes Yes Yes Yes 1704 31300

300 32/2 Anandpura B.K Yes Agri 1 Becharbhai Sankarbhai Solanki Yes Yes Yes Yes Yes Yes 1664 27600

301 32/4 Anandpura B.K Yes Agri 1 Solanki Chanduji Chaturji Yes Yes Yes Yes Yes Yes 1109 22700

302 32/4 to 32/5 Anandpura B.K Yes Agri 1 Dayabhai Gemarbhai Bhatakiya Yes Yes Yes Yes Yes Yes 400 9300

303 32/5 Anandpura B.K Yes Agri 1 Tejaji Nanjiji Bhatakiya Yes Yes Yes Yes Yes Yes 1188 19700

304 32/5 to 33/0 Anandpura B.K Yes Agri 1 Dharamshibhai Punabhai Mehriya Yes Yes Yes Yes Yes Yes 512 8500

305 32/5 to 33/0 Anandpura B.K Yes Agri 1 Gordhanbhai Punabhai Prajapati Yes Yes Yes Yes Yes Yes 500 10200

306 32/5 to 33/0 Anandpura B.K Yes Agri 1 Hirabhai Ramjibhai Mehriya Yes Yes Yes Yes Yes Yes 2320 38500

307 38A/0 Kashra Patan Yes Agri 1 Babu[uri Devpuri Goswami Yes Yes Yes Yes Yes Yes 1638 15000

308 38A/0-1 Kashra Patan Yes Agri 1 Revaben Virambhai Chauodhary Yes Yes Yes Yes Yes Yes 650 18000

309 38A/0-1 Kashra Patan Yes Agri 1 Virampuri Devpuri Goswami Yes Yes Yes Yes Yes Yes 1472 34300

310 38A/1 Kashra Patan Yes Agri 1 Chauodhary Kuberbhai Ramabhai Yes Yes Yes Yes Yes Yes 1925 32250

311 38A/1-2 Kashra Patan Yes Agri 1 Chaoudhary Parmabhai Ratnabhai Yes Yes Yes Yes Yes Yes 680 13800

312 38A/2-3 Kashra Patan Yes Agri 1 Bhagvanbhai Ratnabhai Chaoudhari Yes Yes Yes Yes Yes Yes 510 12000

313 39/0 Devpura Patan Yes Agri 1 Bijolbhai Arjanbhai Rabari Yes Yes Yes Yes Yes Yes 2915 65000

314 40/2 Sariyad Patan Yes Agri 1 Jivrambhai Ujambhai Joshi Yes Yes Yes Yes Yes Yes 904 15000

315 40/4 Sariyad Patan Yes Agri 1 Srirambhai Amrutbhai Joshi Yes Yes Yes Yes Yes Yes 904 15000

316 40/5 Sariyad Patan Yes Agri 1 Hardevbhai BHAMJIBHAI Joshi Yes Yes Yes Yes Yes Yes 904 15000

317 40/7 Sariyad Patan Yes Agri 1 Bharatbhai Gopalbhai Joshi Yes Yes Yes Yes Yes Yes 1472 34000

318 40/8 Sariyad Patan Yes Agri 1 Manchheben Baldevbhai Joshi Yes Yes Yes Yes Yes Yes 904 15000

319 40/9 Sariyad Patan Yes Agri 1 Ambaram Vaghabhai Joshi Yes Yes Yes Yes Yes Yes 904 15000

320 40/10 Sariyad Patan Yes Agri 1 Ramshigbhai Devshibhai Chaoudhay Yes Yes Yes Yes Yes Yes 904 15000

321 40/11 Sariyad Patan Yes Agri 1 Laxmanbhai Dhulabhai Panchal Yes Yes Yes Yes Yes Yes 600 10000

322 41/0 Sariyad Patan Yes Agri 1 Dungarbhai Ramabhai Chaoudhary Yes Yes Yes Yes Yes Yes 605 10000

323 41/2 Sariyad Patan Yes Agri 1 Vasudev Bhanjibhai Joshi Yes Yes Yes Yes Yes Yes 450 7500

324 41/2 Sariyad Patan Yes Agri 1 Prabhuram Jemabhai Joshi Yes Yes Yes Yes Yes Yes 450 7500

325 41A/0 Sariyad Patan Yes Agri 1 Laxmiram Shivarambhai Joshi Yes Yes Yes Yes Yes Yes 904 15000

326 41A/1 Sariyad Patan Yes Agri 1 Revabhai Vashibhai Desai Yes Yes Yes Yes Yes Yes 904 15000

327 41A/2 Sariyad Patan Yes Agri 1 Raniben Laxmanbhai Chaoudhay Yes Yes Yes Yes Yes Yes 904 15000

328 41A/3 Sariyad Patan Yes Agri 1 Parmabhai Devanbhai Chaoudhary Yes Yes Yes Yes Yes Yes 904 15000

329 42/0 Sariyad Patan Yes Agri 1 Ranchhodbhai Bhemabhai Choudhari Yes Yes Yes Yes Yes Yes 904 15000

330 42/2 Sariyad Patan Yes Agri 1 Punabhai Gemabhai Nai Yes Yes Yes Yes Yes Yes 904 15000

331 42/3 Sariyad Patan Yes Agri 1 Laxmanbhai Ganeshbhai Chaoudhary Yes Yes Yes Yes Yes Yes 480 8000

332 42/5 Lodhi Patan Yes Agri 1 Rabari Jorabhai Vastabhai Yes Yes Yes Yes Yes Yes 904 15000

333 43/1 Lodhi Patan Yes Agri 1 Harijan Paniben Haribhai Yes Yes Yes Yes Yes Yes 1060 11925

334 44/1 Vadiya Patan Yes Agri 1 Savshiji Gemaji Thakor Yes Yes Yes Yes Yes Yes 300 5000

335 44/3 Vadiya Patan Yes Agri 1 Manjaji Abhaji Thakor Yes Yes Yes Yes Yes Yes 600 10000

336 44/4 Vadiya Patan Yes Agri 1 Okhaji Kaluji Thakor Yes Yes Yes Yes Yes Yes 480 8000

337 45/0 Kalodhi Patan Yes Agri 1 Thakor Varsungji Rayji Yes Yes Yes Yes Yes Yes 904 15000

Page 32: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

Sr. No. Tower No.Name of the

Village

Name of

the

Districts

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/

No)

Owners

hip

(Agricul

ture) or

Govern

ment

Number

of

Affected

Persons

/Househ

olds/Fa

milies

Name/s of the Owner in case of

Agriculture Land

Founda

tion

Comple

ted

(Yes/No

)

Erection

Complet

ed

(Yes/No)

Stringin

g

Complet

ed

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

foundation

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringing

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of Crop

Compensation

(Rupees) paid

for Stringing

Other

Impacts

such as

approach

road,

additional

area

during

execution

of work

(yes/No)

If Yes,

area for

crop

damage

(hectare)

Names of Affected

Persons

Amount of

Crop

Compensati

on (Rupees)

paid for crop

damage

338 45/3 Sadasan Patan Yes Agri 1 Narshangji Karshnji Thakor Yes Yes Yes Yes Yes Yes 904 15000

339 45B/2 Melusan Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 320 Rabari Govabhai Vas 5500

340 46/0 Melusan Patan Yes Agri 1 Rabari Vershibhai Vasrambhai Yes Yes Yes Yes Yes Yes 180 5000

34146/4 DHANASARA

Patan Yes Agri 1JAYANTHIBHAI RAMESHBHAI

JOSHIYes Yes Yes Yes Yes Yes 905 1305 15000 22000

342 47/0 Dharushan Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 875Hardevbhai

Lakhirambhai Joshi20000

343 47/0 - 47/1 Dharushan Patan Yes Agri 1 Yes Yes Yes Yes Yes Yes Yes 430Mansukbhai

Laxmiram Joshi10000

344 47/2 Dharusan Patan Yes Agri 1 Joshi Hardevbhai Ramjibhai Yes Yes Yes Yes Yes Yes 1112 30000

345 47/3 Kanosan Patan Yes Agri 1 Thakor Ranchhodji Virbhanji Yes Yes Yes Yes Yes Yes 1208 20000

346 49/0 to 49/1 Kanosan Patan Yes Agri 1 Shankerbhai Radhabhai Bhangi Yes Yes Yes Yes Yes Yes 904 15000

347 49/1 Kanosan Patan Yes Agri 1 Thakor Dalsangji Nagarji Yes Yes Yes Yes Yes Yes 904 15000

348 49/2 Kanosan Patan Yes Agri 1 Ramanlal Chunilal Panchal Yes Yes Yes Yes Yes Yes 904 15000

349 49/3 Ganeshpura Patan Yes Agri 1 Ishverbhai Khodabhai Rabari Yes Yes Yes Yes Yes Yes 904 15000

350 49/4 Ganeshpura Patan Yes Agri 1 Babubhai Shartanbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000

351 49/5 Ganeshpura Patan Yes Agri 1 Udesinh Dalaji Rajput Yes Yes Yes Yes Yes Yes 904 15000

352 49/6 Ganeshpura Patan Yes Agri 1 Bharatbhai Sartanbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000

353 49/7 Ganeshpura Patan Yes Agri 1 Ramjibhai Ramchandbhai Raval Yes Yes Yes Yes Yes Yes 904 15000

354 49/8 Ganeshpura Patan Yes Agri 1 Taljabhai Shartanbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000

355 50/1 Abluva Patan Yes Agri 1 Kanjibhai Nathabhai Rabari Yes Yes Yes Yes Yes Yes 904 15000

356 50A/2 Abluva Patan Yes Agri 1 Chaturji Kalaji Thakor Yes Yes Yes Yes Yes Yes 904 15000

357 51/1 Abluva Patan Yes Agri 1 Amrutbhai Nathabhai RABARI Yes Yes Yes Yes Yes Yes 904 15000

358 51/4 Abluva Patan Yes Agri 1 Amrutbhai Maganbhai Rabari Yes Yes Yes Yes Yes Yes 904 15000

359 51B/2 Delvada Patan Yes Agri 1 BharatKumar Kantilal Brahmbhatt Yes Yes Yes Yes Yes Yes 904 15000

360 51B/3 Delvada Patan Yes Agri 1 Rasmikant Natawarlal Bramhbhatt Yes Yes Yes Yes Yes Yes 904 15000

Page 33: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

S.

No.

Towe

r No.

Name of

the Village

Name of

the

Districts

survey

No

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/ No

Ownershi

p (Agri)

or

Governm

ent

Number of

Affected

Persons/H

ouseholds

/Families

Name/s of the Owner

in case of Agri Land

Found

ation

Compl

eted

(Yes/N

o)

Erectio

n

Comple

ted

(Yes/No

)

Stringi

ng

Compl

eted

(Yes/N

o)

Payment

of

Compensa

tion done

for crop

damage

during

foundation

(Yes/No)

Payment

of

Compensa

tion done

for crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringin

g

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of

Crop

Compensati

on

(Rupees)

paid for

Stringing

Amount for

Other Impacts

such as

approach

road,

additional

area during

execution of

work

Other Impacts

such as

approach

road,

additional

area during

execution of

work (yes/No)

If Yes,

area for

crop

damage

(hectare)

Number

of

affected

Person

s

Names of

Affected Person

1 2/0. PATANKA PATAN 405 Yes Agri 5 VIRAMBHAI B.THAKOR YES YES YES YES NO NO 1371 - - 20000 - - 2000 yes 160 5VIRAMBHAI

B.THAKOR

2 2/1. PATANKA PATAN 394 Yes Agri 8 DHARSHIBHAI S.THAKOR YES YES YES YES YES NO 1371 1371 - 20000 20000 - 3000 yes 240 8DHARSHIBHAI

S.THAKOR

3 2/2. PATANKA PATAN 397 Yes Agri 6 BECHARBHAI S.THAKOR YES YES YES YES NO NO 1371 - -20000

- - - no - -BECHARBHAI

S.THAKOR

4 16/2 Korda PATAN 652 Yes Gov. land 1 Sendabhai Thakor YES YES NO YES YES NO 686 686 - 10000 10000 - 2000 yes 240 1 Sendabhai Thakor

5 17/0 Jarusha PATAN 225 Yes Agri 1 Vrajlal Nagjibhai Suthar YES YES NO YES YES NO 1375 1375 - 20000 20000 - 3000+4000 yes 240+240 1Vrajlal Nagjibhai

Suthar

6 Jarusha PATAN 203/1 Yes Agri 1Chaganbhai Danabhai

PrajapatiYES NO NO 675 - - 10000 - - 2000 yes 240 1

Chaganbhai

Danabhai Prajapati

7 Jarusha PATAN 205 Yes Agri 9 Memabhai Jivabhai Patel YES NO NO 675 - - 10000 - - 4000 yes 300 1Memabhai Jivabhai

Patel

8 17/5 Jarusha PATAN 243 Yes Agri 4 Patel jagmal H YES YES NO YES YES NO - 1375 - - 20000 - 4000 yes 300 4 Patel jagmal H

9 17/11 Jekda PATAN 13 Yes Agri 1Chaudhari Vajabhai

MahadevbhaiYES YES NO YES YES NO 1375 1371 - 20000 20000 - 10000+5000 yes 800+400 1

Chaudhari Vajabhai

Mahadevbhai

10 Jekda PATAN 23 Yes Agri 8 Luhar Laxmanbhai B YES YES NO - 1371 - - 20000 - 3000 yes 240 8 Luhar Laxmanbhai B

11 Jekda PATAN 22 Yes Agri 1Shankar Bhai Vrsang Bhai

BharwadYES YES NO - 150 - - 3000 - - no - -

Shankar Bhai Vrsang

Bhai Bharwad

12 18/2 Jekda PATAN 289 Yes Agri 1 Bharvad Varsangbhai R YES YES NO YES YES NO - 1371 - - 20000 - - no - -Bharvad

Varsangbhai R

13 19/0 Bhilot PATAN 55 Yes Agri 1Joshi Pravinkumar

Jayshankar BhaiYES YES NO YES YES NO 1375 1376 - 20000 20000 - 3000+3000 yes 300+150 1

Joshi Pravinkumar

Jayshankar Bhai

14 Bhilot PATAN 49 Yes Agri 7Suthar Jayrambhai

KeshavlalYES YES NO 1371 1371 - 20000 20000 - 3000+3000 yes 150+150 7

Suthar Jayrambhai

Keshavlal

15 Bhilot PATAN Yes Agri 1 Bhogilal Revashankar Joshi YES YES NO 240 280 - 3000 5000 - - no - -Bhogilal

Revashankar Joshi

16 Bhilot PATAN Yes Agri 1Gelubha Mobatsang

VagelaYES NO NO 240 - - 3000 - - - no - -

Gelubha Mobatsang

Vagela

17 21/0 Bhilot PATAN 250/1/1 Yes Agri 5Merambhai Talsibhai

ThakorYES YES NO YES YES NO 1371 1371 - 20000 20000 - 3000+3000 yes 300+240 5

Merambhai

Talsibhai Thakor

18 23/4 Mehmdavad PATANgov.

landYes Gov. land 1

okhabhai mohanbhai

harijanYES YES NO YES YES NO - 1371 - - 20000 - - no - -

okhabhai

mohanbhai harijan

19 26/8 Alahbad PATAN 151/5 Yes Agri 6Bharvad Lakhmanbhai

KarshanbhaiYES YES NO YES YES NO 1371 - 20000 20000 - 5000+3000 yes 343 6

Bharvad

Lakhmanbhai

Karshanbhai

20 26/9 Alahbad PATAN 182 Yes Agri 2 Thakor Devanbhai Ajubhai YES YES NO YES NO NO 1371 - - 19975 - - - no - -Thakor Devanbhai

Ajubhai

21 Alahbad PATAN 67/3 Yes Agri 4 Vejaben Kamabhai Patel YES YES NO 1371 1371 - 20000 20000 - 4000+3000 yes 200+200 4Vejaben Kamabhai

Patel

22 Alahbad PATAN 67/2 Yes Agri 4Patel Laghjirbhai

BhagabhaiYES YES NO - 760 - - 8000 - - no - -

Patel Laghjirbhai

Bhagabhai

23 27/0 Arjansar PATAN79 /5

Yes Gov. land 1 Thakor Dajabhai Gagaram YES YES NO YES YES NO - 1371 - - 20000 - 3000 yes 240 1Thakor Dajabhai

Gagaram

24 33/1 ANADPURABANASKA

NTHA94 Yes

VARSUNGJI MANAJI

THAKORYES YES NO YES YES NO - - - 20000 - - no - -

VARSUNGJI MANAJI

THAKOR

26/11 YES

Annexure A2_Detail of Crop Compensation (400 kV Charanka - Sankhari Line) for Dt-01.11.2014 to Dt-30.04.2015

NO

YES YES

YES

YES

NO

NO

Details on Each Tower 400 KV Charanka - Veloda Line

General Details Details on Affected Status on Construction Status on Payment of

NO

17/3

17/13

Affected Area for crop

20/0

Amount of Compensation (Rupees) Other Impacts

YES

YES

YES

Page 34: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

S.

No.

Towe

r No.

Name of

the Village

Name of

the

Districts

survey

No

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/ No

Ownershi

p (Agri)

or

Governm

ent

Number of

Affected

Persons/H

ouseholds

/Families

Name/s of the Owner

in case of Agri Land

Found

ation

Compl

eted

(Yes/N

o)

Erectio

n

Comple

ted

(Yes/No

)

Stringi

ng

Compl

eted

(Yes/N

o)

Payment

of

Compensa

tion done

for crop

damage

during

foundation

(Yes/No)

Payment

of

Compensa

tion done

for crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringin

g

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of

Crop

Compensati

on

(Rupees)

paid for

Stringing

Amount for

Other Impacts

such as

approach

road,

additional

area during

execution of

work

Other Impacts

such as

approach

road,

additional

area during

execution of

work (yes/No)

If Yes,

area for

crop

damage

(hectare)

Number

of

affected

Person

s

Names of

Affected Person

25 33/2 ANADPURABANASKA

NTHA66 Yes

Kalaniya Chehrabhai

PunjabhaiYES YES NO YES YES NO - - - 20000 - 3000 yes - -

Kalaniya

Chehrabhai

Punjabhai

26 34/0 odhaBANASKA

NTHA64 Yes Gov. land 1

Sonetha Maganbhai

AmathbhaiYES YES YES YES YES YES 1371 1371 20000 20000 20000

3000+13048+60

86yes 900+420 1

Sonetha Maganbhai

Amathbhai

27 34/1 odhaBANASKA

NTHA45 Yes Agri 9

Rajabhai Mafabhai

BhangeeYES YES YES YES YES YES 1370 1371 20000 20000 20000 6956 yes 480 9

Rajabhai Mafabhai

Bhangee

28 34/2 OdhaBANASKA

NTHA37P1 Yes Agri 1 Ghia Saifudeen Husainbhai YES YES YES YES YES YES - - 1371 - - 20000 7826+20869 yes 540+1440 1

Ghia Saifudeen

Husainbhai

29 OdhaBANASKA

NTHA92 Yes Agri 1 Yusufali Ibrahim Ghiya YES YES YES - - 1030 - - 15000 6956 yes 480 1

Yusufali Ibrahim

Ghiya

30 odhaBANASKA

NTHA56 Yes Agri 7

Shankuben Raymalbhai

PataniYES YES YES 240 900 5000 5000 13048 5000 yes 341 7

Shankuben

Raymalbhai Patani

31 34/4 OdhaBANASKA

NTHA89P1 Yes Agri 3

Farudeen Husainbhai

GhiyaYES YES YES YES YES YES - - 1371 - - 20000 10434+12173 yes 840+720 3

Farudeen

Husainbhai Ghiya

32 34/5 OdhaBANASKA

NTHA75 Yes Gov. land 1 Ludharia Bhemabhai V YES YES YES YES YES YES - 1371 - 20000 20000 18550 yes 1280 1

Ludharia

Bhemabhai V

33 TotanaBANASKA

NTHA134 Yes Agri 5

PATNI RAMABHAI

MOHANBHAIYES YES YES - 1371 - 20000 20000 3250+17500 yes 1400 5

PATNI RAMABHAI

MOHANBHAI

34 TotanaBANASKA

NTHA134 Yes Agri 1

Vaghari Naranbhai

MohanbhaiYES YES YES - 1080 - 5500 15650 - no - -

Vaghari Naranbhai

Mohanbhai

34/3

34 /7

YES

YES YES

YES YES

YES

Page 35: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

S.

No.

Towe

r No.

Name of

the Village

Name of

the

Districts

survey

No

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/ No

Ownershi

p (Agri)

or

Governm

ent

Number of

Affected

Persons/H

ouseholds

/Families

Name/s of the Owner

in case of Agri Land

Found

ation

Compl

eted

(Yes/N

o)

Erectio

n

Comple

ted

(Yes/No

)

Stringi

ng

Compl

eted

(Yes/N

o)

Payment

of

Compensa

tion done

for crop

damage

during

foundation

(Yes/No)

Payment

of

Compensa

tion done

for crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringin

g

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of

Crop

Compensati

on

(Rupees)

paid for

Stringing

Amount for

Other Impacts

such as

approach

road,

additional

area during

execution of

work

Other Impacts

such as

approach

road,

additional

area during

execution of

work (yes/No)

If Yes,

area for

crop

damage

(hectare)

Number

of

affected

Person

s

Names of

Affected Person

35 34/12 TotanaBANASKA

NTHA207 Yes

THAKOR VERASIJI

MOHANJIYES YES YES YES YES NO - - - 20000 - 8000 yes - -

THAKOR VERASIJI

MOHANJI

36 34/13 TotanaBANASKA

NTHA202 Yes

TOTANIYA BAJUJI

RAMASIJIYES YES YES YES YES NO - - - 20000 - - no - -

TOTANIYA BAJUJI

RAMASIJI

37 35/3 TotanaBANASKA

NTHAYes

Hajabhai Dayabhai

BharwadYES YES YES YES NO NO - - 20000 - - - no - -

Hajabhai Dayabhai

Bharwad

38 35/4 TotanaBANASKA

NTHA296/3/3 Yes Agri 3

Gandabhai Kasabhai

BharavadYES YES YES YES YES NO 1370 - 20000 20000 - - no - -

Gandabhai Kasabhai

Bharavad

39 35/5 TotanaBANASKA

NTHA296/3/2 Yes Agri 4

Jamabhai Bhurabhai

BharvadYES YES YES YES YES NO 1370 - 20000 20000 - - no - -

Jamabhai Bhurabhai

Bharvad

40 35/6 TotanaBANASKA

NTHA296\4 Yes

Bharvad Babubhai Ganesh

BhaiYES YES YES YES YES NO - - - 20000 - 5000 yes - -

Bharvad Babubhai

Ganesh Bhai

41 35/7 TotanaBANASKA

NTHA433/b/1 Yes Agri 12 Thakor Chelaji Wadhaji YES YES YES YES NO NO 1371 - - 20000 - - - no - -

Thakor Chelaji

Wadhaji

42 35/9 Mota JampurBANASKA

NTHA433/1 Yes Gov. land 1

Charanbha Kanubha

VaghelaYES YES YES YES NO NO 1371 - - 20000 - - - no - -

Charanbha Kanubha

Vaghela

43 35/10 Mota JampurBANASKA

NTHA433/1 Yes Gov. land 1

Charanbha Kanubha

VaghelaYES YES YES YES NO NO 1371 - - 20000 - - - no - -

Charanbha Kanubha

Vaghela

44 35/11 Mota JampurBANASKA

NTHA433/1 Yes Gov. land 1 Pratapjee Thakhaji Solanki YES YES YES YES NO NO 1371 - - 20000 - - - no - -

Pratapjee Thakhaji

Solanki

45 36/0 Mota JampurBANASKA

NTHA433 Yes Gov. land 1 Madhaji Ladhaji Thakor YES YES YES YES YES NO 1471 - 20000 20000 - 4000 yes - -

Madhaji Ladhaji

Thakor

46 37/0 Mota JampurBANASKA

NTHA433/2 Yes Gov. land 1 Vaghila Jambha Chapuji YES YES YES YES NO NO 1371 - - 20000 - - - no - -

Vaghila Jambha

Chapuji

47 37/1 Mota JampurBANASKA

NTHA433/b/1 Yes Gov. land 1 Pratapjee Thakhaji Solanki YES YES YES YES NO NO 1371 - - 20000 - - - no - -

Pratapjee Thakhaji

Solanki

48 37/2 Vithlod PATAN 8 Yes Thakor Ramsanji Babaji YES YES YES YES YES NO - - - 20000 - - no - -Thakor Ramsanji

Babaji

49 37/3 Vithlod PATAN

7

GOV.

LAND

Yes Vershiji Kamaji Thakor YES YES YES YES YES NO - - - 20000 - 7000 yesVershiji Kamaji

Thakor

50 37/4 Vithlod PATAN

6

GOV.

LAND

Yes Thakor Lembuji Devsiji YES YES YES YES YES NO - - - 20000 - 6000 yesThakor Lembuji

Devsiji

51 37/5 Vithlod PATAN 4P1 Yes Thakor Makanji Sursangji YES YES YES YES YES NO - - - 20000 - 5000 yesThakor Makanji

Sursangji

52 37/6 Vithlod PATAN 43P2 Yes Thakor Lilaji Devsiji YES YES YES YES YES NO - - - 20000 - 4000 yes Thakor Lilaji Devsiji

53 37/7 devpura PATAN 89 Yes sarupji rasunji thakor YES YES YES YES YES NO - - - 20000 - 4600 yessarupji rasunji

thakor

54 37/8 devpura PATAN 75 Yes sarupji rasunji thakor YES YES YES YES YES NO - - - 20000 - 6700 yessarupji rasunji

thakor

55 38/0. DEVPURA PATAN 72/2 P1 YesSAMUBEN B.VAGHARI

YES YES YES YES YES NO - - - 20000 - 11000 yesSAMUBEN

B.VAGHARI

56 38/1 devpura PATAN 64 Yes Agri 7 Liluben Jorabhai Desai YES YES NO 1371 - 20000 20000 - 2500 yes 245 7Liluben Jorabhai

Desai

57 38/1 devpura PATAN 25/1 Yes Thakor Bhupatsinh Bajuju YES YES NO - - - 5000 - - no - -Thakor Bhupatsinh

Bajuju

58 39/0 devpura PATAN 18/2/1 Yes Agri 1 Mavajibhai Hirabhai Rava YES YES YES YES YES NO 1371 - 20000 20000 - 6000+6000 yes 300 1Mavajibhai Hirabhai

Rava

59 devpura PATAN 193 Yes thakor vershiji talaji YES YES NO - - - 10000 - 2000 yes thakor vershiji talaji

60 devpura PATAN 192 Yes Agri 1 Lilaji Motiji Thakor YES YES NO 697 - 10000 10000 - 5000 yes Lilaji Motiji Thakor

61 39/2 devpura PATAN 95 Yes Agri 1Raychandbhai Amthabhai

VagharYES YES NO YES YES NO 1371 - 20000 20000 - - no - -

Raychandbhai

Amthabhai Vaghar

62 Vithlod PATAN 98\1 Yes Agri 1 Cheharabhai J Chaudhri YES YES NO - 1371 - - 20000 - 3000 yes 240 1Cheharabhai J

Chaudhri

39/1

YES

NO

YES

NO

YES

YES

YES39/6 YES

YES

Page 36: Social and Environmental Monitoring Report · Social and Environmental Monitoring Report Project Number: 4431-013 Date: 05.10.2015 Reporting Period: Bi Annual Report (1st November

S.

No.

Towe

r No.

Name of

the Village

Name of

the

Districts

survey

No

Complet

ion of

final

surveys

and

pegging

of tower

(Yes/ No

Ownershi

p (Agri)

or

Governm

ent

Number of

Affected

Persons/H

ouseholds

/Families

Name/s of the Owner

in case of Agri Land

Found

ation

Compl

eted

(Yes/N

o)

Erectio

n

Comple

ted

(Yes/No

)

Stringi

ng

Compl

eted

(Yes/N

o)

Payment

of

Compensa

tion done

for crop

damage

during

foundation

(Yes/No)

Payment

of

Compensa

tion done

for crop

damage

during

Erection

(Yes/No)

Payment of

Compensati

on done for

crop

damage

during

Stringing

(Yes/No)

Area

affected

during

foundatio

n (square

meters)

Area

Affected

During

Erection

(square

meters)

Area

Affected

during

stringin

g

(square

meters)

Amount of

Crop

Compensati

on (Rupees)

paid for

foundation

Amount of

Crop

Compensati

on (Rupees)

paid for

Erection

Amount of

Crop

Compensati

on

(Rupees)

paid for

Stringing

Amount for

Other Impacts

such as

approach

road,

additional

area during

execution of

work

Other Impacts

such as

approach

road,

additional

area during

execution of

work (yes/No)

If Yes,

area for

crop

damage

(hectare)

Number

of

affected

Person

s

Names of

Affected Person

63 Vithlod PATAN 98\2 Yes Agri 1Paragbhai Ranchhodbhai

ChaudhariYES YES NO - - - 5000 - - no - -

Paragbhai

Ranchhodbhai

Chaudhari

64 39/7 Dhanera PATAN 96/2 Yes Agri 1 Rajabhai Varshibhai Desai YES YES NO YES YES NO 1371 1371 - 20000 20000 - - no - -Rajabhai Varshibhai

Desai

65 Sariyad PATAN 273P1 Yes Agri 6 Thakor Chandanji Rudaji YES YES NO - 1371 - - 20000 - 10217 yes 705 6Thakor Chandanji

Rudaji

66 Sariyad PATAN Yes Agri 9 Badsangji Rudaji Thakor YES YES NO - 422 - - 4000 - - no - -Badsangji Rudaji

Thakor

67 40/0 Sariyad PATAN 253 Yes Agri 2 Talaji Laxmanji Thakor YES YES YES YES YES NO 1370 1371 - 20000 20000 - 4000+3000 yes 400 2Talaji Laxmanji

Thakor

68 40/1 Sariyad PATAN 246\1 Yes Agri 4 Lakhiram D Joshi YES YES YES YES YES NO 1400 1371 - 20000 20000 - - no - - Lakhiram D Joshi

69 40/2 Sariyad PATAN 241 Yes Agri 3 Shamjibhai A Joshi YES YES YES YES YES NO 1380 1371 - 20000 20000 - 3000+4000 yes 300+300 3 Shamjibhai A Joshi

70 40/5 Sariyad PATAN 188\1 Yes Agri 7Prajapati Jashiben

MafabhaiYES YES YES YES YES NO 1370 1371 - 20000 20000 - 3000+2250 yes 300+246 7

Prajapati Jashiben

Mafabhai

71 40/6 Sariyad PATAN 185\1 Yes Agri 1Pajapati Gandabhai

HaribhaiYES YES YES YES YES NO 1370 1371 - 20000 20000 - 3000+3000 yes 300+360 1

Pajapati Gandabhai

Haribhai

72 Sariyad PATAN 45/1 Yes Agri 1 Pratapji Raychandji Thakor YES YES NO 862 852 - 10000 10000 -8176+5765+

8000+7000yes

705+493+1

60

483

1Pratapji Raychandji

Thakor

73 Sariyad PATAN 430/4 Yes Agri 4 Taljabhai Daljibhai Rabari YES YES NO 738 682 - 10000 10000 - 3000+4000 yes 320+548 4Taljabhai Daljibhai

Rabari

74 41/2 Sariyad PATAN 512 Yes Agri 1Ranchhodbhai Ramabhai

ChaudhryYES YES NO YES YES NO - 1371 - - 20000 - 6500 yes 465 1

Ranchhodbhai

Ramabhai Chaudhry

75 41/4 PATANKA PATAN 543/2 Yes Agri 1 ISHWERBHAI C.CHAMAR YES YES NO YES YES NO - 1371 - - 20000 - - no - -ISHWERBHAI

C.CHAMAR

76 42/0 Sariyad PATAN 581 Yes Agri 2Narotambhai Virambhai

NayeeYES YES YES YES YES NO - 1371 - - 20000 - 5000 yes 342 2

Narotambhai

Virambhai Nayee

77 Sariyad PATAN 587 Yes Agri 1 Nai Velabhai Balvantbhai YES YES NO - 300 - - 4000 - - no - -Nai Velabhai

Balvantbhai

78 Sariyad PATAN 581 Yes Agri 2Valabhai sagrambhai

chudhariYES YES NO - 1371 - - 20000 - 4000 yes 240 2

Valabhai

sagrambhai

chudhari

79 42/4 Sariyad PATAN 732 Yes Agri 8 Lila bhai Karsanbhai Rabari YES YES YES YES YES NO - 1371 - - 20000 - 5000 yes 360 8Lila bhai Karsanbhai

Rabari

80 42/5 Lodhi PATAN 89/41 Yes Agri 3Nagjibhai Vashrambhai

RabariYES YES YES YES YES NO 1340 1371 - 20000 20000 - 3000+4000 yes 150+175 3

Nagjibhai

Vashrambhai Rabari

81 42/6 Lodhi PATAN 89/43 Yes Agri 9Revabhai Hamirbhai

RabariYES YES YES YES YES NO - 1371 - - 20000 - 2500 yes 240 9

Revabhai Hamirbhai

Rabari

82 43/0 Lodhi PATAN 89/49 Yes Agri 1 Rabari Sankabhai Lilabhai YES YES YES YES YES NO 1453 1453 - 20000 20000 - 4000+3000 yes 240+180 1Rabari Sankabhai

Lilabhai

83 43/1 Lodhi PATAN 89/50/1 Yes Agri 1 Jorabhai Vastabhai Rabari YES YES YES YES YES NO - 1371 - - 20000 - 3000 yes 180 1Jorabhai Vastabhai

Rabari

84 43/2 Veloda PATAN 56 Yes Agri 2Bhikhabhai Danabhai

RabariYES YES YES YES YES NO 1371 1371 - 20000 20000 - 3000 yes 210 2

Bhikhabhai

Danabhai Rabari

85 43/3 Veloda PATAN 58/5 Yes Agri 1Rabari Jamabhai Rama

BhaiYES YES YES YES YES NO 1371 1371 - 20000 20000 - 15900 yes 660 1

Rabari Jamabhai

Rama Bhai

86 43/4 Veloda PATAN 62 Yes Agri 10Jamabhai Naranbhai

RabariYES YES YES YES YES NO 1371 1371 - 20000 20000 - 4000 yes 300 10

Jamabhai

Naranbhai Rabari

NO

NO

YES

41/0

YES

YES YES YES

YES YES

YES

39/8 YES

39/6 YES

42/1