+ All Categories
Home > Documents > Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market...

Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market...

Date post: 22-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
14
Transcript
Page 1: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge
Page 2: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

Sustainable Society

Biological

processes

Conversion

to Energy rests

BiogasEthanolBiopolymersElectricity

Chill

Heat

Wastes

Material

Recycling

Plastics

papersMetals

Glasses

etc.

Page 3: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

ApproachApproach

Awareness

ReplicationPilot

Project (Prototype)

Scenario

Role of Stakeholders

Page 4: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

The RoadmapThe Roadmap

• Design• Community development• Socialization

• Installing equipment• Commisioning• Starting up

• Monitoring• Further research• be best possible model

• technical approach• partnership

• Spreading the idea and concept• Seminar• Focus research

Page 5: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

Pilot Project – Biogas PlantPilot Project – Biogas Plant

• Location: “Gemah Ripah” Fruit Market, Yk• Waste production: 4 sd 10 ton/day (could be more) • Waste Biogas electricity• Potency of Biogas: 333 Nm3

• Potency of Electricity: 548 kWh/day• Start to operate: February 2011

Page 6: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

The ProcessThe Process

Page 7: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

UGM

•Research

•Education

•Design

Gemah RipahFruit Market

•Provide Location

•Operation and maintenance

Sleman

•Legal Aspects

•Bridge to Central Government and community

University of Boras

•Research collaboration

•Exchange students

Boras Energy & Environment

•Share experience on technical aspects

Boras Municipality

•Share experience on waste management

•Share experience on policies and regulation developments

Partnership

Page 8: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

Research

# Potency of biogas from different types of fruits

# design of biogas plant

# utilization of side products

# standard operating procedure

Education

# research as part of master thesis

# dissemination of results and concepts to other stakeholders

Community Service

# building the biogas plant

# work with government and others for optimizing the plant

Integration of 3 pillars (Education, Research & Community Services)

Problems found in the operation of biogas plant

are further investigated

Products of research are brought to class for study

case

Improvement on the subject improvement on the quality

of community service

Page 9: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

ChallengesChallenges Sustainability

Operational

• Feedstock

• Process

• Product quality

Financial

• Economic capacity

Spirit

• One strong vision

• Active engagement of all stakeholders (according to respective responsibility)

Page 10: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

Towards Sustainable Biogas PlantTowards Sustainable Biogas Plant

From idea to construction(2008-2010)

Start-up and testing (2010-2013)

System monitoring & feedstock management (2014)

Mass and Energy Balance, SOP development, Trouble shooting (2015)

Development of Technology Package (2016 onward)

LPDP Scheme

SIDA Scheme

Page 11: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

Before and After the Demo PlantBefore and After the Demo Plant

Page 12: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

Optimasi kinerja peralatanOptimasi kinerja peralatan

Page 13: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

PublikasiPublikasi

Page 14: Society - UN ESCAP 3_2_UGM.pdf · UGM •Research •Education •Design GemahRipah Fruit Market •Provide Location •Operation and maintenance Sleman •Legal Aspects •Bridge

L/O/G/O

Thank You!


Recommended