Sustainable Society
Biological
processes
Conversion
to Energy rests
BiogasEthanolBiopolymersElectricity
Chill
Heat
Wastes
Material
Recycling
Plastics
papersMetals
Glasses
etc.
ApproachApproach
Awareness
ReplicationPilot
Project (Prototype)
Scenario
Role of Stakeholders
The RoadmapThe Roadmap
• Design• Community development• Socialization
• Installing equipment• Commisioning• Starting up
• Monitoring• Further research• be best possible model
• technical approach• partnership
• Spreading the idea and concept• Seminar• Focus research
Pilot Project – Biogas PlantPilot Project – Biogas Plant
• Location: “Gemah Ripah” Fruit Market, Yk• Waste production: 4 sd 10 ton/day (could be more) • Waste Biogas electricity• Potency of Biogas: 333 Nm3
• Potency of Electricity: 548 kWh/day• Start to operate: February 2011
The ProcessThe Process
UGM
•Research
•Education
•Design
Gemah RipahFruit Market
•Provide Location
•Operation and maintenance
Sleman
•Legal Aspects
•Bridge to Central Government and community
University of Boras
•Research collaboration
•Exchange students
Boras Energy & Environment
•Share experience on technical aspects
Boras Municipality
•Share experience on waste management
•Share experience on policies and regulation developments
Partnership
Research
# Potency of biogas from different types of fruits
# design of biogas plant
# utilization of side products
# standard operating procedure
Education
# research as part of master thesis
# dissemination of results and concepts to other stakeholders
Community Service
# building the biogas plant
# work with government and others for optimizing the plant
Integration of 3 pillars (Education, Research & Community Services)
Problems found in the operation of biogas plant
are further investigated
Products of research are brought to class for study
case
Improvement on the subject improvement on the quality
of community service
ChallengesChallenges Sustainability
Operational
• Feedstock
• Process
• Product quality
Financial
• Economic capacity
Spirit
• One strong vision
• Active engagement of all stakeholders (according to respective responsibility)
Towards Sustainable Biogas PlantTowards Sustainable Biogas Plant
From idea to construction(2008-2010)
Start-up and testing (2010-2013)
System monitoring & feedstock management (2014)
Mass and Energy Balance, SOP development, Trouble shooting (2015)
Development of Technology Package (2016 onward)
LPDP Scheme
SIDA Scheme
Before and After the Demo PlantBefore and After the Demo Plant
Optimasi kinerja peralatanOptimasi kinerja peralatan
PublikasiPublikasi
L/O/G/O
Thank You!