GF Piping Systems
JointingTechnology
Socket and Butt Fusion
8/19/2019 Socket and Butt Fusion
2/39
Socket and Butt Fusion 22007-01-24 GF Piping Systems
§ Overview which jointing methods are offered by +GF+
§ Basics of the different jointing methods
§ Practical work to get a first impression of
the different jointing technologies
§ Practice socket and butt
fusion by yourself
Goal
8/19/2019 Socket and Butt Fusion
3/39
Socket and Butt Fusion 32007-01-24 GF Piping Systems
Table of Contents
Butt Fusion
Socket Fusion
Basics
Jointing Methods
4
3
2
1
8/19/2019 Socket and Butt Fusion
4/39
Socket and Butt Fusion 42007-01-24 GF Piping Systems
Which jointing technology do I use ?
???
Flange Adapter
Unions, thread
Soldering
Solvent cementPush fit
Compression
Electro fusion
Butt, Socket, IR, BCF fusion
8/19/2019 Socket and Butt Fusion
5/39
Socket and Butt Fusion 52007-01-24 GF Piping Systems
Selection of different fusion methods
What is the best solution for my customer?
Criteria:
§ Specification
§ Application/Material
§ Site conditions (Trench size, space, safety, ...)
§ Availability of machines and/or fittings
§ Cost of total installation
§ Cost of equipment (investment, rental)
§ Experience of personal / training levels
§ Approvals
§ Relationship Customer - Sales personal
(sales and after sale service)
è GF Piping System has the right products and can give the supportto all these questions
8/19/2019 Socket and Butt Fusion
6/39
Socket and Butt Fusion 62007-01-24 GF Piping Systems
Installation examples
§ Mechanical joints- unions / flanges
§ Solvent cement joints
§ Socket fusion
§ IR and BCF fusion
§ Electrofusion
8/19/2019 Socket and Butt Fusion
7/39
Socket and Butt Fusion 72007-01-24 GF Piping Systems
BasicsMain parameters P T T
Main parameters Subordinate parameters
Pressure
Temperature
Time
Fusion joint strength
Equalization pressureHeating pressureJointing pressure
Temperature of the heating element
Ambient temperatureHeating and equalization timeChangeover and jointing timeCooling time under pressure
Human factor Pipe storage and handling, Cutting,Facing, Pipe support, Cleaning
Alignment checkMachine maintenanceetc. etc.
8/19/2019 Socket and Butt Fusion
8/39
Socket and Butt Fusion 82007-01-24 GF Piping Systems
BasicsHandling of pipes and fi tting
8/19/2019 Socket and Butt Fusion
9/39
Socket and Butt Fusion 92007-01-24 GF Piping Systems
BasicsWorking environment
8/19/2019 Socket and Butt Fusion
10/39
Socket and Butt Fusion 102007-01-24 GF Piping Systems
BasicsOverview jointing methods
Electro fusionPE, PB
up to d630
Butt fusionPE, PP, PVDF, PP-n
up to d1200
Socket fusionPE, PP, PVDF, PB
up to d110
8/19/2019 Socket and Butt Fusion
11/39
Socket and Butt Fusion 112007-01-24 GF Piping Systems
BasicsOverview joint ing methods (System)
IR fusionPP, PE100, PVDF, PP-n
up to d 315
BCF fusionPVDF, PP-n
up to d 110
8/19/2019 Socket and Butt Fusion
12/39
Socket and Butt Fusion 122007-01-24 GF Piping Systems
Socket fusion
Electro fusion
Butt fusion
Socket fusion
8/19/2019 Socket and Butt Fusion
13/39
Socket and Butt Fusion 132007-01-24 GF Piping Systems
Cleanser Tangit KS
§ for cleaning the fusion surfaces
§ clean lint free cleaning tissues/paper is required
Socket fusionPreparation for fusion
8/19/2019 Socket and Butt Fusion
14/39
Socket and Butt Fusion 142007-01-24 GF Piping Systems
Socket fusion of PE, PP, PVDF, PB
8/19/2019 Socket and Butt Fusion
15/39
Socket and Butt Fusion 152007-01-24 GF Piping Systems
Socket fusionPrinciple
pipefittingspigot
heater plate
fitting
finished fusion
pipe
8/19/2019 Socket and Butt Fusion
16/39
Socket and Butt Fusion 162007-01-24 GF Piping Systems
Temperature of heater plate
PE-HD 260°C +/ - 10°C
PP 260°C +/ - 10°C
PVDF 260°C +/ - 10°C
PB 260°C +/ - 10°C
at 20°C ambient temperature
Socket fusionHeating element temperature
8/19/2019 Socket and Butt Fusion
17/39
Socket and Butt Fusion 172007-01-24 GF Piping Systems
Heating t ime table
1 2 3 4 5
Heating Change over Outer pipe-
diameter
d in mm
(Maximum
time)
s
fixed
s
total
min
16 4 6 2
20 4 6 2
25 4 10 2
32 6 10 4
40 6 20 4
50 6 20 4
63 8 30 6
75 8 30 6
90 8 40 6
110
for PN 10
SDR 11 2)
s
5
5
7
8
12
12
24
30
40
50
for PN 6
SDR 17.6 2)
s
1)
1)
1)
1)
10
15
22
30 10 50 8
1) because of too small wall thickness socket fusion technology not recommended.
2) Standard Dimension Ratio = d/s (d= Outer pipe diameter, s=pipe wall thickness)
Standard values for socket fusion of pipe and fittings of PP (see table of used material)
Socket fusionTime table for PP
Cooling
8/19/2019 Socket and Butt Fusion
18/39
Socket and Butt Fusion 182007-01-24 GF Piping Systems
Socket fusionPreparation
Plastic pipe cutter
§ ensures that the pipe is cut square
Pipe peeling and beveling
§
for calibration of the pipe end§ for removing the oxidation layer
§ for indicating the fusion depth
8/19/2019 Socket and Butt Fusion
19/39
Socket and Butt Fusion 192007-01-24 GF Piping Systems
Socket fusionHand fusion tool
8/19/2019 Socket and Butt Fusion
20/39
Socket and Butt Fusion 202007-01-24 GF Piping Systems
§ Adjust the fusion temperature at the
temperature control to 260°C
§ Check temperature at the outer side of
the heater bushes with tempil sticks
(253° and 274°C) or with measuring
device
§ Protect fusion area from wind, rain etc.
and wait for correct temperature
§ Clean heater bushes with clean paper
Socket fusionPreparation for fusion
8/19/2019 Socket and Butt Fusion
21/39
8/19/2019 Socket and Butt Fusion
22/39
Socket and Butt Fusion 222007-01-24 GF Piping Systems
§ Locate pipe and fitting in machine clamps
§ Ensure alignment of components
§ Bring the two sides of the machine together up to the stops
§ Heating time starts
§ Open machine sides and remove heater bushing
§ Bring components together to make joint
§ Holding time = heating time
Socket fusionProcedure with machine (d > 63mm)
8/19/2019 Socket and Butt Fusion
23/39
Socket and Butt Fusion 232007-01-24 GF Piping Systems
Socket fusion Advantages for using a machine
§ Alignment of fused components
§ Accurate penetration stops forheating and fusion phase
§ Mechanical fusion forceRecommended if d > 63mm
§ Faster change over phase
8/19/2019 Socket and Butt Fusion
24/39
Socket and Butt Fusion 242007-01-24 GF Piping Systems
§ German Association of Welding technology (DVS)
§ Guidelines of DVS 2207 (heater plate socket fusion)
§ Bead has to be visible and uniform over the wholecircumference
§ Check penetration of pipe
§ Check alignment of pipe and fitting
Socket fusionGuidelines and quality check
8/19/2019 Socket and Butt Fusion
25/39
Socket and Butt Fusion 252007-01-24 GF Piping Systems
Butt fusion
Electro fusion
Butt fusion
Socket fusion
8/19/2019 Socket and Butt Fusion
26/39
Socket and Butt Fusion 262007-01-24 GF Piping Systems
Butt fusionPrinciple
Pressure
(N/mm²)
0.01
0.15
Time Align-menttime
Heating pressure
Jointingtime
Cooling and jointing t ime
Heating time
Al ignment pressure Jointing pressure
8/19/2019 Socket and Butt Fusion
27/39
Socket and Butt Fusion 272007-01-24 GF Piping Systems
Butt fusionPreparation for fusion
Ds
s s max. = 0.1 x s
® max. 10% wall of fset allowed depending on the pipe wall thickness
ÜWall Offset
aa
ÜMaximum GAP (gap between the two parts to be welded)ÜMaximum GAP (gap between the two parts to be welded)
s max. = 0.5 mm with But t fusion(Ds max. = 0.2 mm with IR fusion) s max. = 0.5 mm with But t fusion(Ds max. = 0.2 mm with IR fusion)
incorrect correct
ÜWall thickness (must be same SDR value)
8/19/2019 Socket and Butt Fusion
28/39
Socket and Butt Fusion 282007-01-24 GF Piping Systems
§ Set welding temperature at temperature control
§ Check temperature at the heater plate
§ Clean heater plate always with lint free tissue before every fusion
§ Set fusion force according to machine operating manual
Heater plate temperature according to DVS 2207:
Set temp . value m in . max.
Material
PP 210°C 200°C 220°C
PE 210°C 200°C 220°C
PVDF 240°C 232°C 248°C
Butt fusionPreparation for fusion
8/19/2019 Socket and Butt Fusion
29/39
Socket and Butt Fusion 292007-01-24 GF Piping Systems
Equalization force = jointing force = Ftotal = FA+FBFA= A x p (surface A x specific jointing pressure p)
FB= specific dragging pressure or force
Fusion pressure = Fusion force FA / piston area of machine
Jointing pressure = fusion pressure + dragging pressure
Attent ion: Fusion pressure is always related to used machine (seeoperating manuals for corresponding pressure tables)
Material Equalization pressure Heat soak pressure
PE 0.15 N /mm² 0.02 N /mm²
PP 0.10 N /mm² 0.01 N /mm²
PVDF 0.10 N /mm² 0.01 N /mm²
Butt fusionPressure calculation
8/19/2019 Socket and Butt Fusion
30/39
Socket and Butt Fusion 302007-01-24 GF Piping Systems
§ Use the equalization- and fusion pressures from operating manual
§ Example of fusion times from table for HDPE material
Fusion table/guidelines of DVS 2207/1 for HD-PE
1 2 3 4 5
Wal l t hi ckness Equal isat ion
Bead height on theheating element afterequalization time(equalization at 0,15
N/mm²)
Heat Soak
Heat soak time= 10 x wall thickness(heat soak at0,02 N/mm²)
Change-over Fusion
time until maximumpressure reached
Cooling
Colling time at fusionpressure p = 0,15N/mm² ± 0,01
mm mm(minimum values)
s s(maximum time)
s min(minimum value)
< 4,5 0,5 45 5 5 6
4,5 – 7,0 1,0 45 – 70 5 – 6 5 – 6 6 – 10
7,0 – 12,0 1,5 70 – 120 6 – 8 6 – 8 10 – 16
12,0 – 19,0 2,0 120 – 190 8 – 10 8 – 11 16 – 24
19,0 – 26,0 2,5 190 – 260 10 – 12 11 – 14 24 – 3226,0 – 37,0 3,0 260 – 370 12 – 16 14 – 19 32 – 45
37,0 – 50,0 3,5 370 – 500 16 – 20 19 – 25 45 – 60
50,0 – 70,0 4,0 500 – 700 20 – 25 25 – 35 60 – 80
Butt fusionExample fusion table
8/19/2019 Socket and Butt Fusion
31/39
Socket and Butt Fusion 312007-01-24 GF Piping Systems
§ Melt the pipe and fitting ends until a defined bead height isreached under equalization pressure
§ Reduce pressure to heat soak pressure
§ Following the heat soak time
under heating pressure
Pressure
(N/mm²)
0,15
0,01
Equalization
pressure
Heat soak
pressure
Equalization
timeHeat soak time
Butt fusionEqualization/Heating
8/19/2019 Socket and Butt Fusion
32/39
Socket and Butt Fusion 322007-01-24 GF Piping Systems
§ After the heating time the heater plate has to be removed
§ Bring molten surfaces in contact as quickly as possible
§ The fusion is carried out at the same pressure as the equalization
§ Cooling pressure remains the same as the fusion pressure
Butt fusionFusion- /Cooling time
Jointing pressure
Cooling and
jo inting time
Join-
ting
time
Time
8/19/2019 Socket and Butt Fusion
33/39
Socket and Butt Fusion 332007-01-24 GF Piping Systems
Butt fusionQuality check and guidelines
§ K > 0
§ Double bead over whole circumference ?
§ Misalignment less than 10% of wall thickness
§ Guidelines according to DVS 2207 (German Welding Association)
K
8/19/2019 Socket and Butt Fusion
34/39
Socket and Butt Fusion 342007-01-24 GF Piping Systems
Machine and ToolsSG Line
SG 160 SG 315
SG 315-SSG 110
8/19/2019 Socket and Butt Fusion
35/39
Socket and Butt Fusion 352007-01-24 GF Piping Systems
Machine and toolsWM line
WM 315
WM 500
8/19/2019 Socket and Butt Fusion
36/39
Socket and Butt Fusion 362007-01-24 GF Piping Systems
Machines and toolsHydraulically operated machines (GF line)
GF line
8/19/2019 Socket and Butt Fusion
37/39
Socket and Butt Fusion 372007-01-24 GF Piping Systems
Machine and toolsSUVI® System
SUVI® 50for the GF line
up to 1200 mm
SUVI® WIN-WELD
SUVI® 400for GF line
up to 630 mm
8/19/2019 Socket and Butt Fusion
38/39
Socket and Butt Fusion 382007-01-24 GF Piping Systems
Cutting machines and toolsKRA, PPC 250, KS 355, KS 1600
KRA 63
PPC 250
KS 1600
KS 355