SOFC Demonstration Project
1.) Status of the Technology
2.) The SOFC Project
3.) Financing the Project
4.) Organization / Current Project Status
Pisa, May 15, 2000
May 15, 2000KF-FV, Mes
leader : Siemens Westinghouse capacity : 300 and 1.000 kW (module)
status : 220 PSOFC-GT-Demo
references : 100 kW SOFC Demo, more then 12.000 h of operation
el. efficiency : 57% aspired with GT
costs (target): 2000 DM/kW
in pipeline : 320 kW- PSOFC-/GT-Demo at RWE in Essen1 MW PSOFC-/GT-Demo at EnBW / EDF in Stuttgart
SOFC ( Siemens Westinghouse)
Status of the Technology
May 15, 2000KF-FV, Mes
SOFC Demonstration
Project Partners:Thyssengas, ENEL,Siemens Westinghouse
Cost: ca. 30 Mio. DMFund: Govrnm. NRW 5.17 Mio. DM
a.) 100 kW SOFC:atmospheric, CHPInstallation: Spring 2001Operation: End 2001
b.) 320 kW SOFC/GT:pressurized, CHPInstallation: January 2002Operation: End 2004
Cooperation with EnBW/EdF Consortium
SOFC/GT Hybrid-System
SOFC Demonstration
May 15, 2000KF-FV, Mes
SOFC-Demonstration Plant 100 kW
SOFC Demonstration
May 15, 2000KF-FV, Mes
SOFC-Demonstration Plant 220 kW
SOFC Demonstration
May 15, 2000KF-FV, Mes
System Pictorial View
SOFC
Desulfurizer
Auxiliary AirAccumulator
Purge GasWater Heater
Turbo GeneratorFuel Supply
System
SOFC Demonstration
May 15, 2000KF-FV, Mes
Technical Data
Gas Turbine ( z.B. Allied Signal)
Type single shaft Compressor pressure ratio 3.55:1 Compressor air intake rate 0,68 kg/s Speed of 66,000 rpm
Efficiency of operation (LHV,CH4) 30 %
Gas Turbine ( z.B. Allied Signal)
Type single shaft Compressor pressure ratio 3.55:1 Compressor air intake rate 0,68 kg/s Speed of 66,000 rpm
Efficiency of operation (LHV,CH4) 30 %
SOFC Generator
Pressure vessel diameter 2.9 m,
length 4m Fuel flow 43.4 kg/h Generator exhaust temperature 870 °C 1728 tubular fuel cells, length 1500 mm
SOFC Generator
Pressure vessel diameter 2.9 m,
length 4m Fuel flow 43.4 kg/h Generator exhaust temperature 870 °C 1728 tubular fuel cells, length 1500 mm
Electrical Output (net) 321 kW
SOFC Generator AC-power 268 kWGas Turbine AC-power 63 kW
Electrical Efficiency (net) 58 %Total Efficiency 81 %
Electrical Output (net) 321 kW
SOFC Generator AC-power 268 kWGas Turbine AC-power 63 kW
Electrical Efficiency (net) 58 %Total Efficiency 81 %
SOFC Demonstration
May 15, 2000KF-FV, Mes
System Cycle
Natural Gas
SOFCGenerator
Gas TurbineFilter
Combustor
Recuperator
PowerCond.System
G
Cold Water(in)
Warm Water(out)
Exhaust
Air
AC
DC
Compressor
Desulfurizer
SOFC Demonstration
May 15, 2000KF-FV, Mes
SOFC Generator
Natural Gas 43 kg/h
Air2412 kg/h
NOx 6,2 g/MWhCO2 347 kg/MWhSOx ~ zeroCO ~ zeroCxHy ~ zero
Exhaust2455 kg/h
G
~ 70 kW (AC)
AC/DC~ 250 kW (AC)
~ 124 kWth
SOFC Demonstration
May 15, 2000KF-FV, Mes
Providing Heat and Power
SOFC Demonstration
ca.120 kWth
District Heat
Air Conditioning
MeteoritConsumption:
360kWel / 180kWth
ca. 320 kWel
SOFC/GT
Electricity
May 15, 2000KF-FV, Mes
Meteorit in Essen
1. Pavillon 22. Pavillon 13. Playground4. Meteorit5. Illuminated Logo6. Terrace7. Beam8. Hall9. Main Entrance
10. Entrance/ Box Office11. Mast12. Parking13. Location of the SOFC Demonstration
1. Reception Hall2. Chill-Out Area with Restaurant3. Sun Terrace4. The "Wonder Chambers,“ the underground heart of Meteorite
SOFC Demonstration
May 15, 2000KF-FV, Mes
Meteorit Site Plan
Meteorit
SOFC Demonstration
May 15, 2000KF-FV, Mes
Shelter in the Meteorit Park Different View (Draft)
Side View
Cut
Front View
SOFC Demonstration
May 15, 2000KF-FV, Mes
Shelter in the Meteorit Park
SOFC Demonstration
May 15, 2000KF-FV, Mes
Costs Financial Consortium100/ 320 kW SOFC/ GT Demonstration Plant
Finance / Cost
European Consortium12,1 Mio. US$11,8 Mio. Euro
1 US$ = 1,90 DM
19%
6%
75%
SWPC3,0 Mio. US$2,9 Mio. Euro
DOE0,9 Mio. US$0,9 Mio. Euro
9%
5%22%
64%
RWE Energie7,5 Mio. Euro
Funds by NRW2,6 Mio. Euro
Thyssengas0,6 Mio. Euro
ENEL1,0 Mio. Euro
Total Costs 16.0 Mio. US$ 15,5 Mio. Euro
May 15, 2000KF-FV, Mes
Total Costs (Invest, Operation,Infrastructure)100/ 320 kW SOFC/ GT Demonstration Plant
Finance / Cost
Infrastructure0,6 Mio. Euro
Operation1,3 Mio. Euro
Planing,Coordination,Permission,Engineering 0,8 Mio. Euro
R&D Subcontractors(University)0,4 Mio. Euro
Total Invest12.9 Mio. US$12,5 Mio. Euro
Total Cost 15,5 Mio. Euro
May 15, 2000KF-FV, Mes
Total Invest100/ 320 kW SOFC/ GT Demonstration Plant
Finance / Cost
DOE0.9 Mio. US$0,9 Mio. Euro
European Consortium9 Mio. US$8,7 Mio. Euro
SWPC3 Mio. US$2,9 Mio. Euro
1 US$ = 1,90 DM
Invest Cost 12,9 Mio. Euro
30%16%
54%
SOFC Module7,0 Mio. US$6,8 Mio. Euro
BOP3,8 Mio. US$3,7 Mio. Euro
Thermal Management,Gas Turbine2,1 Mio. US$2,0 Mio. Euro
Partner System
May 15, 2000KF-FV, Mes
Work Groups
Organization
Coordination
Engineering
Permission / License
Technique / Standards
Operating 100 kW
R & D - Program
Operating 320 kW
Group 1
Group 2
Group 3
Group 4
Group 5
Group 6
1999 2000 2001 2002
May 15, 2000KF-FV, Mes
Time Schedule
Organization
Disassembly SystemPermission, Eng.
Install & Start up6 month operating
ShippingSAT
Break downsite
preparationDesign, Manufacture, Assembly
Modul / System
Install & Start up12 month R & D Programm
FATShippingReceive
6 month
2 month
10 month
2 month
22 month
3 month
13 month
01.02.02
01.02.01
NUON 100 kWe CHP
320 kWe Pressurized SOFC / GT
01.03.03
01.01.00
shipping
1 month
01.12.01
01.11.01
01.12.0001.07.00
May 15, 2000KF-FV, Mes
Time Schedule 1999/2000
Organization
9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 121999 2000
Engineering
Design, manufacture, assembly module / system (22 month)
NUON 100 kWe CHP
320 kWe Pressurized SOFC / GT
Consortium Preparation for permission
Permission by authorities
Planing, construction of buildings, preparation, etc.
Basic engineering 320 kW
Standards, components 320 kW
Final design, components, software
Add. permission
Training prog. (operators)
Kick-off-meeting Task force meeting Task force meeting
Disassembly
May 15, 2000KF-FV, Mes
Time Schedule 2001-2004
Organization
Break down
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 52001 2002
Install, Startup, Operation
Site preparation
Design, manufacture, (22 month)
Final design, 320 KWTraining operators
Task force meeting Task force meeting
Shipping
R&D prog.
Site preparation
Install
Task force meeting
FAT
Shake down
Shipping
Install
Operating till 2004 (?)
320 kWe Pressurized SOFC / GT
Consortium
SAT
Shipping
NUON 100 kWe CHP
R&D prog.
May 15, 2000KF-FV, Mes
Components: SOFC Generator100/ 320 kW SOFC/ GT Demonstration Plant
SOFC Demonstration
- fuel cell stack with 1728 cells
- stack liner
- fuel distribution system
- instack reformers
- air distribution system
- internal thermal insulation package
- pressure vessel
- internal module supporting structure
- air / exhaust piping
- fuel inlet piping
- electrical interconnections
- generator instrumentation
- module insulation
May 15, 2000KF-FV, Mes
Components: Thermal Management and GT100/ 320 kW SOFC/ GT Demonstration Plant
SOFC Demonstration
- air inlet system
- compressor
- expander / turbine
- generator solid state power electronics
- recuperator
- combustor
- instrumentation / controller
- heat recovery
May 15, 2000KF-FV, Mes
Components: Balance of Plant (BOP)100/ 320 kW SOFC/ GT Demonstration Plant
SOFC Demonstration
- start up boiler system
- auxiliary air system
- air heater
- electrical distribution
- fuel purge system
- inverter / power conditioning system
- fuel supply system
- fuel desulfurizer system
- fuel compressor
- data monitoring and logging system
- ups (uninterruptible power supply) system
- hot water heat rejection system