SOFIA METRO EXTENSION PROJECT Second metro diameter,section:“Nadezhda r.j.– Central Railway Station – Sv. Nedelya Sq. – NDK – Cherni Vrah blvd.” M S MS Musagenitsa - 08.05.2009 ===================================================================
Transcript
Page 1: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

SOFIA METRO EXTENSION PROJECTSecond metro diameter,section:“Nadezhda r.j.– Central Railway

Station – Sv. Nedelya Sq. – NDK – Cherni Vrah blvd.”

MS

MS Musagenitsa - 08.05.2009

===================================================================

Page 2: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

І. GENERAL INFORMATION OF THE SOFIA METROTransport situation in the Capital of Bulgaria

• Sofia population - 2008 year. 1.6 mlllion

• Number of registered cars - 12.2007 above 900 thousand cars

• Severe traffic jams along the main directions at peak periods

• Transport speed of Road Public Transportin rush hours 10-12 km/ h

• Рassengers in the main directions above 20-30,000/hourmetro Line 1 and Line 2/ /forecast up to 38 th./h

• Speed of the travel by metro up to 80 km/h

===================================================================

Page 3: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT
Page 4: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

MAIN PARAMETERS OF THE SOFIA METRO

GENERAL SCHEME OF METRO LINES DEVELOPMENTNUMBER OF LINES WITH ROUTE DIVERSIONS - 3 linesTOTAL LENGTH OF THE LINES - 64kmNUMBER OF STATIONS - 55 NUMBER OF PASSENGERS PER DAY - 1.2 mln. pass / day

CHARACTERISTICS OF THE OPERATING METRO DIAMETR “OBELIA-LIULIN-ST.NEDELIA – MLADOST”LENGTH - 18 kmNUMBER OF STATIONS - 14 stationsSTARTING OPERATION - 2003 - 10km

- May-September 2009: + 8 kmNUMBER OF PASSENGERS PER DAY - 150-160,000 pass./day

EXTENSIONS IN PROGRESS- DESIGNING AND CONSTRUCTION“ NADEJDA- ST.NEDELIA- CHERNI VRAH ” - 6,4 KM, 7 STATIONSFinancing: European Regional Development Fund and So fia municipality co-financing.

“OBELIA-NADEJDA” - 4,2 км, 4 stations“ MLADOST- TCARIGRADSKO SHOSSE ” /St13-St19/ - 2,5 KM, 2 stations Financing: European Investment Bank with local co-f inancingOPERATION planned for - October-December 2012

===================================================================

Page 5: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

General view of new metro stations /from the new section in operation – 2009/

“SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009

===================================================================

Page 6: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

ІІ.SCOPE OF THE SOFIA METRO EXTENSION PROJECTSecond metro diameter, section “Road junction Nadezh da – Central Railway Station – Sveta Nedelya Sq. – NPK – Cherni Vrah blvd.“

- 7 metro stations; - two- track tunnels with length of 6,4 km; - 3 dispatch control SCADA management systems; - automatic block system and traffic speed control; - 7 power stations and power supply equipment; - train radio connection, dispatch connections, etc.;

Duration of the designing and construction - 45 month s(start 1.12.2008 – completion 08.2012)

Procurement in two lots:1. Section: “Road junction Nadezhda – Central Railway Station – Sve taNedelya Sq. – Patriarch Evtimiy blvd.” – length of 3,8 km - 4 stations ;2. Section: “Patriarch Evtimiy blvd. – Cherni Vrah blvd.” – length of 2,6 km - 3 stations.

===================================================================

Page 7: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

Plan and cross-section of the Sofia Metro Extension Project

===================================================================

Page 8: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

ІІІ.PROJECT’S STATUS AND PROGRESS OF THE CONSTRUCTION WORKS UP TO THE END OF SEPTEMBER

2009

• Preliminary design, regulation, EIA, Construction pe rmit 2006 - 2008• Concluded tender procedures 08. 2008• Cost-Benefit Analysis and Application form under• Regulation ЕС1083/2006, including a Completion Note by JASPERS 10-1 2. 2008• Answers to questions and comments by ЕC 02-05. 2009• Approval by EC 22.09.2009• Start of work design and preparation works 01-04. 2009• Tunneling structures design by Italian engineers in section МS5-МS9 02-04. 2009• Start tunnel (NAM) at the section МS10-МS11 06-09. 2009• Manufacture of tunnel-boring machine by the German c ompany

“Herrenknecht” with total price - 15 million Euro 04-0 8 2009• Contracting equipment by the EU manufacturers - Sieme ns,

Ericsson, Kapsh, Tissen, Telefonica etc./. 07-09. 2009

- Overall Construction progress by September 2009 : 17% - in accordance withcontractual schedule

===================================================================

Page 9: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

START OF THE

PROJECT

===================================================================

Page 10: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

Technology of construction of metro stations by cut-and-cover method - MS 6,7 and “top down ”method- MS 5, 8, 11

Technolocical scheme of tunnel construction by the tunneling machine at the section “Road junction Nadezhda – Railway Station – Sveta Nedelya Sq. –P.Evtimiy blvd.

CONSTRUCTION TECHNOLOGIES AND METHODS

===================================================================

Page 11: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

Construction of Section “ МS5 -МS9”Segment production

by TBM method - October 2009Construction progress at station

MS 5 - October 2009

===================================================================

Page 12: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

Construction of Section “ МS 9 - MS 11”

Construction of station MS 10 – 08.2009 Starting shaf t /NAM/ - 08.2009

===================================================================

Page 13: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

ІV.Economic Indexes, financing and payments of the Project:

INVESTMENTS

2041 (30th year)

€ 108 542 378Residual value

16.7%€ 49 429 228Project Non-EligibleCosts(VAT)

83.3%€ 247 146 138 Project Eligible Costs

2008-2012 (5 years)€ 296 575 365Project Investment

Costs

===================================================================

Page 14: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

Economic Indexes

2,71 Benefit-Cost Ratio

years11 Economic Discounted Pay Back Period

years9 Economic Pay Back Period

16,8%Economic Rate of Return

€457 878 600 Economic Net Present Value

===================================================================

Page 15: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

Financing and payments of the Project towards august 2009

----------------------------------------------------------------------------------------------------------------Financing by Total amount Paid, incl. advance payment

sources 1000 euros for executed construction---------------------------------------------------------------------------------------------------------------Project’s total cost 247,146 49,5 incl 24,4 adv.

OP Transport 185,193 37,125 incl. ERDF 157,415National Fund 27,779

Sofia Municipality 61,952 12,375Beneficiary /VAT/ 49,429 9,9

===================================================================

Page 16: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

V. DISTRIBUTION OF SOCIO-ECONOMIC BENEFITS

OF THE PROJECT

Time savings - 43 thousand hours/day 63.7%Traffic accidents reduction - above 60,000/year 15.5%Reduction of (other) public transport fleet – 72 veh 5.6%Savings of fuel for private cars - 9500 tons /year 4.0%Reduction of public transport output - 8.5 mln. km/year 4,5%

Reduction of private cars - 21000 cars/day 3.5%

Reduction of CO2 and harmful gas emissions - 11500 tons/year 2.1%

Decrease in public transport travel cost - about 20% 1.9%

Number of passengers per day by Line 1 and Line 2 - 1.200 mln. pass / day

===================================================================

Page 17: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

VІ.ASSISTANCE /COOPERATION/ AND CONSULTANTASSISTANCE BY JASPERS

1. General view of “Cost – Benefit Analysis” and Applic ation form (Regulation ЕС1083/2006”).

2. Recommendations regarding transport demand and suppl y estimate

3. Recommendations for unit values of time, harmful emissions,etc.

4. Recommendations regarding the Environmental Impact As sessment.

5. Recommendations regarding exclusion of tickets’ re venues and new investment cost according to tender price.

6. Recommendations regarding the submission of additio nal information to the Appendixes of the Application Form and “CBA”.

7. Consultations regarding the contents and update of the documents.

===================================================================

Page 18: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

TIME-SEQUENCE OF ASSISTANCE WITHJASPERS’ CONSULTANTS

27.06.2007 start of JASPERS assistance28.09 & 29.10.2007 review of feasibility study and CBA17.01.08 joint meeting at MoF and MoT on draft Application Form and CBA.

Advices for additional study and assessment of passe nger flows.02-04. 2008 revision of investments cost in AF and CB A.30.06.2008 discussions regarding the new Guide to Cost- Benefit Analysis and

adaptation of the project documents.06.10.2008 discussion regarding inserting the final results of the tender for

selection of contractors into the AF and CBA;

10.2008 Completion Note by Jaspers – Submission of App lication to EC02-06. 2009 in consultation with Jaspers, preparati on of answers to comments

and questions by the EC22.09.2009 final approval of ERDF grant by the Comm ission

In the whole process was kept continuous contact wit h the Jaspers experts, directly or electronically to resolve problems and finalize App lication documents.

===================================================================

Page 19: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

MAIN PROBLEMS DURING THE PREPARATION OF THE APPLICATION DOCUMENTS

Regarding the preparation of the documents:- Update of the “Cost-Benefit Analysis” – with the recommendations of JASPERS:update of investments cost and recalculation of the e conomic indexes of the Project.- Specification of socio-economic benefits – with the recommendations of JASPERS: new values of parameters for calculation of benefit s.- Change in oil price and other costs during the last year.

Regarding the financing:- Insufficiency of the resources by OP ”Transport ”: high tender price; increase of the

labour expenses, materials and products for the perio d 2007-2008.Decision 1- Re-launch tender for selection of contractors in April - August 2008, resulting in a reduction of the cost by 42 mln. Euros ;

Decision 2: Аdditional resources amounting to 61 mln. Euros by Sofi a Municipalityfor the funding gap between the tender price and EC grant.

Loan by EIB amounting to 105 mln. Euros for next stages o f the Sofia Metro Extension.

===================================================================

Page 20: SOFIA METRO EXTENSION PROJECT - CEI · 2010. 2. 3. · “SU Sv.Kl.Ohridski”- 08.09.2009 “Vasil Levski Stadium”- 08.05.2009 ІІ .SCOPE OF THE SOFIA METRO EXTENSION PROJECT

Thank you !

MS “Mladost І”- 08.05.2009

===================================================================