+ All Categories
Home > Documents > Solar Energy at Gustavus Review of projects underway.

Solar Energy at Gustavus Review of projects underway.

Date post: 31-Dec-2015
Category:
Upload: elwin-jenkins
View: 214 times
Download: 2 times
Share this document with a friend
Popular Tags:
12
Solar Energy at Gustavus Review of projects underway
Transcript
Page 1: Solar Energy at Gustavus Review of projects underway.

Solar Energy at Gustavus

Review of projects underway

Page 2: Solar Energy at Gustavus Review of projects underway.

Johnson Center for Environmental Innovation

Focal point for campus environmental initiativesSustainabilityAmerican College and University Presidents’ Climate CommitmentEnergy conservation and renewable energy

Collaboration across the campusEnvironmental Studies ProgramPhysics DepartmentPhysical Plant Director, Warren Wunderlich

Page 3: Solar Energy at Gustavus Review of projects underway.

Background

http://www.startribune.com/entertainment/movies/143824846.html

Twelve year effort to acquire a utility scale wind turbineCarbon reduction and economic benefitBlocked by county action in 2012$1 million dollar donorPresident asked donor to shift funds to solar projectPart of LEED certification effort on new academic building (Beck Hall)

Page 4: Solar Energy at Gustavus Review of projects underway.

Beck Hall

http://www.startribune.com/entertainment/movies/143824846.html

New (2011) academic classroom and office buildingTargeting LEED PlatinumEcon and Management, Communication Studies, Psychology, Neuroscience, History, Sociology, and Antrhopology

LEED on-site renewable energy60 flat plate solar thermal collectors40 KW solar electric

Page 5: Solar Energy at Gustavus Review of projects underway.

Exploratory specification process

Page 6: Solar Energy at Gustavus Review of projects underway.

Overview of all projectsBeck Hall

60 flat plate solar thermal collectorsSummer reheat and winter heating load

40 KW solar electric (in process)Olin Hall (Math and Physics)

Three 5 KW arrays (5 KW installed to date)TenK, microinverters, central inverter

Lund athletic complex24 flat plate collectorsYear round load—pool and water heating

Jackson Campus CenterSixteen Next Generation NGU-TU panelsBallast mountsYear round water heating load

Page 7: Solar Energy at Gustavus Review of projects underway.

Olin Hall

Page 8: Solar Energy at Gustavus Review of projects underway.

Jackson Campus Center

True south orientation

Fin tube radiator heat dump

Page 9: Solar Energy at Gustavus Review of projects underway.

Jackson Campus Center

Page 10: Solar Energy at Gustavus Review of projects underway.

Lund Athletic CenterCollector orientation about 30 degrees west of south

Priority to pool load

Page 11: Solar Energy at Gustavus Review of projects underway.
Page 12: Solar Energy at Gustavus Review of projects underway.

Performance data

Jackson 20 days

4.98 therms/day production

6.22 therms/day displaced

Lund 9 days

DHW 4.11 therms/day

Pool 3.99 therms/day

Total 8.10 therms/day

Total displaced 10 therms/day