Vietnam RE targets and policy
Solar Energy potential in Vietnam
Barriers and solutions
Investment process guideline for Solar project
Solar targets – Perspective in long terms
PDP VII
(Decision
No.
1208/QĐ-
TTg, 2011)
National Strategy
for Energy
development to
2020, with outlook
up to 2050
(Decision No.
1885/2007/QD-
TTg, 2007)
Strategy for RE
development up
to 2030, with
outlook up to
2050
(Decision No.
2068/QD-TTg,
2015)
PDP VII Revised
(Decision No.
428/QĐ-TTg, 2016)
2020 Solar: N/A Solar: N/A
(RE share is 5% in
total commercial
primary energy).
1.4 TWh (0.5%) Solar: 850 MW, and
account for 0.5% of
total electricity prod.
2030 Solar: N/A - 35.4 TWh (6%) Solar: 12.000 MW and
account for 3.3% of
total electricity prod.
2050 Solar: N/A Solar: N/A
(RE share of 11%
in total).
210 TWh (20%) N/A
Main directive policy for RE dev.
2007
• Nat. Strategy for Energy dev. to 2020, with outlook to 2050
2008
• Establish ACT and SPPA for RE power projects
2011
• PDP VII
• FIT for Wind power projects
2014
• ACT (Avoided Cost Tariff) for Hydro
• FIT for MSW
2015
• Strategy for RE dev. up to 2030, with outlook to 2050
• ACT for biomass
2016
• Revised PDP VII with higher targets for RE
2017
• Incentive (FIT) for solar PV projects
New policy instruments were proposed
Sustainable Energy Development Fund was mentioned
PPA of the type “Take or pay”; Recovery through increasing
electricity tariff.
Renewable Portfolio Standards (RPS) for Generator >1000MW and
for Distributor:
• By 2020: >3% (>5% for distributor)
• By 2030: >10%
• By 2050: >20%
Net Metering was proposed
However, we need more elaboration on implementation,
roadmap, degree and enforcement.
Vietnam RE policy – new proposed instruments
Vietnam support mechanism for solar power projects (FIT)
• With grid-connected Solar project: at delivery point is 2.086 VND/kWh (excluding VAT,
equivalent to 9.35 US Cents/kWh).Adjusted to the fluctuation in VND/USD exchange rate
+ Solar cell efficiency requirement >16%, module is >15%
• Power purchase obligation: EVN shall have to purchase the whole electricity generated from
the grid-connected solar energy projects and roof-top solar energy projects.
• 20 years PPA
• All solar energy projects are entitled to the following the incentives:
+ Investment capital: have the preferential in investment credit as in the prevailing regulations.
+ Import tax: exempt from import tax for imported goods that form fixed assets for the
projects, imported goods which have not locally manufactured as in the prevailing
regulations.
+ Corporate income tax: solar energy projects listed in the field of investment incentives are
corporate income tax exemption and reduction as in the prevailing regulation.
+ Land: exempt and reduce of land use fees, land rent and allocated by the provincial
People's Committee for land area to the project.
Solar Energy in Vietnam
Vietnam is considered a nation with high solar potential, the average sunshine at 150 kcal/m2 is between 2000-4200 hours.
The intensity is lower in the North at about 4 kWh/m2 due to the annual winter-spring cloudy and drizzle sky but inthe central and southern regions, radiation is above 5 kWh/m2
Applications for Solar energy in Vietnam: thermal and electrical power
The most popular solar energy applications in Vietnam is solar water heating which installed in households, hotels as well as industrial scale
Technology applied for electrical conversion is Photovoltaic (PV) stand-alone and grid-connected scale
Total PV installed capacity in Vietnam is just only about 5 MW, the share of PV system is too small only 0.014 %(5/38.500 MW) by end of 2015
Stand-alone PV system: 4 MW is installed in rural and mountainous and remote areas
Grid-connected PV system: less than 1 MW (rooftop and mini hybrid system)
17.04.2016
Solar mapping developed (21 Jan 15)An important activity within the framework of TA
Project, supported by Spain Gov. This is also an
important basis to help state agencies to develop
policies, planning, helping investors find places
with good sunshine hours to implement projects. Large solar potential, especially in the south
region
II. Solar Energy in Vietnam - mapping
Solar energy potential in Vietnam
Economic potential (varies according to the costs and incentive assumptions): 10,000MW (2015)
Currently registered (added into PDP national and provincial) : close to 1,500MW (April 2017).
Area
Tiềm năng lý
thuyết (Theoretical
potential), MWp
Tiềm năng kỹ thuật
(Technical Potential), MWp
Đồng bằng sông
Hồng (Hong Delta
river)
613,906 30,695
Trung du và miền núi
phía Bắc (Highland
and mountainous in
the North)
2,033,466 101,673
Bắc Trung Bộ và
duyên hải miền Trung
(Noth of central and
Coastal areas)
2,132,840 106,642
Tây Nguyên
(Highland central)808,973 40,449
Đông Nam Bộ
(Eastern of South
region)
397,493 19,875
Đàng bằng sông Cửu
Long (Mekong river
delta)
805,880 40,294
6,792,560 339,628
II. Solar Energy in Vietnam – few demo and pilot projects
200 kWp PV system at Intel Hi-tech SHTP in HCM city
With annual production 321 MWh/year, used Sunpower module
Investment: 1,1 million USD (2012) by Intel
II. Solar Energy in Vietnam – few demo and pilot projects
212 kWp on the rooftop of car parking at Big C Supermarket buildings in Binh Duong province
Annual production: 230 MWh/year and reduce of 150 tons CO2/year
Investment: 11 billions VND ( about 550.000 USD according to exchange rate in 2012)
II. Solar Energy in Vietnam – few demo and pilot projects
22 kWp on the rooftop ofMoIT buildings in Ha Noi and
36 kWp on Con Dao island.
• Annual production is 24 MWh and 51,5 MWh respectively
• Investment: 220.000 Euros fundedby Spanish government
The first PV solar power
plant, 19,2MW –grid
connected has just ground-
breaking ceremony dated 29
August 2015 in Quang Ngai
province (center of VN).
The plant is built on a 24 ha
area with a total investment
of VND 826 billion. The
work is expected to connect
national grid in mid-2016
(not yet).
II. Solar Energy in Vietnam – few demo and pilot projects
17.04.2016
Three PV assembly factories in someareas
• Long An province: 12MW/year (Redsun)
• Da Nang city: 150MW/year (IREX - Solar BK)
• Bac Giang province: 150MW/year (Bo Viet/Boway)
II. Solar Energy in Vietnam – Manufacturing capability
Market
17.04.2016
Domestic uses (small share)
Export (large share)
III. Barriers and solutions - some ideas for thoughts
Barriers
• The huge up-front cost of PV systems is the key reason hindering the solar development in Vietnam
• Cost of electricity generated from PV is still high in comparison with others traditional resources (the average retail selling price is 1.622 VND/kWh which is approximate 7,2 US cents/kWh)
• No special tariff for Solar energy (not approved yet)
• Difficulty and uncertainty in the system connection
• Lack of skilled professionals and engineers in the Solar field
• Lack of information/ reliable database for assessing potential of RE sources
• Potential constraint on land resource for PV power project (about 1-1.4 ha/MW)
Solutions
• Develop suitable mechanism, policy to promote Solar industry
• Establishment of RE funds to support RE projects including Solar
• Organizing training courses, cooperate with university to support skilled engineers demand in RE (include Solar)
IV. Investment process guideline for Solar project
Develop a Solar power project in Vietnam
Phase I: Preliminary
Development
Phase II: Development
Phase III: Implementation
Phase IV: O&M
Phase V: Decommissioning
For PV project with capacity is up to 50 MW, investor need to apply for the addition into the provincial power development plant
If the project scale is over 50MW, investor need to apply for the addition into the national power development plant
Phase I: Preliminary Development – if the project was in PDP
Site Identification and selection
Pre FSDecision oninvestment
Investment
certificate
Developmentstage
PrincipalPPA
acceptance
Phase I: Preliminary Development – if the project was not in PDP
Site Identification
Is the site already included in power
development plant?
If NO: Check site availability
Site exclusivity
Temporary land lease
Collection of Solar data
Pre-FSRequest for
inclusion inPPDP
Acceptance for the project to be
included in PPDP
Phase II: Development
FS
Various agreements & acceptance (Grid connection; Metering; SCADA EMS; Protective relay system; Fire
fighting; EIA; Preliminary PPA
PPA and implementation stage
Technical Design
Comments on TD => Acceptanceletter
Construction permit; Land Usecertificate
Phase III, IV, V: Implementation, O&M, Decommissioning
Commissioning/Testing
Electricity Generation License O&M Decommissioning
Construction Operation license
Detailed design Land clearance Financing
Thank you for your attention
By
+ Dr. Nguyen Anh Tuan, Director of Center for RE, Institute of Energy Vietnam (IEV)
Contact emails : [email protected]