Solar Power for Water Interests
TWCA 68th Annual ConventionDallas TexasDallas, Texas
M h 9 2012March 9, 2012
Photovoltaics (PV)Photovoltaics (PV)
EPC Services Provided
• Feasibility studies• Design & Engineeringg & g g• Equipment supply• System installation• System installation • Performance testing & commissioning • Ongoing O&M
QualificationsQualifications• 12+ Years in Business• ~450 installations • ~9 MW installed capacity p y• TDLR Licensed Electrical Contractor• TBPE Registered Engineering Firm• TBPE Registered Engineering Firm• GSA/TXMAS Schedule Holder Status
Who?Who?
Ft. Sam Houston
NAVFAC
Ft. Worth ISD
TSTC Waco
TSTC Harlingen
Smithville
UT Austin Facilities Building
Hill Air Force Base
Bluff’s Landing
Shallowater ISD
UT Austin Manor Parking
UT Austin Manor Parking
UT Arlington
UT Arlington
Why?Why?
Why Clients are Choosing PVWhy Clients are Choosing PV• Leverage Federal Tax Incentives & Private Capital
– 30% Investment Tax Credit– Accelerated Depreciation (MACRS) ~25-30%
• Public Relations
• Local Utility Rebates
• Educational/Community Value
• LEED
• Relatively long term perspective on energy rates/costs
• Hedge Against Commodity Risk– 20-25 year budget Transparency
• Lower Utility Costs• Lower Utility Costs
How?How?
Procurement PathsProcurement Paths• Direct Purchase
– Up-front capital requirement– High single/low double digit return on that capital
Fi /L• Finance/Lease– Lease payment offset by utility cost savings– Asset converts to site host at lease endAsset converts to site host at lease end
• Purchase Power Agreement– 2 MW+ installed capacity – “break point” for pricing scale2 MW installed capacity break point for pricing scale– $0.10-$0.12 per kWh fixed or with 2%-3% annual escalator – 20-25 year term
O&M C d b O /O t– O&M Covered by Owner/Operator
Texas Population Growth(Historical)
Texas Population Growth(Forecasted)
Thank Yo !Thank You!