Solar power project implimentation schedule

Date post: 16-Jul-2015
Category:
Upload: environmentfirst-energy-services-p-ltd
View: 224 times
Download: 7 times
Share this document with a friend
Popular Tags:
16
Transcript

Step 1: Site Survey

Step 2: Leveling of site

Step 3:Site after leveling

Step 4:Marking of mounting structure

Step 5:Drilling Holes for Foundations

Step 6:Solar Foundations

Step 7:Adjusted frame of solar panel

Step 8:Fitting of Module & Alignment

Step 9:DC Cable laying and conduit dressing

Step 10:Control Room

Step 11:Measure of tilt angle

Step 12:Transmission line for solar plant

Step 12:Transmission line

Our Services

• 405 A, Prakrati Corporate, Y N Road, Indore (INDIA)

452001

• +91-731 2970493, 6007860

Registered

Office

• SCO 48, 2nd Floor, Opposite P.O., Sector-8,

Panchkula (INDIA) 134109

• +91-172-4014288

Chandigarh

Office: • +91-172-4014288Office:

• A1-1603, Runwal Garden City, Balkum, Thane (W),

Mumbai (INDIA) – 400607

Mumbai

Office:

Email ID: [email protected],

[email protected]


Recommended