+ All Categories
Home > Documents > Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA-...

Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA-...

Date post: 15-Aug-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
19
Solar PV PPA Solar PV PPA Project Project MBE Outreach MBE Outreach MBE Outreach MBE Outreach May 12, 2011 Rob Taylor Energy Manager
Transcript
Page 1: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Solar PV PPASolar PV PPA ProjectProjectjj

MBE OutreachMBE OutreachMBE OutreachMBE Outreach

May 12, 2011

Rob TaylorEnergy Manager

Page 2: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

WSSC Service Area( ) (2) Water Treatment Plants(Maryland) (2) Water Treatment Plants

(5) Wastewater Treatment Plants

(12) Water Pumping Stations

MontgomeryMontgomeryMontgomeryMontgomeryMontgomery

(50) Wastewater Pumping Stations

(10) Field Offices/Lab/HQ

D.C. Serves population of 1.8 millionS M t d

Prince George'sPrince George'sPrince George'sPrince George'sPrince George's Serves Montgomery and

Prince George's Counties Provides 170 MGD drinking water Collects 200 MGD wastewater Collects 200 MGD wastewater Treats 70 MGD wastewater Supplies DC Water with 130 MGD

wastewater

Page 3: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

WSSC Sustainability GoalsWSSC Sustainability Goals Provide safe and reliable water to a growing

customer basecustomer base.

Maximize energy and residuals recovery from Wastewater Treatment Plants.

Minimize energy consumption and GHGMinimize energy consumption and GHG emissions.

Maximize utilization of renewable energy.Maximize utilization of renewable energy.

Be an asset to the community.

Page 4: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Renewable EnergyRenewable Energy -- SolarSolarRenewable Energy Renewable Energy SolarSolar

Purchase Power Agreement (PPA)

Page 5: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Source: Customer’s Guide to Solar Power Purchase Agreements, Rahus Institute, 2008

Page 6: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

WSSC Solar Project ObjectivesWSSC Solar Project Objectives

Host Solar PV installation (max 2 MW per site). Off source: PPA Provider to design, build, own,

operate solar PV system; sells WSSC power. Reduce energy costs through the purchase of Reduce energy costs through the purchase of

solar energy at Seneca and Western Branch. Reduce Risk: PPA Provider will retain all rights Reduce Risk: PPA Provider will retain all rights

to SRECs for the life of the PPA. Reduce WSSC’s carbon footprint (Scope 2). p ( p )

WSSC will not be able to monetize any PV power production carbon offsets.A d b th it t t Award both sites as one contract.

Page 7: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Solar PV PPA Award CriteriaSolar PV PPA Award Criteria

Technical sufficiency Technical sufficiency. Reliability of proposed system and

componentscomponents. Bid Price ($/kWh); $.10/kWh or less. Project experience (prime & subs). Project team (personnel assigned to j (p g

project). Ability to finance at time of proposal Ability to finance at time of proposal.

Page 8: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Solar PPA RFPSolar PPA RFP-- IncludesIncludes

Hourly Data (2 years).y ( y ) Allowable solar site areas. Critical Area boundaries (Western Br.).Critical Area boundaries (Western Br.). Geotechnical reports. Topographic maps (Seneca) Topographic maps (Seneca) Interface with ENR contractor (Seneca). Electrical one-lines site plans MH and duct Electrical one-lines, site plans, MH, and duct

bank details. Electrical cable & conduit schedules Electrical cable & conduit schedules.

Page 9: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Solar PV PPA Procurement TimelineSolar PV PPA Procurement Timeline

– RFP Issue Date: 4/8/11Pre Proposal Conference/Site Visits: 4/27/11 4/28/11– Pre-Proposal Conference/Site Visits: 4/27/11, 4/28/11

– SLMBE Matchmaking Event: 5/12/11• SLMBE Site Visits: 5/12/11, 5/13/11

– RFP Questions Deadline: 5/16/11– Questions Answered/Last Addendum Issued: 5/20/11– Proposal Due: 6/8/11Proposal Due: 6/8/11– Proposal Evaluation Completed: 6/21/11– Firms Short listed & Interviews Completed: 7/5/11

C t t N ti ti C l t d 7/15/11– Contract Negotiation Completed: 7/15/11– WSSC Commission Approval: 9/21/11– Notice to Proceed: 10/19/11– Pre-Mobilization Meeting: 10/26/11

Page 10: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Solar PV PPA Implementation Solar PV PPA Implementation TimelineTimelineTimelineTimeline

– Design/Construction Initiation: 11/1/11– Seneca ENR duct bank ready for tie-in by y y

6/30/11.– Design/Construction Completion: 12/31/12

Page 11: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Seneca WWTP Seneca WWTP -- GermantownGermantown

Page 12: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Seneca WWTP Solar Ground AreaSeneca WWTP Solar Ground Area

Page 13: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Seneca OneSeneca One--Line DiagramLine Diagram

Page 14: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Western Branch WWTP Western Branch WWTP –– Upper MarlboroUpper MarlboroUpper MarlboroUpper Marlboro

Page 15: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Western Branch WWTP Western Branch WWTP -- Solar Ground AreaSolar Ground AreaSolar Ground AreaSolar Ground Area

Page 16: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Western Branch OneWestern Branch One--Line DiagramsLine Diagrams

Page 17: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Western Branch OneWestern Branch One--Line DiagramsLine Diagrams

Page 18: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Solar PV PPA Project Skills RequiredSolar PV PPA Project Skills Required

Project management Electrical/civil/structural design Permitting (MDE, DNR) Solar module/inverter/transformer equipment Construction Commissioning/startup Financing/REC trading Data performance monitoring Electronic billing

M i t / i Maintenance/repair

Page 19: Solar PPA- MBE Outreach 5-12-11.ppt - WSSC Water...2011/05/12  · Microsoft PowerPoint - Solar PPA- MBE Outreach 5-12-11.ppt [Compatibility Mode] Author tedward Created Date 5/19/2011

Questions/DiscussionQuestions/Discussion


Recommended