+ All Categories
Home > Documents > Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system:...

Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system:...

Date post: 15-Apr-2018
Category:
Upload: buithuy
View: 215 times
Download: 2 times
Share this document with a friend
20
Solution Hotel
Transcript
Page 1: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Solution – Hotel

Page 2: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Content

1. Company description

2. Requirements

3. Specification

4. How does the solution look like?

5. Controls

6. Customer benefit

7. Costs

8. Summary

2 © Hoval / Mar-14 Hoval

Page 3: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

The company

Jolie Ville Hotels

(former Mövenpick Jolie Ville)

Founded 1991 in Aegypten

Owner buys the brand Jolie Ville from Mövenpick and

starts expansion

Today cooperation with the German Hotel chain Maritim

3 © Hoval / Mar-14 Hoval

Page 4: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

The company

International Congress Center (Sharm) 2006

© Hoval / Mar-14 Hoval 4

Page 5: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

The company

Golf Hotel (Sharm): 1998 hot water and 2006 steam

system

© Hoval / Mar-14 Hoval 5

Page 6: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

The company

Resort and Casino – Naama Bay (Sharm) 1990 ModulPlus

© Hoval / Mar-14 Hoval 6

Page 7: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Requirements

Efficient hot water and steam system (Split)

for expansion of Jolie Ville Hotel in Luxor – Kings

Island

400 additional rooms

Pool heating

Replacement of 42 electric heated tanks

Pool boiler house stand-by

Very tight time schedule: Finishing of the complete

project by X-mas (Guests have already bookings!)

Proofed system

Quality - Safety

4 © Hoval / Mar-14 Hoval

Page 8: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Description

Hot water system: 3-zones

Zone 1: 5 Bungalows and 3 Villas

Zone 2: 5 Bungalows

Zone 3: 34 Villas

21 existing Bungalows Replacement of 42 DHW-tanks

New pool with boiler, heat exchanger and filters

Steam system for most modern laundry

8

© Hoval / Mar-14 Hoval

Page 9: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Plant description

6 © Hoval / Mar-14 Hoval

Page 10: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Solution?

2 x THD-U 3000 11bar

7 © Hoval / Mar-14 Hoval

Page 11: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Solution?

Armatures steam header and steam reducing stations

11 © Hoval / Mar-14 Hoval

Page 12: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Solution?

12

2 x THW-I 45/35 NTE

6bar

6 x Modul-Plus F52

Correx

Expansions System

pumpen 264 m3/std

40m Höhe

PLC - Steuerung

© Hoval / Mar-14 Hoval

Page 13: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Hoval System Solution (P&ID)

8 © Hoval / Mar-14 Hoval

Page 14: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Hoval System Solution (P&ID

heat exchanger

14 © Hoval / Mar-14 Hoval

Page 15: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Hoval System Solution (P&ID)

steam boiler plant

15 © Hoval / Mar-14 Hoval

Page 16: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Hoval System Solution (Controls)

9 © Hoval / Mar-14 Hoval

Page 17: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Main Display of Touch Panel S7-200

17 © Hoval / Mar-14 Hoval

Page 18: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Benefit

Easy design "turnkey" solution

Time-saving

Low risk

Hotwater boilers THW-I 45/35 and

hotwater suppy devided in 3 zones:

Very high operating reliability

No interruptions

Hoval system One-stop solution

Time-saving thanks to easy projecting

16 © Hoval / Mar-14 Hoval

Page 19: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Investment cost

Total investment cost (exw) EUR 852‘000,--

Consisting of:

- 2 x THW-I 45/35 NTE 6bar

- 2 x THD-U 3000 E 11bar

- 6 x Modul Plus F52 Correx solution

- 2 x THD-U 3000 E 11bar (Sharm El Sheik)

19 © Hoval / Mar-14 Hoval

Page 20: Solution Hotel - Hoval - Responsibility for energy and …€¦ · Description Hot water system: 3-zones Zone 1: 5 Bungalows and 3 Villas Zone 2: 5 Bungalows Zone 3: 34 Villas 21

Conclusion

© Hoval / May-11 22

Competence as solution supplier

Hoval


Recommended