Energieopslag – mee met de versnelling
Smart Energy, 1 juni 2017
Hans van der Spek, Haike van de Vegte
DNV GL © 2016
Inhoud
Global status of energy storage realisation
Developments in the Netherlands
1
2
Lessons learned and best practices3
Key take-aways4
2
DNV GL © 2016
Global status of energy storage market
Projects and applications
3
DNV GL © 2016
Global status projects
Source: DOE database
4
DNV GL © 20165
DNV GL © 2016
In comparison: the top 7 countries
6
Source: DOE database
DNV GL © 2016
Global status of energy storage market
Economics – li-ion
7
DNV GL © 2016
Capital Cost
8
€125-
310/kWh
€330-
2500/kWh
Verify the cost:
- Who is giving the quote?
- Is it turnkey?
- Who else is involved?
DNV GL © 2016
Projected costs
10
Price floor in 2020:
$100/kWh at the cell level
$200/kWh at the system level
DNV GL © 2016
Project realisation in the Netherlands
11
DNV GL © 2016
Routekaart 2030 & Nationaal Actieplan EnergieOpslag
12
DNV GL © 2016
Frequency Containment Reserve – AES
10 MW of interconnected advanced,
battery-based energy storage
First deployment of AES’
Advancion solution in continental Europe
First battery project in the Netherlands
for Frequency Containment Reserve
purposes
45.000 lithium ion batteries
13
DNV GL © 2016
Energy storage for wind farms
14
Windpark Giessenwind
Prinses Alexia Windpark (122
MW), Zeewolde
Haalbaarheidsonderzoek DNV GL,
Windunie, Greenchoice en Energy
Storage NL: windladen,
zelfconsumptie en onbalansmarkt
DNV GL © 2016
Solar+storage at a farm in Odoorn for multiple applications
15
Solar + storage
Balancing, self-consumption,
peak-shifting
At farm ‘De Jong en Bos’
294 kWh system
ATEPS, Jules Energy, GroenLeven
DNV GL © 2016
Community storage/De Buurtbatterij
16
Commercial,
industrial &
residential
Implementatie
Enexis & Alliander
Etten-Leur en Haarlemmermeer
Demonstratieprojecten
Combinatie van distributie /
transmissie netwerk en markt
Haalbaarheid en schaalbaarheid
DNV GL, Peeeks, Alfen
Realistische cases:
Marktpartij owns & operates
Netwerkbedrijf neemt
diensten af
Business case + framework
Buurtbatterij
DNV GL © 2016
Behind the meter
17
CrowdNett
400 Powerwalls = 1 MWFCR. In NL by Q1 2017.Then scaling up in NL and starting in BE.
Eneco aggregates capacity for FCR application at first instance
Additional value streams at later stage (e.g. post-net metering)
Jouw Energy Moment
Meulenspie in Breda 39 Tesla Powerwalls Testing flexible tariffs For trading and avoiding grid congestion
DNV GL © 2016
Project realisation and risk mitigation
18
DNV GL © 2016
Realisation – best practices & lessons learned
19
Kick-off
manufacturing
Review quality
plan
Review progress
reports
Factory
acceptance test
Kick –off project
Review contract
Review project
plan
Review design
Check compliance
HSE
Kick –off
construction
Review
construction
plan
Review
progress
reports
Progress
meetings
Site visits/
inspections
Punch list
Review
commissioning
plan/procedures
Monitor commis-
sioning test
Witness
acceptance tests
Progress
meetings
Review as-built
documents
Review O&M
plans
Support take-
over
Punch list
Monitor
operations
Follow up punch
list
Lessons learned
Co
nstr
ucti
on
co
mp
lete
Sta
rt
co
mm
ercia
l o
perati
on
Rele
ase
tran
sp
ort
to s
ite
Rele
ase
man
ufa
ctu
rin
g
Co
ntr
act
aw
ard
Feasibility,
preparation and
tendering
Engineering
designOperationManufacturing CommissioningConstruction
Technical
feasibilty
Technical design
Request for
Proposal
Selection of
proposals
Employer’s
Requirements
DNV GL © 2016
Real-life examples of materialised risks
Feasibility risks
System dimensioned on minimum
CAPEX instead of TCO
Market saturation not taken into account
Sub-optimal combination of technology
and applications
Performance risks
Cycle life data under different
conditions (DoD, temperature, C-rate)
Standby losses not taken into account
Contract risks
Conditions warranty and guarantees
unclear
System boundary unclear – e.g. safety
responsibility
20
Regulation/certification risks
System specification not in line with
market regulation / grid code
Systems not meeting standardisation
Commissioning risks
FAT / SAT testing inadequate
Handover unclear
Safety risks
Fire suppression for li-ion batteries
No FMEA analysis, no adequate
measures and training
Cyber safety
DNV GL © 2016
Defining building blocks
for an open competitive
market place
Continuous updates
following technology
development and
end-user applications
DNV GL issued a Recommended Practice (DNVGL-RP-0043) on grid-connected energy storage
Guidelines and methods to evaluate, assess and test safety, operation and performance of grid-connected ES
Referencing ISO, IEC and IEEE standards if possible, enhancing where needed
Industry supported: created by consortium of 7 parties, 36 parties involved in review process
Comprehensive
Free to use
Methodology for de-risking energy storage: GRIDSTOR
21
For more information, see www.dnvgl.com/services/gridstor-recommended-practice-for-grid-connected-energy-
storage-52177 and rules.dnvgl.com/docs/pdf/DNVGL/RP/2015-12/DNVGL-RP-0043.pdf
GRIDSTOR Update!
New technologies (CAES,
ultra-caps, inorg. Li-ion)
Cybersecurity
Communication protocols
Decommissioning
Warrantees, guarantees
Contracting aspects
Bankability
LCoS
Residual value assessment
Procurement
Inverter aspects
…and more…
DNV GL © 2016
Training course Grid-connected energy storage –Oktober, 2017
22
DNV GL © 2016
Key take-aways
23
DNV GL © 201624
Key take-aways
Storage as an
enabler:
For RES
integration,
network support
Costs becoming
commercially
attractive, but
depending on
many aspects
Various projects in
the Netherlands,
breakthrough yet
to come, new
values to be
disclosed
As a relatively new
and complex item,
various examples
of materialised
risks
GRIDSTOR
Recommended
Practice as the
technical
framework for
risk analysis
DNV GL © 2016
SAFER, SMARTER, GREENER
www.dnvgl.com
Thank you
25
Haike van de Vegte
Email: [email protected]
Tel: +31 (0)6 211 94956
DNV GL © 2016
Behind the meter: Post- net metering
26
Replacing net-metering regulation by a 'feed-insubsidy' of which the height can be reduced stepwise over time.
Starting point for this arrangement is the continuation of investment certainty (pay-back time PV installation of 5-7 years) and the stimulance of momentaneous energy usage
Furthermore:
Dynamic pricing for end-users
Dynamic tariffs distribution grids
Customer-led storage
(behind the meter)
<10 MW
Commercial,
industrial &
residential
DNV GL © 2016
Comparison of Li ion batteries
Ref: Leclanché