75
Advanced Work Packaging & WorkFace Planning Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn Technology (WorleyParsons) COAA - AWP Steering Committee member CII - Research Team member RT310 - Improving Engineering and Procurement Alignment and Coordination with Construction
Transcript
Page 1: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Advanced Work Packaging & WorkFace Planning

Solutions for Project Delivery

Joe HobbsManager of Engineering - CoSyn Technology (WorleyParsons)

COAA - AWP Steering Committee memberCII - Research Team member

RT310 - Improving Engineering and Procurement Alignment and Coordination with Construction

Page 2: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RULES OF ENGAGEMENT?

Page 3: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

HOW does WorleyParsonsapply Advanced Work Packaging (AWP) and 

WorkFace Planning (WFP)?

WHY ARE WE HERE?

Page 4: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WHAT?

WHY? HOW?

WHY ARE WE HERE?

Page 5: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

“Safety outweighing every other consideration”

ONEWAY MOMENT

Page 6: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

“The formal processes were too complicated”

ONEWAY MOMENT

Page 7: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

“Uh‐oh!”

ONEWAY MOMENT

Page 8: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

“It will never happen again”

ONEWAY MOMENT

Page 9: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WorkFace Planning (WFP)

WHAT IS WFP?

Page 10: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

The detailed PLAN to ensure  you have the right:

PEOPLETOOLSPLACETIMESCOPE

WHAT IS WFP?

Page 11: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WHAT IS WFP?

Page 12: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Construction Work Package

WHAT IS WFP?

Page 13: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Engineering Work Package

WHAT IS WFP?

Page 14: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Installation Work Package

WHAT IS WFP?

Page 15: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Advanced WorkPackaging

(AWP)?

WHAT IS AWP?

Page 16: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

THINKING WITH THE END IN MINDAT THE START

WHAT IS AWP?

Page 17: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Completions

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

DetailedEngineeringFEEDConceptual

Development Construct

WHAT IS AWP/WFP?

CII – IR 272, Advanced Work Packaging:Implementation Resource 272-2 version 3.0, Volume 2, Sect 1.1, Figure 1

AssetDefinition Operate Decommission

/mothball

Page 18: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

WHAT IS AWP/WFP?MAINTENANCEOPERATIONS

Page 19: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

ADVANCED WORKPACKAGING

WHAT IS AWP/WFP?

Page 20: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Early ALIGNMENT on the project of ENGINEERING, SUPPLY NETWORK and CONSTRUCTION to 

successfully implement the WorkFace Plan

WHAT IS AWP/WFP?

Page 21: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WHY WE DO IT?

Page 22: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WHY WE DO IT?

Page 23: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

WHY WE DO IT?

Page 24: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

WHY WE DO IT?

INFLUENCE CURVE

Project Cum

ulative

Opp

ortu

nitie

s fo

r Sav

ings

Max

Min

100%

Concept Completion0%

AssetDefinition Operate Decommission

/mothballCompletionsDetailedEngineeringFEEDConceptual

Development Construct

Ability to influence

Cost

Page 25: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

I T

PRODUCTIVITY

EP R I C T A YLB I

QUA

ITY

C O S

S

HEDULE

EA FS Y

PRO

UCTIVI

Y

EP R I C T A YB I

QUA

ITY

C O S

S

HEDULE

EA FS Y

D

T

TI

T

C LLLC

BENEFITS

Page 26: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Tool Time33%

Wait / idle44%

Material Movement / Planning

23%

Current Practice

Tool Time33%

ImprovedTool Time 

11%

Wait / idle33%

Material Movement & Planning

23%

WFP Productivity Improvement

BENEFITS

CII – IR 272, Advanced Work Packaging:Implementation Resource 272-2 version 3.0, Volume 1, Sect 1.3.1

Page 27: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

BENEFITS

25%INCREASE IN

LABOR PRODUCTIVITY

Page 28: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

BENEFITS

10%PROJECT COST

SAVINGS

Page 29: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

(WHAT HAS CHANGED?)

HOW?

Page 30: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

PEOPLE

SYSTEMS, PROCESSES & TOOLS

PEOPLE

CUSTOMER FOCUS

CHALLENGES

HOW?

Page 31: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

ADVANCED WORKPACKAGING

OWNER

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

Page 32: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

MODEL MANAGERWhat’s Different

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

Page 33: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CONSTRUCTION ADVISORWhat’s Different

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

Page 34: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

PROCUREMENT MANAGERWhat’s Different

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

Page 35: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

ADVANCED WORKPACKAGING

PLANNERWhat’s New

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

Page 36: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

ADVANCED WORKPACKAGING

CHAMPIONSWhat’s New

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

Page 37: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RIGHTPERSON

RIGHTROLE

PEOPLE

CONSTRUCTIONENGINEERING

SUPPLYNETWORK

ADVANCED WORKPACKAGING

Page 38: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHALLENGES

CUSTOMER FOCUS

PEOPLE

SYSTEMS, PROCESSES & TOOLS

SYSTEMS,PROCESSES &TOOLS

Page 39: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

THINKING WITH THE END IN MINDAT THE START

SYSTEMS,PROCESSES &TOOLS

Page 40: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Installation Work Package

SYSTEMS,PROCESSES &TOOLS

Page 41: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CWP IWP

Engineering Deliverable

1 EWP = 1 CWP (?)

Scope of Work

Drawings

Engineering specifications &

standards

Procurement information

Vendor documents

Quality requirements

Risks/Hazards

Construction Deliverable

Work Face Plan for ~ 500-1000 hours work (2 weeks)

ScopeDeliverableActivities

Resources:equipment, tools

materials, labour, workinstructions, safety

equipment, drawings,vendor data, …

Special ConditionsQuality Control

InterdependenciesRisk PlanningError Proofing

EWP

Engineering/Construction Deliverable

Area Scope ~ 40k – 200k hours

Construction Scope of WorkEngineering Information

Craft / ManpowerDirect Field Equip / Mat’l

SafetyQuality (QA / QC)

Special Permits / RegulatorySubcontractors

Vendor support dataRigging studies

ScaffoldSpecial equip / tools/ consum.

Waste managementRisk register

WFPProject Controls

Turn-over documentsContact List

ProcurementRequired on site dates

Long lead items

Transportation

Materials Management

SYSTEMS,PROCESSES &TOOLS

Page 42: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CWP IWP

Engineering Deliverable

1 EWP = 1 CWP (?)

Scope of Work

Drawings

Engineering specifications &

standards

Procurement information

Vendor documents

Quality requirements

Risks/Hazards

Construction Deliverable

Work Face Plan for ~ 500-1000 hours work (2 weeks)

ScopeDeliverableActivities

Resources:equipment, tools

materials, labour, workinstructions, safety

equipment, drawings,vendor data, …

Special ConditionsQuality Control

InterdependenciesRisk PlanningError Proofing

EWP

Engineering/Construction Deliverable

Area Scope ~ 40k – 200k hours

Construction Scope of WorkEngineering Information

Craft / ManpowerDirect Field Equip / Mat’l

SafetyQuality (QA / QC)

Special Permits / RegulatorySubcontractors

Vendor support dataRigging studies

ScaffoldSpecial equip / tools/ consum.

Waste managementRisk register

WFPProject Controls

Turn-over documentsContact List

ProcurementRequired on site dates

Long lead items

Transportation

Materials Management

SYSTEMS,PROCESSES &TOOLS

Page 43: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Decommission/mothball

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

EWP

WBS CWP

DistinctDefinableTangible

IWPArea or System

CWP EWP= EWPEWPEWPEWPEWPEWPIWP

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment

AssetDefinition FEED OperateConstruct CompletionsDetailed

Engineering

=Contractual

Pay item

CWP EWP= EWP OR EWPEWPEWPEWP

Page 44: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

SYSTEMS,PROCESSES &TOOLS

Page 45: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

NOT JUST THE WHAT BUT ALSO 

THE HOW

SYSTEMS,PROCESSES &TOOLS

Page 46: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

KEY DOCUMENTS

SCHEDULESCOPE

SYSTEMS,PROCESSES &TOOLS

DistinctDefinableTangible

Page 47: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

KEY DOCUMENTS

MODEL

SCHEDULE WBS

PEP

AWP Execution Path-of-ConstructionInterface Management Contract Strategy

Approvals WFP Execution

CWPEWPIWPCBS

3D (Space)4D (Time)5D (IMM)

6D (Ops/Mtce)SCOPE

SYSTEMS,PROCESSES &TOOLS

Page 48: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

PATH-OF-CONSTRUCTION - EXAMPLE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

PROJECT EXECUTION METHODOLOGY

OPERATING AND MAINTENANCE PHILOSOPHY

OWNER

Page 49: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

PATH-OF-CONSTRUCTION - EXAMPLE

OWNER

ENGINEERING CONSTRUCTION

WBS – DEFINED CWP/EWPSPATH-OF-CONSTRUCTION (OUTLINED)LONG LEAD ITEMS IDENTIFIEDCONTRACT STRATEGY

Page 50: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

WBS – IDENTIFY IWPSPATH-OF-CONSTRUCTION (FINALIZED)INTEGRATED MATERIALS MANAGEMENT

PATH-OF-CONSTRUCTION - EXAMPLE

ENGINEERING CONSTRUCTION

SUPPLYCHAIN

Page 51: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

ENGINEERING CONSTRUCTION

EWPS (COMPLETE)CWPS (SUBSTANTIALLY COMPLETE) / IWPS (INITIATED)FABRICATIONS/MATERIALS ON-SITE

PATH-OF-CONSTRUCTION - EXAMPLE

SUPPLYCHAIN

Page 52: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

ENGINEERING CONSTRUCTION

PATH-OF-CONSTRUCTION EXECUTIONAREA IWPS (IMPLEMENTATION)FIELD ERECTION & ASSEMBLY

PATH-OF-CONSTRUCTION - EXAMPLE

SUPPLYCHAIN

Page 53: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

SYSTEMS,PROCESSES &TOOLS

ConceptualDevelopment FEED Operate Decommission

/mothballConstruct CompletionsDetailedEngineering

AssetDefinition

ENGINEERING CONSTRUCTION

SYSTEM IWPS (IMPLEMENTATION) / COMMISSIONING

PATH-OF-CONSTRUCTION - EXAMPLE

OWNER

Page 54: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CUSTOMER FOCUS

Page 55: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

Scalable AGILE Adaptable

CHANGE

BUILDABILITYSAFE

ALIGNMENT

CUSTOMER FOCUS

Page 56: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CHALLENGES

Page 57: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

ADVANCED WORKPACKAGING

LACK OF BUY-INDO IT THIS WAY CONTRACTS

CHALLENGES

Page 58: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

ADVANCED WORKPACKAGING

WFP

CHALLENGES

Page 59: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

OWNER

ENGINEERING CONSTRUCTION

SUPPLYNETWORK

CHALLENGES

Page 60: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHANGE

GLOBALIZATIONCULTURE

CONTRACTS

TECHNOLOGY

CHALLENGES

Page 61: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WORKFACE PLANNINGADVANCED WORK PACKAGING

RECAP

Completions

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

DetailedEngineeringFEEDConceptual

Development ConstructAssetDefinition Operate Decommission

/mothball

HOW does WorleyParsonsapply Advanced Work Packaging (AWP) and 

WorkFace Planning (WFP)?

Page 62: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WORKFACE PLANNINGADVANCED WORK PACKAGING

WHAT?

RECAP

Completions

Select1 IDENTIFY 2 EVALUATE

Deliver3 DEFINE 4 EXECUTE

Improve5 OPERATE

DetailedEngineeringFEEDConceptual

Development ConstructAssetDefinition Operate Decommission

/mothball

Page 63: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WHAT?

WHY?

25% increased labor productivity

10% PROJECT COST SAVINGS

Improved SAFETYVALUEEfficiencyBeing LeadersBetter Capital EfficiencyGood Business

Tool Time33%

Gained 11%

Wait / idle33%

Mat’lMvmt & Planning23%

WFP Productivity Improvement

RECAP

Page 64: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

WHAT?

WHY? HOW?

RECAP

Page 65: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHALLENGES

CUSTOMER FOCUS

SYSTEMS,PROCESSES &TOOLS

SYSTEMS, PROCESSES & TOOLS

PEOPLE

Page 66: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RECAP

RIGHT PEOPLERIGHT ROLE

Page 67: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHALLENGES

CUSTOMER FOCUS

PEOPLE

SYSTEMS, PROCESSES & TOOLS

SYSTEMS,PROCESSES &TOOLS

Page 68: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RECAP

THINKING WITH THE END IN MINDAT THE START

Page 69: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RECAP

NOT JUST THE WHAT BUT ALSO 

THE HOW

Page 70: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CUSTOMER FOCUS

Page 71: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RECAP

THINK SAFETY ADAPTABILITY SCALABILITY

Page 72: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

CHALLENGES

SYSTEMS, PROCESSES & TOOLS

CUSTOMER FOCUS

PEOPLE

CHALLENGES

Page 73: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RECAP

BUY‐INQUALIFIED PEOPLE

CULTURE

Page 74: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

RECAP

Thank-you

Page 75: Solutions for Project Delivery - groupasi.netgroupasi.net/conferencelibrary/2014/AWPC 2014... · 2017-03-07 · Solutions for Project Delivery Joe Hobbs Manager of Engineering - CoSyn

[email protected] Hobbs

Contact Me…

QUESTIONS?


Recommended