SONAR was established in 1977 by Muzaffer Çevik, with specialization in "drilling" and "engineering geology", which was followed by the establishment of "grouting" and "water well drilling" departments. In 1993, "geotechnical engineering" branch of civil engineering discipline became the main field of activity. With 33 years of experience, SONAR has become a national leader in the field of geotechnical engineering.
SONAR is currently engaged in contracting activities with a geographical emphasis on Turkey, Middle East and Eurasian countries.
Within each of our main activities, SONAR offers a range of services and capabilities, ensuring the optimum technical solutions to all kinds of geotechnical problems. We recognize that meeting the needs of our clients involves not only technically effective solution but it also means providing permanent, economic and safe solution in the feasible shortest time.
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
SONAR, Ankara Merkez Ofisi ve Atölyesi
Bored Pile, Barrette Pile, CFA Pile,
Micro Piling Applications
DEEP FOUNDATIONS Diaphragm Wall, Bored Pile, Micro Pile,
RC Walls, Sheet Pile, Ground Anchorage,
Soil Nailing & Rock Bolting Applications
RETAINING STRUCTURES
Slurry Trench, Jet-Grout, Grouting
Applications for impermeability.
CUT-OFF WALLS Design & Build Projects, Geotechnical
System Optimization ve Special Solutions
GEOTECHNICAL DESIGN
Stone Column, Jet-Grout, Grouting, Deep
Compaction, Drain Applications
GROUND IMPROVEMENT
Soil Investigation and Reporting, Ground
Water Investigation and Water Wells
GROUND INVESTIGATION
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Deep Foundations are structural elements designed for the transfer of heavy
loads through weaker soil layers to a suitable bearing layer of soil or rock.
SONAR has been working in the field of deep foundations
since 1993, completing many critical deep foundation
projects for viaducts, bridges, dams, retaining walls
and highrise buildings.
There are various types of deep foundations which are
specialized for application to different soil and loading
conditions.
- Bored Pile
- Barrette Pile
- CFA Pile
- Micro Pile
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
© ZTM
© ZTM
Ø100 Bored Pile: 10753 m Ø120 Bored Pile: 2995 m
Static Pile Loading Tests
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Renaissance Cons. Mall & Hotel - Samsun
Deep Foundation: Ø100 cm Bored Pile = 7524 m
G. Improvement: Ø100 cm Jet Grout = 48000m
Retaining Str. :Ø80 cm Bored Pile = 10000 m
Ø100 cm Jet Grout Column = 7200 m
Ground Anchorage = 40000 m
+ Project Optimization 2012
Ispartakule Viaducts - Istanbul
Bored Piles for Viaduct Improvement
Ø120 cm Bored Pile = 6000 m
+ Machine Optimization for Project
2011
SOYAK Optimus Mavisehir - Izmir
Deep Foundations:
Ø80 cm Bored Piles = 27930 m
Ground Improvement:
Ø65 cm Stone Columns= 65790 m
2012
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
AnkaMall & Crowne Plaza Hotel - Ankara
Bored Piles = Ø100 : 5380 m / Ø80 :1385 m
Ø65 : 2613 m Ground Anchors = 2394 m 2004
Georgia Parliament Building - Kutaisi
Ø120 cm Bored Piles: 9880 m 2010
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Diaphragm Wall Barrette Piles: 12000 m2
Maximum Depth: 52 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Bahçesehir 2nd Phase Highrise - Istanbul
Ø88 cm Bored Piles: 7022 m 1998
Astana M1 Highway River Bridge - Kazakhstan
Ø100 cm Bored Piles : 12634 m 2006
Ünye Cement Factory & Silos - Ordu
Ø120 – 100 cm Bored Piles : 4611 m
1200 Ton Static Pile Loading Tests 2000
Especially in urban environments vertical sidewalls are preferred, requiring a suitable system which will
restrain the lateral soil and groundwater forces and also stop the groundwater from entering into
the excavation from side walls.
• Bored Pile Walls
• Diaphragm Walls
• Micro Pile Walls
• Sheet Pile Walls
• Jet-Grout Walls
• Reinforced Concrete Walls
• Ground Anchors
• Soil Nails / Rock Bolts Combination of all of the systems above
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
The correct retaining system will have significant impact on;
Total Cost
Time
Performance
Sonar, provides design and modification services for
the most suitable and economical system.
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
MISSION : Deep Excavation for Subway Crossing in Downtown Ankara
Geotechnical Project Consultant
& Specialist Contractor
SOLUTION :
A Retaining system supported by
inclined piles and inclined struts, with minimum
occupation in the ground level.
PROBLEM : Located on Busiest Boulevard of the capital city with 4.5 million population!
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
• Ø165 cm Bored Piles – 219 m • Ø80 cm 20° Degree Inclined Bored Piles – 2434 m • Ø80 cm Bored Piles – 583 m • Ø60 cm Jet Grout Columns – 2432 m
ANKARA SUBWAY KIZILAY CROSSING - INCLINED RETAINING SYSTEM, 2008
Special
Solution
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
ANKARA SUBWAY SOGUTOZU-ÇAYYOLU LINE RETAINING SYSTEMS, 2007
Kızılay-Cayyolu Line– Sogutozu Central Station and Expo Center Construction
Project
Optimization:
SONAR
Sögütözü-Çayyolu Line ( Open Excavations for Subway Stations) Retaining Structures
Ø65-80-100-120 cm Bored Pile = 21171 m | Ground Anchors = 21065 m | Ø80 cm Jet-Grout = 1216 m Ø30 cm Micro Pile = 2431 m | Grouting = 820 m / 154 m3 2002 - 2007
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
42 MASLAK RESIDENCE-HOTEL-OFFICE-MALL COMPLEX, ISTANBUL - 2011
42 MASLAK – Residence-Hotel-Office Mall Complex( > 35 m Deep Excavation)
Ø80cm Bored Pile = 12385 m | Ø65cm Bored Pile = 1889 m | Micro Piling = 3543 m
Ground Anchors = 46675 m | Permenant Anchors = 540 m | Soil Nailing = 4692 m 2011
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
SANKOPARK (ZEUGMA) MALL, GAZIANTEP - 2007
Ø80 cm Bored Piles = 7465 m Ø80 cm Jet Grout Columns = 6192 m Ground Anchorage = 12397 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
SOUTH JEDDAH SANITARY DRAINAGE NETWORK SHAFTS BY SECANT PILING, 2009
Ø80 & Ø100 cm Bored Piles = 30390 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
ÇOLAKOGLU FACTORY IN-TAKE POOL CONSTRUCTION, 2010
Ø80 -100 cm Bored Pile = 9705 m Ø300 cm Underwater Pile Assembly = 270 m Sheet Piles = 384 m2 Chemical Anchors = 5764 NOS RC Construction = 10166 m3 / Excavation = 30640 m3
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
In this special method, which is executed by
Diaphragm Walls, the retaining walls are
designed as the basement walls of the structure.
Excavation is done level by level after
constructing the structural slabs of the respective
floor.
Time Saving Advantages: Basement & Upper floor construction may continue at the same time! Climatic Conditions are eliminated in lower floors.
Money Saving Advantages: Retaining wall becomes the permanent walls of the main structure. Anchors are not necessary, slabs functions as struts.
1 – Diaphragm Wall Production 2 – Bored Pile or Barette Pile Production to act as basement columns
3 – Construction of Ground Level Slab 4 – First Basement Floor Excavation and construction of slab.
5 – The Construction of Raft Foundation.
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
ISTANBUL METRO – CIN CIN & MENDERES STATIONS TOP-DOWN CONSTRUCTION, 2009
Diaphragm Wall = 19278 m2 Maximum Depth: 54 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
ISTANBUL SUBWAY – MAHMUTBEY STATION, 2009
Diaphragm Wall = 17726 m2 Maximum Depth: 54 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Mecca Metro Rail System – Slope Stabilization
Rock Bolt, Soil Nail, Ground Anchor = 28860 m
2010
King Saud University Retaining Wall - Riyad
Ø120 cm B. Pile = 1815m / Permanent Anchor= 7538m
Retaining Wall Construction = 5284 m2 2010
Vertical, non-structural Cut-off Walls are constructed when it is necessary or
desirable to restrict horizontal movement of water.
Dams
Canals
Waste Landfill Sites
Open Excavations (High Ground Water Table)
• Slurry Trench
• Jet Grout
• Secant Piling
• Sheet Piling
• Grouting
Cut-off Wall Method should be chosen according to the ground conditions, application
area, and required impermeability, to present an efficient and economic solution.
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Slurry Trench – Cut-off Wall t=80cm : 9723 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
KARKAMIS DAM – CUT-OFF WALL BY SLURRY TRENCH & JET-GROUT, 2008
80 cm Slurry Trench = 140093 m2 Ø80 Jet Grout Column = 17294 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Ø65-80-100 Secant Piling Cut-of Wall = 7408 m
KUMKÖY HYDROELECTRIC POWERPLANT, CUT-OFF WALL BY SECANT PILING, 2006
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Ø65 Secant Piles = 31,000 m
BEYŞEHİR BSA CHANNEL CUT OFF WALL WITH SECANT BORED PILING, 2002
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
In certain soil conditions, it might be more economical to improve the
engineering properties of weak soil, instead of bypassing it with deep
foundations.
Depending on the soil type and application Ground Improvement may;
Increase Bearing Capacity
Increase Lateral Capacity
Reduce Settlement
Mitigate Liquefaction Potential
Improve & Maintain Impermeability
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Ground Improvement Methods applied by SONAR are;
Grouting
Jet Grouting
Vibro Stone Columns
Vibrocompaction
Wickdrain
Well Point
Pre-loading
Dynamic Compaction
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
KARGI DAM AND HYDROELECTRIC POWERPLANT GROUND IMPROVEMENT - 2012
Ø80 cm Stone Columns = 85000 m 80 cm Slurry Trench Cut-off Wall = 8500 m2
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
IZMIR MAVISEHIR OPTIMUS RESIDENTIAL PROJECT GROUND IMPROVEMENT - 2011
Ø80 cm Bored Pile = 27930 m Ø65 cm Stone Columns = 65790 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
ANKARA CAGLAYAN BRIDGE STONE COLUMN PROJECT - 2006
Ø80 Stone Columns = 6443 m Ø80 Stone Columns = 5500 m
ANTALYA FINIKE SPORTS HALL STONE COLUMN PROJECT - 2007
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
SMS Factory Machine Foundation Retaining Structure – 2010 Borçka Highway Viaducts / Artvin – 2006
Ø80 cm Jet Grout = 2100 m
Ø120 cm Jet Grout = 31701 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Grout Drilling = 50469 m Contact Grouting = 51284 m3
Izmir II. Phase Sewer System, 1986 Bozdogan Valley Kemer Weir, 2002
Grout Drilling = 8400 m Aluvium Grout = 1948 m3 Ø100 cm Jet Grout Columns = 4041 m
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Historical Tekel Building, Ankara Ground Improvement by Jet-Grout, 2006
Historical Alaaddin Mosque, Konya Test Grouting, 1986
Photo: Intension, Wikipedia
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
SONAR provides Geotechnical Design Services for;
Design & Build Projects
System Optimization for Most Economical Solutions
Constructions & Structures requiring Special Geotechnical Solutions
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
33 years of Experience & Success in Ground Geology & Geotechnics Area.
Dynamic & Open-minded Organization to New Solutions & Latest Technologies.
Strong relations with Professional Academics & Universities.
ISO 9001:2008 & ISO 14001:2004 quality certified.
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
Strong Machine & Equipment Park
Own Workshop Facilities & Service Staff
Own Spare Part Production
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15
İletişim: Adres: İstanbul Yolu 25. Km Sarayköy Girişi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: 0312 815 47 15
HEADQUARTERS
Address: Istanbul Yolu 25. km Saraykoy Girisi 06980 Kazan / Ankara / TURKEY Tel:(+90 312) 815 47 15 Fax: (+90 312) 815 45 78
Web: http://www.sonarsondaj.com e-mail: [email protected]
SAUDI ARABIA BRANCH OFFICE
Address: Muzaffer Cevik EST. P.O. Box 122843 Jeddah 21332 / Kingdom of Saudi Arabia
Tel: (+966 2) 664 51 21 Fax: (+966 2) 664 50 91 Web: http://www.sonarsondaj.com e-mail: [email protected]
GEORGIA BRANCH OFFICE
Address: (Current Operations are run by the Headquarters) Tel:+90 312 815 47 15 Fax: +90 312 815 45 78
Web: http://www.sonarsondaj.com e-mail: [email protected]
Contact: Address: Istanbul Yolu 25. Km Saraykoy Girisi Kazan/ANKARA Web: http://www.sonarsondaj.com | e-mail: [email protected] | Tel: +90 312 815 47 15