STANDARD OPERATING PROCEDURE PRESSURE VESSEL INSPECTION FOR MIGAS RE-CERTIFICATION Area/Dept.: North Area Production / Production Facility/Section: Attaka Field Rev. Number Rev. Date Description Prepared by Setyo BU MIQA Specialist Reviewed by Suhartono MI & QA Supv Approved by ______________ MI & QA Supt. 0 Septembe r 5, 2007 New Issue Whole Document Partial Chevron Kalimantan Operation Operational Excellence Management System Document ID SOP-MIQA-ATTK- 001 Page 1 of 4 1 GENERAL DESCRIPTION This procedure will explain the steps to inspect the Pressure Vessel for re- certification. 2 HES NOTICE Some possibility of personal injury may occur before and during activities. The inspectors has injury possibilities to i.e. finger pinch, back injury and falling down. 3 PROCEDURAL STEPS Action Number Action Remark (who & when) I. Preparation 1 Check all PPE to be worn, all equipment to be used have been calibrated properly, batteries in full capacity, work sheets and conduct daily tool box meeting. 2 Obtain Safety Work Permit to Production Control Room and approved by HOM/HOP & Field
Transcript

SOP PV Attaka

STANDARD OPERATING PROCEDURE

Pressure Vessel Inspection for Migas re-certification SOP Number

SOP-MIQA-ATTK- 001Page 2 of 4

Chevron Kalimantan OperationRev. Number

0Issued

September 2007Effective

September 2010

STANDARD OPERATING PROCEDURE

PRESSURE VESSEL INSPECTION FOR MIGAS RE-CERTIFICATION

Area/Dept.:

North Area Production / ProductionFacility/Section:

Attaka Field

Rev. NumberRev. DateDescriptionPrepared by

Setyo BUMIQA SpecialistReviewed by

Suhartono

MI & QA Supv

Approved by

______________

MI & QA Supt.

0September 5, 2007 FORMCHECKBOX New Issue FORMCHECKBOX Whole Document FORMCHECKBOX Partial

Chevron Kalimantan OperationOperationalExcellence

Management

SystemDocument ID

SOP-MIQA-ATTK- 001Page 1 of 4

1 General Description

This procedure will explain the steps to inspect the Pressure Vessel for re-certification. 2 HES NoticeSome possibility of personal injury may occur before and during activities. The inspectors has injury possibilities to i.e. finger pinch, back injury and falling down.3 Procedural Steps

Action NumberActionRemark (who & when)

I.Preparation

1Check all PPE to be worn, all equipment to be used have been calibrated properly, batteries in full capacity, work sheets and conduct daily tool box meeting.

2Obtain Safety Work Permit to Production Control Room and approved by HOM/HOP & Field Superintendent, attach the SOP and JSA related.

3Submit the list of pressure vessels will be inspected to Control Room.

4Inspection step and evaluation shall refer to CICO-QP-INS-009 Procedure For Certification and Inspection of Pressure Vessel

II.Execution

1The Pressure Vessels to be externally inspected is on stream. Do not operate all production facilities. Inform Control Room when anomalies occured.

2Ensure the scaffolding has been properly installed and approved by Scaffolding Inspector as an access to conduct unreachable inspection position (when required).

3Do not remove the painting without permissible of Production Operator in charge.

IIICompletion

1When the inspection of the first pressure vessel completed, inform control room that the inspector will inspect to the next pressure vessel, etc.

2Always keep the work place clean before leaving.

3Report to Production Control Room when inspection job have been finished for the day, sign off the Safe Work Permit and write a note Continued if the job will be continued the next day and Completed if the job have been finished.

4. DRAWING/P&ID & DOCUMENTNO.LOCATIONTAG NODESCRIPTION

1ATTAKA HOTELPV-WF-1103Oxygen Scavenger Tank

2ATTAKA HOTELH-PV-M7Gas Lift Receiver

3ATTAKA HOTELH-PV-2Test Separator

4ATTAKA HOTELH-PV-M12Gas Launcher

5ATTAKA HOTELV-1106HAir Receiver

6ATTAKA HOTELH-PV-4Gas Lift KOD

7ATTAKA HOTELH-PV-TK1Sump Tank

8ATTAKA HOTELH-PV-M6Gas Lift Receiver

9ATTAKA HOTELH-PV-M11Gas Receiver

10ATTAKA HOTELH-PV-M10Oil Pig Receiver

11ATTAKA HOTELATH-PV-AD-1AAir Dryer

12ATTAKA HOTELH-PV-1Gross Separator

13ATTAKA HOTELV-115 HVent Gas Scrubber

14ATTAKA HOTELATH-PV-AD-1BAir Dryer

15ATTAKA CPF-1450-1BHT. Cartridge Filter

16ATTAKA CPE-1450-1Glycol Exchanger

17ATTAKA CPV-11022nd Stg Compr In. Scrubber

18ATTAKA CPH-1450-3Still Column & Reflux Coil

19ATTAKA CPVS-1450-1Glycol Contactor

20ATTAKA CPF-1450-2AActivated Carbon Filter

21ATTAKA CPF-1450-2BActivated Carbon Filter

22ATTAKA CPH-1450-1Glycol Reboiler Heater

23ATTAKA CPH-1450-2Glycol Rebolier

24ATTAKA CPVS-88Knock Out Drum

25ATTAKA CPV-11032nd Stg Compr. KOD

26ATTAKA CPCP-PV-M3Gas Lift Receiver

27ATTAKA CPCP-PV-M2Gas Pig Launcher

28ATTAKA CPV-1105Lift Gas Compr. KOD

29ATTAKA CPVS-1450-2Gas Scrubber

30ATTAKA CPV-1101Recycling Separator

31ATTAKA CPATT-L-STA-2Gas Launcher

32ATTAKA CPV-121Knock Out Drum

33ATTAKA CPV-120Knock Out Drum

34ATTAKA CPVS-1450-3Glycol Flush Drum

35ATTAKA CPF-1450-1AHT. Cartridge Filter

4

5. TECHNICAL DATA

control information

DescriptionDate

Revision NoDateNotes

6 Associated Documents

CICo-QP-009 PROCEDURE FOR CERTIFICATION & INSPECTION OF PRESSURE VESSEL

4

3

5

#10A8

A

To sample point

#97

#8

#97

#6

#5

#4

#3

6

2

1

B

#10B

#PI8

#9fromFrom HE-901-A3

A

#2

#1

LCV 1106 A2

LCV 1106 A1

LCV 1106 B2

LCV 1106 B1

UV 85

UV 84

14

13

12

11

10

9

8

SPECTACLE BLIND

7

Plugged

To oil boot V-1101A

#110

#121

Tolong nomornya di-update lagi ya.

Update nomornya lagi ya