Source Control Project, Phase I Chemical hazards Objectives Development of the of risk assessment...

Date post: 03-Jan-2016
Category:
Upload: kathryn-stevens
View: 213 times
Download: 0 times
Share this document with a friend
10
Source Control Project, Phase I Source Control Project, Phase I Chemical hazards Chemical hazards Objectives Objectives Development of the of risk assessment methodology Development of the of risk assessment methodology based on the use of approaches of ISO 14001 standard based on the use of approaches of ISO 14001 standard Carrying out the risk assessment and developing the Carrying out the risk assessment and developing the recommendations to reduce the risk on the example of recommendations to reduce the risk on the example of the the drinking water and sewage treatment utility in drinking water and sewage treatment utility in Apatity, Murmansk region, Russian Federation Apatity, Murmansk region, Russian Federation (State (State unitary enterprise “ Apatityvodokanal ” ) unitary enterprise “ Apatityvodokanal ” ) Implemented by Implemented by IBRAE RAS IBRAE RAS , , Russian Center “Chlorbezopasnost”, SUE Russian Center “Chlorbezopasnost”, SUE "Apatityvodokanal" "Apatityvodokanal" with support from the US with support from the US Department of Energy Department of Energy Duration Duration 200 200 0 0 – 200 – 200 2 2
Transcript

Source Control Project, Phase ISource Control Project, Phase IChemical hazardsChemical hazards

Source Control Project, Phase ISource Control Project, Phase IChemical hazardsChemical hazards

ObjectivesObjectives Development of the of risk assessment methodology Development of the of risk assessment methodology

based on the use of approaches of ISO 14001 based on the use of approaches of ISO 14001 standardstandard

Carrying out the risk assessment and developing the Carrying out the risk assessment and developing the recommendations to reduce the risk on the example recommendations to reduce the risk on the example of theof the drinking water and sewage treatment utility in drinking water and sewage treatment utility in Apatity, Murmansk region, Russian FederationApatity, Murmansk region, Russian Federation (State unitary enterprise “ Apatityvodokanal ” )(State unitary enterprise “ Apatityvodokanal ” )

Implemented byImplemented by IBRAE RASIBRAE RAS, , Russian Center “Chlorbezopasnost”, SUE Russian Center “Chlorbezopasnost”, SUE

"Apatityvodokanal""Apatityvodokanal" with support from the US with support from the US Department of EnergyDepartment of Energy

DurationDuration 20020000 – 200 – 20022

ObjectivesObjectives Development of the of risk assessment methodology Development of the of risk assessment methodology

based on the use of approaches of ISO 14001 based on the use of approaches of ISO 14001 standardstandard

Carrying out the risk assessment and developing the Carrying out the risk assessment and developing the recommendations to reduce the risk on the example recommendations to reduce the risk on the example of theof the drinking water and sewage treatment utility in drinking water and sewage treatment utility in Apatity, Murmansk region, Russian FederationApatity, Murmansk region, Russian Federation (State unitary enterprise “ Apatityvodokanal ” )(State unitary enterprise “ Apatityvodokanal ” )

Implemented byImplemented by IBRAE RASIBRAE RAS, , Russian Center “Chlorbezopasnost”, SUE Russian Center “Chlorbezopasnost”, SUE

"Apatityvodokanal""Apatityvodokanal" with support from the US with support from the US Department of EnergyDepartment of Energy

DurationDuration 20020000 – 200 – 20022

Source Control Project, Phase ISource Control Project, Phase ISource Control Project, Phase ISource Control Project, Phase I

Risk Assessment Methodology at Risk Assessment Methodology at Hazardous Industrial Facilities (chemical Hazardous Industrial Facilities (chemical hazards) was developed as the result of hazards) was developed as the result of the Project, Phase I implementation;the Project, Phase I implementation;

Analysis of risks was performed; andAnalysis of risks was performed; and Recommendations to reduce risks were Recommendations to reduce risks were

made for the facilitymade for the facility

Risk Assessment Methodology at Risk Assessment Methodology at Hazardous Industrial Facilities (chemical Hazardous Industrial Facilities (chemical hazards) was developed as the result of hazards) was developed as the result of the Project, Phase I implementation;the Project, Phase I implementation;

Analysis of risks was performed; andAnalysis of risks was performed; and Recommendations to reduce risks were Recommendations to reduce risks were

made for the facilitymade for the facility

Results:

Risk Assessment Methodology at Risk Assessment Methodology at Hazardous Industrial Facilities (HIF) Hazardous Industrial Facilities (HIF)

Risk Assessment Methodology at Risk Assessment Methodology at Hazardous Industrial Facilities (HIF) Hazardous Industrial Facilities (HIF)

ContentsContents1. A thorough description of the risk assessment 1. A thorough description of the risk assessment

phasesphases work planning and organizationwork planning and organization accident hazard identification (energy sources)accident hazard identification (energy sources) risk assessmentrisk assessment development of recommendations to manage and development of recommendations to manage and

ultimately reduce the riskultimately reduce the risk

2. A survey of the state of the art in risk assessment 2. A survey of the state of the art in risk assessment techniques and criteria and appropriateness for the techniques and criteria and appropriateness for the selection and application of these techniques selection and application of these techniques

3. Requirements to documentary registration of the 3. Requirements to documentary registration of the risk assessment results to provide long-term risk assessment results to provide long-term program(s) development on management of riskprogram(s) development on management of risk

ContentsContents1. A thorough description of the risk assessment 1. A thorough description of the risk assessment

phasesphases work planning and organizationwork planning and organization accident hazard identification (energy sources)accident hazard identification (energy sources) risk assessmentrisk assessment development of recommendations to manage and development of recommendations to manage and

ultimately reduce the riskultimately reduce the risk

2. A survey of the state of the art in risk assessment 2. A survey of the state of the art in risk assessment techniques and criteria and appropriateness for the techniques and criteria and appropriateness for the selection and application of these techniques selection and application of these techniques

3. Requirements to documentary registration of the 3. Requirements to documentary registration of the risk assessment results to provide long-term risk assessment results to provide long-term program(s) development on management of riskprogram(s) development on management of risk

Source Control Project, Phase IISource Control Project, Phase II “Study of Safety Conditions“Study of Safety Conditions ofof SSC RF NIIAR SSC RF NIIAR

Fuel ResearchFuel Research Department”Department”Radiation hazardsRadiation hazards

Source Control Project, Phase IISource Control Project, Phase II “Study of Safety Conditions“Study of Safety Conditions ofof SSC RF NIIAR SSC RF NIIAR

Fuel ResearchFuel Research Department”Department”Radiation hazardsRadiation hazards

ObjectivesObjectives Practicing of a method of risk assessment based on Practicing of a method of risk assessment based on

the use of approaches of ISO 14001 standardthe use of approaches of ISO 14001 standard Carrying out the risk assessment and developing the Carrying out the risk assessment and developing the

recommendations to reduce the risk on the example of recommendations to reduce the risk on the example of thethe Fuel Fuel Research Department (FRD) of State Research Department (FRD) of State Scientific Centre of Russian Federation “Scientific and Scientific Centre of Russian Federation “Scientific and Research Institute of Atomic Reactors” (SSC RF NIIAR)Research Institute of Atomic Reactors” (SSC RF NIIAR)

Implemented byImplemented by IBRAE RASIBRAE RAS, , FRD of SSC RF NIIARFRD of SSC RF NIIAR with support from with support from

the US Department of Energythe US Department of Energy

DurationDuration 2002 – 2002002 – 20044

ObjectivesObjectives Practicing of a method of risk assessment based on Practicing of a method of risk assessment based on

the use of approaches of ISO 14001 standardthe use of approaches of ISO 14001 standard Carrying out the risk assessment and developing the Carrying out the risk assessment and developing the

recommendations to reduce the risk on the example of recommendations to reduce the risk on the example of thethe Fuel Fuel Research Department (FRD) of State Research Department (FRD) of State Scientific Centre of Russian Federation “Scientific and Scientific Centre of Russian Federation “Scientific and Research Institute of Atomic Reactors” (SSC RF NIIAR)Research Institute of Atomic Reactors” (SSC RF NIIAR)

Implemented byImplemented by IBRAE RASIBRAE RAS, , FRD of SSC RF NIIARFRD of SSC RF NIIAR with support from with support from

the US Department of Energythe US Department of Energy

DurationDuration 2002 – 2002002 – 20044

Source Control Project, Phase IISource Control Project, Phase IISource Control Project, Phase IISource Control Project, Phase II

Risk Assessment Methodology at Hazardous Risk Assessment Methodology at Hazardous Industrial Facilities developed at the Phase Industrial Facilities developed at the Phase I of the Project was applied to the radiation I of the Project was applied to the radiation hazard facility and appropriately modified;hazard facility and appropriately modified;

Priorities of the corrective actions have been identified;

Recommendations to enhance the safety of Recommendations to enhance the safety of the facility were made based upon the the facility were made based upon the analysis of risksanalysis of risks

Risk Assessment Methodology at Hazardous Risk Assessment Methodology at Hazardous Industrial Facilities developed at the Phase Industrial Facilities developed at the Phase I of the Project was applied to the radiation I of the Project was applied to the radiation hazard facility and appropriately modified;hazard facility and appropriately modified;

Priorities of the corrective actions have been identified;

Recommendations to enhance the safety of Recommendations to enhance the safety of the facility were made based upon the the facility were made based upon the analysis of risksanalysis of risks

Results:

Source Control Project, Phase IIISource Control Project, Phase IIICombined (chemical & radiation) Combined (chemical & radiation)

hazardshazards

Source Control Project, Phase IIISource Control Project, Phase IIICombined (chemical & radiation) Combined (chemical & radiation)

hazardshazardsObjectives:Objectives: Verification and finalizing of the developed Risk Assessment Verification and finalizing of the developed Risk Assessment

Methodology at radiation and chemical hazardous facilities of the Methodology at radiation and chemical hazardous facilities of the Industrial North of RussiaIndustrial North of Russia

Carrying out the risk assessment and developing the Carrying out the risk assessment and developing the recommendations to reduce the risk at the selected hazardous recommendations to reduce the risk at the selected hazardous facilities facilities

Sites to be studied:Sites to be studied: FSUE “ME Zvezdochka"FSUE “ME Zvezdochka" The facility is engaged in NS decommissioning, and repair and The facility is engaged in NS decommissioning, and repair and

upgrade of vessels and nuclear submarines of all generationsupgrade of vessels and nuclear submarines of all generations FSUE "Atomflot“ FSUE "Atomflot“ The facility maintains and repairs nuclear powered vesselsThe facility maintains and repairs nuclear powered vessels

The project is implementing by:The project is implementing by: IBRAE RAN, FSUE "Atomflot" andIBRAE RAN, FSUE "Atomflot" and FSUE “ME Zvezdochka"FSUE “ME Zvezdochka"

supporting by US Department of Energysupporting by US Department of Energy

Duration:Duration: 2005 – 20082005 – 2008

Phase III : FSUE “ME Phase III : FSUE “ME Zvezdochka“Zvezdochka“

Phase III : FSUE “ME Phase III : FSUE “ME Zvezdochka“Zvezdochka“

The work team has been formedThe work team has been formed

The first site visit was held in The first site visit was held in

November 2005 November 2005

Onshore complex for unloading of Onshore complex for unloading of

the SNF from the decommissioned the SNF from the decommissioned

submarines has been selected as the submarines has been selected as the

facility to implement the risk facility to implement the risk

assessment assessment

The Project Management Plan has been approvedThe Project Management Plan has been approved

Two-day working seminar on ISO14001 EMS Standard and the Two-day working seminar on ISO14001 EMS Standard and the

project history and findings (Phases I-II) was conductedproject history and findings (Phases I-II) was conducted

Phase III : Selected facilityPhase III : Selected facilityPhase III : Selected facilityPhase III : Selected facility

The Complex includes: Part of special quay 40 m long where a portal crane is

installed; Building for loading of transport containers with SNF; Temporary storage facility for transport containers,

and; Site for forming of special train

The technological cycle includes operations on transportation and loading of spent nuclear fuel into transport containers, storage of containers loaded with SNF, loading/unloading works and transportation of containers loaded with SNF, and deactivation operations

Onshore complex for unloading of the SNF from the decommissioned Onshore complex for unloading of the SNF from the decommissioned

submarinessubmarines

Phase III in progress: FSUEPhase III in progress: FSUE “ME Zvezdochka“ “ME Zvezdochka“

Phase III in progress: FSUEPhase III in progress: FSUE “ME Zvezdochka“ “ME Zvezdochka“

Verification of the risk assessment Verification of the risk assessment

methodology documentmethodology document

Studying the requirements of normative and Studying the requirements of normative and

legal documents applicable to the field of legal documents applicable to the field of

activities of facilityactivities of facility

Preparing two-day working seminar on the risk Preparing two-day working seminar on the risk

assessment methodology for the personnel of assessment methodology for the personnel of

both facilities (to be conducted in the middle both facilities (to be conducted in the middle

of April, 2006)of April, 2006)

Phase III : FSUE “Atomflot“Phase III : FSUE “Atomflot“Phase III : FSUE “Atomflot“Phase III : FSUE “Atomflot“

The facility maintains and repairs The facility maintains and repairs

nuclear powered vessels as well asnuclear powered vessels as well as

repairsrepairs reactor equipment, manages solid and liquid radioactive waste.

The first site visit is being The first site visit is being

plannedplanned

The “Atomflot” specialists will attend The “Atomflot” specialists will attend

the two-day working seminar on the the two-day working seminar on the

risk assessment methodologyrisk assessment methodology